SlideShare a Scribd company logo
1 of 23
Download to read offline
I SQUARE ENGINEERS
( ENERGY) Pvt. Ltd.
PROFILE
Established: 2007
ISE
ENERGY
Mission Statement
• To be an engineering company providing good
quality service to Power Plant Consultants,
Developers, Contractors.
– Project Development conceptual Studies.
– Advisory on Project Engineering
– Hydro Project Engineering
– Detailed System and Field Engineering
– Building Services Engineering
– Manpower Support for Large EPC Contractors
– Project System engineering capability enhancement
through tie up with Russian engineering firm.
The Team
• Arvind Srivastava
• K.Krishnan
• R. Suresh Mohan
• A team of young engineers.
• Back up from other consulting firm.
• Panel of Experts available to tackle specific issues.
• International partner(Russian) brings in special area
expertise.
• Tie up with Canadian partner for Turbine Hot Gas Path
life Assessment and remedial solutions
THE TEAM
Arvind Srivastava
 30 years in Power Sector with wide experience in India
and abroad in Hydro and Thermal projects.
 Worked with NEEPCO, Toshiba, GVK and has helped to
develop Power Plant business for a Saudi Company.
 Carried out system improvement studies for Hyderabad,
R&M study for TB Dam Authorities, Energy efficiency
study.
 Involvement in project engineering, management,
development fields.
The Team
• K. Krishnan
 25 years experience in Power Plant Electrical
Engineering & Construction.
 Worked with Toshiba, L&T (ECC Group) and handled
projects in India and Abroad.
 Well experienced in handling Electrical bulk engineering
(Cabling, Raceways, Grounding, Lightning Protection,
Lighting etc) for Large Thermal, Combined Cycle and
Hydro Power projects in India & Abroad.
The Team
• R.Suresh Mohan, BE, MBA
 37 years experience in Power Sector.
 Worked with BHEL, Sumitomo Corporation, KSK group.
 Widely connected and experienced in Project
Development and Project Commercial aspects.
The Team
• Team
 17 engineers working for inhouse engineering
comprising of electrical, mechanical and instrumentation
expertise.
 Experienced ( 20 yr plus) site managers- 3 nos on
permanent roll.
 Experienced team of supervisors and technicians ( 6
nos) on permanent roll.
 Access to source skilled manpower for site construction
requirement depending on site requirements.
TOOLS
 Software for design calculations
 Authorized Design software
 Skilled professionals using the software tools.
 Ability to draw resources from University and Retired
Power plant professionals.
 Basic tools to handle electrical and instrumentation
erection services.
HANDOVER
I SQUARE SERVICES - ENGINEERING, PROCUREMENT, CONSTRUCTION
MANAGEMENT
IMPLEMENTATION
FEASIBILITY
STUDY
DETAILED ENGINEERING
CONSTRUCTION ENGINEERING
PROCUREMENT SUPPORT
MANPOWER FOR ERECTION
ADVISORY ON R&M
MARKET SURVEYS
PRELIMINARY PROJECT
PLANNING
SYSTEM ENGINEERING
TECHNOLOGICAL KNOW-HOW
TRAINING
MANPOWER FOR O &M
ECONOMIC ANALYSIS
PROJECT FINANCING ADVISORY
FEASIBILITY STUDY
E
X
P
E
R
I
E
N
C
E
A.THERMAL CLIENT
1 750MW CCPP in Malaysia - completed Toshiba
2 60MW Co Gen CCPP in Thailand - completed Toshiba
3 2x700MW TPP in Indonesia – completed Toshiba
4
Engineering work for 80MW Combined Cycle project at
Keramasan, Indonesia Toshiba
5 Engineering for 55MW Geo Thermal Project in Indonesia Toshiba
6 Elect Engg for 2x 600MW VISA Power Project, Chattisgarh TPL
7 Engineering support to Konaseema CCPP. Konaseema
8
Elect Engg for 240MW CCPP in Tanzania, 133MW Bovin Cogen
and 60MW Co-gen in Thailand.- Ongoing Toshiba
9
Electrical Engineers for BOP contractors for 2x250MW , 1x600MW
& 1x500MW TPP. Indu/Toshiba
10 Bidding engineering for switchyards upto 400 KV.
FEASIBILITY STUDY, DPR & DETAILED ENGINEERING
ASSIGNMENTS
E
X
P
E
R
I
E
N
C
E
11
Owner’s Engineer for 2x150MW Coal fired TPP in AndhraPradesh.
Prepared DPR & EPC specification. Mecwell
12
Owner’s Engineer for 12MW Captive CO-Generation Bio Mass
Thermal Project. SVPL
13
Detailed Field Elect engineering of BTG block for 2x 300MW
Dhariwal TPP PunjLlyod
14 Conceptual Engineering for Bio-Mass to Energy for a Tea Garden Makaibari
15 System Integration Engineering of 25MW & 8MW Solar PV plants. INDU
B. INDUSTRIAL
CLIENT
1 Elect Engg for SMS-2 of Rastriya Ispat, Visakhapatnam TPL
2 Elect Engg for COB-4 of Rastriya Ispat, Visahakaptnam TPL
3 Electrical Engineering for Tata Steel Expansion , Jamshedpur TPL
4 Elect Engg for STM of Rastriya Ispat, Vishakapatnam TPL
5
Engineering work for JSW Tandem Cold Mill (CRM#2) from
TMEIC, Japan. TMEIC
6
Electrical Engineering for Clean room handling contractor in a
Pharmaceutical Industry. CRP
7
System study and Specification for Revamping Electrical
Distribution of Kakinada Deep Water Port KDWSPA
FEASIBILITY STUDY, DPR & DETAILED ENGINEERING
ASSIGNMENTS
E
X
P
E
R
I
E
N
C
E
C. HYDRO
CLIENT
1 4X225MW Purulia Pumped Storage HE Project - Engineering TOSHIBA
2
Owner’s Engineer for pre- Financial closure for4x3MW Small HEP on
Godavari canal. Prepared DPR . PSM
3 Engineering & Project Mgmt for 500KW &1200 KW Machgunda MHP.
GSSMR
Energy
4 Owner’s Engineer for a River Basin Development in Meghalaya. Manjeera
5 Prepared DPR for a 2x1.5 MW Small HEP in A.P. GRR
6
6MW Small Hydro Electric Project in Himachal Pradesh- Detailed
Engineering Sal Project
ERECTION & EPC ORDERS
CLIENT
1. Erection services for Hail-II Gas Turbine Project, KSA Alfanar
2 Executing 12 MW Bio Mass plant on EPC basis in A.P. SVPL
3
Electrical & Instrumentation Erection of Turbine-Gen of 5x800MW
UMPP, Mundra, Gujarat TOSHIBA
FEASIBILITY STUDY, DPR & DETAILED
ENGINEERING ASSIGNMENTS
ERECTION & EPC ORDERS
CLIENT
4. Pre- Erection services for 2X660MW NTPC, Meja Thermal
Project TOSHIBA
5.
Pre- Erection services for 3x800MW NTPC , Kudigi
Thermal Project TOSHIBA
6
Solar Micro Grid electrification of villages in Sunderbans
, West Bengal Mlinda
How is ISE different?
4000MW UMPP, Mundra
(View from Switchyard side)
4000MW UMPP, Mundra
(ISE Engineer )
4000MW UMPP, Mundra
(Turbine)
4000MW UMPP, Mundra
(Control Room)
CLIENTS CERTIFICATE
SITE OFFICE CONSTRUCTION
Site Office at 2x 660MW MEJA TPP
Site Office at 3x 800MW KUDIGI TPP
SVPL 12 MW Captive Cogeneration Plant at
Kannavaram, AP
(Erection work in progress)
C
O
N
T
A
C
T
U
S
217B, MIGH
(Behind Yellama Temple)
S.R. NAGAR,
Hyderabad-500038
India
•Ph: +91- 40-23812301
23
ISE
ENERGY

More Related Content

What's hot

resume_om_Nov2014
resume_om_Nov2014resume_om_Nov2014
resume_om_Nov2014
Om Jangid
 
Raj_Electrical Designer.doc
Raj_Electrical Designer.docRaj_Electrical Designer.doc
Raj_Electrical Designer.doc
Dinesh Raj
 
SHAIK IRFAN VALI resume (solar)
SHAIK IRFAN VALI  resume (solar)SHAIK IRFAN VALI  resume (solar)
SHAIK IRFAN VALI resume (solar)
Irfan Vali
 
CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15
Santosh Singh
 
WLP-DOC-003-Capability Statement - short version_1
WLP-DOC-003-Capability Statement - short version_1WLP-DOC-003-Capability Statement - short version_1
WLP-DOC-003-Capability Statement - short version_1
Nigel Hotston
 
Resume_Ravinder Kumar Raina dtd 080516
Resume_Ravinder Kumar Raina dtd 080516Resume_Ravinder Kumar Raina dtd 080516
Resume_Ravinder Kumar Raina dtd 080516
Ravinder Raina
 
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERINGRESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
pappu kumar
 
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution
Raushan Kumar
 
Resume for Electrical design engineer
Resume for Electrical design engineerResume for Electrical design engineer
Resume for Electrical design engineer
NISHITKUMAR JOSHI
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
Bokam Divakar
 

What's hot (20)

resume_om_Nov2014
resume_om_Nov2014resume_om_Nov2014
resume_om_Nov2014
 
Raj_Electrical Designer.doc
Raj_Electrical Designer.docRaj_Electrical Designer.doc
Raj_Electrical Designer.doc
 
SHAIK IRFAN VALI resume (solar)
SHAIK IRFAN VALI  resume (solar)SHAIK IRFAN VALI  resume (solar)
SHAIK IRFAN VALI resume (solar)
 
ANIL_UPDATED_RESUME
ANIL_UPDATED_RESUMEANIL_UPDATED_RESUME
ANIL_UPDATED_RESUME
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
 
Anshul_Resume
Anshul_Resume Anshul_Resume
Anshul_Resume
 
Laxmi narayan's resume
Laxmi narayan's resumeLaxmi narayan's resume
Laxmi narayan's resume
 
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
 
CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15
 
Electrical engineer cv.
Electrical engineer cv.Electrical engineer cv.
Electrical engineer cv.
 
WLP-DOC-003-Capability Statement - short version_1
WLP-DOC-003-Capability Statement - short version_1WLP-DOC-003-Capability Statement - short version_1
WLP-DOC-003-Capability Statement - short version_1
 
RAJEEV-RESUME
RAJEEV-RESUMERAJEEV-RESUME
RAJEEV-RESUME
 
Resume
ResumeResume
Resume
 
Resume_Ravinder Kumar Raina dtd 080516
Resume_Ravinder Kumar Raina dtd 080516Resume_Ravinder Kumar Raina dtd 080516
Resume_Ravinder Kumar Raina dtd 080516
 
tufail CV dxb
tufail CV dxbtufail CV dxb
tufail CV dxb
 
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERINGRESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
 
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution
 
Electrical Engineer C.V
Electrical Engineer C.VElectrical Engineer C.V
Electrical Engineer C.V
 
Resume for Electrical design engineer
Resume for Electrical design engineerResume for Electrical design engineer
Resume for Electrical design engineer
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
 

Similar to I_SQUARE_PROFILE. A (20)

Resume - Raveendra S
Resume - Raveendra SResume - Raveendra S
Resume - Raveendra S
 
New CV M.Yasir Saleem IM NEDUET
New CV M.Yasir Saleem IM NEDUETNew CV M.Yasir Saleem IM NEDUET
New CV M.Yasir Saleem IM NEDUET
 
nazeemres
nazeemresnazeemres
nazeemres
 
Resume_Sunil kumar Singh
Resume_Sunil kumar SinghResume_Sunil kumar Singh
Resume_Sunil kumar Singh
 
Manish_Sagar 4 Year
Manish_Sagar 4 YearManish_Sagar 4 Year
Manish_Sagar 4 Year
 
cv_amitava_updated
cv_amitava_updatedcv_amitava_updated
cv_amitava_updated
 
Resume
ResumeResume
Resume
 
Engr. Zeeshan's resume KSA
Engr. Zeeshan's resume KSAEngr. Zeeshan's resume KSA
Engr. Zeeshan's resume KSA
 
Vignesh_Sr.Elec Designer
Vignesh_Sr.Elec DesignerVignesh_Sr.Elec Designer
Vignesh_Sr.Elec Designer
 
CV
CVCV
CV
 
Resume
ResumeResume
Resume
 
CVIPL-PROFILE
CVIPL-PROFILECVIPL-PROFILE
CVIPL-PROFILE
 
Document
DocumentDocument
Document
 
Udai
UdaiUdai
Udai
 
Sutharvinu - Electrical Design engineer
Sutharvinu - Electrical Design engineerSutharvinu - Electrical Design engineer
Sutharvinu - Electrical Design engineer
 
Mayur
MayurMayur
Mayur
 
Engr. yasir haleem cv
Engr. yasir haleem cvEngr. yasir haleem cv
Engr. yasir haleem cv
 
SANJEEV KUMAR
SANJEEV KUMARSANJEEV KUMAR
SANJEEV KUMAR
 
Resume
ResumeResume
Resume
 
Sharath_CV
Sharath_CVSharath_CV
Sharath_CV
 

I_SQUARE_PROFILE. A

  • 1. I SQUARE ENGINEERS ( ENERGY) Pvt. Ltd. PROFILE Established: 2007 ISE ENERGY
  • 2. Mission Statement • To be an engineering company providing good quality service to Power Plant Consultants, Developers, Contractors. – Project Development conceptual Studies. – Advisory on Project Engineering – Hydro Project Engineering – Detailed System and Field Engineering – Building Services Engineering – Manpower Support for Large EPC Contractors – Project System engineering capability enhancement through tie up with Russian engineering firm.
  • 3. The Team • Arvind Srivastava • K.Krishnan • R. Suresh Mohan • A team of young engineers. • Back up from other consulting firm. • Panel of Experts available to tackle specific issues. • International partner(Russian) brings in special area expertise. • Tie up with Canadian partner for Turbine Hot Gas Path life Assessment and remedial solutions
  • 4. THE TEAM Arvind Srivastava  30 years in Power Sector with wide experience in India and abroad in Hydro and Thermal projects.  Worked with NEEPCO, Toshiba, GVK and has helped to develop Power Plant business for a Saudi Company.  Carried out system improvement studies for Hyderabad, R&M study for TB Dam Authorities, Energy efficiency study.  Involvement in project engineering, management, development fields.
  • 5. The Team • K. Krishnan  25 years experience in Power Plant Electrical Engineering & Construction.  Worked with Toshiba, L&T (ECC Group) and handled projects in India and Abroad.  Well experienced in handling Electrical bulk engineering (Cabling, Raceways, Grounding, Lightning Protection, Lighting etc) for Large Thermal, Combined Cycle and Hydro Power projects in India & Abroad.
  • 6. The Team • R.Suresh Mohan, BE, MBA  37 years experience in Power Sector.  Worked with BHEL, Sumitomo Corporation, KSK group.  Widely connected and experienced in Project Development and Project Commercial aspects.
  • 7. The Team • Team  17 engineers working for inhouse engineering comprising of electrical, mechanical and instrumentation expertise.  Experienced ( 20 yr plus) site managers- 3 nos on permanent roll.  Experienced team of supervisors and technicians ( 6 nos) on permanent roll.  Access to source skilled manpower for site construction requirement depending on site requirements.
  • 8. TOOLS  Software for design calculations  Authorized Design software  Skilled professionals using the software tools.  Ability to draw resources from University and Retired Power plant professionals.  Basic tools to handle electrical and instrumentation erection services.
  • 9. HANDOVER I SQUARE SERVICES - ENGINEERING, PROCUREMENT, CONSTRUCTION MANAGEMENT IMPLEMENTATION FEASIBILITY STUDY DETAILED ENGINEERING CONSTRUCTION ENGINEERING PROCUREMENT SUPPORT MANPOWER FOR ERECTION ADVISORY ON R&M MARKET SURVEYS PRELIMINARY PROJECT PLANNING SYSTEM ENGINEERING TECHNOLOGICAL KNOW-HOW TRAINING MANPOWER FOR O &M ECONOMIC ANALYSIS PROJECT FINANCING ADVISORY FEASIBILITY STUDY
  • 10. E X P E R I E N C E A.THERMAL CLIENT 1 750MW CCPP in Malaysia - completed Toshiba 2 60MW Co Gen CCPP in Thailand - completed Toshiba 3 2x700MW TPP in Indonesia – completed Toshiba 4 Engineering work for 80MW Combined Cycle project at Keramasan, Indonesia Toshiba 5 Engineering for 55MW Geo Thermal Project in Indonesia Toshiba 6 Elect Engg for 2x 600MW VISA Power Project, Chattisgarh TPL 7 Engineering support to Konaseema CCPP. Konaseema 8 Elect Engg for 240MW CCPP in Tanzania, 133MW Bovin Cogen and 60MW Co-gen in Thailand.- Ongoing Toshiba 9 Electrical Engineers for BOP contractors for 2x250MW , 1x600MW & 1x500MW TPP. Indu/Toshiba 10 Bidding engineering for switchyards upto 400 KV. FEASIBILITY STUDY, DPR & DETAILED ENGINEERING ASSIGNMENTS
  • 11. E X P E R I E N C E 11 Owner’s Engineer for 2x150MW Coal fired TPP in AndhraPradesh. Prepared DPR & EPC specification. Mecwell 12 Owner’s Engineer for 12MW Captive CO-Generation Bio Mass Thermal Project. SVPL 13 Detailed Field Elect engineering of BTG block for 2x 300MW Dhariwal TPP PunjLlyod 14 Conceptual Engineering for Bio-Mass to Energy for a Tea Garden Makaibari 15 System Integration Engineering of 25MW & 8MW Solar PV plants. INDU B. INDUSTRIAL CLIENT 1 Elect Engg for SMS-2 of Rastriya Ispat, Visakhapatnam TPL 2 Elect Engg for COB-4 of Rastriya Ispat, Visahakaptnam TPL 3 Electrical Engineering for Tata Steel Expansion , Jamshedpur TPL 4 Elect Engg for STM of Rastriya Ispat, Vishakapatnam TPL 5 Engineering work for JSW Tandem Cold Mill (CRM#2) from TMEIC, Japan. TMEIC 6 Electrical Engineering for Clean room handling contractor in a Pharmaceutical Industry. CRP 7 System study and Specification for Revamping Electrical Distribution of Kakinada Deep Water Port KDWSPA FEASIBILITY STUDY, DPR & DETAILED ENGINEERING ASSIGNMENTS
  • 12. E X P E R I E N C E C. HYDRO CLIENT 1 4X225MW Purulia Pumped Storage HE Project - Engineering TOSHIBA 2 Owner’s Engineer for pre- Financial closure for4x3MW Small HEP on Godavari canal. Prepared DPR . PSM 3 Engineering & Project Mgmt for 500KW &1200 KW Machgunda MHP. GSSMR Energy 4 Owner’s Engineer for a River Basin Development in Meghalaya. Manjeera 5 Prepared DPR for a 2x1.5 MW Small HEP in A.P. GRR 6 6MW Small Hydro Electric Project in Himachal Pradesh- Detailed Engineering Sal Project ERECTION & EPC ORDERS CLIENT 1. Erection services for Hail-II Gas Turbine Project, KSA Alfanar 2 Executing 12 MW Bio Mass plant on EPC basis in A.P. SVPL 3 Electrical & Instrumentation Erection of Turbine-Gen of 5x800MW UMPP, Mundra, Gujarat TOSHIBA FEASIBILITY STUDY, DPR & DETAILED ENGINEERING ASSIGNMENTS
  • 13. ERECTION & EPC ORDERS CLIENT 4. Pre- Erection services for 2X660MW NTPC, Meja Thermal Project TOSHIBA 5. Pre- Erection services for 3x800MW NTPC , Kudigi Thermal Project TOSHIBA 6 Solar Micro Grid electrification of villages in Sunderbans , West Bengal Mlinda
  • 14. How is ISE different?
  • 15. 4000MW UMPP, Mundra (View from Switchyard side)
  • 20. SITE OFFICE CONSTRUCTION Site Office at 2x 660MW MEJA TPP Site Office at 3x 800MW KUDIGI TPP
  • 21. SVPL 12 MW Captive Cogeneration Plant at Kannavaram, AP (Erection work in progress)
  • 22. C O N T A C T U S 217B, MIGH (Behind Yellama Temple) S.R. NAGAR, Hyderabad-500038 India •Ph: +91- 40-23812301