1. Commissioning and Startup of the Surmont 2 (SAGD) Project; auxiliary equipment to
include. Main 25 kV lineup, seven 5 kV Utility Power lineups, seven 5 kV Emergency
Power lineups and 600 Volt lineups. For Motor Control Centers (MCC’s); Surmont 2 has
fourteen 5 kV Utility Power MCC’s, twelve 5 kV Emergency Power MCC’s, sixty seven
600 Volt Utility Power MCC’s and eight 600 Volt Emergency Power MCC’s, SEL Relays,
and nine Generator Emergency Power distribution systems.
10/13 01/16 Bantrel/ Bechtel, OG&C
Surmont 2 (SAGD)
Ft. Mc Murray, AB
Roy Tyrie
Lead Electrical
Developed site specific procedures
for the testing templates and
functional commissioning of project
supplied equipment in compliance
with engineered design, codes and
site specific specification.
Development of site Working On
and Near Energized Equipment
procedure; attributed to core
process; incorporating 70E NFPA,
Z462 (Canadian) 70E NFPA,
corporate designed procedure, and
area work contractors policies and
regulations; in conformance with
IEEE
Ensured milestones and scheduling
timelines were achieved by
contributing technical industry
based experience;
recommendations to plans and
preparing procedure; implementing
work flow process, ensuring work
productivity, oversight in the
delivery of a quality customer-
service standards; resolving
NAME (Employee Number): Christopher V. Taluskie (031758) DATE: June 2015
CLASSIFICATION:
WORKING TITLE: Senior Start-Up Specialist
ORGANIZATION: Commissioning and Operating Services
LOCATION: Surmont 2 Project, Ft. Mc Murray, AB
CITIZENSHIP: U.S.A.
CONTINUOUS SERVICE DATE(S): August 20, 2012
RE-EMPLOYMENT DATE(S):
SPOUSE'S NAME: Stephanie
CHILDREN'S DETAILS:
2. problems; completing audits;
identifying improvements and
implementing change; effectively
maintaining a safe and healthy work
environment, to achieve a zero
recorded time loss incident
throughout the projects duration.