The impact of a natural disaster will require structural and non-structural projects, such as rebuilding community infrastructure, remediation of greenspaces, and social recovery. The Project Identification & Prioritization Guide provides elected officials and key municipal leaders with key information to support them in understanding disaster risks and identifying, prioritizing, and implementing the projects required during community recovery.
2. • This guide will provide a common understanding of the pre-disaster
and post-disaster tools and techniques to support disaster recovery
and community resilience
• A disaster’s impact will generate structural and non-structural
projects across the four environments
• Effective identification, prioritization, sequencing, financing, and
coordination enable a successful recovery
INTRODUCTION
3. To provide elected officials and key municipal leaders
within the Province of Alberta relevant information enabling
them to understand disaster risks and to be able to identify,
prioritize, and implement the recovery projects to help
restore the community.
INTENT
11. DAMAGE ASSESSMENTS
DRIVE AND INFORM DECISION-MAKING:
• Activation of the PDR Contingency Plan
• Quantify recovery scope
• Support re-entry
• Initial damage cost-estimates
TWO ASSESSMENTS:
• Rapid Damage Assessments
• Comprehensive Damage Assessments
12. RAPID DAMAGE ASSESSMENTS (RDA)
• Initial damage assessment within
48 hours post-event
• Informs decision to activate PDR
Contingency Plan
• Determines disaster’s scale and
complexity
• Determines level of external
support required
RDA CONDUCTED IN THREE STAGES
17. PROJECT IDENTIFICATION – MUNICIPAL
PROJECT LIST
All desired projects should be captured on a single Municipal Project List
(Guide 3 Appendix 5) and prioritized based on a formal quantitative and
qualitative assessment:
18. PROJECT PRIORITIZATION
FEMA Long-Term Community Recovery Value Tool
Allows planning team to evaluate priorities based on disaster impacts
and physical community needs
20. PERFORMANCE MANAGEMENT
Indicators should consider the following questions:
• You are a citizen of an impacted location following a disaster
What do you want to know?
• You are an elected official of the disaster location
What do you want to know?
• You are a member of the recovery team within the administration
What do you want to know?
Performance indicators and metrics provide both quantitative and
qualitative measures of recovery success
24. INFORMATION REQUIREMENTS
1) What are the standardized
municipal priorities for
RDA/CDA? Is the CI list aligned
to the RDA priorities?
2) Who will the municipality select
to lead and conduct the post-
disaster Haz Op, Security
Assessment and constitute the
DA teams?
3) Who are the recovery finance
lead designates?
4) You are a citizen of an impacted
location following a disaster. What
do you want to know?
5) You are an elected official of the
disaster location. What do you
want to know?
6) You are a member of the recovery
team within the administration.
What do you want to know? What
are the expected performance
indicators & KPIs?
26. IR #1 – MUNICIPAL RDA/CDA PRIORITIES
• IR #1: What are the standardized
municipal priorities for RDA/CDA? Is
the CI list aligned to the RDA
priorities?
• Review: 2016 MEMP, CAMP
• Advice & Opinions:
Method: Plenary Discussion Use Links; Handouts
Link
Link
27. IR #2 – HAZ OP/SECURITY/RDA & CDA TEAMS
• IR #2: Who will the municipality select to lead
and conduct the post-disaster Hazard &
Operability (Haz Op) study, Security
Assessment and constitute the RDA/CDA
teams?
• Review: 2016 MEMP, ICS CANADA
• Advice & Opinions:
Method: Plenary Discussion Use Internet; Handouts
Link
28. IR #3 – RECOVERY FINANCE LEAD DESIGNATE
• IR #3: Who are the recovery finance lead
designates?
• Review: 2016 MEMP, ICS CANADA
• Advice & Opinions:
Method: Plenary Discussion Use Internet; Handouts
Link
29. IR #4 – DESIRED INFORMATION – RESIDENT
• IR #4: You are a citizen of an impacted
location following a disaster. What do you want
to know?
• Advice & Opinions:
Method: Plenary Discussion Use Flip Charts
30. IR #5 – DESIRED INFORMATION – ELECTED
OFFICIAL
• IR #5: You are an elected official of the
disaster location. What do you want to know?
• Advice & Opinions:
Method: Plenary Discussion Use Flip Charts
31. IR #6 – DESIRED INFORMATION – RECOVERY
TEAM
• IR #6: You are a member of the recovery team
within the administration. What do you want to
know? What are the expected performance
indicators & KPIs?
• Advice & Opinions:
Method: Plenary Discussion Use Flip Charts
32. SUMMARY
• Prior to the writing the PDR Contingency Plan, it is important for
the municipality to frame the aforementioned aspects of disaster
recovery
• Participants’ advice and considerations to inform the development
of the community’s PDR Contingency Plan
• Further consultation and feedback will be sought as necessary
As we continue the journey to develop the community’s all hazards pre-disaster recovery contingency plan (PDR ConPlan), this guide will provide a common understanding of the pre-disaster and post-disaster tools and techniques to support disaster recovery and increased community resilience. A disaster’s impact will generate structural and non-structural projects across the four environments, including the rebuilding of community infrastructure, the remediation of greenspaces, and social recovery. The effective identification, prioritization, sequencing, financing, and coordination of these recovery projects enable a successful recovery.
The intent of this municipal recovery guide is to provide elected officials and key municipal leaders within the Province of Alberta relevant information enabling them to understand disaster risks and to be able to identify, prioritize, and implement the recovery projects to help recover the community.
Desired Outcomes. The following are the desired outcomes for Guide #3:
An understanding of the importance of an all-hazards risk assessment process
How to develop a comprehensive asset management plan
How to conduct post-disaster damage assessments
How to manage recovery projects, including project identification and prioritization
How to finance the recovery operation
As we continue the journey to develop the community’s all hazards pre-disaster recovery contingency plan (PDR ConPlan), this guide will provide a common understanding of the pre-disaster and post-disaster tools and techniques to support disaster recovery and increased community resilience. A disaster’s impact will generate structural and non-structural projects across the four environments, including the rebuilding of community infrastructure, the remediation of greenspaces, and social recovery. The effective identification, prioritization, sequencing, financing, and coordination of these recovery projects enable a successful recovery.
With a large emphasis on pre-disaster preparation and planning in Guide 1, this Guide is primarily intended to support recovery operations post-disaster. This Project Identification and Prioritization Guide supports any municipality faced with planning, decision-making, and implementation of a recovery operation.
This figure illustrates some of the activities, deliverables, and decision points typical of recovery.
The importance of damage assessments cannot be overstated. They drive key recovery decisions (such as activation of the PDR Contingency Plan), they assist in quantifying the work required to set the conditions for a safe re-entry (if evacuated) and they determine the initial cost estimates of damages to municipal, residential and commercial properties (key to the needed discussion with the provincial government for access to supporting response and recovery funding; i.e.: Disaster Recovery Program).
The rapid damage assessment (RDA) provides the first damage assessment following an event. Once safe for site inspections, the goal is to complete RDAs within 48 hours of the disaster.
These preliminary assessments will be key to several decision points or information requirements, including: determining the extent of the PDR ConPlan activation; determining whether the scale and complexity of the disaster necessitates the development of a recovery campaign plan; and determining the level of support to request from the Government of Alberta.
Given the importance of the information provided by the RDA process, recovery leaders and planners should conduct a deliberate planning session to ensure the conditions are set to achieve the short-and-long term needs of the damage assessments.
This process flow diagram illustrates a process for the development and execution of an RDA. The RDA priorities can be established during this planning session. The CAMP tools and the critical infrastructure (CI) list discussed in Guide 1 will be key inputs to the plan.
The Pillars of Recovery are represented below: Social, Natural, Economy, and Built. They represent logical themes for the grouping of key actions to guide the community’s recovery. The supporting foundation and upper beam highlight necessary supporting functions to ensure an effective recovery and an increase to community resilience.
A simplified version of components involved in identification of projects, and their subsequent prioritization, funding, and project management.
To simplify the project prioritization and approvals, all desired projects should be initially captured on a single Municipal Project List. Note that this list contains a quantitative ranking metric, generated by a qualitative assessment, that will be used to support project prioritization, approval and resourcing.
A broad range of desired projects will likely be identified in the Municipal Project List. As such, the competition for limited resources such as funding, procurement and project management needs, will be immense. Therefore, to ensure that projects are approved and executed in a way that is in the best interest of the community’s recovery and increased resilience, a formal project prioritization process is required.
To ensure a transparent assessment, best-practices identify a valuation tool from FEMA for recommended use: the Long-Term Community Recovery (LTCR) Project Recovery Value Tool. The Recovery Value Tool allows for the planning team to evaluate priorities based on both the disaster impacts, and the physical community needs resulting from the disaster.
Effective PgM/PM ensures successful delivery of the recovery activities. Whether structural or non-structural projects, recovery project management practices should be guided by the Project Management Institute (PMI) methodology and follow the municipality’s legislative requirements and practices.
Recovery Pillars – Project Scope.
Recovery Schedule.
Project Coordination.
Managing Risk.
During this facilitated session, key performance indicators will be selected for the PDR ConPlan, based largely on the pillars of recovery and the desired outcome of the pillars’ projects. These elements will form the basis for long-term recovery planning efforts as well as the lens through which recovery efforts can be assessed. When developing these indicators, consider the following:
You are a citizen of The Town of High River following a disaster. What do you want to know?
You are an elected official of The Town of High River. What do you want to know?
You are a member of the recovery team within the administration. What do you want to know?
The municipality’s role in the sourcing and management of recovery financing is extremely instrumental to the overall success of the community’s recovery. From the start of the recovery process until eventual close-out of recovery activities and audit roles, financing recovery is the most lasting activity within recovery. The financial resources needed to sustain an effective recovery plan can be extensive, and the sourcing of these funds can place a significant liability on the municipal government.
Note that municipalities may not receive any funding from the provincial government or any other external sources. Depending upon the severity of the disaster, the event may not qualify for the Disaster Recovery Program and may not attract the attention for financial support through private donations and NGOs. If it is assumed that the municipality will need to fully fund their recovery, all possible options should be examined.
This slide depicts a variety of these potential external funding sources.
In addition to providing an overview of the learnings from this guide, the intent is to extract the community representative’s advice and opinions that supports the developing of the community specific, pre-disaster recovery plan. This session is designed to draw advice or opinions for the following information requirements:
What are the standardized municipal priorities for RDA/CDA? Is the CI list aligned to the RDA priorities?
Who will the municipality select to lead and conduct the post-disaster Haz Op, Security Assessment and constitute the DA teams?
Who are the recovery finance lead designate(s)?