CONSULTANT
RESEARCH OF FLY OVER AS A SOLUTION TO CONGESTIO
OF INTERSECTION JUNCTION
(Case Study: Jalan Jatingaleh Semarang)
Systematics of presentation
Background of study
Bibliography
Research methodology
Analysis
Summary
of
Background of Study
formulation of the
problem
The density of traffic flow, especially at
peak hours
The transportation problem, that is
traffic in the area of study
The existence of an intersection at
grade that is not signalized could
potentially cause delays
The various function of land use such
as Jatingaleh Market, office building
and BRT bus stop
The existance of side barriers such as
vehicle parking, vehicle turning
direction, and vehicles in and out of
main road
Effected to the occurance of Vehicle
slow down speed and queue
Traffic Management
Increasing the use of road capacity,
namely: road widening and or
interchange
CAUSE
MAIN PROBLEM
DUE TO
SOLUTION
Problems of study
 The characteristic of road and traffics
 Designing of interchange, such as :
1. Flyover
2. Underpass
Areas of study
Research location
 To identify the exsisting condition of the road
 To design a precise Fly Over
Research Objectives
10
1. Road and Intersections
2. Traffic
3. Interchange
Bibliography
1. Road and intersection
 Urban roads is a road that has a permanent and
continuous development throughout the year for
the entire or almost the entire way, at least on one
side of the road with a population of over 100,000
inhabitants. (MKJI, 1997)
2. Traffic
 Traffic is time wasted on travel because of the
reduced speed within normal limits expressed in
units of minutes. (Hobbs,1997:107)
3. Interchange
Interchange is the intersection with the traffic flow on the
main “kaki persimpangan” intersect spatially separated.
(Mujihartono, 2002 : 181)
RESEARCH METHODOLOGY
15
The design of precise fly over
Inputs
direct observation
literature review
Typical Sequence of Phases in a Research
INPUT ANALYSIS
Highway Capacity
degree of Saturation
Delay
opportunities Queue
Traffic Flow Prediction
efficiency modeling :
Fly Over
Underpass
Fly Over-Underpass
Primary Data
Secondary Data
OUTPUT
Analysis
Quantitative Methods
descriptive
Conclusion
 Determining the observer that register all
vehicles that pass through the study site
 Recording the vehicle data of arrival and stop on
a long sheets
 Recording is done to get the number of vehicles
per hour
Data Collection Phase
Analysis of Existing Conditions
Current traffic conditions
effected by the vehicle that
turn to different direction
Side barrier that occurs at
the intersection of PLN
The Occurance of vehical flow (in
and out )of the toll booth and
Jatingaleh market
32%
2%
66%
morning
LV
HV
MC 40%
2%
58%
afternoon
MC LV
HV
Type of Vehicle in Scale
The Analysis of road capasity on
Jatingaleh Intersections
The Analysis of Fly Over
The Picture of Fly Over 3D Shown
skecth-up
Basic design Fly Over to increase the number of road capacity
Comparison of flow reduction toward
Fly Over
Effectiveness Analysis of
Fly Over
Comparison of traffic conditions before
and after the existance Fly Over
The Analysis of Underpass
The picture Underpass -3D
shown (sketchup)
Comparison of Flow Reduction on
Underpass
Effectiveness
Analysis of
Underpass
Comparison of traffic conditions before and
after the existance of underpass
The Analysis of Fly Over-Underpas
The picture FO-U 3D shown
(sketchup)
Dua Underpass Untuk Urai
Jatingaleh
Model Underpass
Jatingaleh
Effectiveness Analysis of Fly Over-
Underpass Calculation of Flow Reduction
Fly Over-Underpass
Comparison of Fly Over, Underpass,
and Fly Over-Underpass
Result of Study
1. Factors Causes Traffic :
• On site Activity
• Intersection at a grade
• Side barrier
Types of vehicle is dominated by motorcycles (MC)
2. From the 3 (three) Fly Over designs, that is fly over,
Underpass and combination Fly Over-Underpass, it is
found the precise fly over design.
Conclusion
Bagan Alir Tahun ke 1
Identifikasi
Karakteristik
Lalu Lintas
yang ada
Analisis
Kemacetan
berbasis
manajemen
transportasi
Kajian (Research)
model Flyover
•Golongan
kendaraan
•Jenis kendaraan
•Kendaraan
dominan
Geometrik Jalan
•Kelandaian
•Kelengkungan
•Elevasi
•Lebar jalan
•Model-model flyover
•Analisis masing-masing
model secara teknis dan
ekonomis
•Penentuan model
flyover yang multiguna
dan tepat sasaran
Luaran:
•Model Flyover berbasis
manajemen transportasi
•Seminar
Bagan Alir Tahun ke 2
Membuat
model
prototype
flyover yang
paling cocok
Simulasi
model flyover
berbasis
teknis &
ekonomis
Optimalisasi model
flyover berbasis
manajemen
transportasi
Maket flyover
Model 3 Dimensi
Flyover dan simulasi
lalu lintas
Luaran:
•Model Flyover yang
cocok dan berbasis
manajemen transportasi
•Seminar
•Buku Ajar
Kegiatan
Tahap (Tahun) Ke - 2
1 2 3 4 5 6 7 8 9 10
Perancangan
Prototipe
Pembuatan
Prototipe
Analisis dan
Pembahasan
Simulasi
Prototipe
Model 3 D
Penyusunan
Laporan
Penelitian
Buku Ajar
Thank you For Your Attention
Question & Answer
Alasan pemilihan judul : disesuaikan dg :
1. Rumusan permasalahan
2. output dari tujuan penelitian
CONTRACTOR
PROGRESS PELAKSANAAN Pembangunan Gedung Kuliah Bers
Yayasan Badan Wakaf Sultan Agung/Sugiyanto,ST/Semarang
Jl. Raya Kaligawe Km. 04 Semarang
YAYASAN BADAN WAKAF
SULTAN AGUNG
PROGRESS PELAKSANAAN Pembangunan Gedung Kuliah Bers
Yayasan Badan Wakaf Sultan Agung/Sugiyanto,ST/Semarang
Jl. Raya Kaligawe Km. 04 Semarang
YAYASAN BADAN WAKAF
SULTAN AGUNG
PEKERJAAN PENURUNAN PANCANG
PROSES PENURUNAN PANCANG PROSES PENURUNAN PANCANG
PROSES PENURUNAN PANCANG PROSES PENURUNAN PANCANG
Yayasan Badan Wakaf Sultan Agung/Sugiyanto,ST/Semarang
PEKERJAAN TIANG PANCANG
PROSES PENGELASAN PANCANG
PROSES AKIR MENDORONG DOLI
PROSES PENGELASAN PANCANG
PROSES PEMOTONGAN PANCANG
Yayasan Badan Wakaf Sultan Agung/Sugiyanto,ST/Semarang
PEKERJAAN TEST PDA
PROSES TEST PDA ( PILE DRIVING ANALYZER )
Tujuan : Untuk menentukan kapasitas Ultimate
PROSES TEST PDA ( PILE DRIVING ANALYZER )
Tujuan : Untuk menentukan kapasitas Ultimate
Yayasan Badan Wakaf Sultan Agung/Sugiyanto,ST/Semarang
PEKERJAAN PENGUKURAN DAN GALIAN TANAH
PROSES PENGUKURAN AREA LAPANGAN PROSES GALIAN TANAH
Yayasan Badan Wakaf Sultan Agung/Sugiyanto,ST/Semarang
PEKERJAAN STRUKTUR BAWAH
PROSES PENGECORAN LANTAI KERJA
PROSES PENGECORAN TUSUK KONDE
Yayasan Badan Wakaf Sultan Agung/Sugiyanto,ST/Semarang
PEKERJAAN PEMBESIAN
PEKERJAAN PEMBESIAN
PEKERJAAN PEMBESIAN
Yayasan Badan Wakaf Sultan Agung/Sugiyanto,ST/Semarang
PEKERJAAN BEGESTING DAN PEMBESIAN
PROSES BEGESTING DAN PEMBESIAN PILE CAP
PROSES PEMBESIAN KOLOM
Yayasan Badan Wakaf Sultan Agung/Sugiyanto,ST/Semarang
PEKERJAAN PEMBESIAN
PROSES PEMBESIAN KOLOM PROSES PEMBESIAN KOLOM
Yayasan Badan Wakaf Sultan Agung/Sugiyanto,ST/Semarang
PEKERJAAN PEMBESIAN BALOK BEAM
PROSES PEMBESIAN BALOK
PROSES PEMBESIAN BALOK
Yayasan Badan Wakaf Sultan Agung/Sugiyanto,ST/Semarang
METODE PELAKSANAAN Pembangunan Gedung Kuliah Bers
Yayasan Badan Wakaf Sultan Agung/Sugiyanto,ST/Semarang
Jl. Raya Kaligawe Km. 04 Semarang
YAYASAN BADAN WAKAF
SULTAN AGUNG
Yayasan Badan Wakaf Sultan Agung/Sugiyanto,ST/Semarang
52 135 52
135
15
L=45
M
/
FINAL
SET
100
5
5
150
Potongan P7
S k a l a 1 : 40
15
52 135 52
135
15
L=45
M
/
FINAL
SET
100
55
150
Potongan P7
S k a l a 1 : 40
15
METODE PELAKSANAAN PENGECORAN
ALTERNATIF 1
Pengecoran Pile Cap, Balok Beam dibawah plat lantai 1
Keuntungannya :
1. Mudah pelaksanaanya.
2. Begesting bisa digunakan 2 atau 3 kali
3. Lebih hemat anggaranya.
Kekurangannya :
1. Pengecoran antara plat dengan balok atau pilecap tidak
bersamaan sehingga tidak menyatu bersamaan.
2. Bila pengecoran plat lantai akan dikerjakan perlu pembersihan
dan memakai zat aditif tambahan biar menyatu.
3. Besi yang belum di cor kelihatan berserakan (pating nyrongot)
ALTERNATIF 2
Pengecoran Balok beam, Pile Cap dan plat lantai 1 bersamaan
Keuntungannya :
1. Pengecoran Pilecap,Balok Beam dan Plat menyatu dan rata.
2. Begesting tengah memakai dinding bataco
3. Anggaranya lebih mahal.
Kekurangannya :
1. Anggaran lebih mahal
2. Tanpa ada zat additif
3.
PILECAP
BALOK BEAM
Nama Pemilik : YAYASAN BADAN WA
Alamat : JL. Raya Kaligawe KM.04 Se
Lokasi Bang. : JL. Raya Kaligawe KM.
SEMARANG
Alamat :
Jl. Truntum IX/43 Tlogosari
Ir Sri Hartuti Wahyuningrum, MT
Nama :
DIGAMBAR PERENCA
PERENCANAAN
GEDUNG KULIAH BERSAMA
UNIVERSITAS ISLAM SULTAN AGU
SEMARANG
Semarang
LE
KETERANGAN
SKALA
KONSULTAN TEKNIK
PUSAT
KANTOR/STUDIO
ANGGOTA INKINDO
Perencana S
Jl. Truntum IX
Jl. Badak v N
Telp (024) 67
12201/P0562
CV. Studi Teknik
ST Semarang
CV. STUDI T
PILECAP
BALOK BEAM
TAHAP PENGECORAN 2 ( Cor PileCap, Balok, dan plat )
TAHAP PENGECORAN 1 ( Cor PileCap & Balok bawah plat )
1. Pembesian dan begesting Pilecap dan Beam sudah selesai diperiksa oleh direksi
2. Pengecoran Pilecap dan Beam di bawah plat lantai siap dilaksanakan
3. Jeda 2 minggu pelepasan begesting samping
4. Pemerataan tanah dan membuat lantai kerja
5. Pembesian plat lantai
6. Selesai pembesian plat lantai dilakukan pemeriksaan oleh direksi
7. Pengecoran Plat lantai siap dilaksanakan
Metode Pelaksanaan Pengecoran :
Yayasan Badan Wakaf Sultan Agung/Sugiyanto,ST/Semarang
1. Bekisting setinggi 38 cm untu siklop diberi bekisting yang bekas
(tidak dilepas)
2. Setelah siklop di cor ( bekisting tidak usah dilepas )
3. Untuk mengurangi buang tanah yang banyak kemudian bagian tengah
diurug tanah sampai bawah lantai ( diatas pile cap kosong )
4. Tanah urugan di padatkan dengan stemper ( jangan sampai kena
beton siklop )
5. Lantai kerja peluran 5 cm
6. Pembesian plat lantai
7. Selesai pembesian plat lantai dilakukan pemeriksaan oleh direksi
8. Pengecoran Plat lantai siap dilaksanakan
Metode Pelaksanaan Pengurugan Tanah
dan Lantai kerja plat lantai :
Yayasan Badan Wakaf Sultan Agung/Sugiyanto,ST/Semarang

More Related Content

Similar to Gambar Struktur Bangunan 1.ppt

Research Methodology Proposal Presentation.pptx
Research Methodology Proposal Presentation.pptxResearch Methodology Proposal Presentation.pptx
Research Methodology Proposal Presentation.pptxssuserbaba32
 
LAFINHAN O. O. FINAL YEAR PROJECT PRESENTATION
LAFINHAN O. O. FINAL YEAR PROJECT PRESENTATIONLAFINHAN O. O. FINAL YEAR PROJECT PRESENTATION
LAFINHAN O. O. FINAL YEAR PROJECT PRESENTATIONTobi Lafinhan
 
roadway condition survey
roadway condition surveyroadway condition survey
roadway condition surveymruemran
 
PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM PRESENTATION
PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM PRESENTATIONPROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM PRESENTATION
PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM PRESENTATIONWael Alawsey
 
Geometry condition survey from panthapath to russel square report submited by...
Geometry condition survey from panthapath to russel square report submited by...Geometry condition survey from panthapath to russel square report submited by...
Geometry condition survey from panthapath to russel square report submited by...Pronob Ghosh
 
Resume Bharadwaj
Resume Bharadwaj Resume Bharadwaj
Resume Bharadwaj Bharadwaj B
 
Pavement Maintenance Practices in
Pavement Maintenance Practices inPavement Maintenance Practices in
Pavement Maintenance Practices inMohhammad Sujon
 
Study of Traffic Volume and Level of Service of Panjab University, Chandigarh
Study of Traffic Volume and Level of Service of Panjab University, ChandigarhStudy of Traffic Volume and Level of Service of Panjab University, Chandigarh
Study of Traffic Volume and Level of Service of Panjab University, ChandigarhIJERA Editor
 
Identification of Factors to Improve Public Transit Services (A Case Study of...
Identification of Factors to Improve Public Transit Services (A Case Study of...Identification of Factors to Improve Public Transit Services (A Case Study of...
Identification of Factors to Improve Public Transit Services (A Case Study of...Dr. Amarjeet Singh
 
Resume Bharadwaj
Resume Bharadwaj Resume Bharadwaj
Resume Bharadwaj Bharadwaj B
 
Car-Following Parameters by Means of Cellular Automata in the Case of Evacuation
Car-Following Parameters by Means of Cellular Automata in the Case of EvacuationCar-Following Parameters by Means of Cellular Automata in the Case of Evacuation
Car-Following Parameters by Means of Cellular Automata in the Case of EvacuationCSCJournals
 
Impact of Lane Occupancy on Urban Roads
Impact of Lane Occupancy on Urban RoadsImpact of Lane Occupancy on Urban Roads
Impact of Lane Occupancy on Urban RoadsScientific Review SR
 
Traffic Engineering And Drainage
Traffic Engineering And DrainageTraffic Engineering And Drainage
Traffic Engineering And DrainagePrashant Ranjan
 
Febrian p aoke
Febrian p aokeFebrian p aoke
Febrian p aokeAl Mtdrs
 

Similar to Gambar Struktur Bangunan 1.ppt (20)

Research Methodology Proposal Presentation.pptx
Research Methodology Proposal Presentation.pptxResearch Methodology Proposal Presentation.pptx
Research Methodology Proposal Presentation.pptx
 
LAFINHAN O. O. FINAL YEAR PROJECT PRESENTATION
LAFINHAN O. O. FINAL YEAR PROJECT PRESENTATIONLAFINHAN O. O. FINAL YEAR PROJECT PRESENTATION
LAFINHAN O. O. FINAL YEAR PROJECT PRESENTATION
 
roadway condition survey
roadway condition surveyroadway condition survey
roadway condition survey
 
Predictive Model for Road Pavement Deterioration Indices
Predictive Model for Road Pavement Deterioration IndicesPredictive Model for Road Pavement Deterioration Indices
Predictive Model for Road Pavement Deterioration Indices
 
PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM.
PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM.PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM.
PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM.
 
PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM PRESENTATION
PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM PRESENTATIONPROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM PRESENTATION
PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM PRESENTATION
 
ITS presentation final
ITS presentation final ITS presentation final
ITS presentation final
 
Geometry condition survey from panthapath to russel square report submited by...
Geometry condition survey from panthapath to russel square report submited by...Geometry condition survey from panthapath to russel square report submited by...
Geometry condition survey from panthapath to russel square report submited by...
 
Resume Bharadwaj
Resume Bharadwaj Resume Bharadwaj
Resume Bharadwaj
 
Masters Dissertation Posters 2016
Masters Dissertation Posters 2016Masters Dissertation Posters 2016
Masters Dissertation Posters 2016
 
Pavement Maintenance Practices in
Pavement Maintenance Practices inPavement Maintenance Practices in
Pavement Maintenance Practices in
 
Study of Traffic Volume and Level of Service of Panjab University, Chandigarh
Study of Traffic Volume and Level of Service of Panjab University, ChandigarhStudy of Traffic Volume and Level of Service of Panjab University, Chandigarh
Study of Traffic Volume and Level of Service of Panjab University, Chandigarh
 
Identification of Factors to Improve Public Transit Services (A Case Study of...
Identification of Factors to Improve Public Transit Services (A Case Study of...Identification of Factors to Improve Public Transit Services (A Case Study of...
Identification of Factors to Improve Public Transit Services (A Case Study of...
 
Its copy
Its   copyIts   copy
Its copy
 
Resume Bharadwaj
Resume Bharadwaj Resume Bharadwaj
Resume Bharadwaj
 
V35119123
V35119123V35119123
V35119123
 
Car-Following Parameters by Means of Cellular Automata in the Case of Evacuation
Car-Following Parameters by Means of Cellular Automata in the Case of EvacuationCar-Following Parameters by Means of Cellular Automata in the Case of Evacuation
Car-Following Parameters by Means of Cellular Automata in the Case of Evacuation
 
Impact of Lane Occupancy on Urban Roads
Impact of Lane Occupancy on Urban RoadsImpact of Lane Occupancy on Urban Roads
Impact of Lane Occupancy on Urban Roads
 
Traffic Engineering And Drainage
Traffic Engineering And DrainageTraffic Engineering And Drainage
Traffic Engineering And Drainage
 
Febrian p aoke
Febrian p aokeFebrian p aoke
Febrian p aoke
 

Recently uploaded

Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.PrashantGoswami42
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdfKamal Acharya
 
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringC Sai Kiran
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfKamal Acharya
 
retail automation billing system ppt.pptx
retail automation billing system ppt.pptxretail automation billing system ppt.pptx
retail automation billing system ppt.pptxfaamieahmd
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
 
Soil Testing Instruments by aimil ltd.- California Bearing Ratio apparatus, c...
Soil Testing Instruments by aimil ltd.- California Bearing Ratio apparatus, c...Soil Testing Instruments by aimil ltd.- California Bearing Ratio apparatus, c...
Soil Testing Instruments by aimil ltd.- California Bearing Ratio apparatus, c...Aimil Ltd
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf884710SadaqatAli
 
Online book store management system project.pdf
Online book store management system project.pdfOnline book store management system project.pdf
Online book store management system project.pdfKamal Acharya
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdfKamal Acharya
 
Electrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission lineElectrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission lineJulioCesarSalazarHer1
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdfKamal Acharya
 
2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edgePaco Orozco
 
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGKOUSTAV SARKAR
 
Dairy management system project report..pdf
Dairy management system project report..pdfDairy management system project report..pdf
Dairy management system project report..pdfKamal Acharya
 
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...Amil baba
 
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdfDR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdfDrGurudutt
 
Natalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in KrakówNatalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in Krakówbim.edu.pl
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Aryaabh.arya
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringC Sai Kiran
 

Recently uploaded (20)

Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
 
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
 
retail automation billing system ppt.pptx
retail automation billing system ppt.pptxretail automation billing system ppt.pptx
retail automation billing system ppt.pptx
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Soil Testing Instruments by aimil ltd.- California Bearing Ratio apparatus, c...
Soil Testing Instruments by aimil ltd.- California Bearing Ratio apparatus, c...Soil Testing Instruments by aimil ltd.- California Bearing Ratio apparatus, c...
Soil Testing Instruments by aimil ltd.- California Bearing Ratio apparatus, c...
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf
 
Online book store management system project.pdf
Online book store management system project.pdfOnline book store management system project.pdf
Online book store management system project.pdf
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
 
Electrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission lineElectrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission line
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdf
 
2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge
 
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
 
Dairy management system project report..pdf
Dairy management system project report..pdfDairy management system project report..pdf
Dairy management system project report..pdf
 
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...
 
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdfDR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
 
Natalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in KrakówNatalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in Kraków
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
 

Gambar Struktur Bangunan 1.ppt

  • 1. FAKULTAS TEKNIK JURUSAN SIPIL UNIVERSITAS ISLAM SULTAN AGUNG (UNISSULA) SEMARANG Jl. Raya Kaligawe Km. 4 PO BOX 1054 Semarang 50112
  • 3. RESEARCH OF FLY OVER AS A SOLUTION TO CONGESTIO OF INTERSECTION JUNCTION (Case Study: Jalan Jatingaleh Semarang)
  • 4. Systematics of presentation Background of study Bibliography Research methodology Analysis Summary
  • 6. formulation of the problem The density of traffic flow, especially at peak hours The transportation problem, that is traffic in the area of study The existence of an intersection at grade that is not signalized could potentially cause delays The various function of land use such as Jatingaleh Market, office building and BRT bus stop The existance of side barriers such as vehicle parking, vehicle turning direction, and vehicles in and out of main road Effected to the occurance of Vehicle slow down speed and queue Traffic Management Increasing the use of road capacity, namely: road widening and or interchange CAUSE MAIN PROBLEM DUE TO SOLUTION
  • 7. Problems of study  The characteristic of road and traffics  Designing of interchange, such as : 1. Flyover 2. Underpass
  • 9.  To identify the exsisting condition of the road  To design a precise Fly Over Research Objectives
  • 10. 10 1. Road and Intersections 2. Traffic 3. Interchange Bibliography
  • 11. 1. Road and intersection  Urban roads is a road that has a permanent and continuous development throughout the year for the entire or almost the entire way, at least on one side of the road with a population of over 100,000 inhabitants. (MKJI, 1997)
  • 12. 2. Traffic  Traffic is time wasted on travel because of the reduced speed within normal limits expressed in units of minutes. (Hobbs,1997:107)
  • 13. 3. Interchange Interchange is the intersection with the traffic flow on the main “kaki persimpangan” intersect spatially separated. (Mujihartono, 2002 : 181)
  • 15. 15 The design of precise fly over Inputs direct observation literature review Typical Sequence of Phases in a Research INPUT ANALYSIS Highway Capacity degree of Saturation Delay opportunities Queue Traffic Flow Prediction efficiency modeling : Fly Over Underpass Fly Over-Underpass Primary Data Secondary Data OUTPUT Analysis Quantitative Methods descriptive Conclusion
  • 16.  Determining the observer that register all vehicles that pass through the study site  Recording the vehicle data of arrival and stop on a long sheets  Recording is done to get the number of vehicles per hour Data Collection Phase
  • 17. Analysis of Existing Conditions
  • 18. Current traffic conditions effected by the vehicle that turn to different direction Side barrier that occurs at the intersection of PLN The Occurance of vehical flow (in and out )of the toll booth and Jatingaleh market
  • 20.
  • 21.
  • 22. The Analysis of road capasity on Jatingaleh Intersections
  • 23. The Analysis of Fly Over
  • 24. The Picture of Fly Over 3D Shown skecth-up
  • 25. Basic design Fly Over to increase the number of road capacity
  • 26.
  • 27. Comparison of flow reduction toward Fly Over Effectiveness Analysis of Fly Over Comparison of traffic conditions before and after the existance Fly Over
  • 28. The Analysis of Underpass
  • 29. The picture Underpass -3D shown (sketchup)
  • 30. Comparison of Flow Reduction on Underpass Effectiveness Analysis of Underpass Comparison of traffic conditions before and after the existance of underpass
  • 31. The Analysis of Fly Over-Underpas
  • 32. The picture FO-U 3D shown (sketchup)
  • 33. Dua Underpass Untuk Urai Jatingaleh
  • 35. Effectiveness Analysis of Fly Over- Underpass Calculation of Flow Reduction Fly Over-Underpass
  • 36. Comparison of Fly Over, Underpass, and Fly Over-Underpass
  • 38. 1. Factors Causes Traffic : • On site Activity • Intersection at a grade • Side barrier Types of vehicle is dominated by motorcycles (MC) 2. From the 3 (three) Fly Over designs, that is fly over, Underpass and combination Fly Over-Underpass, it is found the precise fly over design. Conclusion
  • 39. Bagan Alir Tahun ke 1 Identifikasi Karakteristik Lalu Lintas yang ada Analisis Kemacetan berbasis manajemen transportasi Kajian (Research) model Flyover •Golongan kendaraan •Jenis kendaraan •Kendaraan dominan Geometrik Jalan •Kelandaian •Kelengkungan •Elevasi •Lebar jalan •Model-model flyover •Analisis masing-masing model secara teknis dan ekonomis •Penentuan model flyover yang multiguna dan tepat sasaran Luaran: •Model Flyover berbasis manajemen transportasi •Seminar
  • 40. Bagan Alir Tahun ke 2 Membuat model prototype flyover yang paling cocok Simulasi model flyover berbasis teknis & ekonomis Optimalisasi model flyover berbasis manajemen transportasi Maket flyover Model 3 Dimensi Flyover dan simulasi lalu lintas Luaran: •Model Flyover yang cocok dan berbasis manajemen transportasi •Seminar •Buku Ajar
  • 41. Kegiatan Tahap (Tahun) Ke - 2 1 2 3 4 5 6 7 8 9 10 Perancangan Prototipe Pembuatan Prototipe Analisis dan Pembahasan Simulasi Prototipe Model 3 D Penyusunan Laporan Penelitian Buku Ajar
  • 42. Thank you For Your Attention
  • 44. Alasan pemilihan judul : disesuaikan dg : 1. Rumusan permasalahan 2. output dari tujuan penelitian
  • 46. PROGRESS PELAKSANAAN Pembangunan Gedung Kuliah Bers Yayasan Badan Wakaf Sultan Agung/Sugiyanto,ST/Semarang Jl. Raya Kaligawe Km. 04 Semarang YAYASAN BADAN WAKAF SULTAN AGUNG
  • 47.
  • 48.
  • 49.
  • 50.
  • 51.
  • 52.
  • 53.
  • 54.
  • 55.
  • 56.
  • 57.
  • 58.
  • 59.
  • 60.
  • 61.
  • 62.
  • 63.
  • 64.
  • 65.
  • 66.
  • 67.
  • 68.
  • 69.
  • 70.
  • 71. PROGRESS PELAKSANAAN Pembangunan Gedung Kuliah Bers Yayasan Badan Wakaf Sultan Agung/Sugiyanto,ST/Semarang Jl. Raya Kaligawe Km. 04 Semarang YAYASAN BADAN WAKAF SULTAN AGUNG
  • 72. PEKERJAAN PENURUNAN PANCANG PROSES PENURUNAN PANCANG PROSES PENURUNAN PANCANG PROSES PENURUNAN PANCANG PROSES PENURUNAN PANCANG Yayasan Badan Wakaf Sultan Agung/Sugiyanto,ST/Semarang
  • 73. PEKERJAAN TIANG PANCANG PROSES PENGELASAN PANCANG PROSES AKIR MENDORONG DOLI PROSES PENGELASAN PANCANG PROSES PEMOTONGAN PANCANG Yayasan Badan Wakaf Sultan Agung/Sugiyanto,ST/Semarang
  • 74. PEKERJAAN TEST PDA PROSES TEST PDA ( PILE DRIVING ANALYZER ) Tujuan : Untuk menentukan kapasitas Ultimate PROSES TEST PDA ( PILE DRIVING ANALYZER ) Tujuan : Untuk menentukan kapasitas Ultimate Yayasan Badan Wakaf Sultan Agung/Sugiyanto,ST/Semarang
  • 75. PEKERJAAN PENGUKURAN DAN GALIAN TANAH PROSES PENGUKURAN AREA LAPANGAN PROSES GALIAN TANAH Yayasan Badan Wakaf Sultan Agung/Sugiyanto,ST/Semarang
  • 76. PEKERJAAN STRUKTUR BAWAH PROSES PENGECORAN LANTAI KERJA PROSES PENGECORAN TUSUK KONDE Yayasan Badan Wakaf Sultan Agung/Sugiyanto,ST/Semarang
  • 77. PEKERJAAN PEMBESIAN PEKERJAAN PEMBESIAN PEKERJAAN PEMBESIAN Yayasan Badan Wakaf Sultan Agung/Sugiyanto,ST/Semarang
  • 78. PEKERJAAN BEGESTING DAN PEMBESIAN PROSES BEGESTING DAN PEMBESIAN PILE CAP PROSES PEMBESIAN KOLOM Yayasan Badan Wakaf Sultan Agung/Sugiyanto,ST/Semarang
  • 79. PEKERJAAN PEMBESIAN PROSES PEMBESIAN KOLOM PROSES PEMBESIAN KOLOM Yayasan Badan Wakaf Sultan Agung/Sugiyanto,ST/Semarang
  • 80. PEKERJAAN PEMBESIAN BALOK BEAM PROSES PEMBESIAN BALOK PROSES PEMBESIAN BALOK Yayasan Badan Wakaf Sultan Agung/Sugiyanto,ST/Semarang
  • 81. METODE PELAKSANAAN Pembangunan Gedung Kuliah Bers Yayasan Badan Wakaf Sultan Agung/Sugiyanto,ST/Semarang Jl. Raya Kaligawe Km. 04 Semarang YAYASAN BADAN WAKAF SULTAN AGUNG
  • 82. Yayasan Badan Wakaf Sultan Agung/Sugiyanto,ST/Semarang 52 135 52 135 15 L=45 M / FINAL SET 100 5 5 150 Potongan P7 S k a l a 1 : 40 15 52 135 52 135 15 L=45 M / FINAL SET 100 55 150 Potongan P7 S k a l a 1 : 40 15 METODE PELAKSANAAN PENGECORAN ALTERNATIF 1 Pengecoran Pile Cap, Balok Beam dibawah plat lantai 1 Keuntungannya : 1. Mudah pelaksanaanya. 2. Begesting bisa digunakan 2 atau 3 kali 3. Lebih hemat anggaranya. Kekurangannya : 1. Pengecoran antara plat dengan balok atau pilecap tidak bersamaan sehingga tidak menyatu bersamaan. 2. Bila pengecoran plat lantai akan dikerjakan perlu pembersihan dan memakai zat aditif tambahan biar menyatu. 3. Besi yang belum di cor kelihatan berserakan (pating nyrongot) ALTERNATIF 2 Pengecoran Balok beam, Pile Cap dan plat lantai 1 bersamaan Keuntungannya : 1. Pengecoran Pilecap,Balok Beam dan Plat menyatu dan rata. 2. Begesting tengah memakai dinding bataco 3. Anggaranya lebih mahal. Kekurangannya : 1. Anggaran lebih mahal 2. Tanpa ada zat additif 3. PILECAP BALOK BEAM Nama Pemilik : YAYASAN BADAN WA Alamat : JL. Raya Kaligawe KM.04 Se Lokasi Bang. : JL. Raya Kaligawe KM. SEMARANG Alamat : Jl. Truntum IX/43 Tlogosari Ir Sri Hartuti Wahyuningrum, MT Nama : DIGAMBAR PERENCA PERENCANAAN GEDUNG KULIAH BERSAMA UNIVERSITAS ISLAM SULTAN AGU SEMARANG Semarang LE KETERANGAN SKALA KONSULTAN TEKNIK PUSAT KANTOR/STUDIO ANGGOTA INKINDO Perencana S Jl. Truntum IX Jl. Badak v N Telp (024) 67 12201/P0562 CV. Studi Teknik ST Semarang CV. STUDI T PILECAP BALOK BEAM
  • 83. TAHAP PENGECORAN 2 ( Cor PileCap, Balok, dan plat ) TAHAP PENGECORAN 1 ( Cor PileCap & Balok bawah plat ) 1. Pembesian dan begesting Pilecap dan Beam sudah selesai diperiksa oleh direksi 2. Pengecoran Pilecap dan Beam di bawah plat lantai siap dilaksanakan 3. Jeda 2 minggu pelepasan begesting samping 4. Pemerataan tanah dan membuat lantai kerja 5. Pembesian plat lantai 6. Selesai pembesian plat lantai dilakukan pemeriksaan oleh direksi 7. Pengecoran Plat lantai siap dilaksanakan Metode Pelaksanaan Pengecoran : Yayasan Badan Wakaf Sultan Agung/Sugiyanto,ST/Semarang
  • 84. 1. Bekisting setinggi 38 cm untu siklop diberi bekisting yang bekas (tidak dilepas) 2. Setelah siklop di cor ( bekisting tidak usah dilepas ) 3. Untuk mengurangi buang tanah yang banyak kemudian bagian tengah diurug tanah sampai bawah lantai ( diatas pile cap kosong ) 4. Tanah urugan di padatkan dengan stemper ( jangan sampai kena beton siklop ) 5. Lantai kerja peluran 5 cm 6. Pembesian plat lantai 7. Selesai pembesian plat lantai dilakukan pemeriksaan oleh direksi 8. Pengecoran Plat lantai siap dilaksanakan Metode Pelaksanaan Pengurugan Tanah dan Lantai kerja plat lantai : Yayasan Badan Wakaf Sultan Agung/Sugiyanto,ST/Semarang

Editor's Notes

  1. 3
  2. 5
  3. 14
  4. 17
  5. 23
  6. 28
  7. 31
  8. 37
  9. 42