1. Page 1 of 15
Rev.7.01.2014
Resume
Job Applied:Optical Enigneering / Project Manager / Presale
Expected Salary :(Negotiate)
Part 1: PERSONAL DATA:
Name in English: First Name Mr.Thammarak _______Last Name__Hoisang_____ Nick AOR
Gender Male Nationality Thai Date of Birth Feb 26,1979 Country of Birth Thailand
Passport/ID Card No. 3600200038752
Home Address with Post Code 337/15 , Lompo Village, Soi1, Bangkruai-Sainoi Rd., Bangrak-Pattana
District, Ampor. Bangbuathong, Nontaburi Province, 11110
Mobile No.: (+66) 0989645663
Email Address: No.: thammarak.h@gmail.com
Part 2: SUMMARY HISTORY WORK.
DATE
(MM-YYYY ) Company Job Title Main Responsibilities
From To
May,
2011
Now SAMART
COMTECH
Co.,Ltd.
(4Yrs./4m.)
•Presale, Solution,
Implementation
• Optical
Transport Expert
Engineer &
Specialist
• Optical Transportation Network (DWDM,OTN,SDH)
• Designer & Operation work
• TOT 3G/LTE Network Planning
• TOT MSAN (FTTX) Designer/Presale
• Designed Site Preparation, Tower, Interface, RF ,
Installation
2. Page 2 of 15
Rev.7.01.2014
July,
2007
May,
2011
ZTE
(THAILAND)
CO.,LTD.
(3Yr.,/11m.)
• Project Manager
• Senior Engineer
• Planning Issue, Progress Tracking , Negotiate with
customer
• To control project Cost ,Progress , Timeline, Team
member for engineer, Sub-contractor.
• Stocking control, Material approval for installation.
• Solve for cause and find the best way for project.
• Forecasted the problem that effect with project.
• Training delivery to customer
Aug,
2005
July,
2007
Harris Stratex
Network
(Thailand)
Limited
(2Yr./0m.)
• Support Engineer
• Lab & Test
Engineer
• Testing , Presale for R&R Microwave Equipment.
• Repair the faulty equipment
• Design the Test tools and, find the material for repair
by local device.
• Repairing Laboratory Leader
July,
2002
Aug,
2005
BFKT
(Thailand)
Limited
(3Yr./2m.)
• Field Site
Engineer
• OMC Engineer
•Operation any activities on BTS work.
• Inspector for Site prep. ,Civil,
Transmission Link, BTS, Tower, Antennas.
• To software configure the equipment as BTS,
Power, MicroWave and, ect.
• Site Acquiring and, Land Rental with Owner
•Corrective Maintenance & Preventive Maintenance
3. Page 3 of 15
Rev.7.01.2014
Part 3: EDUCATION AND TRAINING RECORDS
3.1 Education:
Time (MM-YYYY) Name of
School/College
Location of
School/College
Major Certificate
From To
1991 1994 Visittisuksa School Nakornsawan M.3
1995 1997
Nakronsawan
Technical Collage
Nakornsawan Electronic
Vocational
Education
1998 2000
Nakronsawan
Technical Collage
Nakornsawan
Electronics
Computer
Diploma Cert.
2000 2004
King Mongkut’s
Institute
Technology North
of Bangkok
BKK
Electronics
Telecommunications
Technology
Bachelor Degree
Part 4: LANGUAGES & DIALECTS
LANAGUAGES
SPEAKING READING WRITING
Good Fair Poor Good Fair Poor Good Fair Poor
1.Local (Thai Language) X X X
2. ENGLISH X X X
4. Page 4 of 15
Rev.7.01.2014
Part 5: SKILLS DETAILS & ABILITIES
1. Work @ SAMART COMTECH Co.,LTD
• Period: May ,2011 to Present (4Yr.,/4m.)
• Job History Responsibility for Consultant Senior Engineer / Optical Transmission Engineer
• Experience Details:
Engineering : To solution designing and, planning for project groundwork and, preparing the
BOM with costing as Core Network , UTRAN (NodeB , eNodeB), Site-Prep, Site Tower, Civil Work
, TOT 3G & LTE (4G) such as IBC and, Macro site type and, also must be support for GSM-R
technology. (Thailand Rail Way) , Optical Transmission Engineer such as DWDM
Consultant & Specialist : To support Mobile vender as NSN, ALU, Huawei , ZTE’s partner &
customer requirement, and find to best solution to user.
Other Technologies : ePassport system , Primary MUX, Outside Plant for Optical Fiber , FTTx,
MSAN.
2. Work @ ZTE Thailand Co.,LTD. (Thailand)
• Period: July 2007 to Oct 2011 (3Yr.,/11m.)
• Job History Responsibility for Project Manager & Optical Transmission Sr.Engineer
• Experience Details:
Project Management: I should was taken responding for since project started up until that
finished such as below:
5. Page 5 of 15
Rev.7.01.2014
– To kick-up, Risk-forecast, Control, Progress Tracking and, any Coordination between ZTE
Company, Partner and Sub-Contractor. Also should be made the tasked, Mile stone, Planning
revising, Investigated the root-cause for fix any problem to relate with expect finished date.
– To support all engineering job till to project closed out and got any documentation as Delivery
Certificate, PAC, FAC and each payment of project collecting.
Engineering : Commissioning worked, Installation and Maintenance to Optical Transmission
- Equipment that had sole on Thailand Market or Some time will be trouble shooting and
the root cause when was requested by customer such as TOT, CAT, EGAT, Partner or Sub-
contractor.
- For Military and EGAT Project must be negotiated for getting the customer requirement and -
discussion with partner to looking for best solution to be done.
- For some third party’s project equipment that also I will be fast learning for to be configure
them by myself and, also teach the customer as well.
3. Work @ Harris Stratex Network (Thailand) Limited
• Period: Aug,2005 to July,2007 (2Yr.,/-m.)
• Job History Responsibility for Laboratory Test Engineer (Microwave System)
• Experience Details:
Pre test: To test Microwave units all model of product such as Eclipse, DXR, XP4 (E1/E3
Capacity) and Altium MX which anytime unit was removed from site or the new shipped
6. Page 6 of 15
Rev.7.01.2014
order unit from manufactory thence to report the results to Project planning and R&R
Division.
Commissioning microwave link: To offer commissioning the Microwave link performance on
at Customer site what was requested.
Analysis problem case: To looking cause of problem and then feedback to Repair Center
(Philippine) and manufactory (Singapore and Thailand).
Customer Support: To take the care that customer satisfaction or sub-contact requested for
help that information of product cause by cause to them.
Cause study Simulate: To simulated Microwave system for development, adjustment
and/or reorganization the test processing to reduce time and cost for customer most satisfy.
4. Work @ BFKT Thailand Co.,LTD. (Thailand)
• Period: July,2002 to Aug,2005 (3Yr.,/2m.)
• Job History Responsibility for Field Site Engineer for Mobile Network
• Experience Details:
Site acquisition & Site survey: To find out the best candidate both technical and
environment to build cell site.
Site leasing support: To support company complete land leasing negotiation.
Site inspector: To control contractor construct all civil work such as Room, Shelter,
Container, Tower, Fence, Access road, Main - AC power and etc. base on civil specification
agreement.
7. Page 7 of 15
Rev.7.01.2014
Equipment installation & commissioning: To control vender install their equipment follow
the standard of procedure for each element such as BTS, SDH, Optical fiber cable,
Microwave, Repeater , Feeder & Antenna, DC-AC power plant and also perform the
equipment commissioning with vender.
PAT & System integration: To do the acceptance tested for all equipment with vender to
achieve standard and also do the system integration to ready for network service.
Field maintenance : Taking care cell site both Corrective and Preventive all equipment
such as BTS, SDH, OFC, Microwave, Repeater, Rectifier, Air-conditioner, AC-power and all
Infra control , Totally ~ 300 sites in West Coast Region including with Western Bangkok
as Western Samutprakarn , Samutsakorn, Samutsongkram, Nakhonpathom, Ratchaburi,
Kanchanaburi, Suphanburi, Petchaburi, Prachuapkirikhan, Lopburi, and Singburi province.
Customer complaint support : To take care case of customer complaint by help central
office to pin point the exact problem and resolve as soon as we can do for customer
satisfaction
Drive test support: To help central office check an RF environment in such area which
taking care then feedback
Reference Project:
For Year 2015 – Present: .
SCHQ DWDM Nationwide Network:
8. Page 8 of 15
Rev.7.01.2014
(Responsibility: ALU DWDM & SDH Testing & Commissioning Team for 1830PSS16/32/64/
1626LM / 1678MCC )
TOT IIG Expansion project :
(Responsibility: ALU DWDM & SDH Testing & Commissioning Team)
CAT DWDM NorthEast Project:
(Responsibility: ALU DWDM & SDH Testing & Commissioning Team)
CAT DWDM East-West Project :
(Responsibility: ALU DWDM & SDH Testing & Commissioning Team) CAT DWDM CLS2-SRT-
CLS3 Project : (Responsibility: ALU DWDM & SDH Testing & Commissioning Team)
For Year 2014 – 2015 :
TOT MSAN Charan-sanitwong: (Responsibility: Presale & Consult)
TOT MSAN Phaholyotin: (Responsibility: Presale & Consult)
TOT MSAN Onnut : (Responsibility: Presale & Consult)
SCHQ DWDM Nationwide Network: (Responsibility: Presale , Consult, Expect Operation
Team)
PEA DWDM Network: (Responsibility: Presale , Consult, Expect & Commissioning Team)
TOT DWDM Network: (Responsibility: Presale , Consult, Expect Operation Team)
CAT AAG DWDM Network: (Responsibility: Presale , Consult, Expect Operation Team)
For Other :
SDH Military Project on 2007. (Responsibility: Engineer)
EGAT TNRP COMM07 on 2007. (Responsibility: Engineer and Co-ordinator)
TOT DWDM 7 ROUTE with Traviscom on 2008. (Responsibility: Project Manager ,Engineer
and Co-ordinator)
CAT 9 HOP and Microwave 7.5 GHz with TTI company on 2009. (Responsibility: Project
Manager ,Engineer and Co-ordinator)
9. Page 9 of 15
Rev.7.01.2014
TOT 2 ROUTE with Infitel company on 2009. (Responsibility: Project Manager ,Engineer
and Co-ordinator)
TOT 4 HOP with TTI company on 2009. (Responsibility: Project Manager ,Engineer and Co-
ordinator)
CAT ASON nationwide Thailand on 2009. (Responsibility: Training Manager , Engineer and
Co-ordinator)
EGAT DWDM expension 2009 Project .(Responsibility: Project Manager ,Engineer and
Co-ordinator)
TOT MSAN Phasichareon Area3: (2010). (Responsibility: Project Manager & Co-ordinator)
TOT MSAN Area4: (2010). (Responsibility: Project Manager & Co-ordinator)
EGAT DWDM expension 2010: (Responsibility: Project Manager & Co-ordinator
Engineer)
EGAT SDH 2 node : (2010). (Responsibility: Project Manager & Co-ordinator Engineer)
UIH ID4 trial testing : (2010). (Responsibility: Project Manager & Co-ordinator Engineer)
AIS PTN trial testing : (2010). (Responsibility: Project Manager)
TOT MSAN south 8K: (2011). (Responsibility: Project Manager & Co-ordinator)
TOT 3G Phase 1 & TOT3G Phase2 (Within 2013)
TOT 4G (200 Site LTE in BKK in soon for pilot project as TOT on sky-train BTS)
10. Page 10 of 15
Rev.29.8.2015
TRAINING HISTORY:
High Light for Telecom Line:
Alcatel-Lucent DWDM / SDH : 1830PSS , 1626LM, 1678MCC, 1350OMS ,1354Phm
ZTE Transmission Equipment product:
SDH DWDM ASON NMS Other
ZXMP S385
ZXMP S330
S200
M800
M900
M600
Ciena C660 Software N100
and EMS
Software E300
Power Supply
and Monitoring
system
BTS & NodeB : Huawei NodeB ,MOTOROLA model SC-4812T ; SC-4812ET SC-300
General Equipment Training
o MW: Stratex-DMC model XP-4 ; DXR-711 ; Eclipse and Altium. , HARRIS model Microstar o
SDH: SIEMENS ; NEC o DC POWER PLANT: TYCO ; ELTEK ; ASCOM
o Mobile Repair: Nokia DCT3 ; Nokia DCT4 Flasher ;Nokia Tool ;PC suit ; JIC DCT4 ;
Ericsson Wrokshop Atx ; other o
o CCTV: Bosch Dinion CCTV + DiBos
o MOTOROLA BTS (Base Transceiver Station) Training. (Internal Training) o RF Optimization.
(Internal Training) o NEC-SDH Training by NESIC (Thailand) Ltd. o Using the Cell/BTS Site Field
Test (YBT350) for analysis signal. o How to repair faulty module of Microwave DXR-711 model.
11. Page 11 of 15
Rev.29.8.2015
o WebDesign by Dreamwever and Photoshop.(ComART Design School or www.Comart.com)
(Date :2005)
o Repairing Microwave units of Stratex Network at Phillipines. (Repair Center) . (Date :Sep-2006)
o Mobile Repairing Training by Private Course. (Date : 20-Nov-2006)
o BOSCH CCTV guide and installation. (Date: Jan-2007)
o CMA5000 and CMA3000 Family tester (OTDR and Data Network tester) (Date: March 2007)
o SDH internal training of Jasmine Telecom System PLC (Date: June 2007)
----------------------------------------------------------------------------------------------------------------------------------------
COMPUTER PROGRAM:
Office Program: Operating Window 95/98/ME/2000/XP, MS Access, MS PowerPoint,
MS Excel, MS Word, MS Outlook, IEInternet, ACDsee
Technical Program: Sun Unix for CBSC ; LinkView (MW) ; I-CLT(SDH) ; Hyper-terminal
WinPower (Power Rectifier) ; Harris (BTS) ; Eclipse Portal ; DXR-NET
Other & Programming: Dreamwever 2004 MX IIS Photoshop 7 Multimedia Program
Protel 99se MySql C++ VB6 for Database by MS Access. Basic of ASP and PHP
language Hardware and Software Reparing and Maintenance. Knowledge the IP Address
Network assignment.
------------------------------------------------------------------------------------------------------------------------------------------
12. Page 12 of 15
Rev.29.8.2015
Part 6: HOBBIES:
Looking new product on Internet, Learn new technical, Watch Movie , Music, Travel, Seek for good
delicious foods.
------------------------------------------------------------------------------------------------------------------------------------------
Part 7: PERSONALITY,CHARACTERS AND SELF ASSESMENT:
Positive:
Good for team playing , I can acceptable for colleague opinion as therefore, it is difference with
my opinion. and several time to use the brain-storming process for some trouble with my team
working. But the sometime that should motivate for myself and, our teams.
Negative :
So worried and, I can’t rest if mission that was assigned pending or unexpected thing happen for
working finishing date delay and, costing, So strictly the best performance of worked result . I more over
honorably, After has been committed with veraciously.
------------------------------------------------------------------------------------------------------------------------------------------
Part 8: FAMILY DATA
Marital Status MARRIED
Passport /ID. Card No. Occupation Present residence place
Emergency
Contact
K.Woranun Supanut Tel: 08-4671-8106