2. Indonesia is
accelerating its
energy
infrastructure
157 MW
1945
[Independence]
45,000 MW
2015
95,000 MW
2020
125,000 MW
2025
>30%
COAL-FIRED
POWER PLANT
*Energy mix target by 2025 : coal will contribute more than 30% (RUPTL PLN 2016-2025).
3. Domestic coal consumption is
expected to double by 2020
*Domestic coal production 2015 : 400 million tons (300 million tons were exported).
COAL-FIRED PLANT INSTALLED CAPACITY
DOMESTIC COAL CONSUMPTION FOR POWER GENERATION
23,000 MW
(75% STATE & 25% IPP)
52,000 MW
(45% STATE & 55% IPP)
58,000 MW
(47% STATE & 53% IPP)
70
MILLION TONS
155
MILLION TONS
172
MILLION TONS
2015 2020 2025
4. Today’s coal i ers
are to orro ’s e ergy pro iders
*Indonesia will only use supercritical & ultra supercritical boiler to lowering its carbon emission.
MINE-MOUTH POWER PLANT
25 – 30 YEARS CONTRACT PERIOD
25% GUARANTEED MARGIN
5. The bargain : public coal companies
*NAV assumption : 75% recoverable reserves, $ 30 coal price per ton, 80% margin of safety.
$ 42B
NAV
$ 8B
MARKET CAP
80%
DISCOUNT
approximately
$ 1.9B public float
2015 book value at $ 5.6B
with P/BV ranged from
0.2x to 12x
7. DISCLAIMER This research is compiled from sources believed to be
reliable, but its accuracy and completeness are not guaranteed.
This is not a solicitation to buy or sell of any securities.