Dubai Call Girls Starlet O525547819 Call Girls Dubai Showen Dating
Dallas madson resume2
1. Dallas M. Madson (Kenya Consulting LTD)
2801-67ave, Lloydminster, A.B. T9V3k3 (780)-872-0062 dsmadson@hotmail.com
C O N S T R U C T I O N A N D I N S P E C T I O N S
Personal Profile
An accomplished professional with over 15 years’ of diversified experience in the oil and gas industry. A
reputation for maintaining the highest production, quality control, safety records, and cost maintenance.
Effective at managing business relationships at all levels including contractors, vendors, subcontractors,
landowners, and associates. Guarantee compliance with quality requirements for procurement, fabrication,
construction, pre-commissioning, and commissioning. Proactive leader with an ability to communicate
effectively well maintaining a positive safe and productive work environment.
Key Skills
• Project Management: Managed all procurement, regulatory documentation, and contractors for over
$30M/year in surface, facilities, and pipeline construction projects.
• Procurement: Negotiated better prices from distributors and contractors, which saved clients over $1.25M last
year alone and delivered all projects on or under budget.
• Meticulous documentation: Instituted a digital document control system with a client, resulting in savings in
excess of $1M. My notes credited by engineers for cross verification weeks earlier than expected.
• Inspections : Ensured welding, pipefitting, and heavy equipment construction met QA/QC standards while
handling up to 10 separate projects at once
• Stakeholder Relations: Developed such strong relationships with landowners that three will now only allow
construction on their property if I am managing the project
• Safety & Regulatory Assurance: Have delivered safety presentations on every worksite-specific section of
OH&S manual. Recognized by contractors for being above and beyond their expectations.
• Interdisciplinary: Afforded exceptional mentorship to surface, facility, and pipeline construction while ensuring
close attention to assuring client satisfaction.
Relevant Employment Summary
2003-Present Rife Resources Ltd. (Exploration and Production Company)
● Completed the maintenance work on over 40 facility sites at less than 50% of cost for a total
savings of over $600,000.00.
● Re-calculated volumes on engineer approved and purchased containment and found a critical mistakes.
Corrected mistake before the Ministry of Economy issued a defect and saved client millions of dollars worth of repairs.
● Outside of contractual obligations, instated a new field assets protocol and found over $1m redeployable assets.
● Inspecting of welding and creation of welding inspection reports followed by QC documentation and sign off for
facility and pipeline construction on multiple sites and pipelines.
● Reclamation of surface locations to government specifications including saltwater and chemical contaminated
sites. Re-contouring the surface elevation of clay, top, and sub soils proceeded by revegetation.
● Casing extension under CN rails tracks, excavated soils, exposed line, installed casing extension around 6” line,
backfilled and meet compaction rates.
● Based on field experience provided redline drawings to engineers to improve upon equipment selection,
orientation, and process flow for a treating facility.
● Ensuring the vegetation growth pertaining to 500 sites were compliant and meet regulatory requirements.
Contracted 3 separate contractors with up to 20 men simultaneously.
● De-Commissioning of separators, compressors stations, with pipeline abandonments.
● Installation of water injection sites form single well battery’s with 3” fiberglass tied into disposal well.
2. Credentials/Safety Tickets
— Journeyman Electrician
— Pipeline and facility
Installation Inspector
(certification)
— Gas Pressure Operator
(GPO certification)
─ Level 1 CWB
(Certification)
—Weld Inspection and
Quality Control Level 1
(CINDE)
Awaiting Results;
— API 510
— API 570
— Quality Systems and
Inspection for Pressure
Equipment
(ABSA certification)
— Pressure Equipment Safety
Legislation
(ABSA certification)
— Process Piping Construction
Code (B31.3 certification)
— Reclamation Criteria
(Certificate)
— NACE Basic Corrosion
— Ground Disturbance
— H2S Alive
— First Aid with Pad Training
—Petroleum Orientation Safety
—WHMIS
— Confined Spaces Level 2
— POST- Behavior Based Safety
— Class 1A Endorsement with air
─ Acorn Pipe
2013-2014 Ramier Resources
● Negotiated the removal of surface equipment that the owner had viewed as scrap and estimated as 100% loss, in
turn I was able to make a $6000.00 profit by finding a purchaser.
● multiple abandonments of 4” yellow jacket, coordinated crews for excavation, removal of riser, ran pig and
capturing returns, attached documentation to pipe, backfilled regaining compaction.
● De-commissioning and removal of dehydration skid package in a third of the time estimated by contractor saving
$20,000.00.
2011-2012 Fano Energy Inc. (Oil and gas Exploration)
● Met with crown officials, landowners and Surveyors to co-ordinate the construction of lease
and access roads well ensuring sensitive lands (special areas) were keep to as minimal disturbance as
possible.
● Brought in by recommendation from Magus Engineering was able to completed well site
construction at 50% of pervious contractor.
2002-2012 Advantage Oil and Gas (Oil and gas Exploration)
● Constructed locations in forestry areas, further coordinating the removal of log decks to local mills, with
installation of rig matting to maintain low impact to vegetation.
● Inspected equipment condition commencing with inspection reports, indicating corrosion concerns, gathering
material information
2008-2011 Spry Energy Ltd. (Oil and gas Exploration)
● Surveyed in the surface location for sensitive areas, and crown land followed by construction. Assisting with
archaeologist in areas having been reported to contain historical artifacts. Reduce the amount of man power required and
length of time of monitoring.
2006-2008 Twin Butte Energy (Oil and gas Exploration)
● Stayed in camp outside of Grande Cache for an extent of an 8 month stretch without leave as no replacement
was available. I coordinated and directed crews on soil stripping placement, construction of sump for recycling the water off
the rig, cement and flare pit size and distances. On one particular location upon excavating grade approximately one meter
below surface we exposed a coal bed which required continues watering to lower flammability.
2004-2006 Vaquero Energy Ltd. (Oil and gas Exploration)
● Coordinated and overseen the construction of locations in heavy muskeg areas located borrow pits pushing out
clay cap to allow for access.
● Assisted with the pipeline crew primarily to insure hours and that line was being proper weighted as to not have
it heave back up in the muskeg.
References Upon Request