SlideShare a Scribd company logo
1 of 1
Download to read offline
Sub Regional Transport Project Preparatory Facility
Hjfab International AB, Sweden, in association with - DESTIA FINNROAD,BCL,ESL,DEVTEC
Technical Assistance for Sub Regional Road Transport Project Preparatory Facility under
Roads and Highways Department
Date: June 25, 2015
TO WHOM IT MAY CONCR..~
This is to certify that Mr. B. M. Nural Absar, worked as a Junior Engineer from 5 May 2013 to the present
time (25 June 2015) as part of a large international team of 55 persons engaged upon the feasibility studies and
detailed design of highways and bridges, under the Ministry of Road Transport and Bridges, Roads and
Highways Department, in Bangladesh.
The project comprised Df four separate national highways (TDtal length 830 lcms) which are to be upgraded
from 2-lane roads to 4-lane roads plus additional segregated slow moving vehicle lanes on each side (i.e. 6-lanes
in all).
The number of ex-isting bridges is 285 (two hundred and eighty five). The total number of exj~ing structures
(including culverts) is 1200 (one thousand two bundred). Works are planned to be bid in total of36 no. separate
·contract lots.
During uris peliod. his job resporu.ibilities are as follows:
Phase 1 - During Feasibility Study (January, 2013 to May, 2014)
~ Fiekl survey, superlisl0n, inspection, coUecting data, managing and documenting field output, guiding
draftsman simultaneously in their tasks through preparing drawings according to instructed standard. These
are
a. 	 Structural (Bridge, Culvc!t, F!yovcr, Railway overpass etc.) inventory su.-vey, Hydraulic survey­
RoadslRoutes:N1, N2, N102, Z102, N7 (lOth ofJune, 2{)13 to 31st ofJuly, 2013)
b. 	 Traffic survey- RoadslRoutes: N2, N7 (5th ofAugust, 2013 to 20th ofAugust, 2013)
c. 	 Axle Load Survey- Roads/Routes: Nl, N7 (26th of August, 2013 to 25th of September, 201,3)
d. 	 Sub-soil investigation- RoadIRoutes: N1 (2nd ofNovember, 2013 to 6th ofJanuary, 2014)
Phase 2 - During Detail Designing (June, 2014 to May, 2015)
• 	 To prepare standard format ofbar benctingscheduJes based on structural components ofbridge,
flyover, overpass, railway overpass, culvert etc. and structural drawing sets for individual
roads/routes by leading draftsman according to code standard for individual contract/package
under structural (bridge) design section.
• 	 Setup different types of drainage system and placing them in allocated location through
highway. Assisting senior hydrologist to prepare technical hydrological report.
• 	 Under highway section, in RoadslRoutes: N2, N102, Z1202, N7 - Planning for traffic signs
(warning, regulatory, directional, informative) at typical road intersections, roundabouts,
junctions, bus bay, market areas, road markings in highway plan-profile and also prepare
standard schedules for same.
Mr. Absar has performed his duties willingly with diligence and enthusiasm. He has been an asset to this project
and I would be happy to welcome him back for future projects of a similar nature. I wish him every success in
future.
Lalit~;:::Team Leader
HIFAB BANGlADESH:
PROJECT OFFICE: 	 HEAD OFFICE:
House 14(711) floor), Road 32
House 20/C(4th floor). Road 26, Sveavagen 167
Gulshan, Dhaka·1212, Bangladesh
Gulshan·l, Dhaka·1212 	 Box 19090
Tel: +880-2·9857835, 8811955
Bangladesh 	 SE·l04 32 Stockholm, Sweden
Fax: +880·2·9857836
Tel: +46-10-476 6000,
Fax: +46-10-476 6778

More Related Content

Viewers also liked (20)

CV_Dilip_General
CV_Dilip_GeneralCV_Dilip_General
CV_Dilip_General
 
Publications_NishadW
Publications_NishadWPublications_NishadW
Publications_NishadW
 
Revised CV_Np Gyawali latest
Revised CV_Np Gyawali latestRevised CV_Np Gyawali latest
Revised CV_Np Gyawali latest
 
CV_Uddin
CV_UddinCV_Uddin
CV_Uddin
 
Dr. Ramanand Jadhav_CV
Dr. Ramanand Jadhav_CVDr. Ramanand Jadhav_CV
Dr. Ramanand Jadhav_CV
 
151111_shahriar_esri_australia
151111_shahriar_esri_australia151111_shahriar_esri_australia
151111_shahriar_esri_australia
 
Resume
ResumeResume
Resume
 
CV Dr. Pant June 2016
CV Dr. Pant June 2016CV Dr. Pant June 2016
CV Dr. Pant June 2016
 
vishnu resume (1)
vishnu resume (1)vishnu resume (1)
vishnu resume (1)
 
Cv of md zahidul islam 120316
Cv of md zahidul islam 120316Cv of md zahidul islam 120316
Cv of md zahidul islam 120316
 
CV 2016 Oct 31
CV 2016 Oct 31CV 2016 Oct 31
CV 2016 Oct 31
 
Name of the Assignment
Name of the AssignmentName of the Assignment
Name of the Assignment
 
Updated CV-MPJ 010416.DOC
Updated CV-MPJ 010416.DOCUpdated CV-MPJ 010416.DOC
Updated CV-MPJ 010416.DOC
 
Wood CV_short_Sept 2015
Wood CV_short_Sept 2015Wood CV_short_Sept 2015
Wood CV_short_Sept 2015
 
CV- Mowdudur RAHMAN
CV- Mowdudur RAHMANCV- Mowdudur RAHMAN
CV- Mowdudur RAHMAN
 
Abu_Nahid_-Env. Engineer.doc(December 14 )
Abu_Nahid_-Env. Engineer.doc(December 14  )Abu_Nahid_-Env. Engineer.doc(December 14  )
Abu_Nahid_-Env. Engineer.doc(December 14 )
 
CV_Birara
CV_BiraraCV_Birara
CV_Birara
 
CV-_Dr_S_K_Singh -Nov. 2016
CV-_Dr_S_K_Singh -Nov. 2016CV-_Dr_S_K_Singh -Nov. 2016
CV-_Dr_S_K_Singh -Nov. 2016
 
CV for Irshad Anwer, Operations & Finance
CV for Irshad Anwer, Operations & FinanceCV for Irshad Anwer, Operations & Finance
CV for Irshad Anwer, Operations & Finance
 
Wijdan Hussain CV
Wijdan Hussain CVWijdan Hussain CV
Wijdan Hussain CV
 

Similar to Work Experiment Certificate From SRTPPF-2 Team Leader

CV Kruger Barend Johannes (Johan)1
CV Kruger Barend Johannes (Johan)1CV Kruger Barend Johannes (Johan)1
CV Kruger Barend Johannes (Johan)1Johan Kruger
 
CV for Nyquist rev bob 2
CV for Nyquist rev bob 2CV for Nyquist rev bob 2
CV for Nyquist rev bob 2Michael Nyquist
 
WB 04-2016 Schonken Mark
WB 04-2016 Schonken MarkWB 04-2016 Schonken Mark
WB 04-2016 Schonken Markmark schonken
 
project final year civil
project final year civilproject final year civil
project final year civilAlankar jaiswal
 
EASTERN PERIPHERAL EXPRESSWAY REPORT
EASTERN PERIPHERAL EXPRESSWAY REPORTEASTERN PERIPHERAL EXPRESSWAY REPORT
EASTERN PERIPHERAL EXPRESSWAY REPORTATUL SHUKLA
 
Traning report on pwd cement concrete road pavement
Traning report on pwd cement concrete road pavementTraning report on pwd cement concrete road pavement
Traning report on pwd cement concrete road pavementNIWASHISH VISWAS
 
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...IRJET Journal
 
Design of rural road in uttarakhand
Design of rural road in uttarakhandDesign of rural road in uttarakhand
Design of rural road in uttarakhandeSAT Journals
 
Hesham CV - Senior Road Eng 2023.pdf
Hesham CV - Senior Road Eng  2023.pdfHesham CV - Senior Road Eng  2023.pdf
Hesham CV - Senior Road Eng 2023.pdfHeshamSaleh30
 

Similar to Work Experiment Certificate From SRTPPF-2 Team Leader (20)

cv Updated M.Anwar
cv Updated M.Anwarcv Updated M.Anwar
cv Updated M.Anwar
 
C.V.
C.V.C.V.
C.V.
 
Muhammad Asad Shaheen - CV
Muhammad Asad Shaheen - CVMuhammad Asad Shaheen - CV
Muhammad Asad Shaheen - CV
 
CV_Bavanam Veenadhari_July_16
CV_Bavanam Veenadhari_July_16CV_Bavanam Veenadhari_July_16
CV_Bavanam Veenadhari_July_16
 
CV Kruger Barend Johannes (Johan)1
CV Kruger Barend Johannes (Johan)1CV Kruger Barend Johannes (Johan)1
CV Kruger Barend Johannes (Johan)1
 
CV for Nyquist rev bob 2
CV for Nyquist rev bob 2CV for Nyquist rev bob 2
CV for Nyquist rev bob 2
 
WB 04-2016 Schonken Mark
WB 04-2016 Schonken MarkWB 04-2016 Schonken Mark
WB 04-2016 Schonken Mark
 
Transpot system in India
Transpot system in IndiaTranspot system in India
Transpot system in India
 
CV -Nildo M. Nhaliginga
CV -Nildo M. NhaligingaCV -Nildo M. Nhaliginga
CV -Nildo M. Nhaliginga
 
project final year civil
project final year civilproject final year civil
project final year civil
 
ProjectReport.pdf
ProjectReport.pdfProjectReport.pdf
ProjectReport.pdf
 
EASTERN PERIPHERAL EXPRESSWAY REPORT
EASTERN PERIPHERAL EXPRESSWAY REPORTEASTERN PERIPHERAL EXPRESSWAY REPORT
EASTERN PERIPHERAL EXPRESSWAY REPORT
 
CV_MPS_Elango_Vadiveloo
CV_MPS_Elango_VadivelooCV_MPS_Elango_Vadiveloo
CV_MPS_Elango_Vadiveloo
 
ToR
ToRToR
ToR
 
Road construction report
Road construction reportRoad construction report
Road construction report
 
Traning report on pwd cement concrete road pavement
Traning report on pwd cement concrete road pavementTraning report on pwd cement concrete road pavement
Traning report on pwd cement concrete road pavement
 
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
 
Design of rural road in uttarakhand
Design of rural road in uttarakhandDesign of rural road in uttarakhand
Design of rural road in uttarakhand
 
CV_Anil Malagi
CV_Anil MalagiCV_Anil Malagi
CV_Anil Malagi
 
Hesham CV - Senior Road Eng 2023.pdf
Hesham CV - Senior Road Eng  2023.pdfHesham CV - Senior Road Eng  2023.pdf
Hesham CV - Senior Road Eng 2023.pdf
 

Work Experiment Certificate From SRTPPF-2 Team Leader

  • 1. Sub Regional Transport Project Preparatory Facility Hjfab International AB, Sweden, in association with - DESTIA FINNROAD,BCL,ESL,DEVTEC Technical Assistance for Sub Regional Road Transport Project Preparatory Facility under Roads and Highways Department Date: June 25, 2015 TO WHOM IT MAY CONCR..~ This is to certify that Mr. B. M. Nural Absar, worked as a Junior Engineer from 5 May 2013 to the present time (25 June 2015) as part of a large international team of 55 persons engaged upon the feasibility studies and detailed design of highways and bridges, under the Ministry of Road Transport and Bridges, Roads and Highways Department, in Bangladesh. The project comprised Df four separate national highways (TDtal length 830 lcms) which are to be upgraded from 2-lane roads to 4-lane roads plus additional segregated slow moving vehicle lanes on each side (i.e. 6-lanes in all). The number of ex-isting bridges is 285 (two hundred and eighty five). The total number of exj~ing structures (including culverts) is 1200 (one thousand two bundred). Works are planned to be bid in total of36 no. separate ·contract lots. During uris peliod. his job resporu.ibilities are as follows: Phase 1 - During Feasibility Study (January, 2013 to May, 2014) ~ Fiekl survey, superlisl0n, inspection, coUecting data, managing and documenting field output, guiding draftsman simultaneously in their tasks through preparing drawings according to instructed standard. These are a. Structural (Bridge, Culvc!t, F!yovcr, Railway overpass etc.) inventory su.-vey, Hydraulic survey­ RoadslRoutes:N1, N2, N102, Z102, N7 (lOth ofJune, 2{)13 to 31st ofJuly, 2013) b. Traffic survey- RoadslRoutes: N2, N7 (5th ofAugust, 2013 to 20th ofAugust, 2013) c. Axle Load Survey- Roads/Routes: Nl, N7 (26th of August, 2013 to 25th of September, 201,3) d. Sub-soil investigation- RoadIRoutes: N1 (2nd ofNovember, 2013 to 6th ofJanuary, 2014) Phase 2 - During Detail Designing (June, 2014 to May, 2015) • To prepare standard format ofbar benctingscheduJes based on structural components ofbridge, flyover, overpass, railway overpass, culvert etc. and structural drawing sets for individual roads/routes by leading draftsman according to code standard for individual contract/package under structural (bridge) design section. • Setup different types of drainage system and placing them in allocated location through highway. Assisting senior hydrologist to prepare technical hydrological report. • Under highway section, in RoadslRoutes: N2, N102, Z1202, N7 - Planning for traffic signs (warning, regulatory, directional, informative) at typical road intersections, roundabouts, junctions, bus bay, market areas, road markings in highway plan-profile and also prepare standard schedules for same. Mr. Absar has performed his duties willingly with diligence and enthusiasm. He has been an asset to this project and I would be happy to welcome him back for future projects of a similar nature. I wish him every success in future. Lalit~;:::Team Leader HIFAB BANGlADESH: PROJECT OFFICE: HEAD OFFICE: House 14(711) floor), Road 32 House 20/C(4th floor). Road 26, Sveavagen 167 Gulshan, Dhaka·1212, Bangladesh Gulshan·l, Dhaka·1212 Box 19090 Tel: +880-2·9857835, 8811955 Bangladesh SE·l04 32 Stockholm, Sweden Fax: +880·2·9857836 Tel: +46-10-476 6000, Fax: +46-10-476 6778