1. :E-mail chad9irvine@yahoo.com.au :Phone 0429482423
:Address 230 Maundrell Trc Aspley QLD 4034
Scotia Access Jan 2016 — Current
MI Scaffolding & Rigging June 15 — Oct 15
Bechtel July 2012 — April 2015
Theiss Dec 11 — Jun 12
N.C.M Oct 11 — Dec 11
D.M.S Scaffolding & Rigging Sep 11 — Oct 11
U.G.L Jun 11 — Aug 11
Chad Irvine
Work experience
Scaffolding & Rigging Team Leader
Installing and maintaining Mast Climbers at the Meriton Sundale Appartments Southport. We currently have 8 Mast
Climbers in service at heights of 150m.
Scaffolding Team Leader
Scaffolding around pylons & dolphins under wharf for the handover of the Hay Pt Expansion Project. Layher system with
tube & fit was used.
Rigging Team Leader/ Crane Operater
Structural erection of Feed Preps & pipe racks, rigging & installation of heavy lift modules weighing around 80t to 150t.
Also operating Various cranes around sight ie 280t Hitachi, 140t Liebherr, 80t Grove, 60t Grove, 60t Liebherr, 25t Mobile
Crane etc.
Scaffolding Team Leader
Erecting work platforms for the installation of pipe work, valves, chutes, conveyors, crushers, screens, separators, the
structure of the process building etc at the Lake Vermont Wash Plant Project.
Scaffolder/ Rigger
Rigging & Scaffolding duties for the build of No.5 Boiler & also maintenance around sight ie for heat exchangers, pumps,
condensers, valves, tanks, vessels etc at B.P Refinery.
Scaffolding Team Leader
Scaffolding for the refurbishment of the main structure of the ship loader and dolphins at the Hay Pt Shutdown.
Rigging Team Leader/ Crane Operator
Changing out crane rails (12m sections) in the production line over live cells, moving gantry cranes & machinery, also
operating the 25t mobile crane at Boyne Is Alumina Smelter. The most dangerous job I have ever done, by far.
Chad Irvine 1
2. Ausscaffolding & Rigging Nov 10 — May 11
Giovenco March 10 — Oct 10
Downer EDI Jun 09 — Feb 10
FKG Jul 08 — Apr 09
Downer ODI Nov 07 — Jun 08
NCM Jul 07 — Nov 07
Ace Scaffolding Apr 07 — Jun 07
Ace Scaffolding Feb 07 — Apr 07
Global Dec 06 — Jan 07
Broadspectrum Aug 06 — Nov 06
CBH Jul 06 — Aug 06
Bechtel Oct 04 — Jul 06
Scaffolding/ Rigging Team Leader
Scaffolding/ Rigging around and under the wharf, dolphins, pylons, ship loader structure, for the handover of the Abott Pt
Expansion Project.
Scaffolding Team Leader
Scaffolding work platforms for the replacement of fibreglass pipework in the Osmosis room & around the site, at Tugun
Desalinisation Project.
Scaffolder/ Rigger
Scaffolding & Rigging duties in the Cyanide & Acid plants, at Orica Fertilization Plant Gladstone shutdown.
Scaffolding/ Rigging Team Leader
Dogging tower crane for various trades and scaffolding in & around the Expansion of the Fortitude Valley Police Station.
Rigging Team Leader
Rigging duties ie steel erection, pipe installation, reeving of wire rope cantering & lifting at B.P Refinery Flare Project.
Rigger
Rigging pipework, pumps, valves, separators etc for the B.P Refinery Alkaline shutdown.
Scaffolding Team Leader
Scaffolding out Bag Houses for the Vales Pt Shutdown.
Scaffolding Team Leader
Scaffolding in the processing unit, boiler & around site, at the Yabula Nickel Refinery Expansion Project.
Scaffolder/ Crane Operator
Scaffolding pipe racks, tanks, vessels etc and 25t operating around the Alcon Gove Expansion Project.
Rigging/ Scaffolfding Team Leader
Scaffolding & Rigging for the installation of HV lines over conveyors & general duties around site at the Gladstone
Expansion Project.
Scaffolder/ Rigger
Scaffolding a bird cage in the No.4 Boiler & the removal of burners and general duties at QAL Gladstone Shutdown.
Scaffolding Team Leader
Chad Irvine 2
3. Universal Cranes & Rigging Feb 04 — Aug 04
John Holland Jul 03 — Feb 04
Armflame Feb 03 — Jul 03
Ron Gee Enterprisers Aug 02 — Feb 03
Barklay Mowlem Nov 00 — Aug 02
Downer EDI Oct 99 — Sep 00
ABB Jul 97 — Aug 99
Scaffolding the threw out the Train, Fin Fans, vessels, tanks etc, at the Darwin LNG Project.
Rigger
Rigging duties around Brisbane suburbs ie Telecommunication towers, dismantle & erecting cranes, bridge beams, tilt
slabs, construction sites etc.
Scaffolder/ Rigger
Steel erection of modules & scaffolding in and around Bag Houses at Hemmant Fabrication Yard for the Gladstone CAR
Project.
Rigger/ Scaffolder/ Crane Operator
Rigging turbines, pipes, valves, tanks etc & scaffolding duties plus operating the 60t slew crane & 18t non-slew crane
around Co-Generation Project at Roma Gas Feilds.
Scaffolding/ Rigging Team Leader
Rigging & Scaffolding duties ie pipes, valves etc at Olympic Dam Copper & Uranium SX Plant Rebuild.
Scaffolder/ Rigger
Steel erection of the Boiler structure, erection of the header pipework, valves, shutes, burners, heavy scaled piping etc &
general scaffolding duties around site at Tarong North Power Station Project.
Scaffolder/ Rigger/ Crane Operator
Rigging/ Scaffolding in the Sulphur Recovery unit & around site, also operating 20t non-slew crane at BP Refinery Clean
Fuels Project.
Rigger
The erection of the Feed Prep Building, structural & mechanical, also rigging in the Acid Plant & around site at the
Olympic Dam Expansion Project.
Qualifications
Open Crane
Advanced Rigger
Advanced Scaffolder
EWP
Forklift
Safe Working At Heights
Confined Space
First Aid
Certificate II Business
Chad Irvine 3
4. Interests
Im a big sports fan who is very competitive which led me to an Australian/ QLD titles in boxing. I pretty much enjoy all
sports ie AFL, Cricket. Also like to travel when I can to anywhere interesting overseas....
References
1. Tony Herbet - Superintendent 0417849008
2. James Cowan - Scaffolding Supervisor 0438014513
3. Carl Keen - Rigging Supervisor 0437381750
4. John Vanpolen - Company Director (MIS) 0499764481
5. Tony Barton - Rigging Supervisor 0408589029
6. Dallas Menchin - Superintendent 0447151315
Chad Irvine 4