4. Area Summary
• Total: 4,802,800 SF.
• Office: 1,368,000 SF.
• Hotel: 530,000 SF.
• Apartments: 2,170,400 SF.
• Retail: 696,200SF.
• Cineplex: 38,200 SF.
• Car Parking: 2,800 Cars
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16. Harbour Station, Woodbridge, VA
High-rise Service Apartment Complex
rise
Company: HOK Group, DC Office
Role: Designer
Supervisor: Duncan Lyons, Design Principal
17.
18.
19.
20.
21. Shanghai Jin Hongqiao Center
High-rise Office + Low
rise Low-rise Retail
Company: John Portman & Associates
Role: Design Architect
Supervisor: Kinka Wong, Project Director
30. Hilton Bayfront Hotel & Convention Center
San Diego, CA
High-rise Hotel + Convention Center
rise
Company: John Portman & Associates
Role: Design Architect
Supervisor: Kinka Wong, Project Director
32. Project Data
l Hilton Bayfront Hotel
l 1190 room convention center hotel
l 92,900 sq. meters
l Two Large ballrooms (3160 sq. meters
and 2230 sq. meters)
l 15,330 sq. meters total meeting space
l Three restaurants
33. Design Experience
•The site was prone to eartquakes, requiring •The site had been a ship building yard
special structure throughout the building previously, so there was a necessity to
remediate the soil
•Our assignment during this project was to
work with the developer to design and address
voluminous project conditions.
•The site location adjacent to the bay had salt-
laden air, complicating details which had metal
exposed to the air
35. Vertical Transportation
• From early design development to
substantial completion took 3.5
years.
• Vertical transportation including
elevator core/lobby and escalator
lobby were part of my responsibility
from design concept through
construction document phase.
36. Guestrooms
• From early design development to
substantial completion took 3.5 years.
• Trying to get more guestrooms to enjoy
the bay view.