CHARLES LI ZHANG
Senior Engineer
Years of experience
21 (1 with Thorndon Cook, 7 with Parsons Brinckerhoff, 13 with others)
Residence
New Zealand
Languages
English, Mandarin
Education
Dip. of Business Computing/Unitec Institute of Technology, Auckland, 1998
ME, Thermal Power Engineering Dept, Northeast University of Electric Power, China, 1987
BE, Thermal Power Engineering Dept, Northeast University of Electric Power, China, 1984
Key qualifications
Charles is a mechanical (piping) engineer with extensive experience in NZ, China and other countries. He
is bilingual, speaking both Mandarin Chinese and English. He specializes in piping for gas pipelines,
steam/water pipeline, pressure vessels, geothermal steam field and power plant, etc. This includes
piping/pressure vessel process engineering and piping system engineering, and computer simulation and
cycle optimization. Charles has also gained hands-on experience in project management for installation
and commissioning, and installation supervision. He is also experienced in the provision of
troubleshooting, faulty investigation and technical support.
Charles is familiar with some engineering software packages: AutoPipe, NozzlePRO, Steam Pro & Steam
Master, GT Pro & GT Master, etc.
Charles also has advanced software programming skills from his 5 years’ computer programming work in
IT industry.
Thorndon Cook experience
Geothermal piping
 Lahendong 1x5MW EPC Engineering (2016), Indonesia, JFE Engineering Corporation, undertook
wellhead, cross country and power station piping system layout design, and determining pipe support
quantities as well as loads and vessel nozzle loads.
 Karaha 1x30MW Geothermal Power Project (2015-2016), Indonesia, Hawkins, undertook detailed
mechanical piping design, separator and rock muffler process design review for steamfield FCRS.
 MRP Geothermal Standard Specifications (2015), New Zealand, Mighty River Power, lead engineer
for developing piping specifications of Pipe and Fitting Material Supply, Piping Fabrication and
Inspections, Pipe Insulation and Cladding, and Piping Classes.
 Rotokawa Power Station Steam Purity Improvement Project (2015), New Zealand, Mighty River
Power, undertook new steam scrubbing system process analysis, piping layout and pipe system
conceptual engineering.
Parsons Brinckerhoff experience
Geothermal piping
 Karaha Geothermal Power Plant Project FCRS EPC Bid Engineering (2014), Indonesia, Pertamina
Geothermal Energy (PGE). Lead piping design engineer. Undertook piping process design, piping
design and pipe support design.
 Ulubelu Unit 3 & 4 Geothermal Power Project SAGS EPC Bid Engineering (2013), Indonesia,
Pertamina Geothermal Energy (PGE). Lead piping design engineer. Undertook piping process design,
piping design and pipe support design.
 Te Mihi Geothermal Power Plant EPC (2012), Taupo, New Zealand, Contact Energy. Lead design
engineer. Undertook pipeline sizing, main piping detailed design with AutoPIPE and pipe support
design for normal operation and steam blow and hydrotest, undergroud FRP piping design, process
engineering, Non-condensable gas (NCG) removal system design and engineering, pressure vessel’s
process engineering and vendor’s design review, steam turbine vendor’s design review, and pipeline
installation support.
THORNDON COOK 13/03/2016
Charles Zhang
 Te Mihi Geothermal Power Plant EPC Bid Preparation (2010), Taupo, New Zealand, Contact Energy.
Design engineer. Undertook piping design with AutoPIPE, Non-condensable gas (NCG) removal
system design and engineering, pressure vessel’s process engineering and selection, pipeline sizing,
valve selection and PIDs with KKS labelling.
 BacMan Geothermal Rehabilitation Project - BacMan I & II (2010), South Eastern Luzon, Philippines,
Energy Development Corporation (EDC). Design engineer. Undertook existing/new Gas Removal
System (GRS) and main steam piping engineering, including pipeline sizing, pressure drop, and piping
layout and design with AutoPIPE.
 Patuha Geothermal Power Station (2009), Patuha, Indonesia, Geo Dipa Energi. Lead design engineer.
Responsible for geothermal steam field performance modeling and optimization, piping design,
process engineering and preparation of plant specifications for the proposed 55 MW power station at
Patuha, south of Bandung. Work was carried out in the client’s office in Jakarta, with site visits to
gather information.
 Kawerau 100 MW Geothermal Power Binary Plant (2008), Kawerau, New Zealand, Mighty River
Power. Engineer. Setup a spreadsheet model with VBA functions of geothermal field piping work, and
undertook the pipe system performance (pressure drop, flow rate and enthalpy) analysis of removing
and adjusting branch line control valves.
 Te Mihi Geothermal Power Binary Plant (2008), Wairakei, New Zealand, Contact Energy. Design
engineer. Undertook preliminary engineering, e.g. pressure vessel’s process engineering and
selection, pipeline sizing, valve selection and PIDs with KKS labelling.
 Pipe Stress Analysis (2009), Auckland, New Zealand, Mighty River Power. Engineer. Undertook the
study of pipe stress analysis (ASME B31.1) regarding the using nominal pipe wall thickness, and the
review of design transient issue of a steam field piping system with comparing different piping design
standards and codes (including Australia standard: AS 4041-2006).
 Nga Awa Purua 130 MW Geothermal Power Plant (2009), Taupo, New Zealand, Mighty River Power.
Engineer. Steam field production and reinjection control valve operation principles, steam field pipe
line and valve spec from PIDs with KKS labelling.
 Pipe Two-phase Flow Model Study and Improvement (2009), Auckland, New Zealand. In-house
development. Engineer. Undertook the study and comparison of Harrison method with Zhao method,
programmed Zhao method with corrections and fitting corrections into PB’s two-phase flow model.
 Evaluation of Design Cost Effectiveness of Geothermal Pipe Support Design (2009), Auckland, New
Zealand. In-house development. Engineer. Undertook the study on PB’s pipe support span,
foundation, stanchion and head, and the comparison with other designs to evaluate PB’s pipe support
design in terms of cost effectiveness.
 Data transferring from AutoPIPE to Pipe Support Design Model (2009), Auckland, New Zealand. In-
house development. Engineer. Recoded the data transferring programme from new AutoPIPE version
(XM) report document to pipe support design spreadsheet model.
 Nga Awa Purua Piping Design (2008), Taupo, New Zealand, Mighty River Power. Design engineer.
Undertook piping system preliminary design using AutoPipe for steam field design bid preparation.
Gas and water piping
 Waterview Tunnel Project Detail Design (2013), New Zealand, NZTA. Piping design engineer,
Undertook buried gas main piping above tunnel assessment due to settlements and deigned this
piping by using AutoPIPE and NozzlePRO.
 Pantabangan Hydro Power Plant Tail Water Depression (2012), Philippes. Piping design engineer,
Undertook piping design of compressed air supply form air receiver to draft tube to withstand negative
112o
C/41barg by using AutoPIPE and NozzlePRO.
 Victoria Desalination Plant (2010), Melbourne, Vic., Australia, Thiess Degrement Joint Venture
(TDJV). Piping design engineer. Undertook piping design (AutoPIPE) within Transfer Pump Station
(TPS) and Booster Pump Station (BPS), flexible joints (belows) engineering and fittings design, piping
support and pump nozzle loads investigation and analysis to reduce the loads.
THORNDON COOK 13/03/2016 2
Charles Zhang
Power
 KEPCO Cebu Unit 2 I/LP Steam Turbine (103MW), Root Cause Investigation of Rotor Bow (2012),
Philippes. Engineer. Undertook analysis turbine operation history data, installation and maintenance
information, and figured out the main reason which caused the turbine rotor bow.
 2x150 MW 60Hz Jaguar CFB Coal-based Power Plant (2009), Guatemala, AEI., Owner’s Engineer.
Lead engineer. Responsible for turbine technical support, procurement support, document and design
review and Chinese language support, factory test witness, and construction and commissioning
supervision.
 Huntly Power Station (2008), Huntly, New Zealand, Genesis Energy. Engineer. Undertook
investigation of technologies of carbon capture and storage (CCS) for power generation and reviewing
the current status of technologies of CCS worldwide.
 Ma’adam 6x340 MW Oil Fired Power Plant (2009), Saudi Arabia, Saudi National Mining. Engineer.
Undertook investigation about the capability of reducing NOx technology (Tangential Tilting Burning) of
Harbin Boiler Co. (China).
 Anhui Hefei No. 2 2x350 MW Power Plant (2009), Anhui Province, China, Anhui Hefei United Power.
Engineer. Undertook technical document review and Chinese language support.
Previous experience
Project management
 Managing Director of a photo processing company, (2003-2008), Auckland, New Zealand.
Programming
 Analyst/programmer; programming languages: Dephi, VB & C++; databases: SQL Server & Oracle,
(1998-2003), Auckland, New Zealand.
Thermal power generation
 Turbine & Thermal Cycle Dept, (1987-1995), China, Xi’an Thermal Power Research Institute (National
Headquarters). Engineer. Specialist in turbine machines and thermal systems efficiency and reliability,
including cogeneration systems.
 Project manager for installation and commissioning of Jiu Quan Iron and Steel Company thermal
cogeneration power plant. Also personally supervised the installation of the steam turbine and
commissioning / troubleshooting of the power plant.
 Project manager for the redesign of the steam turbine exhaust cooling water system and spray
nozzles to enhance steam turbine efficiency and to avoid water damage to last stage blades.
 Project manager for the redesign of the drainage system for a steam turbine to avoid condensing
water coming into the turbine steam path and damaging the turbine blades and diaphragms for the
Changchun Automobile Manufacture Ltd’s power plant.
Publications
 Charles Zhang 2010, ‘Optimisation of a Geothermal Steamfield Conceptual Design with Its Power
Plant’. GeoNZ 2010, The University of Auckland.
Professional history
2015 – present Thorndon Cook
2008 – 2015 Parsons Brinckerhoff
2003 – 2008 Photoland Ltd
1998 – 2003 Greenwood Technology
1987 – 1995 Xi’an Thermal Power Research Institute, China
THORNDON COOK 13/03/2016 3

More Related Content

What's hot

Ilasi-Engineer-Resume_Linkedin
Ilasi-Engineer-Resume_LinkedinIlasi-Engineer-Resume_Linkedin
Ilasi-Engineer-Resume_LinkedinMichael Ilasi
 
Resume_Krishna Kumar_Btech_EL
Resume_Krishna Kumar_Btech_ELResume_Krishna Kumar_Btech_EL
Resume_Krishna Kumar_Btech_ELkrishna kumar
 
A Gomez Resume Pipe Designer_Checker_plain
A Gomez Resume Pipe Designer_Checker_plainA Gomez Resume Pipe Designer_Checker_plain
A Gomez Resume Pipe Designer_Checker_plainAmerico Gomez
 
CV John Raugstad Woodgroup
CV John Raugstad WoodgroupCV John Raugstad Woodgroup
CV John Raugstad WoodgroupJohn Raugstad
 
LF Lanza Resume 2016
LF Lanza Resume 2016LF Lanza Resume 2016
LF Lanza Resume 2016Lou Lanza
 
cv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachmentcv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachmentEugene van Brakel
 
Danielle Krysiak Mech Engineer 5-5-2016
Danielle Krysiak Mech Engineer 5-5-2016Danielle Krysiak Mech Engineer 5-5-2016
Danielle Krysiak Mech Engineer 5-5-2016Danielle Krysiak
 
Steve Chu resume
Steve Chu resumeSteve Chu resume
Steve Chu resumeSteve Chu
 
BugariuDex Resume _ 2017
BugariuDex Resume _ 2017BugariuDex Resume _ 2017
BugariuDex Resume _ 2017Dex Bugariu
 
Resume electrical & instrumentation engg 10+ yrs exp
Resume  electrical & instrumentation engg 10+ yrs expResume  electrical & instrumentation engg 10+ yrs exp
Resume electrical & instrumentation engg 10+ yrs expSudipto Majumder
 
Resume of Jerry C. Hussain refer DECEMBER 2015
Resume of  Jerry C. Hussain refer   DECEMBER  2015Resume of  Jerry C. Hussain refer   DECEMBER  2015
Resume of Jerry C. Hussain refer DECEMBER 2015Jerry Hussain
 
Dinesh Kumar S Mechanical
Dinesh Kumar S MechanicalDinesh Kumar S Mechanical
Dinesh Kumar S Mechanicaldineshnandhu007
 

What's hot (18)

Ilasi-Engineer-Resume_Linkedin
Ilasi-Engineer-Resume_LinkedinIlasi-Engineer-Resume_Linkedin
Ilasi-Engineer-Resume_Linkedin
 
Mvcv v10
Mvcv v10Mvcv v10
Mvcv v10
 
Resume_Krishna Kumar_Btech_EL
Resume_Krishna Kumar_Btech_ELResume_Krishna Kumar_Btech_EL
Resume_Krishna Kumar_Btech_EL
 
A Gomez Resume Pipe Designer_Checker_plain
A Gomez Resume Pipe Designer_Checker_plainA Gomez Resume Pipe Designer_Checker_plain
A Gomez Resume Pipe Designer_Checker_plain
 
CV John Raugstad Woodgroup
CV John Raugstad WoodgroupCV John Raugstad Woodgroup
CV John Raugstad Woodgroup
 
LF Lanza Resume 2016
LF Lanza Resume 2016LF Lanza Resume 2016
LF Lanza Resume 2016
 
Hossein emadi CV
Hossein emadi CVHossein emadi CV
Hossein emadi CV
 
cv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachmentcv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachment
 
M.foreman's resume'
M.foreman's resume'M.foreman's resume'
M.foreman's resume'
 
Danielle Krysiak Mech Engineer 5-5-2016
Danielle Krysiak Mech Engineer 5-5-2016Danielle Krysiak Mech Engineer 5-5-2016
Danielle Krysiak Mech Engineer 5-5-2016
 
JG Mech Eng CV
JG Mech Eng CVJG Mech Eng CV
JG Mech Eng CV
 
Steve Chu resume
Steve Chu resumeSteve Chu resume
Steve Chu resume
 
Hossein emadi CV
Hossein emadi CVHossein emadi CV
Hossein emadi CV
 
BugariuDex Resume _ 2017
BugariuDex Resume _ 2017BugariuDex Resume _ 2017
BugariuDex Resume _ 2017
 
Resume - John D Miller
Resume - John D MillerResume - John D Miller
Resume - John D Miller
 
Resume electrical & instrumentation engg 10+ yrs exp
Resume  electrical & instrumentation engg 10+ yrs expResume  electrical & instrumentation engg 10+ yrs exp
Resume electrical & instrumentation engg 10+ yrs exp
 
Resume of Jerry C. Hussain refer DECEMBER 2015
Resume of  Jerry C. Hussain refer   DECEMBER  2015Resume of  Jerry C. Hussain refer   DECEMBER  2015
Resume of Jerry C. Hussain refer DECEMBER 2015
 
Dinesh Kumar S Mechanical
Dinesh Kumar S MechanicalDinesh Kumar S Mechanical
Dinesh Kumar S Mechanical
 

Viewers also liked (13)

CV Herwandi
CV HerwandiCV Herwandi
CV Herwandi
 
Karen Mills, KarimSyah Law Firm, 2014 ASEAN-OECD Investment Policy Conference
Karen Mills, KarimSyah Law Firm, 2014 ASEAN-OECD Investment Policy ConferenceKaren Mills, KarimSyah Law Firm, 2014 ASEAN-OECD Investment Policy Conference
Karen Mills, KarimSyah Law Firm, 2014 ASEAN-OECD Investment Policy Conference
 
219222477 chevron-gunung-salak
219222477 chevron-gunung-salak219222477 chevron-gunung-salak
219222477 chevron-gunung-salak
 
Indonesia Geothermal EOI Presentation
Indonesia Geothermal EOI PresentationIndonesia Geothermal EOI Presentation
Indonesia Geothermal EOI Presentation
 
Instalasi kondensor pltp 55 mw
Instalasi kondensor pltp 55 mwInstalasi kondensor pltp 55 mw
Instalasi kondensor pltp 55 mw
 
Mt 2
Mt 2Mt 2
Mt 2
 
OJT / KP Chevron Geothermal Salak
OJT / KP Chevron Geothermal SalakOJT / KP Chevron Geothermal Salak
OJT / KP Chevron Geothermal Salak
 
Job Application
Job ApplicationJob Application
Job Application
 
Materi Mata Kuliah Geomorfologi Indonesia (Geomorfologi Jawa)
Materi Mata Kuliah Geomorfologi Indonesia (Geomorfologi Jawa)Materi Mata Kuliah Geomorfologi Indonesia (Geomorfologi Jawa)
Materi Mata Kuliah Geomorfologi Indonesia (Geomorfologi Jawa)
 
Turning thesis to publication
Turning thesis to publicationTurning thesis to publication
Turning thesis to publication
 
Geothermal power plant
Geothermal power plantGeothermal power plant
Geothermal power plant
 
Impetus Underwear 2010
Impetus Underwear 2010Impetus Underwear 2010
Impetus Underwear 2010
 
CV Yantori
CV YantoriCV Yantori
CV Yantori
 

Similar to Charles Zhang CV(2016)

VARUN_SINGH_CHANDEL
VARUN_SINGH_CHANDELVARUN_SINGH_CHANDEL
VARUN_SINGH_CHANDELalstom127
 
EN Mr.Rittiporn Pinrod resume(update 13-03-15)
EN Mr.Rittiporn Pinrod resume(update 13-03-15)EN Mr.Rittiporn Pinrod resume(update 13-03-15)
EN Mr.Rittiporn Pinrod resume(update 13-03-15)Rittiporn Pinrod
 
EN Mr.Rittiporn Pinrod resume(update 13-03-15)
EN Mr.Rittiporn Pinrod resume(update 13-03-15)EN Mr.Rittiporn Pinrod resume(update 13-03-15)
EN Mr.Rittiporn Pinrod resume(update 13-03-15)Rittiporn Pinrod
 
d premanatha reddy_original (2)
d premanatha reddy_original (2)d premanatha reddy_original (2)
d premanatha reddy_original (2)Reddy Premnath
 
EdwardRueblingResume-7-20-16
EdwardRueblingResume-7-20-16EdwardRueblingResume-7-20-16
EdwardRueblingResume-7-20-16Edward Ruebling
 
Saeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updatedSaeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updatedAbbas Saeidi
 
Vignesh_Sr.Elec Designer
Vignesh_Sr.Elec DesignerVignesh_Sr.Elec Designer
Vignesh_Sr.Elec DesignerVignesh V
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016Sher Chuhan
 
CV Ken Tease
CV Ken TeaseCV Ken Tease
CV Ken TeaseKen Tease
 
Engineering Resume_JR_1.11.16
Engineering Resume_JR_1.11.16Engineering Resume_JR_1.11.16
Engineering Resume_JR_1.11.16James Ratino
 

Similar to Charles Zhang CV(2016) (20)

VARUN_SINGH_CHANDEL
VARUN_SINGH_CHANDELVARUN_SINGH_CHANDEL
VARUN_SINGH_CHANDEL
 
EN Mr.Rittiporn Pinrod resume(update 13-03-15)
EN Mr.Rittiporn Pinrod resume(update 13-03-15)EN Mr.Rittiporn Pinrod resume(update 13-03-15)
EN Mr.Rittiporn Pinrod resume(update 13-03-15)
 
EN Mr.Rittiporn Pinrod resume(update 13-03-15)
EN Mr.Rittiporn Pinrod resume(update 13-03-15)EN Mr.Rittiporn Pinrod resume(update 13-03-15)
EN Mr.Rittiporn Pinrod resume(update 13-03-15)
 
d premanatha reddy_original (2)
d premanatha reddy_original (2)d premanatha reddy_original (2)
d premanatha reddy_original (2)
 
Updated_CV
Updated_CVUpdated_CV
Updated_CV
 
EdwardRueblingResume-7-20-16
EdwardRueblingResume-7-20-16EdwardRueblingResume-7-20-16
EdwardRueblingResume-7-20-16
 
Ukeje cv updated
Ukeje cv updatedUkeje cv updated
Ukeje cv updated
 
Saeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updatedSaeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updated
 
Deepak Resume
Deepak ResumeDeepak Resume
Deepak Resume
 
Nailesh Patel CV
Nailesh Patel CVNailesh Patel CV
Nailesh Patel CV
 
Anshul_Resume
Anshul_Resume Anshul_Resume
Anshul_Resume
 
RAJEEV-RESUME
RAJEEV-RESUMERAJEEV-RESUME
RAJEEV-RESUME
 
Vignesh_Sr.Elec Designer
Vignesh_Sr.Elec DesignerVignesh_Sr.Elec Designer
Vignesh_Sr.Elec Designer
 
RICHARD HEATH-CV3a
RICHARD HEATH-CV3aRICHARD HEATH-CV3a
RICHARD HEATH-CV3a
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016
 
CV
CVCV
CV
 
I_SQUARE_PROFILE. A
I_SQUARE_PROFILE. AI_SQUARE_PROFILE. A
I_SQUARE_PROFILE. A
 
CV Ken Tease
CV Ken TeaseCV Ken Tease
CV Ken Tease
 
MY CV feb 2016
MY CV feb 2016MY CV feb 2016
MY CV feb 2016
 
Engineering Resume_JR_1.11.16
Engineering Resume_JR_1.11.16Engineering Resume_JR_1.11.16
Engineering Resume_JR_1.11.16
 

Charles Zhang CV(2016)

  • 1. CHARLES LI ZHANG Senior Engineer Years of experience 21 (1 with Thorndon Cook, 7 with Parsons Brinckerhoff, 13 with others) Residence New Zealand Languages English, Mandarin Education Dip. of Business Computing/Unitec Institute of Technology, Auckland, 1998 ME, Thermal Power Engineering Dept, Northeast University of Electric Power, China, 1987 BE, Thermal Power Engineering Dept, Northeast University of Electric Power, China, 1984 Key qualifications Charles is a mechanical (piping) engineer with extensive experience in NZ, China and other countries. He is bilingual, speaking both Mandarin Chinese and English. He specializes in piping for gas pipelines, steam/water pipeline, pressure vessels, geothermal steam field and power plant, etc. This includes piping/pressure vessel process engineering and piping system engineering, and computer simulation and cycle optimization. Charles has also gained hands-on experience in project management for installation and commissioning, and installation supervision. He is also experienced in the provision of troubleshooting, faulty investigation and technical support. Charles is familiar with some engineering software packages: AutoPipe, NozzlePRO, Steam Pro & Steam Master, GT Pro & GT Master, etc. Charles also has advanced software programming skills from his 5 years’ computer programming work in IT industry. Thorndon Cook experience Geothermal piping  Lahendong 1x5MW EPC Engineering (2016), Indonesia, JFE Engineering Corporation, undertook wellhead, cross country and power station piping system layout design, and determining pipe support quantities as well as loads and vessel nozzle loads.  Karaha 1x30MW Geothermal Power Project (2015-2016), Indonesia, Hawkins, undertook detailed mechanical piping design, separator and rock muffler process design review for steamfield FCRS.  MRP Geothermal Standard Specifications (2015), New Zealand, Mighty River Power, lead engineer for developing piping specifications of Pipe and Fitting Material Supply, Piping Fabrication and Inspections, Pipe Insulation and Cladding, and Piping Classes.  Rotokawa Power Station Steam Purity Improvement Project (2015), New Zealand, Mighty River Power, undertook new steam scrubbing system process analysis, piping layout and pipe system conceptual engineering. Parsons Brinckerhoff experience Geothermal piping  Karaha Geothermal Power Plant Project FCRS EPC Bid Engineering (2014), Indonesia, Pertamina Geothermal Energy (PGE). Lead piping design engineer. Undertook piping process design, piping design and pipe support design.  Ulubelu Unit 3 & 4 Geothermal Power Project SAGS EPC Bid Engineering (2013), Indonesia, Pertamina Geothermal Energy (PGE). Lead piping design engineer. Undertook piping process design, piping design and pipe support design.  Te Mihi Geothermal Power Plant EPC (2012), Taupo, New Zealand, Contact Energy. Lead design engineer. Undertook pipeline sizing, main piping detailed design with AutoPIPE and pipe support design for normal operation and steam blow and hydrotest, undergroud FRP piping design, process engineering, Non-condensable gas (NCG) removal system design and engineering, pressure vessel’s process engineering and vendor’s design review, steam turbine vendor’s design review, and pipeline installation support. THORNDON COOK 13/03/2016
  • 2. Charles Zhang  Te Mihi Geothermal Power Plant EPC Bid Preparation (2010), Taupo, New Zealand, Contact Energy. Design engineer. Undertook piping design with AutoPIPE, Non-condensable gas (NCG) removal system design and engineering, pressure vessel’s process engineering and selection, pipeline sizing, valve selection and PIDs with KKS labelling.  BacMan Geothermal Rehabilitation Project - BacMan I & II (2010), South Eastern Luzon, Philippines, Energy Development Corporation (EDC). Design engineer. Undertook existing/new Gas Removal System (GRS) and main steam piping engineering, including pipeline sizing, pressure drop, and piping layout and design with AutoPIPE.  Patuha Geothermal Power Station (2009), Patuha, Indonesia, Geo Dipa Energi. Lead design engineer. Responsible for geothermal steam field performance modeling and optimization, piping design, process engineering and preparation of plant specifications for the proposed 55 MW power station at Patuha, south of Bandung. Work was carried out in the client’s office in Jakarta, with site visits to gather information.  Kawerau 100 MW Geothermal Power Binary Plant (2008), Kawerau, New Zealand, Mighty River Power. Engineer. Setup a spreadsheet model with VBA functions of geothermal field piping work, and undertook the pipe system performance (pressure drop, flow rate and enthalpy) analysis of removing and adjusting branch line control valves.  Te Mihi Geothermal Power Binary Plant (2008), Wairakei, New Zealand, Contact Energy. Design engineer. Undertook preliminary engineering, e.g. pressure vessel’s process engineering and selection, pipeline sizing, valve selection and PIDs with KKS labelling.  Pipe Stress Analysis (2009), Auckland, New Zealand, Mighty River Power. Engineer. Undertook the study of pipe stress analysis (ASME B31.1) regarding the using nominal pipe wall thickness, and the review of design transient issue of a steam field piping system with comparing different piping design standards and codes (including Australia standard: AS 4041-2006).  Nga Awa Purua 130 MW Geothermal Power Plant (2009), Taupo, New Zealand, Mighty River Power. Engineer. Steam field production and reinjection control valve operation principles, steam field pipe line and valve spec from PIDs with KKS labelling.  Pipe Two-phase Flow Model Study and Improvement (2009), Auckland, New Zealand. In-house development. Engineer. Undertook the study and comparison of Harrison method with Zhao method, programmed Zhao method with corrections and fitting corrections into PB’s two-phase flow model.  Evaluation of Design Cost Effectiveness of Geothermal Pipe Support Design (2009), Auckland, New Zealand. In-house development. Engineer. Undertook the study on PB’s pipe support span, foundation, stanchion and head, and the comparison with other designs to evaluate PB’s pipe support design in terms of cost effectiveness.  Data transferring from AutoPIPE to Pipe Support Design Model (2009), Auckland, New Zealand. In- house development. Engineer. Recoded the data transferring programme from new AutoPIPE version (XM) report document to pipe support design spreadsheet model.  Nga Awa Purua Piping Design (2008), Taupo, New Zealand, Mighty River Power. Design engineer. Undertook piping system preliminary design using AutoPipe for steam field design bid preparation. Gas and water piping  Waterview Tunnel Project Detail Design (2013), New Zealand, NZTA. Piping design engineer, Undertook buried gas main piping above tunnel assessment due to settlements and deigned this piping by using AutoPIPE and NozzlePRO.  Pantabangan Hydro Power Plant Tail Water Depression (2012), Philippes. Piping design engineer, Undertook piping design of compressed air supply form air receiver to draft tube to withstand negative 112o C/41barg by using AutoPIPE and NozzlePRO.  Victoria Desalination Plant (2010), Melbourne, Vic., Australia, Thiess Degrement Joint Venture (TDJV). Piping design engineer. Undertook piping design (AutoPIPE) within Transfer Pump Station (TPS) and Booster Pump Station (BPS), flexible joints (belows) engineering and fittings design, piping support and pump nozzle loads investigation and analysis to reduce the loads. THORNDON COOK 13/03/2016 2
  • 3. Charles Zhang Power  KEPCO Cebu Unit 2 I/LP Steam Turbine (103MW), Root Cause Investigation of Rotor Bow (2012), Philippes. Engineer. Undertook analysis turbine operation history data, installation and maintenance information, and figured out the main reason which caused the turbine rotor bow.  2x150 MW 60Hz Jaguar CFB Coal-based Power Plant (2009), Guatemala, AEI., Owner’s Engineer. Lead engineer. Responsible for turbine technical support, procurement support, document and design review and Chinese language support, factory test witness, and construction and commissioning supervision.  Huntly Power Station (2008), Huntly, New Zealand, Genesis Energy. Engineer. Undertook investigation of technologies of carbon capture and storage (CCS) for power generation and reviewing the current status of technologies of CCS worldwide.  Ma’adam 6x340 MW Oil Fired Power Plant (2009), Saudi Arabia, Saudi National Mining. Engineer. Undertook investigation about the capability of reducing NOx technology (Tangential Tilting Burning) of Harbin Boiler Co. (China).  Anhui Hefei No. 2 2x350 MW Power Plant (2009), Anhui Province, China, Anhui Hefei United Power. Engineer. Undertook technical document review and Chinese language support. Previous experience Project management  Managing Director of a photo processing company, (2003-2008), Auckland, New Zealand. Programming  Analyst/programmer; programming languages: Dephi, VB & C++; databases: SQL Server & Oracle, (1998-2003), Auckland, New Zealand. Thermal power generation  Turbine & Thermal Cycle Dept, (1987-1995), China, Xi’an Thermal Power Research Institute (National Headquarters). Engineer. Specialist in turbine machines and thermal systems efficiency and reliability, including cogeneration systems.  Project manager for installation and commissioning of Jiu Quan Iron and Steel Company thermal cogeneration power plant. Also personally supervised the installation of the steam turbine and commissioning / troubleshooting of the power plant.  Project manager for the redesign of the steam turbine exhaust cooling water system and spray nozzles to enhance steam turbine efficiency and to avoid water damage to last stage blades.  Project manager for the redesign of the drainage system for a steam turbine to avoid condensing water coming into the turbine steam path and damaging the turbine blades and diaphragms for the Changchun Automobile Manufacture Ltd’s power plant. Publications  Charles Zhang 2010, ‘Optimisation of a Geothermal Steamfield Conceptual Design with Its Power Plant’. GeoNZ 2010, The University of Auckland. Professional history 2015 – present Thorndon Cook 2008 – 2015 Parsons Brinckerhoff 2003 – 2008 Photoland Ltd 1998 – 2003 Greenwood Technology 1987 – 1995 Xi’an Thermal Power Research Institute, China THORNDON COOK 13/03/2016 3