SlideShare a Scribd company logo
1 of 6
1
EhabRadwan
Objectives
To work in leading Organization in a Challenging and growth oriented position as a “Lead
Planning & Claim Engineer” where my capabilities, skills and Knowledge can be utilized to an
optimum level and where I can fulfill my thirst for continued knowledge.
Education
2017 | Claims Management and Delay Analysis
 Panning Engineer
 Construction Claims & EOT Delay Analysis
2012 | Project Management using primavera enterprise (P6 -R8.1)
 Collaboration, Management and ControlSolutions(CMCS)
 102 Project Management in Primavera P6
 106P Advanced Project Management in Primavera P6
 106R Resource Management in Primavera P6
2009 | Project Management using primavera enterprise (P6)
 Project Management InstituteGulfChapter (PMI-AGC)
 Planning & Scheduling with Primavera P6-R6.2.
2007 | Project Management using primavera enterprise (P5)
 Promastar Primavera representative(Cairo).
 Primavera enterprise P105.
 Primavera enterprise P106.
2005 | Professional Program in Project Management (PRMG)
 Divisionof GraduateStudies - AmericanUniversityinCairo.
 Project Planning and Control Technique.
 Management of Project Resources.
 Project Budgeting and Financial Control.
 Project Feasibility Studies.
Ehab Radwan
+201141144967
+20227093560
ehabrad@gmail.com
skype : pop1167
2
EhabRadwan
 Project Bids and Contracts.
 Project Primavera Planner P3.
1993 | Bachelor of Architectural Engineering
 Facultyof Engineering - CairoUniversity.
Experience
Feb 2015 – Till Now| Senior/Lead Planning and Claim Engineer
MISR SONS DEVELOPMENT (HASSAN ALLAM
SONS)|Cairo,EGYPTwww.allamsons.com
Projects:
 South Helwan Supercritical Power Plant 3x650 MW
 CONSORTIUM OF CONSOLIDATED CONTRACTORSGroup (S.A.L) (Offshore) &
MISR SONS DEVELOPMENT (HASSAN ALLAM SONS) CCC/HAC.
Responsibilities:
 Maintenance and updating the Detailed EPC Baseline Schedule.
 Prepare and follow up “Disciplines Schedules” and Reports.
 Prepare and follow up “Subcontractors’ Schedules” and Reports.
 Prepare and maintain the wall charts/graphic displays with current schedule status.
 Monitoring Performance of subcontractors.
 Preparing the Weekly and Monthly engineering report for Consultant (PGESCo), Owner (UEEPC)
and JV CCC/HAC.
 Attending the Weekly Progress Meeting with Consultant (PGESCo)and owner (UEEPC).
 Preparing and manage the internal Weekly Progress Meeting.
May 2014 – Jan 2015| Senior Planning Engineer
Otaishan Consulting Engineers | RIYADH, SAUDI ARABIA. www.otaishan.com.sa
Projects:
 Consulting and Follow up 26 Schools for Tatweer Building Company TBC with 3 Contractors.
Responsibilities:
 Check and approve of contractors Schedules and S-Curves.
 follow up “contractors’ Schedules” and Reports daily, weekly, monthly and submit consultant
reports to the client TBC.
 Prepare and follow up weekly and monthly meetings for the three contractors.
 Monitoring Performance of contractors.
JULY-2009 – May2014| Senior Planning Engineer
ABV ROCK GROUP LIMITED | RIYADH, SAUDI ARABIA. www.abvrock.com
3
EhabRadwan
 Sep-2012 – May 2014 | Senior Planning Engineer for ENDOWMENT
TOWERS PROJECT(endowment.ksu.edu.s a):
Lead Team of 3 Planners to manage all Planning issues related to the UE projects under Saudi Diyar
Consultant as follow:
Projects:
 B003 5-Star Hotel Building (48,487 m2 - 1B,GR,10Fl – 176 Mio SAR)
 B004 Medical Center Building (39,996 m2 - GR,7Fl - 112 Mio SAR)
 B005/006 Residential Suites Building (33,283 m2 – B,GR,13Fl – 162 Mio SAR)
 B011 Building Tower No 5 (74,300 m2 - B,GR,MZ,15 Fl – 254 Mio SAR)
 B910 Building Tower No 3,4 (63,200 m2 - B,GR,MZ,11Fl - 216 Mio SAR)
 B012A Cooling Plant (63,200 m2 - B,GR,RF Fl - 56 Mio SAR)
 B013 Office Building (19,812 m2 - B,GR,8Fl - 75 Mio SAR)
 Service Tunnel A&B (2,592 lm - 85 Mio SAR)
 Refurbishment Tunnel (12,000 lm - 146 Mio SAR)
Responsibilities:
 Maintenance and updating the Detailed EPC Baseline Schedule.
 Prepare and follow up “Subcontractors’ Schedules” and Reports.
 Prepare and maintain the wall charts/graphic displays with current schedule status.
 Monitoring Performance of subcontractors.
 Preparing the monthly engineering report.
 JULY-2009 – Sep-2012 | Senior Planning Engineer for KING SAUD
UNIVERSITY CONTRACT (MEDICAL CITY EXTENSION – ENDOWMENT
TOWERS PROJECTS)
Projects:
 034 King Khaled Hospital Extension (84,593 m2 - 2B,GR,5Fl – 695 Mio SAR – 500 Bed)
 044 Dental College Extension (39,600 m2 - 2B,GR,10Fl - 197 Mio SAR – 200 Chair)
 029 National Diabetic Center (15,400 m2 – B,GR,3Fl – 99 Mio SAR)
 011 Building Tower No 5 (74,300 m2 - B,GR,MZ,15 Fl – 254 Mio SAR)
 910 Building Tower No 3,4 (63,200 m2 - B,GR,MZ,11Fl - 216 Mio SAR)
Responsibilities:
 Maintenance and updating the Detailed EPC Baseline Schedule.
 Prepare “Subcontractors’ Schedules”.
 Prepare and maintain the wall charts/graphic displays with current schedule status.
 Monitoring Performance of subcontractors.
 Preparing the monthly engineering report.
NOV-2007 – MAY-2009 | Senior Planning Engineer
Beijing Emirates International Construction | Dubai, UAE.www.becgroup.ae
4
EhabRadwan
Projects:
 P270 Offices Tower in Silicon Oasis (3B,GR,25Fl)
 P370 Residential Building in Nahda (GR,13Fl)
 P252 Residential Tower in Al Khan (GR,28Fl)
 P264 Offices Residential Building in Memzar (3B,GR,13 Fl)
 P405 A. Omran Hospital in Ras Alkhaima (GR, 2Fl)
Responsibilities:
 Maintenance and updating both the Detailed Schedule and the Baseline Schedule.
 Prepare “Subcontractors’ Schedules”.
 Prepare and maintain the wall charts/graphic displays with current schedule status.
 Monitoring Performance of subcontractors.
 Preparing the monthly engineering report.
 Preparing income cash flow.
JUL-2001 – OCT-2007 | Senior Planning & Estimation Engineer
Siemens Ltd. | Cairo, Egypt.
Projects:
 Al Nozha III Exchange.
 Luxor I&II Exchange.
 90 Village Contract.
 Egypt 2000 Package.
Responsibilities:
 Bids & offers, B.O.Q Check, Contracts, Subcontractors & Suppliers request (RFQ), Prices
evaluation, Technical comparisons, Customers follow up.
 Prepairing preliminary schedules for tenders.
 Prepairing Master/General schedule of procurements.
 Planning of major milestons in the projects & procurements.
 Resources estimation.
NOV-1998 – JUN-2001 | Technical Office Engineer
Morrison Kundsen International | Cairo, Egypt.
 Shop Drawings for Design/Build telephone Exchange area outside Plant Facilities (OSPII).
JUL-1995 – OCT-1998 | Architect
Arab Consulting Engineers "Moharram – Bakhoum"| Cairo, Egypt.
 Working for conceptual design and work shop drawings for the various projects.
 Qatar Embassy in Cairo.
5
EhabRadwan
 National Bank of Egypt.
 McDonald's Cairo Series:
 El Marghani Branch.
 El Maadi Branch.
 A.U.C Branch.
 El Shams Club Branch.
 Soliman Basha Branch.
 Commercial and Residential Bldg.
 Water Supply and Sanitary Auth; Bldg.
 El Souqh Station Alex; Underground Subway.
 El Hadra Bridge Alex.
 Management Bldg. Of Safeer Co.
NOV-1993 – JUN-1995 | Architect
Architecture & Urbanism Group "| Cairo, Egypt.
 Working for conceptual design and work shop drawings for the various projects.
 Management Bldg; Of Webco Co.
 Social Club Of Palma Co.
 Interior Design “Villa El Manial”
 Villa El Faioum
 Petroloap Gas Station “Abou Homos”
 Management Blldg; Of palma Co.
 Management Bldg; Of Egyptian Drilling Co.
Skills
 Computer Skills:
 Primavera Project Planning P3.0 & P6 R 8.1.
 MS-Projects 2007.
 Microsoft Office 2007.
 AutoCAD 2009.
 Neat User of Internet Dealings and Transactions.
 Language Skills:
 Fully Conversant With Arabic & English (Reading Writing and Speaking).
 Other Skills
 Design, Artistic Skills (Freehand Sketching, Perspectives).
PersonalInformation
6
EhabRadwan
 Date of Birth
 13/11/1967
 Nationality
 Egyptian
 Marital status
 Married with four Children.
References
 Furnished Upon Request.

More Related Content

What's hot

nizamuddinG Planning Engineer
nizamuddinG Planning EngineernizamuddinG Planning Engineer
nizamuddinG Planning Engineerghulam nizamuddin
 
C.V@ Haytham2015 final
C.V@ Haytham2015 finalC.V@ Haytham2015 final
C.V@ Haytham2015 finalHaytham Taalab
 
My CV with Exp.26-11-2016
My CV with Exp.26-11-2016My CV with Exp.26-11-2016
My CV with Exp.26-11-2016Ayman Alhaggar
 
002 My Cv in English (Briefing updated 03.04.2016-All)
002 My Cv in English (Briefing updated 03.04.2016-All)002 My Cv in English (Briefing updated 03.04.2016-All)
002 My Cv in English (Briefing updated 03.04.2016-All)Ahmed Abdeen
 
Abanoub ghobrial , Senior planning engineer
Abanoub ghobrial , Senior planning engineerAbanoub ghobrial , Senior planning engineer
Abanoub ghobrial , Senior planning engineerAbanoubGhobrial1
 
Amgad_ Reda_Barakat.CV
Amgad_ Reda_Barakat.CVAmgad_ Reda_Barakat.CV
Amgad_ Reda_Barakat.CVAmgad Barakat
 
Osama Rashwan Resume
Osama Rashwan ResumeOsama Rashwan Resume
Osama Rashwan ResumeOsama Rashwan
 
Majdi Murjan (Sr.Civil Engineer, LEED Green Associate) C.V.
Majdi Murjan (Sr.Civil Engineer, LEED Green Associate) C.V.Majdi Murjan (Sr.Civil Engineer, LEED Green Associate) C.V.
Majdi Murjan (Sr.Civil Engineer, LEED Green Associate) C.V.Majdi Murjan
 
Eng. tarek ali cv - 29 oct 2015
Eng. tarek ali   cv - 29 oct 2015Eng. tarek ali   cv - 29 oct 2015
Eng. tarek ali cv - 29 oct 2015Tarek Ali
 
hikal CV June 2016
hikal CV June 2016hikal CV June 2016
hikal CV June 2016Ahmed Hikal
 
Mohamed_Huseiny CV-2016+exp.cert
Mohamed_Huseiny CV-2016+exp.certMohamed_Huseiny CV-2016+exp.cert
Mohamed_Huseiny CV-2016+exp.certMohamed El-huseiny
 
Sailesh CV-Planning Engineer
Sailesh CV-Planning EngineerSailesh CV-Planning Engineer
Sailesh CV-Planning Engineersailesh konduru
 
CV - CIVIL ENGINEER-KHODR Maen -
CV - CIVIL ENGINEER-KHODR Maen -CV - CIVIL ENGINEER-KHODR Maen -
CV - CIVIL ENGINEER-KHODR Maen -maen KHODR
 

What's hot (20)

Ahmed mahdi cv_planning_engineer
Ahmed mahdi cv_planning_engineerAhmed mahdi cv_planning_engineer
Ahmed mahdi cv_planning_engineer
 
nizamuddinG Planning Engineer
nizamuddinG Planning EngineernizamuddinG Planning Engineer
nizamuddinG Planning Engineer
 
C.V@ Haytham2015 final
C.V@ Haytham2015 finalC.V@ Haytham2015 final
C.V@ Haytham2015 final
 
My CV with Exp.26-11-2016
My CV with Exp.26-11-2016My CV with Exp.26-11-2016
My CV with Exp.26-11-2016
 
002 My Cv in English (Briefing updated 03.04.2016-All)
002 My Cv in English (Briefing updated 03.04.2016-All)002 My Cv in English (Briefing updated 03.04.2016-All)
002 My Cv in English (Briefing updated 03.04.2016-All)
 
Abanoub ghobrial , Senior planning engineer
Abanoub ghobrial , Senior planning engineerAbanoub ghobrial , Senior planning engineer
Abanoub ghobrial , Senior planning engineer
 
Ahmed suleiman 1
Ahmed suleiman 1Ahmed suleiman 1
Ahmed suleiman 1
 
Amgad_ Reda_Barakat.CV
Amgad_ Reda_Barakat.CVAmgad_ Reda_Barakat.CV
Amgad_ Reda_Barakat.CV
 
Abdullah's Resume
Abdullah's ResumeAbdullah's Resume
Abdullah's Resume
 
X 2016
X 2016X 2016
X 2016
 
Osama Rashwan Resume
Osama Rashwan ResumeOsama Rashwan Resume
Osama Rashwan Resume
 
Majdi Murjan (Sr.Civil Engineer, LEED Green Associate) C.V.
Majdi Murjan (Sr.Civil Engineer, LEED Green Associate) C.V.Majdi Murjan (Sr.Civil Engineer, LEED Green Associate) C.V.
Majdi Murjan (Sr.Civil Engineer, LEED Green Associate) C.V.
 
Eng. tarek ali cv - 29 oct 2015
Eng. tarek ali   cv - 29 oct 2015Eng. tarek ali   cv - 29 oct 2015
Eng. tarek ali cv - 29 oct 2015
 
hikal CV June 2016
hikal CV June 2016hikal CV June 2016
hikal CV June 2016
 
Mohamed_Huseiny CV-2016+exp.cert
Mohamed_Huseiny CV-2016+exp.certMohamed_Huseiny CV-2016+exp.cert
Mohamed_Huseiny CV-2016+exp.cert
 
CV - 2017
CV - 2017CV - 2017
CV - 2017
 
mubashir C-V
mubashir C-Vmubashir C-V
mubashir C-V
 
Sailesh CV-Planning Engineer
Sailesh CV-Planning EngineerSailesh CV-Planning Engineer
Sailesh CV-Planning Engineer
 
Resume (final cv)
Resume (final cv)Resume (final cv)
Resume (final cv)
 
CV - CIVIL ENGINEER-KHODR Maen -
CV - CIVIL ENGINEER-KHODR Maen -CV - CIVIL ENGINEER-KHODR Maen -
CV - CIVIL ENGINEER-KHODR Maen -
 

Similar to Ehab Radwan (20)

MY C.V final 2000
MY C.V final 2000MY C.V final 2000
MY C.V final 2000
 
Resume - Moustapha Omar
Resume - Moustapha OmarResume - Moustapha Omar
Resume - Moustapha Omar
 
Tarek CV 2015 planning
Tarek CV 2015 planningTarek CV 2015 planning
Tarek CV 2015 planning
 
CV2015
CV2015CV2015
CV2015
 
Adly CV111
Adly CV111Adly CV111
Adly CV111
 
Eng. Tarek Ali cv - 29 oct 2015
Eng. Tarek Ali   cv - 29 oct 2015Eng. Tarek Ali   cv - 29 oct 2015
Eng. Tarek Ali cv - 29 oct 2015
 
Abo-Eldardaa_CV_2015 & Duties
Abo-Eldardaa_CV_2015 & DutiesAbo-Eldardaa_CV_2015 & Duties
Abo-Eldardaa_CV_2015 & Duties
 
TDCCV 2016
TDCCV 2016TDCCV 2016
TDCCV 2016
 
Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019
 
Mohammed Yousuf cv
Mohammed Yousuf cvMohammed Yousuf cv
Mohammed Yousuf cv
 
Rafeek's CV
Rafeek's CV Rafeek's CV
Rafeek's CV
 
Update CV
Update CVUpdate CV
Update CV
 
mohamed_mahmoud_atia - Planning & Cost Control Engineer
mohamed_mahmoud_atia - Planning & Cost Control Engineermohamed_mahmoud_atia - Planning & Cost Control Engineer
mohamed_mahmoud_atia - Planning & Cost Control Engineer
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
FAHD_CV
FAHD_CVFAHD_CV
FAHD_CV
 
Akhila CV
Akhila CVAkhila CV
Akhila CV
 
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
 
ALAA ABBAS
ALAA ABBASALAA ABBAS
ALAA ABBAS
 
NEW CV
NEW CVNEW CV
NEW CV
 
My cv
My cvMy cv
My cv
 

More from Ehab Radwan

Ehab Radwan PM Certificates
Ehab Radwan PM CertificatesEhab Radwan PM Certificates
Ehab Radwan PM CertificatesEhab Radwan
 
Ehab Radwan P6 R8.2 Certificates
Ehab Radwan P6 R8.2 CertificatesEhab Radwan P6 R8.2 Certificates
Ehab Radwan P6 R8.2 CertificatesEhab Radwan
 
Ehab Radwan P6 Certificates
Ehab Radwan P6 CertificatesEhab Radwan P6 Certificates
Ehab Radwan P6 CertificatesEhab Radwan
 
Ehab Radwan PRMG Certificates
Ehab Radwan PRMG CertificatesEhab Radwan PRMG Certificates
Ehab Radwan PRMG CertificatesEhab Radwan
 
Claims Management and Delay Analysis Certificate
Claims Management and Delay Analysis CertificateClaims Management and Delay Analysis Certificate
Claims Management and Delay Analysis CertificateEhab Radwan
 
Saudi Engineer Certificate
Saudi Engineer CertificateSaudi Engineer Certificate
Saudi Engineer CertificateEhab Radwan
 

More from Ehab Radwan (6)

Ehab Radwan PM Certificates
Ehab Radwan PM CertificatesEhab Radwan PM Certificates
Ehab Radwan PM Certificates
 
Ehab Radwan P6 R8.2 Certificates
Ehab Radwan P6 R8.2 CertificatesEhab Radwan P6 R8.2 Certificates
Ehab Radwan P6 R8.2 Certificates
 
Ehab Radwan P6 Certificates
Ehab Radwan P6 CertificatesEhab Radwan P6 Certificates
Ehab Radwan P6 Certificates
 
Ehab Radwan PRMG Certificates
Ehab Radwan PRMG CertificatesEhab Radwan PRMG Certificates
Ehab Radwan PRMG Certificates
 
Claims Management and Delay Analysis Certificate
Claims Management and Delay Analysis CertificateClaims Management and Delay Analysis Certificate
Claims Management and Delay Analysis Certificate
 
Saudi Engineer Certificate
Saudi Engineer CertificateSaudi Engineer Certificate
Saudi Engineer Certificate
 

Ehab Radwan

  • 1. 1 EhabRadwan Objectives To work in leading Organization in a Challenging and growth oriented position as a “Lead Planning & Claim Engineer” where my capabilities, skills and Knowledge can be utilized to an optimum level and where I can fulfill my thirst for continued knowledge. Education 2017 | Claims Management and Delay Analysis  Panning Engineer  Construction Claims & EOT Delay Analysis 2012 | Project Management using primavera enterprise (P6 -R8.1)  Collaboration, Management and ControlSolutions(CMCS)  102 Project Management in Primavera P6  106P Advanced Project Management in Primavera P6  106R Resource Management in Primavera P6 2009 | Project Management using primavera enterprise (P6)  Project Management InstituteGulfChapter (PMI-AGC)  Planning & Scheduling with Primavera P6-R6.2. 2007 | Project Management using primavera enterprise (P5)  Promastar Primavera representative(Cairo).  Primavera enterprise P105.  Primavera enterprise P106. 2005 | Professional Program in Project Management (PRMG)  Divisionof GraduateStudies - AmericanUniversityinCairo.  Project Planning and Control Technique.  Management of Project Resources.  Project Budgeting and Financial Control.  Project Feasibility Studies. Ehab Radwan +201141144967 +20227093560 ehabrad@gmail.com skype : pop1167
  • 2. 2 EhabRadwan  Project Bids and Contracts.  Project Primavera Planner P3. 1993 | Bachelor of Architectural Engineering  Facultyof Engineering - CairoUniversity. Experience Feb 2015 – Till Now| Senior/Lead Planning and Claim Engineer MISR SONS DEVELOPMENT (HASSAN ALLAM SONS)|Cairo,EGYPTwww.allamsons.com Projects:  South Helwan Supercritical Power Plant 3x650 MW  CONSORTIUM OF CONSOLIDATED CONTRACTORSGroup (S.A.L) (Offshore) & MISR SONS DEVELOPMENT (HASSAN ALLAM SONS) CCC/HAC. Responsibilities:  Maintenance and updating the Detailed EPC Baseline Schedule.  Prepare and follow up “Disciplines Schedules” and Reports.  Prepare and follow up “Subcontractors’ Schedules” and Reports.  Prepare and maintain the wall charts/graphic displays with current schedule status.  Monitoring Performance of subcontractors.  Preparing the Weekly and Monthly engineering report for Consultant (PGESCo), Owner (UEEPC) and JV CCC/HAC.  Attending the Weekly Progress Meeting with Consultant (PGESCo)and owner (UEEPC).  Preparing and manage the internal Weekly Progress Meeting. May 2014 – Jan 2015| Senior Planning Engineer Otaishan Consulting Engineers | RIYADH, SAUDI ARABIA. www.otaishan.com.sa Projects:  Consulting and Follow up 26 Schools for Tatweer Building Company TBC with 3 Contractors. Responsibilities:  Check and approve of contractors Schedules and S-Curves.  follow up “contractors’ Schedules” and Reports daily, weekly, monthly and submit consultant reports to the client TBC.  Prepare and follow up weekly and monthly meetings for the three contractors.  Monitoring Performance of contractors. JULY-2009 – May2014| Senior Planning Engineer ABV ROCK GROUP LIMITED | RIYADH, SAUDI ARABIA. www.abvrock.com
  • 3. 3 EhabRadwan  Sep-2012 – May 2014 | Senior Planning Engineer for ENDOWMENT TOWERS PROJECT(endowment.ksu.edu.s a): Lead Team of 3 Planners to manage all Planning issues related to the UE projects under Saudi Diyar Consultant as follow: Projects:  B003 5-Star Hotel Building (48,487 m2 - 1B,GR,10Fl – 176 Mio SAR)  B004 Medical Center Building (39,996 m2 - GR,7Fl - 112 Mio SAR)  B005/006 Residential Suites Building (33,283 m2 – B,GR,13Fl – 162 Mio SAR)  B011 Building Tower No 5 (74,300 m2 - B,GR,MZ,15 Fl – 254 Mio SAR)  B910 Building Tower No 3,4 (63,200 m2 - B,GR,MZ,11Fl - 216 Mio SAR)  B012A Cooling Plant (63,200 m2 - B,GR,RF Fl - 56 Mio SAR)  B013 Office Building (19,812 m2 - B,GR,8Fl - 75 Mio SAR)  Service Tunnel A&B (2,592 lm - 85 Mio SAR)  Refurbishment Tunnel (12,000 lm - 146 Mio SAR) Responsibilities:  Maintenance and updating the Detailed EPC Baseline Schedule.  Prepare and follow up “Subcontractors’ Schedules” and Reports.  Prepare and maintain the wall charts/graphic displays with current schedule status.  Monitoring Performance of subcontractors.  Preparing the monthly engineering report.  JULY-2009 – Sep-2012 | Senior Planning Engineer for KING SAUD UNIVERSITY CONTRACT (MEDICAL CITY EXTENSION – ENDOWMENT TOWERS PROJECTS) Projects:  034 King Khaled Hospital Extension (84,593 m2 - 2B,GR,5Fl – 695 Mio SAR – 500 Bed)  044 Dental College Extension (39,600 m2 - 2B,GR,10Fl - 197 Mio SAR – 200 Chair)  029 National Diabetic Center (15,400 m2 – B,GR,3Fl – 99 Mio SAR)  011 Building Tower No 5 (74,300 m2 - B,GR,MZ,15 Fl – 254 Mio SAR)  910 Building Tower No 3,4 (63,200 m2 - B,GR,MZ,11Fl - 216 Mio SAR) Responsibilities:  Maintenance and updating the Detailed EPC Baseline Schedule.  Prepare “Subcontractors’ Schedules”.  Prepare and maintain the wall charts/graphic displays with current schedule status.  Monitoring Performance of subcontractors.  Preparing the monthly engineering report. NOV-2007 – MAY-2009 | Senior Planning Engineer Beijing Emirates International Construction | Dubai, UAE.www.becgroup.ae
  • 4. 4 EhabRadwan Projects:  P270 Offices Tower in Silicon Oasis (3B,GR,25Fl)  P370 Residential Building in Nahda (GR,13Fl)  P252 Residential Tower in Al Khan (GR,28Fl)  P264 Offices Residential Building in Memzar (3B,GR,13 Fl)  P405 A. Omran Hospital in Ras Alkhaima (GR, 2Fl) Responsibilities:  Maintenance and updating both the Detailed Schedule and the Baseline Schedule.  Prepare “Subcontractors’ Schedules”.  Prepare and maintain the wall charts/graphic displays with current schedule status.  Monitoring Performance of subcontractors.  Preparing the monthly engineering report.  Preparing income cash flow. JUL-2001 – OCT-2007 | Senior Planning & Estimation Engineer Siemens Ltd. | Cairo, Egypt. Projects:  Al Nozha III Exchange.  Luxor I&II Exchange.  90 Village Contract.  Egypt 2000 Package. Responsibilities:  Bids & offers, B.O.Q Check, Contracts, Subcontractors & Suppliers request (RFQ), Prices evaluation, Technical comparisons, Customers follow up.  Prepairing preliminary schedules for tenders.  Prepairing Master/General schedule of procurements.  Planning of major milestons in the projects & procurements.  Resources estimation. NOV-1998 – JUN-2001 | Technical Office Engineer Morrison Kundsen International | Cairo, Egypt.  Shop Drawings for Design/Build telephone Exchange area outside Plant Facilities (OSPII). JUL-1995 – OCT-1998 | Architect Arab Consulting Engineers "Moharram – Bakhoum"| Cairo, Egypt.  Working for conceptual design and work shop drawings for the various projects.  Qatar Embassy in Cairo.
  • 5. 5 EhabRadwan  National Bank of Egypt.  McDonald's Cairo Series:  El Marghani Branch.  El Maadi Branch.  A.U.C Branch.  El Shams Club Branch.  Soliman Basha Branch.  Commercial and Residential Bldg.  Water Supply and Sanitary Auth; Bldg.  El Souqh Station Alex; Underground Subway.  El Hadra Bridge Alex.  Management Bldg. Of Safeer Co. NOV-1993 – JUN-1995 | Architect Architecture & Urbanism Group "| Cairo, Egypt.  Working for conceptual design and work shop drawings for the various projects.  Management Bldg; Of Webco Co.  Social Club Of Palma Co.  Interior Design “Villa El Manial”  Villa El Faioum  Petroloap Gas Station “Abou Homos”  Management Blldg; Of palma Co.  Management Bldg; Of Egyptian Drilling Co. Skills  Computer Skills:  Primavera Project Planning P3.0 & P6 R 8.1.  MS-Projects 2007.  Microsoft Office 2007.  AutoCAD 2009.  Neat User of Internet Dealings and Transactions.  Language Skills:  Fully Conversant With Arabic & English (Reading Writing and Speaking).  Other Skills  Design, Artistic Skills (Freehand Sketching, Perspectives). PersonalInformation
  • 6. 6 EhabRadwan  Date of Birth  13/11/1967  Nationality  Egyptian  Marital status  Married with four Children. References  Furnished Upon Request.