About the project
The Queensland Government has identified the need to
upgrade and increase the existing train fleet in South East
Queensland. The New Generation Rollingstock (NGR) project
represents a significant investment in trains and will support
the government’s long-term commitment to public transport.
The $4.4 billion NGR project involves:
•	 purchasing 75 new six-car electric trains
•	 maintaining these trains for approximately 30 years
•	 constructing a modern, purpose-built maintenance centre
at Wulkuraka at Ipswich.
The project will see a significant growth in rail fleet to replace
ageing trains and supply more services to commuters. The
purchase of 75 new six-car trains represents a net increase of
177 rail cars for the CityTrain network. The project will increase
the rail fleet by 30 per cent, to cater for service growth and to
maximise the capacity of the existing network.
Eventually, NGR trains will operate on all lines, with a mix
of existing and NGR fleet. Once all trains are delivered, NGR
trains will comprise 55 per cent of trains operating on the
CityTrain passenger network.
The first trains will be in service by mid-2016, with all 75 trains
delivered and in service by December 2018.
Project delivery
The Queensland Government has awarded the contract for
the NGR project to the Bombardier NGR Consortium. The
consortium comprises Bombardier Transportation, John
Laing, ITOCHU Corporation and Uberior. The consortium
is responsible for the delivery of the new trains and for
maintenance over the 32 year contract period.
The project is being delivered under an availability payment
Public Private Partnership (PPP), which means that the
Bombardier NGR Consortium must meet set targets to
receive payment. The use of a PPP model for funding and
implementation of the project has provided cost savings,
better risk sharing and provides greater certainty about
delivery timeframes.
NGR trains
Commuters will benefit from safer, modern and efficient
trains, with less overcrowding, and improved comfort and
travel times.
NGR trains will service all lines in South East Queensland,
and will be suitable for use in the proposed Brisbane
Underground Bus and Train tunnel.
The coupled trains will allow access between all six carriages,
enabling passengers to travel through from one end of the
train to the other and all NGR trains will be equipped with
toilet facilities and WiFi.
New Generation Rollingstock project
Project fact sheet
Artist’s impression of NGR train
January 2014
Trains will be designed with additional safety features to meet
the requirements of tunnel travel. The carriages will be flexible
to adapt to future needs, to enable longer train sets in future
if required. NGR trains will be designed to enable them to be
retrofitted in future to accommodate new safety features.
NGR maintenance centre
A significant expansion of the rail fleet to deliver modern,
efficient rollingstock requires a new purpose-built
maintenance centre.
Following an extensive assessment of 72 sites against
operational and environmental criteria, the site at 1 Ada
Street, Wulkuraka was assessed as most suitable. Further
information about the selection process is available on the
project website.
The maintenance centre will service the new NGR trains only
and will not be servicing diesel or other electric locomotives
or wagons.
Key components of the NGR maintenance centre will include:
•	 utility services
•	 site track work, including holding roads for trains, hand-
over roads and maintenance roads
•	 signalling and yard control overhead traction power for trains
•	 maintenance building with underfloor access for wheel lathe
•	 train cleaning and decant facility
•	 storage areas
•	 administration office with training/meeting rooms and
amenities areas
•	 car parking, roads and pedestrian walkways
•	 fencing, lighting and security
•	 landscaping
•	 temporary on-site office during construction
•	 permanent on-site office areas.
Around 150 full-time ongoing new maintenance staff will
be employed at the maintenance centre during the operation
period. It is anticipated that there will be no more than
100 operational staff on site at any one time. While the
maintenance centre will have a 24 hour, 7 day a week
operational capability, it may not necessarily operate at
these times.
It is also anticipated that traffic travels on local streets
surrounding will not increase and only minor traffic
increases will be experienced to Toongarra Road and the
Warrego Highway.
Site access for construction and operation will be via Dixon
Street West.
Preliminary site work has commenced, with construction to
commence in early 2014. The maintenance centre will be
commissioned by June 2016, in time for first NGR services in
June 2016.
Information will be provided to the local community about
the design, construction and operation of the centre.
Artist’s impression of the NGR maintenance centre at Wulkuraka
For further information
Further information on the project, including the
fly-through is available on the project website
www.tmr.qld.gov.au/ngr.
Free call: 1800 478 238* The project team is available
to answer your questions from 9am to 4pm, Monday
to Friday (excluding public holidays).
Email: ngr@tmr.qld.gov.au
Visit: www.tmr.qld.gov.au/ngr
*Free call from anywhere in Australia. Call charges apply
from mobile phones and payphones.
13 QGOV (13 74 68)

More Related Content

What's hot

Delivering a Cruise/Ferry Port at Preston Links
Delivering a Cruise/Ferry Port at Preston LinksDelivering a Cruise/Ferry Port at Preston Links
Delivering a Cruise/Ferry Port at Preston LinksCalum Miller
 
Maputo Development Corridor update: Swaziland Rail
Maputo Development Corridor update: Swaziland RailMaputo Development Corridor update: Swaziland Rail
Maputo Development Corridor update: Swaziland RailTristan Wiggill
 
Connected Cities - Perth's Transport Future
Connected Cities - Perth's Transport FutureConnected Cities - Perth's Transport Future
Connected Cities - Perth's Transport Futurewmud
 
Mozambique’s Moatize Coal Basin - David Hunter, Mott McDonald
Mozambique’s Moatize Coal Basin - David Hunter, Mott McDonaldMozambique’s Moatize Coal Basin - David Hunter, Mott McDonald
Mozambique’s Moatize Coal Basin - David Hunter, Mott McDonaldMining On Top
 
doubling project synopsis
doubling project synopsisdoubling project synopsis
doubling project synopsisNeha Singh
 
Logistics 2013: Mark Basnett
Logistics 2013: Mark Basnett Logistics 2013: Mark Basnett
Logistics 2013: Mark Basnett Place North West
 
STEP Conference 2015 - Peter Marshall, Perth & Kinross Council - Perth Transp...
STEP Conference 2015 - Peter Marshall, Perth & Kinross Council - Perth Transp...STEP Conference 2015 - Peter Marshall, Perth & Kinross Council - Perth Transp...
STEP Conference 2015 - Peter Marshall, Perth & Kinross Council - Perth Transp...STEP_scotland
 
126_Vejprojekt_Tanzania_UK_5(1)
126_Vejprojekt_Tanzania_UK_5(1)126_Vejprojekt_Tanzania_UK_5(1)
126_Vejprojekt_Tanzania_UK_5(1)Niraj Minocher
 
Are AP's 10 new ports gateways for global cargo
Are AP's 10 new ports gateways for global cargoAre AP's 10 new ports gateways for global cargo
Are AP's 10 new ports gateways for global cargoAbeer Ray
 
Doubling progress report
Doubling progress reportDoubling progress report
Doubling progress reportNeha Singh
 
Mozambique's rail industry
Mozambique's rail industryMozambique's rail industry
Mozambique's rail industryTristan Wiggill
 
London Underground - Redesigning White-chapel Station
London Underground - Redesigning White-chapel Station London Underground - Redesigning White-chapel Station
London Underground - Redesigning White-chapel Station Ibrahim Al-Hudhaif
 
Hareket Magazine 27. issue-2018- English
Hareket Magazine 27. issue-2018- EnglishHareket Magazine 27. issue-2018- English
Hareket Magazine 27. issue-2018- EnglishHareket
 
LMRC summer training
LMRC summer trainingLMRC summer training
LMRC summer trainingPrachi Dixit
 
Hbk nr aug.20. 14 finalizes barge load-out and piling contract other
Hbk nr  aug.20. 14  finalizes barge load-out and piling contract  otherHbk nr  aug.20. 14  finalizes barge load-out and piling contract  other
Hbk nr aug.20. 14 finalizes barge load-out and piling contract otherFollow me on Twitter @Stockshaman
 
Kpct presentation
Kpct presentation Kpct presentation
Kpct presentation Kiran K.V.S.
 

What's hot (20)

Delivering a Cruise/Ferry Port at Preston Links
Delivering a Cruise/Ferry Port at Preston LinksDelivering a Cruise/Ferry Port at Preston Links
Delivering a Cruise/Ferry Port at Preston Links
 
Session 11 – site visits port of maputo
Session 11  – site visits  port of maputoSession 11  – site visits  port of maputo
Session 11 – site visits port of maputo
 
Maputo Development Corridor update: Swaziland Rail
Maputo Development Corridor update: Swaziland RailMaputo Development Corridor update: Swaziland Rail
Maputo Development Corridor update: Swaziland Rail
 
Connected Cities - Perth's Transport Future
Connected Cities - Perth's Transport FutureConnected Cities - Perth's Transport Future
Connected Cities - Perth's Transport Future
 
Mozambique’s Moatize Coal Basin - David Hunter, Mott McDonald
Mozambique’s Moatize Coal Basin - David Hunter, Mott McDonaldMozambique’s Moatize Coal Basin - David Hunter, Mott McDonald
Mozambique’s Moatize Coal Basin - David Hunter, Mott McDonald
 
doubling project synopsis
doubling project synopsisdoubling project synopsis
doubling project synopsis
 
Logistics 2013: Mark Basnett
Logistics 2013: Mark Basnett Logistics 2013: Mark Basnett
Logistics 2013: Mark Basnett
 
STEP Conference 2015 - Peter Marshall, Perth & Kinross Council - Perth Transp...
STEP Conference 2015 - Peter Marshall, Perth & Kinross Council - Perth Transp...STEP Conference 2015 - Peter Marshall, Perth & Kinross Council - Perth Transp...
STEP Conference 2015 - Peter Marshall, Perth & Kinross Council - Perth Transp...
 
126_Vejprojekt_Tanzania_UK_5(1)
126_Vejprojekt_Tanzania_UK_5(1)126_Vejprojekt_Tanzania_UK_5(1)
126_Vejprojekt_Tanzania_UK_5(1)
 
Gulf news t92
Gulf news t92Gulf news t92
Gulf news t92
 
Are AP's 10 new ports gateways for global cargo
Are AP's 10 new ports gateways for global cargoAre AP's 10 new ports gateways for global cargo
Are AP's 10 new ports gateways for global cargo
 
Doubling progress report
Doubling progress reportDoubling progress report
Doubling progress report
 
Mozambique's rail industry
Mozambique's rail industryMozambique's rail industry
Mozambique's rail industry
 
London Underground - Redesigning White-chapel Station
London Underground - Redesigning White-chapel Station London Underground - Redesigning White-chapel Station
London Underground - Redesigning White-chapel Station
 
Woden Bus Interchange Progress report - ACTED
Woden Bus Interchange Progress report - ACTEDWoden Bus Interchange Progress report - ACTED
Woden Bus Interchange Progress report - ACTED
 
Hareket Magazine 27. issue-2018- English
Hareket Magazine 27. issue-2018- EnglishHareket Magazine 27. issue-2018- English
Hareket Magazine 27. issue-2018- English
 
LMRC summer training
LMRC summer trainingLMRC summer training
LMRC summer training
 
Hbk nr aug.20. 14 finalizes barge load-out and piling contract other
Hbk nr  aug.20. 14  finalizes barge load-out and piling contract  otherHbk nr  aug.20. 14  finalizes barge load-out and piling contract  other
Hbk nr aug.20. 14 finalizes barge load-out and piling contract other
 
Kpct presentation
Kpct presentation Kpct presentation
Kpct presentation
 
Port of Beira
Port of BeiraPort of Beira
Port of Beira
 

Similar to NGRprojectfactsheetJan2014

Transport poster
Transport posterTransport poster
Transport posterGordon Best
 
2.railway track gauge
2.railway track gauge2.railway track gauge
2.railway track gaugeMani Vel
 
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_KoiDFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_KoiShobhit Acharya
 
Introduction to railway engineering
Introduction to railway engineeringIntroduction to railway engineering
Introduction to railway engineeringMuhammad Taimur Khan
 
Analyst presentation: Crossrail and our international tunnelling expertise - ...
Analyst presentation: Crossrail and our international tunnelling expertise - ...Analyst presentation: Crossrail and our international tunnelling expertise - ...
Analyst presentation: Crossrail and our international tunnelling expertise - ...Atkins
 
Thrissur railway station development 2
Thrissur railway station development 2Thrissur railway station development 2
Thrissur railway station development 2nicenaison
 
Rail Budget 2016-17
Rail Budget 2016-17 Rail Budget 2016-17
Rail Budget 2016-17 VIJAY KAMBOJ
 
Railway infrastructure construction and upgrading in india and the middle eas...
Railway infrastructure construction and upgrading in india and the middle eas...Railway infrastructure construction and upgrading in india and the middle eas...
Railway infrastructure construction and upgrading in india and the middle eas...Business Finland
 
Spring 2017-service-change-external-memo -final-feb-27-en
Spring 2017-service-change-external-memo -final-feb-27-enSpring 2017-service-change-external-memo -final-feb-27-en
Spring 2017-service-change-external-memo -final-feb-27-enDevyn Barrie
 
Community liason-group-presentation-10-02-2015
Community liason-group-presentation-10-02-2015Community liason-group-presentation-10-02-2015
Community liason-group-presentation-10-02-2015Auckland Transport
 
Zvezdan Kostic Portfolio
Zvezdan Kostic PortfolioZvezdan Kostic Portfolio
Zvezdan Kostic PortfolioZvezdan Kostic
 

Similar to NGRprojectfactsheetJan2014 (20)

Rail Report 2017
Rail Report 2017Rail Report 2017
Rail Report 2017
 
SMRT - Your Journey Matters
SMRT - Your Journey MattersSMRT - Your Journey Matters
SMRT - Your Journey Matters
 
Transport poster
Transport posterTransport poster
Transport poster
 
2.railway track gauge
2.railway track gauge2.railway track gauge
2.railway track gauge
 
UK Rail_(c) Arup
UK Rail_(c) ArupUK Rail_(c) Arup
UK Rail_(c) Arup
 
wdfcil
wdfcilwdfcil
wdfcil
 
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_KoiDFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
 
Introduction to railway engineering
Introduction to railway engineeringIntroduction to railway engineering
Introduction to railway engineering
 
Network Rail Developments
Network Rail DevelopmentsNetwork Rail Developments
Network Rail Developments
 
SMRT Trains Case Study
SMRT Trains Case StudySMRT Trains Case Study
SMRT Trains Case Study
 
Cpec, by Egr Khalil Dawar
Cpec,  by Egr Khalil DawarCpec,  by Egr Khalil Dawar
Cpec, by Egr Khalil Dawar
 
Analyst presentation: Crossrail and our international tunnelling expertise - ...
Analyst presentation: Crossrail and our international tunnelling expertise - ...Analyst presentation: Crossrail and our international tunnelling expertise - ...
Analyst presentation: Crossrail and our international tunnelling expertise - ...
 
Thrissur railway station development 2
Thrissur railway station development 2Thrissur railway station development 2
Thrissur railway station development 2
 
CAREER LAND MARKS
CAREER LAND MARKSCAREER LAND MARKS
CAREER LAND MARKS
 
Rail Budget 2016-17
Rail Budget 2016-17 Rail Budget 2016-17
Rail Budget 2016-17
 
Railway infrastructure construction and upgrading in india and the middle eas...
Railway infrastructure construction and upgrading in india and the middle eas...Railway infrastructure construction and upgrading in india and the middle eas...
Railway infrastructure construction and upgrading in india and the middle eas...
 
Spring 2017-service-change-external-memo -final-feb-27-en
Spring 2017-service-change-external-memo -final-feb-27-enSpring 2017-service-change-external-memo -final-feb-27-en
Spring 2017-service-change-external-memo -final-feb-27-en
 
Community liason-group-presentation-10-02-2015
Community liason-group-presentation-10-02-2015Community liason-group-presentation-10-02-2015
Community liason-group-presentation-10-02-2015
 
Zvezdan Kostic Portfolio
Zvezdan Kostic PortfolioZvezdan Kostic Portfolio
Zvezdan Kostic Portfolio
 
Perth Stadium community briefing presentation
Perth Stadium community briefing presentationPerth Stadium community briefing presentation
Perth Stadium community briefing presentation
 

NGRprojectfactsheetJan2014

  • 1. About the project The Queensland Government has identified the need to upgrade and increase the existing train fleet in South East Queensland. The New Generation Rollingstock (NGR) project represents a significant investment in trains and will support the government’s long-term commitment to public transport. The $4.4 billion NGR project involves: • purchasing 75 new six-car electric trains • maintaining these trains for approximately 30 years • constructing a modern, purpose-built maintenance centre at Wulkuraka at Ipswich. The project will see a significant growth in rail fleet to replace ageing trains and supply more services to commuters. The purchase of 75 new six-car trains represents a net increase of 177 rail cars for the CityTrain network. The project will increase the rail fleet by 30 per cent, to cater for service growth and to maximise the capacity of the existing network. Eventually, NGR trains will operate on all lines, with a mix of existing and NGR fleet. Once all trains are delivered, NGR trains will comprise 55 per cent of trains operating on the CityTrain passenger network. The first trains will be in service by mid-2016, with all 75 trains delivered and in service by December 2018. Project delivery The Queensland Government has awarded the contract for the NGR project to the Bombardier NGR Consortium. The consortium comprises Bombardier Transportation, John Laing, ITOCHU Corporation and Uberior. The consortium is responsible for the delivery of the new trains and for maintenance over the 32 year contract period. The project is being delivered under an availability payment Public Private Partnership (PPP), which means that the Bombardier NGR Consortium must meet set targets to receive payment. The use of a PPP model for funding and implementation of the project has provided cost savings, better risk sharing and provides greater certainty about delivery timeframes. NGR trains Commuters will benefit from safer, modern and efficient trains, with less overcrowding, and improved comfort and travel times. NGR trains will service all lines in South East Queensland, and will be suitable for use in the proposed Brisbane Underground Bus and Train tunnel. The coupled trains will allow access between all six carriages, enabling passengers to travel through from one end of the train to the other and all NGR trains will be equipped with toilet facilities and WiFi. New Generation Rollingstock project Project fact sheet Artist’s impression of NGR train January 2014
  • 2. Trains will be designed with additional safety features to meet the requirements of tunnel travel. The carriages will be flexible to adapt to future needs, to enable longer train sets in future if required. NGR trains will be designed to enable them to be retrofitted in future to accommodate new safety features. NGR maintenance centre A significant expansion of the rail fleet to deliver modern, efficient rollingstock requires a new purpose-built maintenance centre. Following an extensive assessment of 72 sites against operational and environmental criteria, the site at 1 Ada Street, Wulkuraka was assessed as most suitable. Further information about the selection process is available on the project website. The maintenance centre will service the new NGR trains only and will not be servicing diesel or other electric locomotives or wagons. Key components of the NGR maintenance centre will include: • utility services • site track work, including holding roads for trains, hand- over roads and maintenance roads • signalling and yard control overhead traction power for trains • maintenance building with underfloor access for wheel lathe • train cleaning and decant facility • storage areas • administration office with training/meeting rooms and amenities areas • car parking, roads and pedestrian walkways • fencing, lighting and security • landscaping • temporary on-site office during construction • permanent on-site office areas. Around 150 full-time ongoing new maintenance staff will be employed at the maintenance centre during the operation period. It is anticipated that there will be no more than 100 operational staff on site at any one time. While the maintenance centre will have a 24 hour, 7 day a week operational capability, it may not necessarily operate at these times. It is also anticipated that traffic travels on local streets surrounding will not increase and only minor traffic increases will be experienced to Toongarra Road and the Warrego Highway. Site access for construction and operation will be via Dixon Street West. Preliminary site work has commenced, with construction to commence in early 2014. The maintenance centre will be commissioned by June 2016, in time for first NGR services in June 2016. Information will be provided to the local community about the design, construction and operation of the centre. Artist’s impression of the NGR maintenance centre at Wulkuraka For further information Further information on the project, including the fly-through is available on the project website www.tmr.qld.gov.au/ngr. Free call: 1800 478 238* The project team is available to answer your questions from 9am to 4pm, Monday to Friday (excluding public holidays). Email: ngr@tmr.qld.gov.au Visit: www.tmr.qld.gov.au/ngr *Free call from anywhere in Australia. Call charges apply from mobile phones and payphones. 13 QGOV (13 74 68)