Work Samples - Peng Wang
Zayed Center, Lahore
High-rise Mixed-
               -use Complex



  Company: HOK Group, DC Office
  Role:       Designe...
Bird’s Eye View Rendering
Area Summary


      •   Total:      4,802,800 SF.
      •   Office:     1,368,000 SF.
      •   Hotel:       530,000 SF.
...
Harbour Station, Woodbridge, VA
High-rise Service Apartment Complex
     rise




    Company: HOK Group, DC Office
    Ro...
Shanghai Jin Hongqiao Center
  High-rise Office + Low
       rise          Low-rise Retail




  Company: John Portman & A...
Bird’s Eye View Rendering
Design Concept – City Gate Shanghai
                      Gate,
         Bird’s Eye View Rendering
Ground Floor Plan & North Elevation
Typical Low-RiseTower Plan & South Elevation
            RiseTower
Hilton Bayfront Hotel & Convention Center
              San Diego, CA
       High-rise Hotel + Convention Center
         ...
Bird’s Eye View Rendering
Project Data




        l   Hilton Bayfront Hotel

        l   1190 room convention center hotel

        l   92,900 sq. ...
Design Experience
•The site was prone to eartquakes, requiring       •The site had been a ship building yard
special struc...
Ground Floor Plan, Views of Spa & Bar
Vertical Transportation

•   From early design development to
    substantial completion took 3.5
    years.
•   Vertical ...
Guestrooms

•   From early design development to
    substantial completion took 3.5 years.
•   Trying to get more guestro...
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Upcoming SlideShare
Loading in …5
×

Recent Work Samples of Peng Wang

948 views

Published on

Work samples from Portman and HOK

Published in: Design, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
948
On SlideShare
0
From Embeds
0
Number of Embeds
4
Actions
Shares
0
Downloads
16
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Recent Work Samples of Peng Wang

  1. 1. Work Samples - Peng Wang
  2. 2. Zayed Center, Lahore High-rise Mixed- -use Complex Company: HOK Group, DC Office Role: Designer Supervisor: Duncan Lyons, Design Principal
  3. 3. Bird’s Eye View Rendering
  4. 4. Area Summary • Total: 4,802,800 SF. • Office: 1,368,000 SF. • Hotel: 530,000 SF. • Apartments: 2,170,400 SF. • Retail: 696,200SF. • Cineplex: 38,200 SF. • Car Parking: 2,800 Cars
  5. 5. Harbour Station, Woodbridge, VA High-rise Service Apartment Complex rise Company: HOK Group, DC Office Role: Designer Supervisor: Duncan Lyons, Design Principal
  6. 6. Shanghai Jin Hongqiao Center High-rise Office + Low rise Low-rise Retail Company: John Portman & Associates Role: Design Architect Supervisor: Kinka Wong, Project Director
  7. 7. Bird’s Eye View Rendering
  8. 8. Design Concept – City Gate Shanghai Gate, Bird’s Eye View Rendering
  9. 9. Ground Floor Plan & North Elevation
  10. 10. Typical Low-RiseTower Plan & South Elevation RiseTower
  11. 11. Hilton Bayfront Hotel & Convention Center San Diego, CA High-rise Hotel + Convention Center rise Company: John Portman & Associates Role: Design Architect Supervisor: Kinka Wong, Project Director
  12. 12. Bird’s Eye View Rendering
  13. 13. Project Data l Hilton Bayfront Hotel l 1190 room convention center hotel l 92,900 sq. meters l Two Large ballrooms (3160 sq. meters and 2230 sq. meters) l 15,330 sq. meters total meeting space l Three restaurants
  14. 14. Design Experience •The site was prone to eartquakes, requiring •The site had been a ship building yard special structure throughout the building previously, so there was a necessity to remediate the soil •Our assignment during this project was to work with the developer to design and address voluminous project conditions. •The site location adjacent to the bay had salt- laden air, complicating details which had metal exposed to the air
  15. 15. Ground Floor Plan, Views of Spa & Bar
  16. 16. Vertical Transportation • From early design development to substantial completion took 3.5 years. • Vertical transportation including elevator core/lobby and escalator lobby were part of my responsibility from design concept through construction document phase.
  17. 17. Guestrooms • From early design development to substantial completion took 3.5 years. • Trying to get more guestrooms to enjoy the bay view.

×