PROJECT DATA SHEET 1255
BGC Contracting. The Leader in Mining and Civil Contracting
WWW.BGC.CC
CLIENT
Samsung C&T
ENGINEER/CONSULTANT
AMEC/Halcrow
LOCATION
Port Hedland, WA
VALUE ($A)
$450 Million
TIMING
August 2013 - Ongoing
(Due June 2015)
QUICK FACTS
45,000m³ Structural Concrete
500 Person Workforce
34 Road Trains used on site
6,000m Cast in-situ Piles
5,500,000m³ Cut to Fill
Earthworks
Roy Hill Port Landside
Civil and Earthworks
Project Details
The Package 3 – Port Landside Contract is part of the overall Roy Hill
Project which includes a new iron ore mine at the Roy Hill deposit, a mine
process plant, a heavy haul railway system from mine to port and new port
facilities at Boodarie Industrial Estate, south west of Port Hedland, Western
Australia.
With a targeted construction program of 22 months, the scope for this
project consists of all earthworks and civil works necessary to develop the
landside facilities at the Roy Hill Port. Works include construction of car
dumpers, screen buildings, stock yard facilities, rail loop and the rail
terminal yard.
The scope of work included in this project was:
Clearing & Grubbing.
Topsoil removal and reuse.
Ground improvement (rock displacement).
Construction of 5km of Rail and Road embankment over soft ground
and tidal areas.
Rock armour and flexible concrete mattress protection to embankment
slopes in tidal area.
Construction of stockyard 1.5km x 0.5km over soft ground and tidal
areas.
Rail embankment construction (to top of Sub-Ballast capping).
Stockyard pavement construction.
Stacker-Reclaimer rail works.
Construction of site access roads.
Culverts and storm water drainage.
Car dumper structural works.
Site dewatering.
PROJECT DATA SHEET 1255
BGC Contracting. The Leader in Mining and Civil Contracting
WWW.BGC.CC
Relevant construction components
Structural Concrete (m³) 45,000 Rail supply & install (t)
(stackers and reclaimer)
1,000
Reinforcement (t) 10,000 Rail formation (km) 45
Bored Piles (m) 30,000 Roads & Drainage (km) 75
Cast in-situ Piles (m) 6,000 Cut to fill earthworks (m³) 5,500,000
Workforce (No.) 500
Equipment - number and size of equipment used on site
Excavators 20 Scrapers 12
Graders 21 Road Trains 34
Dozers 14 Rollers 28
Water Carts 22 Dump Trucks 12
Front End Loaders 26 Cranes 3
Owners Representatives
Name Position Company Contact Number Contact Email
John Joonsoon
Lee
Area Project
Director
Samsung C&T 0477 764 787 Joonsoon.lee@samsung.com
BGC Contracting representatives
Name Position Contact Number
Kim Tan Project Director 0438 938 357
John Beattie Deputy Project Director 0419 193 618

More Related Content

What's hot

Work Experiment Certificate From SRTPPF-2 Team Leader
Work Experiment Certificate From SRTPPF-2 Team LeaderWork Experiment Certificate From SRTPPF-2 Team Leader
Work Experiment Certificate From SRTPPF-2 Team LeaderB. M. Nural Absar
 
Project - Roy Hill Rail
Project - Roy Hill RailProject - Roy Hill Rail
Project - Roy Hill RailDamian Brandon
 
Stephen Groombridge-CV-1 (1)
Stephen Groombridge-CV-1 (1)Stephen Groombridge-CV-1 (1)
Stephen Groombridge-CV-1 (1)Steve Groombridge
 
Khalifa Port & Industrial Zone
Khalifa Port & Industrial ZoneKhalifa Port & Industrial Zone
Khalifa Port & Industrial ZoneFalco Ziehl
 
Track-O Greengo Case study
Track-O Greengo Case study Track-O Greengo Case study
Track-O Greengo Case study Johanne Jacques
 
KAINES RESUME 041014
KAINES RESUME 041014KAINES RESUME 041014
KAINES RESUME 041014Kaine Luck
 
Edinburgh proposed City plan 2030 C&BCC presentation 7 12 21
Edinburgh proposed City plan 2030   C&BCC presentation 7 12 21Edinburgh proposed City plan 2030   C&BCC presentation 7 12 21
Edinburgh proposed City plan 2030 C&BCC presentation 7 12 21CramondandBarntonCom
 
BE presentation slides
BE presentation slidesBE presentation slides
BE presentation slidesDoreen Yeo
 
PROJECT NEWS Hilsea Bus Depot Sml
PROJECT NEWS Hilsea Bus Depot SmlPROJECT NEWS Hilsea Bus Depot Sml
PROJECT NEWS Hilsea Bus Depot SmlSimon Tennent
 
Concrete Towers - a business case for sustained investment_Rev 5
Concrete Towers - a business case for sustained investment_Rev 5Concrete Towers - a business case for sustained investment_Rev 5
Concrete Towers - a business case for sustained investment_Rev 5Santie Gouws
 
Kranbau Koethen - Flyer Automatic Cranes - English
Kranbau Koethen - Flyer Automatic Cranes - EnglishKranbau Koethen - Flyer Automatic Cranes - English
Kranbau Koethen - Flyer Automatic Cranes - EnglishKranbau Köthen GmbH
 
Gurit UK - Projects and Case Studies
Gurit UK - Projects and Case StudiesGurit UK - Projects and Case Studies
Gurit UK - Projects and Case StudiesAdam Davison
 
Proposed additional car parking facility - south of Timber Bridge
Proposed additional car parking facility  - south of Timber BridgeProposed additional car parking facility  - south of Timber Bridge
Proposed additional car parking facility - south of Timber BridgeNaoise
 
ASPASA Eastern Cape Regional Committee Meeting_20151008-without SCC video
ASPASA Eastern Cape Regional Committee Meeting_20151008-without SCC videoASPASA Eastern Cape Regional Committee Meeting_20151008-without SCC video
ASPASA Eastern Cape Regional Committee Meeting_20151008-without SCC videoSantie Gouws
 
Porto De Caio: The new gateway to trade in Africa
Porto De Caio: The new gateway to trade in AfricaPorto De Caio: The new gateway to trade in Africa
Porto De Caio: The new gateway to trade in AfricaTristan Wiggill
 
Chester Development Update: Phil Mayall, Muse Developments
Chester Development Update: Phil Mayall, Muse DevelopmentsChester Development Update: Phil Mayall, Muse Developments
Chester Development Update: Phil Mayall, Muse DevelopmentsPlace North West
 

What's hot (20)

Work Experiment Certificate From SRTPPF-2 Team Leader
Work Experiment Certificate From SRTPPF-2 Team LeaderWork Experiment Certificate From SRTPPF-2 Team Leader
Work Experiment Certificate From SRTPPF-2 Team Leader
 
Project - Roy Hill Rail
Project - Roy Hill RailProject - Roy Hill Rail
Project - Roy Hill Rail
 
Stephen Groombridge-CV-1 (1)
Stephen Groombridge-CV-1 (1)Stephen Groombridge-CV-1 (1)
Stephen Groombridge-CV-1 (1)
 
Khalifa Port & Industrial Zone
Khalifa Port & Industrial ZoneKhalifa Port & Industrial Zone
Khalifa Port & Industrial Zone
 
Track-O Greengo Case study
Track-O Greengo Case study Track-O Greengo Case study
Track-O Greengo Case study
 
Highway Construction
Highway ConstructionHighway Construction
Highway Construction
 
KAINES RESUME 041014
KAINES RESUME 041014KAINES RESUME 041014
KAINES RESUME 041014
 
Crossrail-C336-Paddington-New-Yard
Crossrail-C336-Paddington-New-YardCrossrail-C336-Paddington-New-Yard
Crossrail-C336-Paddington-New-Yard
 
Edinburgh proposed City plan 2030 C&BCC presentation 7 12 21
Edinburgh proposed City plan 2030   C&BCC presentation 7 12 21Edinburgh proposed City plan 2030   C&BCC presentation 7 12 21
Edinburgh proposed City plan 2030 C&BCC presentation 7 12 21
 
BE presentation slides
BE presentation slidesBE presentation slides
BE presentation slides
 
H3 New Conveyer Logistics
H3 New Conveyer LogisticsH3 New Conveyer Logistics
H3 New Conveyer Logistics
 
PROJECT NEWS Hilsea Bus Depot Sml
PROJECT NEWS Hilsea Bus Depot SmlPROJECT NEWS Hilsea Bus Depot Sml
PROJECT NEWS Hilsea Bus Depot Sml
 
Concrete Towers - a business case for sustained investment_Rev 5
Concrete Towers - a business case for sustained investment_Rev 5Concrete Towers - a business case for sustained investment_Rev 5
Concrete Towers - a business case for sustained investment_Rev 5
 
Kranbau Koethen - Flyer Automatic Cranes - English
Kranbau Koethen - Flyer Automatic Cranes - EnglishKranbau Koethen - Flyer Automatic Cranes - English
Kranbau Koethen - Flyer Automatic Cranes - English
 
Gurit UK - Projects and Case Studies
Gurit UK - Projects and Case StudiesGurit UK - Projects and Case Studies
Gurit UK - Projects and Case Studies
 
Case study - Kettering train station
Case study - Kettering train stationCase study - Kettering train station
Case study - Kettering train station
 
Proposed additional car parking facility - south of Timber Bridge
Proposed additional car parking facility  - south of Timber BridgeProposed additional car parking facility  - south of Timber Bridge
Proposed additional car parking facility - south of Timber Bridge
 
ASPASA Eastern Cape Regional Committee Meeting_20151008-without SCC video
ASPASA Eastern Cape Regional Committee Meeting_20151008-without SCC videoASPASA Eastern Cape Regional Committee Meeting_20151008-without SCC video
ASPASA Eastern Cape Regional Committee Meeting_20151008-without SCC video
 
Porto De Caio: The new gateway to trade in Africa
Porto De Caio: The new gateway to trade in AfricaPorto De Caio: The new gateway to trade in Africa
Porto De Caio: The new gateway to trade in Africa
 
Chester Development Update: Phil Mayall, Muse Developments
Chester Development Update: Phil Mayall, Muse DevelopmentsChester Development Update: Phil Mayall, Muse Developments
Chester Development Update: Phil Mayall, Muse Developments
 

Similar to 1255 - Roy Hill Port Landside

Dart Underground, Dublin - Light Rail Network in Tunnels
Dart Underground, Dublin - Light Rail Network in TunnelsDart Underground, Dublin - Light Rail Network in Tunnels
Dart Underground, Dublin - Light Rail Network in TunnelsDavid H Moloney
 
2015 excellence-infrastructure-summary-slides-en
2015 excellence-infrastructure-summary-slides-en2015 excellence-infrastructure-summary-slides-en
2015 excellence-infrastructure-summary-slides-enTeresa Elliott
 
Runway construction project execution plan
Runway construction project execution plan Runway construction project execution plan
Runway construction project execution plan David H Moloney
 
Richards Bay Industrial Development Zone
Richards Bay Industrial Development ZoneRichards Bay Industrial Development Zone
Richards Bay Industrial Development ZoneTristan Wiggill
 
PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...
PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...
PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...PowerLift Events
 
Dcl presentaion for hdd
Dcl presentaion for hddDcl presentaion for hdd
Dcl presentaion for hddMohammed wahab
 
Dcl hdd presentation 9 2-2014
Dcl hdd presentation 9 2-2014Dcl hdd presentation 9 2-2014
Dcl hdd presentation 9 2-2014Mohammed wahab
 
Buildingworkmethodstatement cm-ms-bw-001-141120013134-conversion-gate01(1)
Buildingworkmethodstatement cm-ms-bw-001-141120013134-conversion-gate01(1)Buildingworkmethodstatement cm-ms-bw-001-141120013134-conversion-gate01(1)
Buildingworkmethodstatement cm-ms-bw-001-141120013134-conversion-gate01(1)Krm Chari
 
20160704 Carline_Andrew
20160704 Carline_Andrew20160704 Carline_Andrew
20160704 Carline_AndrewAndrew Carline
 
PPT seri Nallah 19.10.2023.pptx
PPT seri Nallah 19.10.2023.pptxPPT seri Nallah 19.10.2023.pptx
PPT seri Nallah 19.10.2023.pptxSaketChandra4
 
JAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE NavyJAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE NavyMike Bisland
 
Engineer and Project management CV 'Ali Al Obaidy
Engineer and Project management  CV 'Ali Al ObaidyEngineer and Project management  CV 'Ali Al Obaidy
Engineer and Project management CV 'Ali Al ObaidyAli Alobaidy
 
Whitescape Civil Engineering Case Study
Whitescape Civil Engineering Case StudyWhitescape Civil Engineering Case Study
Whitescape Civil Engineering Case StudyAndrew White
 
Metro North, Dublin - Construction Explained
Metro North, Dublin  - Construction ExplainedMetro North, Dublin  - Construction Explained
Metro North, Dublin - Construction ExplainedDavid H Moloney
 
Senior surveyor ragab atta c.v
Senior surveyor ragab atta c.vSenior surveyor ragab atta c.v
Senior surveyor ragab atta c.vragabata
 
Jamsheer P_CV (1)
Jamsheer P_CV (1)Jamsheer P_CV (1)
Jamsheer P_CV (1)jamsheer p
 

Similar to 1255 - Roy Hill Port Landside (20)

Dart Underground, Dublin - Light Rail Network in Tunnels
Dart Underground, Dublin - Light Rail Network in TunnelsDart Underground, Dublin - Light Rail Network in Tunnels
Dart Underground, Dublin - Light Rail Network in Tunnels
 
Paquette, Jason 2016 CV
Paquette, Jason 2016 CVPaquette, Jason 2016 CV
Paquette, Jason 2016 CV
 
Harthill footbridge
Harthill footbridgeHarthill footbridge
Harthill footbridge
 
14.30 tarek shuaib, pace
14.30 tarek shuaib, pace14.30 tarek shuaib, pace
14.30 tarek shuaib, pace
 
2015 excellence-infrastructure-summary-slides-en
2015 excellence-infrastructure-summary-slides-en2015 excellence-infrastructure-summary-slides-en
2015 excellence-infrastructure-summary-slides-en
 
Runway construction project execution plan
Runway construction project execution plan Runway construction project execution plan
Runway construction project execution plan
 
Muhammad_Aslam_CV
Muhammad_Aslam_CVMuhammad_Aslam_CV
Muhammad_Aslam_CV
 
Richards Bay Industrial Development Zone
Richards Bay Industrial Development ZoneRichards Bay Industrial Development Zone
Richards Bay Industrial Development Zone
 
PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...
PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...
PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...
 
Dcl presentaion for hdd
Dcl presentaion for hddDcl presentaion for hdd
Dcl presentaion for hdd
 
Dcl hdd presentation 9 2-2014
Dcl hdd presentation 9 2-2014Dcl hdd presentation 9 2-2014
Dcl hdd presentation 9 2-2014
 
Buildingworkmethodstatement cm-ms-bw-001-141120013134-conversion-gate01(1)
Buildingworkmethodstatement cm-ms-bw-001-141120013134-conversion-gate01(1)Buildingworkmethodstatement cm-ms-bw-001-141120013134-conversion-gate01(1)
Buildingworkmethodstatement cm-ms-bw-001-141120013134-conversion-gate01(1)
 
20160704 Carline_Andrew
20160704 Carline_Andrew20160704 Carline_Andrew
20160704 Carline_Andrew
 
PPT seri Nallah 19.10.2023.pptx
PPT seri Nallah 19.10.2023.pptxPPT seri Nallah 19.10.2023.pptx
PPT seri Nallah 19.10.2023.pptx
 
JAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE NavyJAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE Navy
 
Engineer and Project management CV 'Ali Al Obaidy
Engineer and Project management  CV 'Ali Al ObaidyEngineer and Project management  CV 'Ali Al Obaidy
Engineer and Project management CV 'Ali Al Obaidy
 
Whitescape Civil Engineering Case Study
Whitescape Civil Engineering Case StudyWhitescape Civil Engineering Case Study
Whitescape Civil Engineering Case Study
 
Metro North, Dublin - Construction Explained
Metro North, Dublin  - Construction ExplainedMetro North, Dublin  - Construction Explained
Metro North, Dublin - Construction Explained
 
Senior surveyor ragab atta c.v
Senior surveyor ragab atta c.vSenior surveyor ragab atta c.v
Senior surveyor ragab atta c.v
 
Jamsheer P_CV (1)
Jamsheer P_CV (1)Jamsheer P_CV (1)
Jamsheer P_CV (1)
 

1255 - Roy Hill Port Landside

  • 1. PROJECT DATA SHEET 1255 BGC Contracting. The Leader in Mining and Civil Contracting WWW.BGC.CC CLIENT Samsung C&T ENGINEER/CONSULTANT AMEC/Halcrow LOCATION Port Hedland, WA VALUE ($A) $450 Million TIMING August 2013 - Ongoing (Due June 2015) QUICK FACTS 45,000m³ Structural Concrete 500 Person Workforce 34 Road Trains used on site 6,000m Cast in-situ Piles 5,500,000m³ Cut to Fill Earthworks Roy Hill Port Landside Civil and Earthworks Project Details The Package 3 – Port Landside Contract is part of the overall Roy Hill Project which includes a new iron ore mine at the Roy Hill deposit, a mine process plant, a heavy haul railway system from mine to port and new port facilities at Boodarie Industrial Estate, south west of Port Hedland, Western Australia. With a targeted construction program of 22 months, the scope for this project consists of all earthworks and civil works necessary to develop the landside facilities at the Roy Hill Port. Works include construction of car dumpers, screen buildings, stock yard facilities, rail loop and the rail terminal yard. The scope of work included in this project was: Clearing & Grubbing. Topsoil removal and reuse. Ground improvement (rock displacement). Construction of 5km of Rail and Road embankment over soft ground and tidal areas. Rock armour and flexible concrete mattress protection to embankment slopes in tidal area. Construction of stockyard 1.5km x 0.5km over soft ground and tidal areas. Rail embankment construction (to top of Sub-Ballast capping). Stockyard pavement construction. Stacker-Reclaimer rail works. Construction of site access roads. Culverts and storm water drainage. Car dumper structural works. Site dewatering.
  • 2. PROJECT DATA SHEET 1255 BGC Contracting. The Leader in Mining and Civil Contracting WWW.BGC.CC Relevant construction components Structural Concrete (m³) 45,000 Rail supply & install (t) (stackers and reclaimer) 1,000 Reinforcement (t) 10,000 Rail formation (km) 45 Bored Piles (m) 30,000 Roads & Drainage (km) 75 Cast in-situ Piles (m) 6,000 Cut to fill earthworks (m³) 5,500,000 Workforce (No.) 500 Equipment - number and size of equipment used on site Excavators 20 Scrapers 12 Graders 21 Road Trains 34 Dozers 14 Rollers 28 Water Carts 22 Dump Trucks 12 Front End Loaders 26 Cranes 3 Owners Representatives Name Position Company Contact Number Contact Email John Joonsoon Lee Area Project Director Samsung C&T 0477 764 787 Joonsoon.lee@samsung.com BGC Contracting representatives Name Position Contact Number Kim Tan Project Director 0438 938 357 John Beattie Deputy Project Director 0419 193 618