SlideShare a Scribd company logo
1 of 4
Engr. Anas Ijaz
Personal
Father’s Name: Prof. Dr. Ijaz Farooq Akram
Current Address: 6th Floor, Saudi Pak Tower, Blue Area, Islamabad.
Permanent Address: 116-J Tech Town, Satyana Road, Faisalabad.
Phone No: +92-345-2314160
E-mail: anasijaz@yahoo.com
Date of Birth: July 31, 1988.
Career Objective
Always like to join the institution that can provide me with the best development environment
and help me to enhance my skills with exposure to future technologies.
Academics
2005- 09 BSc. Telecommunication Engineering
Government College University, Faisalabad
(PEC Reg no: TELE-2443)
Experience
 Working as Microwave Planning & Optimization Engineer in Network
Integration Services Department at Huawei Technologies, Pakistan.
(Dec,2013-Present)
 Working with major responsibilities of Transmission planning and optimization
for 2G, 3G & 4G LTE Project of CMPAK Pakistan.
 Designing new links for 2G/3G/4G-LTE rollout sites.
 Optimization for deployed TXN network for readiness of 2G,3G/4G LTE.
 Maintain database and prepare design for overall network.
 Extracting all logs and data from NMS U2000.
 Optimization of links with degraded KPI.
 Working on Huawei RTN Designer & Pathloss for link planning.
 Working on Huawei AMS5000 tools for KPI reporting.
 Working with major responsibilities to supervise all activities of 4G LTE Project &
3G Wireless optimization of CMPAK Pakistan.
 Managing Transmission teams, Subcons, equipment, Activities etc.
 Connectivity of Microwave Transmission with PTN and IP Core network.
 ELine, ELAN services for Ethernet/IP traffic.
 Testing Ethernet services End to End.
 Integration of Node B’s & ENode B’s and clearance of transmission
alarms.
 Making Test/1st Call from Node B & ENode B.
 Integrating Regional Network with Main network from Backbone and
enable NMS at NOC via NMS Routers.
 Visibility of all transmission network on NMS iManager U2000.
 Working with major responsibilities to ensure KPI’s monitoring, reporting and
optimizing of PMCL Transmission Network on Mobilink Mega NPM Project.
 Extracting all logs and data from NMS U2000.
 Monitoring & reporting Microwave & MSTP network.
 Troubleshooting all problematic transmission links in the network.
 TDM/Ethernet KPI’s reporting with customers on daily, weekly &
monthly basis.
 Optimization of links with degraded KPI.
 Working on Huawei AMS5000 tools for KPI reporting.
 Worked as TxN Engineer in Assurance & Managed Services Department at
Huawei Technologies, Afghanistan. (Jun,2012-Nov,2013)
 Working with major responsibilities to supervise all Transmission network of
Etisalat Kabul Grand & North Region.
 Configuration of Ethernet and SDH services (ELAN, ELine, STM-4, STM-
1and Native E1).
 Managing teams in regions, assigning duties for PM/CM.
 Troubleshooting for any issues in the network.
 Maintaining Kabul 18 HOPS Ring, 19 HOPS Ring, Kabul to Pakistan
Backbone.
 Maintaining Etisalat North Region Network.
 Reporting on daily, weekly, monthly, Quarterly or yearly basis of
network issue, incidents, availability, outages, fluctuation, CM & PM.
 Maintaining transmission NMS of complete Etisalat Network.
 Working as TxN Engineer on Etisalat 3.2 Gbps Microwave backbone
project at Huawei Technologies, Afghanistan. (June,2012-Nov,2013)
 Working with following major responsibilities,
 Installation and commissioning microwave equipment RTN980.
 Creating & testing backbone Ethernet, STM & TDM services over
backbone.
 Troubleshooting for any issues in the network.
 Maintaining transmission NMS of backbone.
 Worked as TxN Engineer on Etisalat 3G Project at Huawei Technologies,
Afghanistan. (June,2012-Nov,2012)
 Working with major responsibilities to supervise all activities in Afghanistan for
Etisalat 3G Project as Regional Manager.
 Managing Transmission teams, Subcons, equipment, Activities etc.
 Installation & Commissioning of RTN 620,910,950,980.
 Creating & implementing 2G/3G Services, Board plans and verifying
them.
 ELine, ELAN services for Ethernet/IP traffic.
 Testing ethernet services by Ethernet OAM Services.
 Integrate Ethernet services with Node B (3G BTS) to all region from
RNC (3G BSC).
 Making Test/1st Call from Node B.
 Integrating Regional Network with Main network from Backbone and
enable NMS at NOC via NMS Routers
 ATP/PATs from Etisalat customers.
 Worked as TxN & BSS Engineer of Huawei on Ufone Project (Phase-10) at
U.C.C (pvt), Pakistan. (March,2012-June,2012)
 Working as Sr. Engineer at Region with responsibilities such as Leading teams
installations, commissioning, configurations, link alignment, quality, cutover,
NMS etc.
 Creating SNCP’s for rings in MSC/BSC’s, Cross-connections, including media
verification from Microwave Link of Huawei RTN, NEC Pasolink & Startex Eclipse.
 Making all sites visible by NMS.
 Worked as P.O.C of Huawei on CMPak Microwave Swap Project (Phase-II)
at InterSES(pvt), Pakistan. (December,2011-March,2012)
 Major responsibilities to supervise all activities in Faisalabad Region for CMPak
Project such as contacting to Huawei & CMPak representatives.
 Managed complete project with all responsibilities like,
 Managing Transmission teams, equipment etc.
 Creating documentations like PAT docs, TSSR Trackers, I & C Trackers,
Quality & Audit Reports, Traffic sheets for media distribution.
 Validating and placing all audit materials for customers such as assets
tags, serial no’s, site and equipment snaps etc.
 Worked as Sr. TxN Engineer at region with all responsibilities such as;
 Leading all regional teams for installations, commissioning,
configurations, link alignment, quality, media buildup, cutover & NMS.
 Installed/Commissioned/Configured all kind of Microwave Links such as
PDH, SDH, 1xSTM, 2xSTM, 1+0/1+1, SD, XPIC (1+0/1+1).
 Created & Implement all traffic sheets for media distribution in Ring,
Tree, and Star Topologies.
 Creating SNCP’s for Rings in MSC/BSC’s, Cross-connections. Including
media verification form MSC/BSC/Optical nodes to Terminal sites from
Microwave Links.
 Making all sites visible by NMS.
 Worked as Transmission Engineer on Ufone (Phase 9) & CMPak(Phase-I)
Projects at InterSES(pvt), Pakistan. (September,2010-March,2012)
 Worked as TxN Engineer with responsibilities such as;
 Installed/Commissioned/Configured Microwave Links.
 Creating SNCP’s for Rings in MSC/BSC’s, Cross-connections. Including
media verification form MSC/BSC/Optical nodes to Terminal sites from
Microwave Links on Huawei RTN/NEC Pasolink/Startax Eclipse.
 NMS Visibility of RTN& NEC.
 6 Months in CDAS-1218, Pakistan Telecommunication Company Limited
(PTCL) as Broadband Supervisor. (December,2009-August,2010)
Trainings
 ZTE MUX training by Etisalat, Afghanistan.
 3G BTS & RNC Training by Huawei Technologies.
 Ethernet Services implementation & Testing on RTN by Huawei R&D Dept.
 NEC & RTN NMS Training by Huawei, Pakistan.
 Cisco Certified Network Associate (CCNA) Training form Corvit Systems, Lahore.
 Cisco Certified Network Professional (CCNP) Training form Corvit Systems, Lahore.
 WiMAX Training form Corvit Systems, Lahore.
 Juniper Networks Certified Internet Professional (JNCIP) Training form Corvit Systems,
Lahore.
 2 months Internshipat Pakistan Telecommunication Limited (PTCL) FTR,
Faisalabad in following departments;
 Power Plant
 WLL MSC
 Alcatel NMC
 ZTE MSC
 Attended two day workshop on Microcontroller conducted by IEEE-GCUF
Skills
 Telecom: Ethernet, SDH services on all Huawei Transmission Equipment.
 Tools:
 Huawei
 iManager U2000
 U2000 WebLCT
 Optix Navigator
 Tool Kit/ Data collector
 NEC Pasolink
 PNMT
 Mapinfo, LabView, MatLab, Workbench, MS Office, MS Windows
98/2000/XP/Vista/7/8
 Computer Languages: C, Visual C++, JAVA.
 Languages:
 Urdu (Native)
 English (IELTS: 6.5 bands)
Educational Projects
 Digital Car Parking using Parallel port Interfacing.
Final Year Project:
 Interference Cancellation in CDMA
Managerial Skills
 Managed a complete region of Afghanistan as Regional Manager at
Etisalat 3G Project at Huawei Technologies. co., Afghanistan.
 Managed complete Huawei CMPak DG RTN Swap Project (Phase-II) at
InterSES(pvt), Pakistan.
 I was member of different societies in my education carrier.
 Also was an IEEE member at IEEE-GCUF Student Branch.
 Managed and organized many seminars, group discussions, events.
 Organize and manage inauguration of IEEE-GCUF Branch.
 Organize seminars & Tech Discussion in Tech Fair 2008 conducted by IEEE-GCUF
at national level.
Training skills
 I have delivered trainings of Transmission NMS to multiple companies
 Also gave tutorials of Ethernet services for 3G network.
Co-Curricular Activities
 Games:Cricket, Chess, Frisbee, Video Games.
 Hobbies: Reading, Exploring, Computer Programming.
 Participated in dramas, debate, Charting competitions at many events and also got
positions.
 I had participated in SOFTEC 2008 Programming competition held at FAST-NU
Lahore.
 Have great interest in National/International relations.
References can be provided on request

More Related Content

What's hot (20)

Adeel Ahmed- CV
Adeel Ahmed- CVAdeel Ahmed- CV
Adeel Ahmed- CV
 
Resume-3
Resume-3Resume-3
Resume-3
 
Resume of Md. Bellal Hossain
Resume of Md. Bellal HossainResume of Md. Bellal Hossain
Resume of Md. Bellal Hossain
 
Mahmoud mahfouz senior transmission engineer-cv
Mahmoud mahfouz senior transmission engineer-cvMahmoud mahfouz senior transmission engineer-cv
Mahmoud mahfouz senior transmission engineer-cv
 
Rami Abou Omeira_CV
Rami Abou Omeira_CVRami Abou Omeira_CV
Rami Abou Omeira_CV
 
Er. Navdeep Thaman-Resume
Er. Navdeep Thaman-ResumeEr. Navdeep Thaman-Resume
Er. Navdeep Thaman-Resume
 
Resume
ResumeResume
Resume
 
MOHAMMAD SALEEM CV.
MOHAMMAD SALEEM CV.MOHAMMAD SALEEM CV.
MOHAMMAD SALEEM CV.
 
KUNAL
KUNALKUNAL
KUNAL
 
AHMAD HUSSAIN CV
AHMAD HUSSAIN CVAHMAD HUSSAIN CV
AHMAD HUSSAIN CV
 
Nilesh rai
Nilesh raiNilesh rai
Nilesh rai
 
DORAIRAJ_2015_
DORAIRAJ_2015_DORAIRAJ_2015_
DORAIRAJ_2015_
 
Delivery Engineer (Junior)-JD
Delivery Engineer (Junior)-JDDelivery Engineer (Junior)-JD
Delivery Engineer (Junior)-JD
 
Transmission_Profile_swatantra tripathi
Transmission_Profile_swatantra tripathiTransmission_Profile_swatantra tripathi
Transmission_Profile_swatantra tripathi
 
Amin Bolghari
Amin BolghariAmin Bolghari
Amin Bolghari
 
SANTOSH_TELECOM_CV
SANTOSH_TELECOM_CVSANTOSH_TELECOM_CV
SANTOSH_TELECOM_CV
 
Resume gyan prakash new
Resume gyan prakash newResume gyan prakash new
Resume gyan prakash new
 
KAMALJEET_SINGH_cv_NEW
KAMALJEET_SINGH_cv_NEWKAMALJEET_SINGH_cv_NEW
KAMALJEET_SINGH_cv_NEW
 
AHSANULLAH BHUTTO CV-DT
AHSANULLAH BHUTTO CV-DTAHSANULLAH BHUTTO CV-DT
AHSANULLAH BHUTTO CV-DT
 
ARSHAD cv with pic
ARSHAD cv with picARSHAD cv with pic
ARSHAD cv with pic
 

Similar to Curriculum vitae_Anas Ijaz (20)

Sanjoy_Resume (1)
Sanjoy_Resume (1)Sanjoy_Resume (1)
Sanjoy_Resume (1)
 
CV_Devesh
CV_DeveshCV_Devesh
CV_Devesh
 
Resume Deepak Pandey Ericsson
Resume  Deepak Pandey EricssonResume  Deepak Pandey Ericsson
Resume Deepak Pandey Ericsson
 
Ihab Eltahan's C.V.
Ihab Eltahan's C.V.Ihab Eltahan's C.V.
Ihab Eltahan's C.V.
 
Ihab Eltahan's C.V.
Ihab Eltahan's C.V.Ihab Eltahan's C.V.
Ihab Eltahan's C.V.
 
Aashar_CV
Aashar_CVAashar_CV
Aashar_CV
 
Imtiaz Ali ... CV
Imtiaz Ali ... CV Imtiaz Ali ... CV
Imtiaz Ali ... CV
 
Senior LTE Engineer CV
Senior LTE Engineer CVSenior LTE Engineer CV
Senior LTE Engineer CV
 
alexander Eze
alexander Ezealexander Eze
alexander Eze
 
shriram2016
shriram2016shriram2016
shriram2016
 
Mir Ahmed Raza
Mir Ahmed RazaMir Ahmed Raza
Mir Ahmed Raza
 
Mohammed Abu Aqel Cv 11 10 2012
Mohammed Abu Aqel Cv 11 10 2012Mohammed Abu Aqel Cv 11 10 2012
Mohammed Abu Aqel Cv 11 10 2012
 
my Resume
my Resumemy Resume
my Resume
 
CV_VIKAS RAJPUROHIT
CV_VIKAS RAJPUROHITCV_VIKAS RAJPUROHIT
CV_VIKAS RAJPUROHIT
 
Resume 7June2016
Resume 7June2016Resume 7June2016
Resume 7June2016
 
Muhammad Faisal
Muhammad Faisal Muhammad Faisal
Muhammad Faisal
 
Lokesh_Srivastava_CV_6
Lokesh_Srivastava_CV_6Lokesh_Srivastava_CV_6
Lokesh_Srivastava_CV_6
 
Lokesh_Srivastava_CV_6
Lokesh_Srivastava_CV_6Lokesh_Srivastava_CV_6
Lokesh_Srivastava_CV_6
 
Asif-Res-2015
Asif-Res-2015Asif-Res-2015
Asif-Res-2015
 
Ajay verma RESUME
Ajay verma RESUMEAjay verma RESUME
Ajay verma RESUME
 

Curriculum vitae_Anas Ijaz

  • 1. Engr. Anas Ijaz Personal Father’s Name: Prof. Dr. Ijaz Farooq Akram Current Address: 6th Floor, Saudi Pak Tower, Blue Area, Islamabad. Permanent Address: 116-J Tech Town, Satyana Road, Faisalabad. Phone No: +92-345-2314160 E-mail: anasijaz@yahoo.com Date of Birth: July 31, 1988. Career Objective Always like to join the institution that can provide me with the best development environment and help me to enhance my skills with exposure to future technologies. Academics 2005- 09 BSc. Telecommunication Engineering Government College University, Faisalabad (PEC Reg no: TELE-2443) Experience  Working as Microwave Planning & Optimization Engineer in Network Integration Services Department at Huawei Technologies, Pakistan. (Dec,2013-Present)  Working with major responsibilities of Transmission planning and optimization for 2G, 3G & 4G LTE Project of CMPAK Pakistan.  Designing new links for 2G/3G/4G-LTE rollout sites.  Optimization for deployed TXN network for readiness of 2G,3G/4G LTE.  Maintain database and prepare design for overall network.  Extracting all logs and data from NMS U2000.  Optimization of links with degraded KPI.  Working on Huawei RTN Designer & Pathloss for link planning.  Working on Huawei AMS5000 tools for KPI reporting.  Working with major responsibilities to supervise all activities of 4G LTE Project & 3G Wireless optimization of CMPAK Pakistan.  Managing Transmission teams, Subcons, equipment, Activities etc.  Connectivity of Microwave Transmission with PTN and IP Core network.  ELine, ELAN services for Ethernet/IP traffic.  Testing Ethernet services End to End.  Integration of Node B’s & ENode B’s and clearance of transmission alarms.  Making Test/1st Call from Node B & ENode B.  Integrating Regional Network with Main network from Backbone and enable NMS at NOC via NMS Routers.  Visibility of all transmission network on NMS iManager U2000.  Working with major responsibilities to ensure KPI’s monitoring, reporting and optimizing of PMCL Transmission Network on Mobilink Mega NPM Project.  Extracting all logs and data from NMS U2000.  Monitoring & reporting Microwave & MSTP network.  Troubleshooting all problematic transmission links in the network.  TDM/Ethernet KPI’s reporting with customers on daily, weekly & monthly basis.  Optimization of links with degraded KPI.  Working on Huawei AMS5000 tools for KPI reporting.  Worked as TxN Engineer in Assurance & Managed Services Department at Huawei Technologies, Afghanistan. (Jun,2012-Nov,2013)  Working with major responsibilities to supervise all Transmission network of Etisalat Kabul Grand & North Region.
  • 2.  Configuration of Ethernet and SDH services (ELAN, ELine, STM-4, STM- 1and Native E1).  Managing teams in regions, assigning duties for PM/CM.  Troubleshooting for any issues in the network.  Maintaining Kabul 18 HOPS Ring, 19 HOPS Ring, Kabul to Pakistan Backbone.  Maintaining Etisalat North Region Network.  Reporting on daily, weekly, monthly, Quarterly or yearly basis of network issue, incidents, availability, outages, fluctuation, CM & PM.  Maintaining transmission NMS of complete Etisalat Network.  Working as TxN Engineer on Etisalat 3.2 Gbps Microwave backbone project at Huawei Technologies, Afghanistan. (June,2012-Nov,2013)  Working with following major responsibilities,  Installation and commissioning microwave equipment RTN980.  Creating & testing backbone Ethernet, STM & TDM services over backbone.  Troubleshooting for any issues in the network.  Maintaining transmission NMS of backbone.  Worked as TxN Engineer on Etisalat 3G Project at Huawei Technologies, Afghanistan. (June,2012-Nov,2012)  Working with major responsibilities to supervise all activities in Afghanistan for Etisalat 3G Project as Regional Manager.  Managing Transmission teams, Subcons, equipment, Activities etc.  Installation & Commissioning of RTN 620,910,950,980.  Creating & implementing 2G/3G Services, Board plans and verifying them.  ELine, ELAN services for Ethernet/IP traffic.  Testing ethernet services by Ethernet OAM Services.  Integrate Ethernet services with Node B (3G BTS) to all region from RNC (3G BSC).  Making Test/1st Call from Node B.  Integrating Regional Network with Main network from Backbone and enable NMS at NOC via NMS Routers  ATP/PATs from Etisalat customers.  Worked as TxN & BSS Engineer of Huawei on Ufone Project (Phase-10) at U.C.C (pvt), Pakistan. (March,2012-June,2012)  Working as Sr. Engineer at Region with responsibilities such as Leading teams installations, commissioning, configurations, link alignment, quality, cutover, NMS etc.  Creating SNCP’s for rings in MSC/BSC’s, Cross-connections, including media verification from Microwave Link of Huawei RTN, NEC Pasolink & Startex Eclipse.  Making all sites visible by NMS.  Worked as P.O.C of Huawei on CMPak Microwave Swap Project (Phase-II) at InterSES(pvt), Pakistan. (December,2011-March,2012)  Major responsibilities to supervise all activities in Faisalabad Region for CMPak Project such as contacting to Huawei & CMPak representatives.  Managed complete project with all responsibilities like,  Managing Transmission teams, equipment etc.  Creating documentations like PAT docs, TSSR Trackers, I & C Trackers, Quality & Audit Reports, Traffic sheets for media distribution.  Validating and placing all audit materials for customers such as assets tags, serial no’s, site and equipment snaps etc.  Worked as Sr. TxN Engineer at region with all responsibilities such as;  Leading all regional teams for installations, commissioning, configurations, link alignment, quality, media buildup, cutover & NMS.  Installed/Commissioned/Configured all kind of Microwave Links such as PDH, SDH, 1xSTM, 2xSTM, 1+0/1+1, SD, XPIC (1+0/1+1).  Created & Implement all traffic sheets for media distribution in Ring, Tree, and Star Topologies.
  • 3.  Creating SNCP’s for Rings in MSC/BSC’s, Cross-connections. Including media verification form MSC/BSC/Optical nodes to Terminal sites from Microwave Links.  Making all sites visible by NMS.  Worked as Transmission Engineer on Ufone (Phase 9) & CMPak(Phase-I) Projects at InterSES(pvt), Pakistan. (September,2010-March,2012)  Worked as TxN Engineer with responsibilities such as;  Installed/Commissioned/Configured Microwave Links.  Creating SNCP’s for Rings in MSC/BSC’s, Cross-connections. Including media verification form MSC/BSC/Optical nodes to Terminal sites from Microwave Links on Huawei RTN/NEC Pasolink/Startax Eclipse.  NMS Visibility of RTN& NEC.  6 Months in CDAS-1218, Pakistan Telecommunication Company Limited (PTCL) as Broadband Supervisor. (December,2009-August,2010) Trainings  ZTE MUX training by Etisalat, Afghanistan.  3G BTS & RNC Training by Huawei Technologies.  Ethernet Services implementation & Testing on RTN by Huawei R&D Dept.  NEC & RTN NMS Training by Huawei, Pakistan.  Cisco Certified Network Associate (CCNA) Training form Corvit Systems, Lahore.  Cisco Certified Network Professional (CCNP) Training form Corvit Systems, Lahore.  WiMAX Training form Corvit Systems, Lahore.  Juniper Networks Certified Internet Professional (JNCIP) Training form Corvit Systems, Lahore.  2 months Internshipat Pakistan Telecommunication Limited (PTCL) FTR, Faisalabad in following departments;  Power Plant  WLL MSC  Alcatel NMC  ZTE MSC  Attended two day workshop on Microcontroller conducted by IEEE-GCUF Skills  Telecom: Ethernet, SDH services on all Huawei Transmission Equipment.  Tools:  Huawei  iManager U2000  U2000 WebLCT  Optix Navigator  Tool Kit/ Data collector  NEC Pasolink  PNMT  Mapinfo, LabView, MatLab, Workbench, MS Office, MS Windows 98/2000/XP/Vista/7/8  Computer Languages: C, Visual C++, JAVA.  Languages:  Urdu (Native)  English (IELTS: 6.5 bands) Educational Projects  Digital Car Parking using Parallel port Interfacing. Final Year Project:  Interference Cancellation in CDMA
  • 4. Managerial Skills  Managed a complete region of Afghanistan as Regional Manager at Etisalat 3G Project at Huawei Technologies. co., Afghanistan.  Managed complete Huawei CMPak DG RTN Swap Project (Phase-II) at InterSES(pvt), Pakistan.  I was member of different societies in my education carrier.  Also was an IEEE member at IEEE-GCUF Student Branch.  Managed and organized many seminars, group discussions, events.  Organize and manage inauguration of IEEE-GCUF Branch.  Organize seminars & Tech Discussion in Tech Fair 2008 conducted by IEEE-GCUF at national level. Training skills  I have delivered trainings of Transmission NMS to multiple companies  Also gave tutorials of Ethernet services for 3G network. Co-Curricular Activities  Games:Cricket, Chess, Frisbee, Video Games.  Hobbies: Reading, Exploring, Computer Programming.  Participated in dramas, debate, Charting competitions at many events and also got positions.  I had participated in SOFTEC 2008 Programming competition held at FAST-NU Lahore.  Have great interest in National/International relations. References can be provided on request