Commissioning and Startup of the Surmont 2 (SAGD) Project; auxiliary equipment to
include. Main 25 kV lineup, seven 5 kV Utility Power lineups, seven 5 kV Emergency
Power lineups and 600 Volt lineups. For Motor Control Centers (MCC’s); Surmont 2 has
fourteen 5 kV Utility Power MCC’s, twelve 5 kV Emergency Power MCC’s, sixty seven
600 Volt Utility Power MCC’s and eight 600 Volt Emergency Power MCC’s, SEL Relays,
and nine Generator Emergency Power distribution systems.
10/13 01/16 Bantrel/ Bechtel, OG&C
Surmont 2 (SAGD)
Ft. Mc Murray, AB
Roy Tyrie
Lead Electrical
 Developed site specific procedures
for the testing templates and
functional commissioning of project
supplied equipment in compliance
with engineered design, codes and
site specific specification.
 Development of site Working On
and Near Energized Equipment
procedure; attributed to core
process; incorporating 70E NFPA,
Z462 (Canadian) 70E NFPA,
corporate designed procedure, and
area work contractors policies and
regulations; in conformance with
IEEE
 Ensured milestones and scheduling
timelines were achieved by
contributing technical industry
based experience;
recommendations to plans and
preparing procedure; implementing
work flow process, ensuring work
productivity, oversight in the
delivery of a quality customer-
service standards; resolving
NAME (Employee Number): Christopher V. Taluskie (031758) DATE: June 2015
CLASSIFICATION:
WORKING TITLE: Senior Start-Up Specialist
ORGANIZATION: Commissioning and Operating Services
LOCATION: Surmont 2 Project, Ft. Mc Murray, AB
CITIZENSHIP: U.S.A.
CONTINUOUS SERVICE DATE(S): August 20, 2012
RE-EMPLOYMENT DATE(S):
SPOUSE'S NAME: Stephanie
CHILDREN'S DETAILS:
problems; completing audits;
identifying improvements and
implementing change; effectively
maintaining a safe and healthy work
environment, to achieve a zero
recorded time loss incident
throughout the projects duration.

More Related Content

What's hot (8)

CV
CVCV
CV
 
Microsoft Word - johnwaterhousei
Microsoft Word - johnwaterhouseiMicrosoft Word - johnwaterhousei
Microsoft Word - johnwaterhousei
 
Kaizen
KaizenKaizen
Kaizen
 
SAIFULLAH RESUME 261216
SAIFULLAH RESUME 261216SAIFULLAH RESUME 261216
SAIFULLAH RESUME 261216
 
Resume_Chandan
Resume_ChandanResume_Chandan
Resume_Chandan
 
Robert Gerrish CV
Robert Gerrish CVRobert Gerrish CV
Robert Gerrish CV
 
Paul smart a
Paul smart aPaul smart a
Paul smart a
 
Roxtec BG Applications
Roxtec BG ApplicationsRoxtec BG Applications
Roxtec BG Applications
 

Similar to Surmont 2 SAGD

INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071Nithy Anantham
 
Narendra@working reliance CV
Narendra@working reliance CVNarendra@working reliance CV
Narendra@working reliance CVNARENDRA CHAROLA
 
KE House Solar Project Highlights Dec 2016
KE House Solar Project Highlights Dec 2016KE House Solar Project Highlights Dec 2016
KE House Solar Project Highlights Dec 2016sfact
 
CV Mahboob Updated 24.10.15
CV Mahboob Updated  24.10.15CV Mahboob Updated  24.10.15
CV Mahboob Updated 24.10.15Mahboob Iqbal
 
PROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CVPROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CVMAHMOOD AHMED
 
Manoj Ahire-Resume
Manoj Ahire-ResumeManoj Ahire-Resume
Manoj Ahire-ResumeManoj Ahire
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed
 
Business opportunities in PHWR and technical preparedness from vendors Philip...
Business opportunities in PHWR and technical preparedness from vendors Philip...Business opportunities in PHWR and technical preparedness from vendors Philip...
Business opportunities in PHWR and technical preparedness from vendors Philip...ProSIM R & D Pvt. Ltd.
 
electrical maintenace (2)
electrical maintenace  (2)electrical maintenace  (2)
electrical maintenace (2)Bharjendu vimal
 

Similar to Surmont 2 SAGD (20)

INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
 
Narendra@working reliance CV
Narendra@working reliance CVNarendra@working reliance CV
Narendra@working reliance CV
 
CV_ RKS 2016
CV_ RKS 2016 CV_ RKS 2016
CV_ RKS 2016
 
KE House Solar Project Highlights Dec 2016
KE House Solar Project Highlights Dec 2016KE House Solar Project Highlights Dec 2016
KE House Solar Project Highlights Dec 2016
 
Sushil podia Ahm
Sushil podia AhmSushil podia Ahm
Sushil podia Ahm
 
Wajid Ali Shah
Wajid Ali ShahWajid Ali Shah
Wajid Ali Shah
 
CV Mahboob Updated 24.10.15
CV Mahboob Updated  24.10.15CV Mahboob Updated  24.10.15
CV Mahboob Updated 24.10.15
 
CV
CVCV
CV
 
PROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CVPROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CV
 
Yahya Khan CV(1)
Yahya Khan CV(1)Yahya Khan CV(1)
Yahya Khan CV(1)
 
PROJECT ENGINEER- ELECTRICAL._L
PROJECT ENGINEER-  ELECTRICAL._LPROJECT ENGINEER-  ELECTRICAL._L
PROJECT ENGINEER- ELECTRICAL._L
 
Manoj Ahire-Resume
Manoj Ahire-ResumeManoj Ahire-Resume
Manoj Ahire-Resume
 
CV-Ulysses Bustillo
CV-Ulysses BustilloCV-Ulysses Bustillo
CV-Ulysses Bustillo
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
 
Wind Power EPCM
Wind Power EPCMWind Power EPCM
Wind Power EPCM
 
Business opportunities in PHWR and technical preparedness from vendors Philip...
Business opportunities in PHWR and technical preparedness from vendors Philip...Business opportunities in PHWR and technical preparedness from vendors Philip...
Business opportunities in PHWR and technical preparedness from vendors Philip...
 
electrical maintenace (2)
electrical maintenace  (2)electrical maintenace  (2)
electrical maintenace (2)
 
Satham Mohamed.A-CV..
Satham Mohamed.A-CV..Satham Mohamed.A-CV..
Satham Mohamed.A-CV..
 
ajit-cv-2015
ajit-cv-2015ajit-cv-2015
ajit-cv-2015
 
Brij mohan cv
Brij mohan  cvBrij mohan  cv
Brij mohan cv
 

Surmont 2 SAGD

  • 1. Commissioning and Startup of the Surmont 2 (SAGD) Project; auxiliary equipment to include. Main 25 kV lineup, seven 5 kV Utility Power lineups, seven 5 kV Emergency Power lineups and 600 Volt lineups. For Motor Control Centers (MCC’s); Surmont 2 has fourteen 5 kV Utility Power MCC’s, twelve 5 kV Emergency Power MCC’s, sixty seven 600 Volt Utility Power MCC’s and eight 600 Volt Emergency Power MCC’s, SEL Relays, and nine Generator Emergency Power distribution systems. 10/13 01/16 Bantrel/ Bechtel, OG&C Surmont 2 (SAGD) Ft. Mc Murray, AB Roy Tyrie Lead Electrical  Developed site specific procedures for the testing templates and functional commissioning of project supplied equipment in compliance with engineered design, codes and site specific specification.  Development of site Working On and Near Energized Equipment procedure; attributed to core process; incorporating 70E NFPA, Z462 (Canadian) 70E NFPA, corporate designed procedure, and area work contractors policies and regulations; in conformance with IEEE  Ensured milestones and scheduling timelines were achieved by contributing technical industry based experience; recommendations to plans and preparing procedure; implementing work flow process, ensuring work productivity, oversight in the delivery of a quality customer- service standards; resolving NAME (Employee Number): Christopher V. Taluskie (031758) DATE: June 2015 CLASSIFICATION: WORKING TITLE: Senior Start-Up Specialist ORGANIZATION: Commissioning and Operating Services LOCATION: Surmont 2 Project, Ft. Mc Murray, AB CITIZENSHIP: U.S.A. CONTINUOUS SERVICE DATE(S): August 20, 2012 RE-EMPLOYMENT DATE(S): SPOUSE'S NAME: Stephanie CHILDREN'S DETAILS:
  • 2. problems; completing audits; identifying improvements and implementing change; effectively maintaining a safe and healthy work environment, to achieve a zero recorded time loss incident throughout the projects duration.