I am a Civil Planning Engineer by profession with quality experience by working on large scale projects. I am interested in expanding my professional horizons by seeking new challenges. I am self-motivated with a willingness to accept change an challenges, and heightened levels of responsibility. Moreover , I do have good professional knowledge of engineering software like Primavera 6 (v.8.3.2), and excellent working knowledge of other desktop application. I am well versed with Primavera software for the scheduling & controlling of activities involved in the project.
please find the attached resume for more details.
Regards:
Abbas Khan
(+971) 56 6130374
abbas.khan@ghantootogd.ae
abbasjadoon52@gmail.com
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Abbas khan resume
1. Page 1 / 2
Abbas Khan
Profession : Planning Engineer (Civil)
Address: Salam street, Abu Dhabi United Arab Emirates
Mobile No.: 056 6130374 (UAE), 052 5790562 (UAE)
Email : abbasjadoon52@gmail.com
LinkedIn: https://pk.linkedin.com/in/abbasjadoon
Skype: abbasjadoon
Date of birth: 12/04/1992
EXPERIENCE
OBJECTIVE
To enhance professional exposure and growth in a reputed organization with the purpose of diversifying
and developing my Planning & Management experience and professional skills.
QUALIFICATION
B.E (Civil Engineering) , 2014
NED University of Engineering & Technology , Karachi (Pakistan)
AREAS OF EXPERTISE
Management Applications: PRIMAVERA P6 (v.8.3)
Microsoft Office: (Excel, PowerPoint, Word), Google Sketch up
Construction of High rise buildings (Residential & Commercial), Industrial Projects and Power Plant.
PLANNING ENGINEER
Feb 2017 to till date
Ghantoot Transport & General Contracting LLC
www.ghantootgroup.com
Project: 33kv Substation at Taweelah Gas Compressor
Client: GASCO Abu Dhabi Gas Industries Ltd.
Responsibilities:
▪ Preparing micro programs (level 5) for execution as per baseline program.
▪ Monitor day to day work progress and prepare the Daily, weekly and monthly progress reports.
▪ Monitor critical and near critical activities based on the project schedule and advise site management.
▪ Tracking material submittal schedule & shop drawing schedule on daily/weekly/monthly basis.
▪ Report to the Project Manager about the current work progress and make comparison between
planned and actual progress and study impact of alternative approaches to work.
▪ Assist the team to develop WBS as per scope for progress measurement, scheduling and cost
loading, resource loading as per BOQ division for Baseline Program.
▪ Attend Weekly Progress Meeting with Client and Consultants.
▪ Preparing two weeks look-ahead schedule that reflect the priority activities to be executed.
2. Page 2 / 2
INTERNSHIP
JUNIOR PLANNING ENGINEER
Sep 2015 to Jan, 2017
SEPCOIII
www.sepco3.com
(Shandong Electric Power Construction Corporation III)
Project: 2x660 MW Coal-Fired Power Project Port Qasim Karachi.
1
st
Energy project of CPEC (China Pakistan Economic Corridor).
Client: Power Construction Corporation of China and Al Mirqab Capital S.P.C Qatar.
Responsibilities:
▪ Monitor critical and near critical activities based on the project schedule and advise site management.
▪ Prepare daily and weekly report reflecting work progress summary.
▪ Preparing look-ahead schedule for execution team.
▪ Set work program and target milestones for each phase based on the project plan.
▪ Preparing micro programs for different sub-contractors absed on baseline program.
▪ Attend Weekly Progress Meeting with Client and Consultants.
▪ Reported to the Civil Department Manager & Planning Manager about the current work progress and make
comparison between planned and actual progress.
▪ Gathering site issues & reasons for lower productivity to resolve conflicts, push the project to bring it back on its
track.
▪ Updated the Construction Program with Actual Progress at Site.
SITE ENGINEER
Dec 2014 to Sep 2015
AA Quality Builders, Bahria Town Pvt. Ltd. Karachi
Project: Bahria Heights, Construction of 12 Octagonal Towers, 10 story
Client: Bahria Town Karachi
Responsibilities:
▪ Involved in planning, supervision and execution of civil works including Foundation work, Earth work &
superstructure works.
▪ Executied project by monitoring and implementing construction activities.
▪ Coordinatied with the client in the project implementation for inspection and site related issues
▪ Prepared Bar Bending Schedule of all structural members as per drawings to execute at site.
▪ Estimated quantities of materials, equipment and labour to determine project feasibility.
▪ Supervised Reinforcement, Formwork and pouring of all structural members as per drawing.
▪ Monitoring the progress of work at site, equipment mobilization, work preparation and execution.
▪ Prepare record drawings, technical reports, site diary.
Paragon Constructors Pvt. Ltd. ( December 2013)
Project: AMAN Tower (G+13) IBA City Campus, Sadder Karachi
Karachi Metropolitan Corporation (KMC) (June-July 2013)
Project: Ayesha Manzil 2-way flyover Shahrah-e-Pakistan Karachi
REFERENCES Personal and professional references will be furnished upon request.