AMJATH CHANBASHA
Contact No’s.: +971-504670350, +91-7200173107 E-Mail: c.amjathkhan@gmail.com
In pursuit of challenging and enriching assignments in Site Management/ Project Management
With an organization of high repute
SNAPSHOT
 A result oriented professional with 5.1 years of experience in Site Management and Project Management.
 Rich experience in Scheduling (Primavera 6), Monitoring & Control, EOT and report's
EMPLOYMENT RECITAL
From July'11 –Dec'14 at ETA MNE as a Planning Engineer
From Jan’15 – Feb’16 at VOLTAS Ltd as a Planning Engineer.
From June’16 till date at AE ARMA ELEKTROPANC as a Planning Engineer.
AREA OF EXPERIENCE
Project Management
 Planning and scheduling all involved activities in the project.
 Planning, Allocation, Leveling and Projection of Resources.
 Determining Construction Methodology based on the Design, Contract Duration and Schedule.
 Preparation of Preliminary Planning and Detailed Planning of Construction activities.
 Involved in determining the risks associated with the project during the construction phase.
Site Project Planning, Scheduling and Monitoring
 Preparation of Baseline program, Work Breakdown Structure, milestones, Critical Path
 Micro level planning on daily/weekly/monthly basis
 Tracking project with respect to Baseline and Milestones to the Actual Progress at site
 Ensure the completion of activity planned on the respective time
 Preparation of Action plan schedule if required
 Generating Cash flow through cost loaded program.
 Generating various Project monitoring deliverables to assist management in proper control.
WORK EXPERIENCE
From June’16 till date at AE ARMA ELEKTROPANC ,BLUE WATERS WHARF RETAIL, DUBAI,as
Planning Engineer
Title: BLUE WATERS WHARF RETAIL, DUBAI.
Client: MIRAGE.
Engineering Consultant: WSP.
Main Contractor: AL JABER L.E.G.T ENGINEERING &CONTRACTING(ALEC)L.LC.
MEP Contractor: AE ARMA ELEKTROPANC.
Value: AED 235 Million Dirhams
Description: Project comprised of Basements, Retail shops.
Responsibility
 Planning, Scheduling, Monitoring and Controlling construction activities.
 Preparation of Baseline program with cost and recourse loading for the project as per the scope of work using
primavera 6.
 Preparation weekly and Monthly reports.
 Tracking the progress at site
 Progress Monitoring and Reporting to Top Management.
 Preparation of KPI.
From Jan’15–Feb’16 at Voltas Ltd,REGENT EMIRATES PEARL HOTEL, Abu Dhabi,as Planning Engineer
Title: THE REGENT EMIRATES PEARL HOTEL- ABU DHABI
Client: EMIRATES PEARL FOR DEVELOPMENT & INVESTMENT LLC.
Engineering Consultant: ARKAN ARCHITECTS CONSULTANTS.
Main Contractor: ARABIAN CONSTRUCTION COMPANY.
MEP Contractor: VOLTAS LIMITED.
Value: AED 270 Million Dirhams
Description: Project comprised of Basements, Podiums and Tower.
Responsibility
 Planning, Scheduling, Monitoring and Controlling construction activities.
 Preparation of Baseline program with cost and recourse loading for the project as per the scope of work using
primavera 6.
 Preparation of Extension of Time (E.O.T) Program due to changes in scope of work.
 Preparation of S-curve.
 Preparation of Dash board.
 Tracking the progress at site
 Progress Monitoring and Reporting to Top Management.
From June’14 –Dec’14 at ETA MNE (Emirates Technical Associates) CONSTRUCTION & MAINTENANCE
OF OFFICERS VILLA, Abu Dhabi, as Planning Engineer
Title: CONSTRUCTION & MAINTENANCE OF OFFICERS VILLA MUSSAFAH- ABU DHABI
Client: ABU DHABI POLICE GHQ
Project Manager: ACCURATE PROJECT MANAGEMENT – ABU DHABI
Engineering Consultant: KN INTERNATIONAL ARCHITECTS & ENGINEERS LLC.
Main Contractor: CHIEF CONTRACTING LLC.
Civil Contractor: SQUARE GENERAL CONTRACTING COMPANY
MEP Contractor: Emirates Technical Associates (ETA M&E Division)
Value: AED 48.5 Million Dirhams
Description: Project comprised of 129 villas of Type-I and Type-II. Type-I is 4 Bed room villas-76 nos, and Type-II
is 5 Bed room Villas-53nos.
Responsibility
 Preparation of Baseline program with cost and recourse loading for the project as per the scope of work using
primavera 6.
 Preparation of 2 week and 4 week look ahead program.
 Program Update on weekly & Monthly basis.
 Tracking the progress at site
 Maintaining the status of project deliverables such as drawings & material deliveries logs.
 Preparation of Manpower Histogram.
From Sep’12to June’14 at ETA MNE (Emirates Technical Associates)CCAD, Abu Dhabi, as Planning Engineer
Title: Cleveland Clinic, Abu Dhabi
Client: MUBADALA
Project Manager: JACOBS Engineering Group
Engineering Consultant: KEO International Consultants
Main Contractor: Samsung –Six Construct Joint Venture
MEP Contractor: Emirates Technical Associates (ETA M&E Division)
Value: AED 1.63 Billon Dirhams
Description: Cleveland Clinic Abu Dhabi was a multi-specialty hospital. It comprised of 7 buildings, which were
D&T, Clinic, Gallery, ICU, Swing-wing, Car park & Patient Tower. This medical center project was based on Cleve
land clinic, Ohio, United States. This was Multi International Hospital in the Gulf region.
Responsibility
 Planning, Scheduling, Monitoring and Controlling construction activities.
 Program Update on weekly & Monthly basis.
 Tracking the progress at site.
 Preparation of S-Curve.
 Preparation Demobilization Plan for staffs and workers.
 Preparation of Testing and Commissioning Report.
 Maintaining the status of project deliverables such as drawings & material deliveries logs.
 Progress Monitoring and Reporting to Top Management.
From July’11-Sep’12 at ETA MNE (Emirates Technical Associates) C3-Airport ,Dubai, as Planning Engineer
 Title: Dubai International Airport Terminal 3 Expansion(Phase-II)Concourse-3, Dubai.
 Client: DCA
 Engineering Consultant: DAR
 Main Contractor: ALEC
 MEP Contractor: Emirates Technical Associates (ETA M&E Division)
 Value: AED 2.2 Billon Dirhams
 Description: Airport C3 comprised of 11 levels, which were Basement-3,Basement-2,Basement-
1,Apron,Arrival,Departure,First Class Lounge, Business Class Lounge, Hotel level-1,Hotel Level-2,Hotell
Roof.
Responsibility
 Planning, Scheduling, Monitoring and Controlling construction activities.
 Preparation of Baseline program with cost and recourse loading for the project as per the scope of work using
primavera 6.
 Program Update on weekly & Monthly basis.
 Tracking the progress with respect to the progress at site.
 Rolling Schedules like Two/ Four Week Look Ahead etc
 Coordination with Construction Managers, Site Project Managers, Sub-Contractors, QS& Site Engineers
 Action Plan / Catch-up program if required.
 Maintaining the status of project deliverables such as drawings & material deliveries logs.
 Progress Monitoring and Reporting to Top Management.
 Earned Value Analysis & Integrated S curve through software applications.
From Nov’10-Mar’11 at ETA UNISTAR (Emirates Technical Associates) AT KING ABDULLAH
FINANCIAL DISTRICT,Riyadh as a Planning Engineer.
 Monitoring Chart Preparation.
 Preparing and Updating Shop drawing Submittal log.
 Organization Chart Preparation.
 Daily Progress Report Preparation.
 Preparation of Construction Program and Updating in P6.
SOFTWARE KNOWN
 Primavera Project Planning Software P6 V8.2.
 MS Project.
 Office Packages: Microsoft Office (Word, Excel, Power Point).
EDUCATION DETAILS
2010 PG-Advanced Construction Management from NICMAR (National Institute of Construction Management &
Research), Goa
2008 B.E-Electrical and Electronics Engineering from C.Abdul Hakeem College of Engineering and
Technology, Melvisharam Vellore, TamilNadu, India.
PERSONAL DETAILS
Date of Birth: 07 May 1987
Father Name: Chan Basha
Nationality: Indian
Passport No.: G8789681
Date of Issue: 19 Jun, 2008
Visa Details: Residence
Date of Expiry: 18 Jun, 2018
Place of Issue: Chennai, Tamil Nadu.
Hobbies Playing Volley Ball, Table Tennis, Cricket & singing
Languages Known: English, Urdu, Tamil, and Hindi
Permanent Address: 1/13Muslim Street, Veppankuppam, G.R.Palayam (Via), Vellore-632107, Tamilnadu.
Declaration:
I do hereby certify that the above information furnished by me is true to the best of my knowledge.
(Amjath Chanbasha)

More Related Content

What's hot

Planning Engineer Resume-mech
Planning Engineer Resume-mechPlanning Engineer Resume-mech
Planning Engineer Resume-mechMohammed Maqsood
 
CV GUERRERO, AIMEE G._Network Planning Engineer - Data Analyst - Project Mana...
CV GUERRERO, AIMEE G._Network Planning Engineer - Data Analyst - Project Mana...CV GUERRERO, AIMEE G._Network Planning Engineer - Data Analyst - Project Mana...
CV GUERRERO, AIMEE G._Network Planning Engineer - Data Analyst - Project Mana...Aimee Guerrero, ECE
 
nizamuddinG Planning Engineer
nizamuddinG Planning EngineernizamuddinG Planning Engineer
nizamuddinG Planning Engineerghulam nizamuddin
 
Updated IRFAN AHAMED CV (2)
Updated IRFAN AHAMED CV (2)Updated IRFAN AHAMED CV (2)
Updated IRFAN AHAMED CV (2)Irfan ahamed
 
Resume(Ali Mohebbi)
Resume(Ali Mohebbi)Resume(Ali Mohebbi)
Resume(Ali Mohebbi)Ali Mohebbi
 
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanMohideen Sheik Asan
 
Amjad - Planning Manager
Amjad - Planning ManagerAmjad - Planning Manager
Amjad - Planning ManagerAmjad Nawaz
 
Mahmoud Makram-Planning Engineeer-CV
Mahmoud Makram-Planning Engineeer-CVMahmoud Makram-Planning Engineeer-CV
Mahmoud Makram-Planning Engineeer-CVMahmoud Makram
 
CV-Atif_Ashraf-4
CV-Atif_Ashraf-4CV-Atif_Ashraf-4
CV-Atif_Ashraf-4Atif Ashraf
 
Jordan Wallins Resume Sep 16
Jordan Wallins Resume Sep 16Jordan Wallins Resume Sep 16
Jordan Wallins Resume Sep 16Jordan Wallins
 
Muhammad Yamin (CV)
Muhammad Yamin (CV)Muhammad Yamin (CV)
Muhammad Yamin (CV)Najam Awan
 
A2) CV - July 2016 incl. EXXON & NES-BHP
A2) CV - July 2016 incl. EXXON & NES-BHP A2) CV - July 2016 incl. EXXON & NES-BHP
A2) CV - July 2016 incl. EXXON & NES-BHP Robert Romero
 

What's hot (20)

Planning Engineer Resume-mech
Planning Engineer Resume-mechPlanning Engineer Resume-mech
Planning Engineer Resume-mech
 
CV GUERRERO, AIMEE G._Network Planning Engineer - Data Analyst - Project Mana...
CV GUERRERO, AIMEE G._Network Planning Engineer - Data Analyst - Project Mana...CV GUERRERO, AIMEE G._Network Planning Engineer - Data Analyst - Project Mana...
CV GUERRERO, AIMEE G._Network Planning Engineer - Data Analyst - Project Mana...
 
Planning Engineer CV
Planning Engineer CVPlanning Engineer CV
Planning Engineer CV
 
nizamuddinG Planning Engineer
nizamuddinG Planning EngineernizamuddinG Planning Engineer
nizamuddinG Planning Engineer
 
12741
1274112741
12741
 
Tanveer Sr Planning Engineer
Tanveer Sr Planning EngineerTanveer Sr Planning Engineer
Tanveer Sr Planning Engineer
 
Nawaz Eng-OCT
Nawaz Eng-OCTNawaz Eng-OCT
Nawaz Eng-OCT
 
Updated IRFAN AHAMED CV (2)
Updated IRFAN AHAMED CV (2)Updated IRFAN AHAMED CV (2)
Updated IRFAN AHAMED CV (2)
 
Resume(Ali Mohebbi)
Resume(Ali Mohebbi)Resume(Ali Mohebbi)
Resume(Ali Mohebbi)
 
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik Asan
 
selva-cv
selva-cvselva-cv
selva-cv
 
Amjad - Planning Manager
Amjad - Planning ManagerAmjad - Planning Manager
Amjad - Planning Manager
 
Mahesh - Resume (3)
Mahesh -   Resume (3)Mahesh -   Resume (3)
Mahesh - Resume (3)
 
Mahmoud Makram-Planning Engineeer-CV
Mahmoud Makram-Planning Engineeer-CVMahmoud Makram-Planning Engineeer-CV
Mahmoud Makram-Planning Engineeer-CV
 
CV-Atif_Ashraf-4
CV-Atif_Ashraf-4CV-Atif_Ashraf-4
CV-Atif_Ashraf-4
 
Jordan Wallins Resume Sep 16
Jordan Wallins Resume Sep 16Jordan Wallins Resume Sep 16
Jordan Wallins Resume Sep 16
 
Muhammad Yamin (CV)
Muhammad Yamin (CV)Muhammad Yamin (CV)
Muhammad Yamin (CV)
 
C.V_for_Planning_Engg._Datta
C.V_for_Planning_Engg._DattaC.V_for_Planning_Engg._Datta
C.V_for_Planning_Engg._Datta
 
Peter Khalil CV
Peter Khalil CVPeter Khalil CV
Peter Khalil CV
 
A2) CV - July 2016 incl. EXXON & NES-BHP
A2) CV - July 2016 incl. EXXON & NES-BHP A2) CV - July 2016 incl. EXXON & NES-BHP
A2) CV - July 2016 incl. EXXON & NES-BHP
 

Similar to AMJATH-PLANNER CV (20)

- CV Planning Engr - Clinton Chidi -Jan 2023.docx
- CV Planning Engr - Clinton Chidi -Jan 2023.docx- CV Planning Engr - Clinton Chidi -Jan 2023.docx
- CV Planning Engr - Clinton Chidi -Jan 2023.docx
 
CV Shreenivash Chandra
CV Shreenivash ChandraCV Shreenivash Chandra
CV Shreenivash Chandra
 
Resume _ Sahabuddin Seikh
Resume _ Sahabuddin SeikhResume _ Sahabuddin Seikh
Resume _ Sahabuddin Seikh
 
Resume - Moustapha Omar
Resume - Moustapha OmarResume - Moustapha Omar
Resume - Moustapha Omar
 
My cv
My cvMy cv
My cv
 
Resume
ResumeResume
Resume
 
Updated CV
Updated CVUpdated CV
Updated CV
 
Ehab Radwan
Ehab RadwanEhab Radwan
Ehab Radwan
 
Planning Engr Samar Abbas
Planning Engr Samar AbbasPlanning Engr Samar Abbas
Planning Engr Samar Abbas
 
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
 
Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CV
 
Vignesh Nagarajan CV
Vignesh Nagarajan CVVignesh Nagarajan CV
Vignesh Nagarajan CV
 
mazhar_resume
mazhar_resumemazhar_resume
mazhar_resume
 
Roshanak Jalili CV
Roshanak Jalili CVRoshanak Jalili CV
Roshanak Jalili CV
 
CV Khaja Raheemuddin Sr. Planning Engineer
CV Khaja Raheemuddin Sr. Planning EngineerCV Khaja Raheemuddin Sr. Planning Engineer
CV Khaja Raheemuddin Sr. Planning Engineer
 
12741
1274112741
12741
 
Resume
ResumeResume
Resume
 
Project Management Specialist
Project Management SpecialistProject Management Specialist
Project Management Specialist
 
Planning_Engineer_Ramesh Babu P
Planning_Engineer_Ramesh Babu PPlanning_Engineer_Ramesh Babu P
Planning_Engineer_Ramesh Babu P
 
Abbas khan resume
Abbas khan resumeAbbas khan resume
Abbas khan resume
 

AMJATH-PLANNER CV

  • 1. AMJATH CHANBASHA Contact No’s.: +971-504670350, +91-7200173107 E-Mail: c.amjathkhan@gmail.com In pursuit of challenging and enriching assignments in Site Management/ Project Management With an organization of high repute SNAPSHOT  A result oriented professional with 5.1 years of experience in Site Management and Project Management.  Rich experience in Scheduling (Primavera 6), Monitoring & Control, EOT and report's EMPLOYMENT RECITAL From July'11 –Dec'14 at ETA MNE as a Planning Engineer From Jan’15 – Feb’16 at VOLTAS Ltd as a Planning Engineer. From June’16 till date at AE ARMA ELEKTROPANC as a Planning Engineer. AREA OF EXPERIENCE Project Management  Planning and scheduling all involved activities in the project.  Planning, Allocation, Leveling and Projection of Resources.  Determining Construction Methodology based on the Design, Contract Duration and Schedule.  Preparation of Preliminary Planning and Detailed Planning of Construction activities.  Involved in determining the risks associated with the project during the construction phase. Site Project Planning, Scheduling and Monitoring  Preparation of Baseline program, Work Breakdown Structure, milestones, Critical Path  Micro level planning on daily/weekly/monthly basis  Tracking project with respect to Baseline and Milestones to the Actual Progress at site  Ensure the completion of activity planned on the respective time  Preparation of Action plan schedule if required  Generating Cash flow through cost loaded program.  Generating various Project monitoring deliverables to assist management in proper control. WORK EXPERIENCE From June’16 till date at AE ARMA ELEKTROPANC ,BLUE WATERS WHARF RETAIL, DUBAI,as Planning Engineer Title: BLUE WATERS WHARF RETAIL, DUBAI. Client: MIRAGE. Engineering Consultant: WSP. Main Contractor: AL JABER L.E.G.T ENGINEERING &CONTRACTING(ALEC)L.LC. MEP Contractor: AE ARMA ELEKTROPANC. Value: AED 235 Million Dirhams Description: Project comprised of Basements, Retail shops. Responsibility  Planning, Scheduling, Monitoring and Controlling construction activities.  Preparation of Baseline program with cost and recourse loading for the project as per the scope of work using primavera 6.  Preparation weekly and Monthly reports.  Tracking the progress at site  Progress Monitoring and Reporting to Top Management.  Preparation of KPI. From Jan’15–Feb’16 at Voltas Ltd,REGENT EMIRATES PEARL HOTEL, Abu Dhabi,as Planning Engineer
  • 2. Title: THE REGENT EMIRATES PEARL HOTEL- ABU DHABI Client: EMIRATES PEARL FOR DEVELOPMENT & INVESTMENT LLC. Engineering Consultant: ARKAN ARCHITECTS CONSULTANTS. Main Contractor: ARABIAN CONSTRUCTION COMPANY. MEP Contractor: VOLTAS LIMITED. Value: AED 270 Million Dirhams Description: Project comprised of Basements, Podiums and Tower. Responsibility  Planning, Scheduling, Monitoring and Controlling construction activities.  Preparation of Baseline program with cost and recourse loading for the project as per the scope of work using primavera 6.  Preparation of Extension of Time (E.O.T) Program due to changes in scope of work.  Preparation of S-curve.  Preparation of Dash board.  Tracking the progress at site  Progress Monitoring and Reporting to Top Management. From June’14 –Dec’14 at ETA MNE (Emirates Technical Associates) CONSTRUCTION & MAINTENANCE OF OFFICERS VILLA, Abu Dhabi, as Planning Engineer Title: CONSTRUCTION & MAINTENANCE OF OFFICERS VILLA MUSSAFAH- ABU DHABI Client: ABU DHABI POLICE GHQ Project Manager: ACCURATE PROJECT MANAGEMENT – ABU DHABI Engineering Consultant: KN INTERNATIONAL ARCHITECTS & ENGINEERS LLC. Main Contractor: CHIEF CONTRACTING LLC. Civil Contractor: SQUARE GENERAL CONTRACTING COMPANY MEP Contractor: Emirates Technical Associates (ETA M&E Division) Value: AED 48.5 Million Dirhams Description: Project comprised of 129 villas of Type-I and Type-II. Type-I is 4 Bed room villas-76 nos, and Type-II is 5 Bed room Villas-53nos. Responsibility  Preparation of Baseline program with cost and recourse loading for the project as per the scope of work using primavera 6.  Preparation of 2 week and 4 week look ahead program.  Program Update on weekly & Monthly basis.  Tracking the progress at site  Maintaining the status of project deliverables such as drawings & material deliveries logs.  Preparation of Manpower Histogram. From Sep’12to June’14 at ETA MNE (Emirates Technical Associates)CCAD, Abu Dhabi, as Planning Engineer Title: Cleveland Clinic, Abu Dhabi Client: MUBADALA Project Manager: JACOBS Engineering Group Engineering Consultant: KEO International Consultants Main Contractor: Samsung –Six Construct Joint Venture MEP Contractor: Emirates Technical Associates (ETA M&E Division) Value: AED 1.63 Billon Dirhams Description: Cleveland Clinic Abu Dhabi was a multi-specialty hospital. It comprised of 7 buildings, which were D&T, Clinic, Gallery, ICU, Swing-wing, Car park & Patient Tower. This medical center project was based on Cleve land clinic, Ohio, United States. This was Multi International Hospital in the Gulf region. Responsibility
  • 3.  Planning, Scheduling, Monitoring and Controlling construction activities.  Program Update on weekly & Monthly basis.  Tracking the progress at site.  Preparation of S-Curve.  Preparation Demobilization Plan for staffs and workers.  Preparation of Testing and Commissioning Report.  Maintaining the status of project deliverables such as drawings & material deliveries logs.  Progress Monitoring and Reporting to Top Management. From July’11-Sep’12 at ETA MNE (Emirates Technical Associates) C3-Airport ,Dubai, as Planning Engineer  Title: Dubai International Airport Terminal 3 Expansion(Phase-II)Concourse-3, Dubai.  Client: DCA  Engineering Consultant: DAR  Main Contractor: ALEC  MEP Contractor: Emirates Technical Associates (ETA M&E Division)  Value: AED 2.2 Billon Dirhams  Description: Airport C3 comprised of 11 levels, which were Basement-3,Basement-2,Basement- 1,Apron,Arrival,Departure,First Class Lounge, Business Class Lounge, Hotel level-1,Hotel Level-2,Hotell Roof. Responsibility  Planning, Scheduling, Monitoring and Controlling construction activities.  Preparation of Baseline program with cost and recourse loading for the project as per the scope of work using primavera 6.  Program Update on weekly & Monthly basis.  Tracking the progress with respect to the progress at site.  Rolling Schedules like Two/ Four Week Look Ahead etc  Coordination with Construction Managers, Site Project Managers, Sub-Contractors, QS& Site Engineers  Action Plan / Catch-up program if required.  Maintaining the status of project deliverables such as drawings & material deliveries logs.  Progress Monitoring and Reporting to Top Management.  Earned Value Analysis & Integrated S curve through software applications. From Nov’10-Mar’11 at ETA UNISTAR (Emirates Technical Associates) AT KING ABDULLAH FINANCIAL DISTRICT,Riyadh as a Planning Engineer.  Monitoring Chart Preparation.  Preparing and Updating Shop drawing Submittal log.  Organization Chart Preparation.  Daily Progress Report Preparation.  Preparation of Construction Program and Updating in P6. SOFTWARE KNOWN  Primavera Project Planning Software P6 V8.2.  MS Project.  Office Packages: Microsoft Office (Word, Excel, Power Point). EDUCATION DETAILS 2010 PG-Advanced Construction Management from NICMAR (National Institute of Construction Management & Research), Goa 2008 B.E-Electrical and Electronics Engineering from C.Abdul Hakeem College of Engineering and Technology, Melvisharam Vellore, TamilNadu, India.
  • 4. PERSONAL DETAILS Date of Birth: 07 May 1987 Father Name: Chan Basha Nationality: Indian Passport No.: G8789681 Date of Issue: 19 Jun, 2008 Visa Details: Residence Date of Expiry: 18 Jun, 2018 Place of Issue: Chennai, Tamil Nadu. Hobbies Playing Volley Ball, Table Tennis, Cricket & singing Languages Known: English, Urdu, Tamil, and Hindi Permanent Address: 1/13Muslim Street, Veppankuppam, G.R.Palayam (Via), Vellore-632107, Tamilnadu. Declaration: I do hereby certify that the above information furnished by me is true to the best of my knowledge. (Amjath Chanbasha)