SlideShare a Scribd company logo
1 of 12
Name of Staff : ABU NAHID MUNIR UDDIN 
Profession : Environmental Engineer/Environmental Specialist 
Date of Birth : July 22, 1964 
Nationality : Bangladeshi 
Membership in 
Professional Societies : - Fellow (F-8995), Institution of Engineers Bangladesh 
- Member, National EIA Association of Bangladesh 
- Registered Consultant with ADB CMS (# 054060). 
Contact Address : 10 Segunbaghicha, ‘Bashati’, Apt # B-1, 1st Floor, Ramna, Dhaka- 
1000, Bangladesh; Telephone: +88-02-8315704(Res), +88-01715- 
452920(cell); 
Skype address: aantara.anjum 
Key Qualifications 
More than Twenty two years total experiences with more than eighteen (18) years professional 
experience in the field of environmental engineering, environmental safeguard and management, 
environmental assessment, preparation of Environmental Management Framework, Environmental 
Management Plan (EMP), preparation and implementation of Code of Practices on various safeguard 
measures, supervising and monitoring EMP implementation. 
Has gained extensive experience in environmental management through all cycles of project i.e. pre-feasibility, 
feasibility, detailed project preparation and construction supervision on projects funded by 
various multilateral funding agencies like World Bank, Asian Development Bank, JBIC, DFID etc. Has 
thorough knowledge and experience of Word Bank’s safeguard policies such as OP/BP 4.01 
(Environmental Assessment), OP/BP 4.04 (Natural Habitat), OP 4.12 (Resettlement Policy) and ADB 
Safeguard Policies- Environment, Social Resettlement and Indigenous people) .
Abu Nahid Munir Uddin Environmental Engineer Page 2 of 12 
Familiar with outline and outcome of various international conventions on environmental issues and 
sustainable development, global laws, regulations, standards, trends and practices. Familiar with 
regulations and standards of USEPA, OSHA etc. and has extensive experience in environmental 
management complying with GoB environmental legislations as well as operational policies of 
multilateral funding agencies. 
Education 
- Post Graduation Degree (equivalent to Masters) (1996) in Environmental Engineering, at 
the Institute of Infrastructure, Hydraulic and Environment (IHE) Delft, The Netherlands. 
- BSc in Civil Engg. (1991), Bangladesh University of Engineering & Technology (BUET), Dhaka. 
Training 
- EIA Training Workshops in Selected Sectors (Oil & Gas, Power, and Industry) organized 
by National EIA Association of Bangladesh (NEAB) held in Dhaka during 13-20 March, 10-17 
April and 8-15 May 1999. 
- Training on Environmental Management with special emphasis on ISO 14001 
Environmental management System, (EMS) organized by the Institution of Engineers, 
Bangladesh (IEB), August 2003, under Bridge Replacement Project, funded by DFID. 
- Environmental Management conducted by Bangladesh University of Engineering & 
Technology (BUET), Dhaka, 1994 in cooperation with Environment Unit of Jamuna Multipurpose 
Bridge Authority and Sponsored by World Bank. 
- Participated in a field work programme on Operation and maintenance of Waste Water 
Treatment Plants at Pilot and full scale in the Department of Environmental Technology of 
Wageningen University, The Netherlands 
Countries of work Experience : Bangladesh, Kazakhstan, Georgia, UAE, 
Countries Visited : India, United Arab Emirates, Netherlands, Germany, 
Belgium, France, Switzerland, London, Luxemburg
Abu Nahid Munir Uddin Environmental Engineer Page 3 of 12 
Employment Record 
Period : April 2009 to Date 
Employer : DevConsultants Ltd. 
Position held : Environmental Manager 
Description of duties : 
Tracking business opportunities for consultancy services in public and private sector; Preparation of 
project proposals; Undertaking detailed project planning, resource mobilization, monitoring and 
execution; Providing direction, guidance, and formulating structure and programs on issues of 
monitoring and evaluation of projects. 
Environmental Engineer, Bangladesh Rural Water Supply and Sanitation Project of Department 
of Public Health Engineering, funded by World Bank (January 2014 to date) 
Carry out Environmental assessment in the form of IEE for each of the schemes; Develop 
Environmental and Social Management Plans in connection with Environmental Management 
Framework and Social Development Framework developed for the project; Assist to prepare 
standard Bid documents integration environmental safeguard measures of 125 WSS. 
Environmental Specialist, Urban Dredging Demonstration Project with Viten Evides 
International (September 2013 to December 2013) 
Responsible for assessing both positive and negative environmental impacts due to each project 
activities; assess the impacts and recommend appropriate mitigation measures during operation and 
post operation phases to minimize negative impacts of the Project to acceptable levels; prepare EIA 
and EMP in compliance with the Government and other co-financiers’ requirements.
Abu Nahid Munir Uddin Environmental Engineer Page 4 of 12 
Environmental Specialist, Financial Sector Project for Development Small and Medium Sized 
Enterprises (FSPDSME) of Bangladesh Bank funded by JICA.. Responsabilités includes : Assistance 
to BB-PIU in carrying out the capacity development for BB-PIU and PFIs in respect to JICA’s 
guidelines on environmental and social consideration; monitoring and évaluation activities in particular 
monitoring of the sub projects/sub loans in terms of their compliance with JICA’s guidelines on 
environment and social considerations. (July 2013 to December 2013) 
Environmental Specialist, Preparation of Water Supply Master Plan for Dhaka City for Dhaka Water 
Supply and Sewerage Authority (March 2013 to June 2013; intermittent). Responsible for Provide 
advice and direction to the environmental study groups and specially lead the EIA study team; 
Establish the modalities, organization and empowerment of a monitoring and execution environmental 
protection unit; Formulate sustainable option for protection of raw water quality; Prepare Strategic 
Environmental Assessment and suggest and formulate option scenarios for the study; Prepare 
project plan, schedules and time frame work for the publications of reports; Attend meetings as and 
when required. 
Environmental Specialist, CAREC 2 Corridor (MANGISTAU OBLAST Section) Investment Program, 
Project 1 Construction Supervision Consultant , Loan No. 2728- KZ, funded by ADB (July 2013 to 
December 2014 intermittent); Responsabilités inclue: (a) to ensure implementation of environmental 
mitigation measures in the contract documents; (b) to supervise and monitor the implementation of 
environmental mitigation measures as per contract; and (c) in the event of occurrence of any 
unexpected environmental impacts, coordinate with the EA/PD to provide necessary mitigation 
measures for submission to the Committee of Roads and ADB; (d) preparation of bi-annual 
environmental monitoring report.; Assisting in identification of social environment parameters including 
loss of assets of project affected people and preparation of resettlement action plan as a part of EIA 
and EMP 
Environmental Specialist, ADB Loan #:2772-UZB, Second CAREC Corridor 2 Road Investment 
Program-Project 1, Project Management and Construction Supervision Consultant (74km), funded by 
ADB (May to June 2014) ; Responsabilités includes preparation of due diligence report in respect of 
environnemental compliance. 
Environmental Specialist, Loan No. 2562-KAZ CAREC Transport Corridor 1 (Taraz-Korday 
Section) Investment Program – Project 2 of Ministry of Transport and Communication (MOTC) 
funded by ADB (May 2012 to March 2014; intermittent); Responsabilités includes (a) ensure that all the 
environmental mitigation measures required to be implemented are incorporated in the contract 
documents; (b) supervise and monitor the implementation of environmental mitigation measures 
required; and (c) in the event of occurrence of any unexpected environmental impacts, coordinate with 
the EA/PD to provide necessary mitigation measures for submission to the Committee of Roads and 
ADB. 
Environmental Specialist, Loan No. 2560-GEO Road Corridor Investment Program- Project 1- 
Supervision of the construction of bypass roads around Batumi and Kobuleti for Trench 1 
funded by ADB. (September to October 2012;); Responsabilités includes (a) checking of required 
permits and licenses; checking of management documentation(Health and Safety Procedures and 
records, Environmental Management Plans, Training and instructions records for personnel etc.); 
Waste management in camps, offices and at the construction sites; Top soil protection and 
management measures; Traffic safety; Fuel spill prevention measures; noise, dust and emissions at 
workings, maintenance of equipments, quarries and borrow pits, top soil prevention and all other 
measures and actions to be implemented and monitored according to the EMPs.
Abu Nahid Munir Uddin Environmental Engineer Page 5 of 12 
Environmental Specialist, Updating Bangladesh Profile regarding Environment and Social 
Consideration of JICA (May 2012) Responsabilités include : Update and revise the current profile by 
checking the change in the domestic regulatory system relevant to environment and social 
consideration items from November 2006 when the current environmental profile was created to the 
present; Work on practical information-gathering via additional local consultants who have abundant 
experience in environmental and social considerations-related projects and a strong network of local 
experts; Conduct research on natural environment, pollution, and environmental contamination again 
by working closely with the local consultants. Recently, in Bangladesh in particular, loss of natural 
environmental resources caused by urbanization and the impact of climate change are remarkable. 
Detailed information gathering is to be conducted for these issues; Conduct gap analysis between the 
local regulatory system pertinent to the environmental and social considerations identified above vis-a- 
vis the Guideline and the World Bank’s Safeguard Policies. 
Environmental Specialist, Dhaka-Chittagong National Highway (N-1) Bridge Construction and 
Rehabilitation Project of Road & Highways Department under Special Assistance for Project 
Formulation (SAPROF) study of JICA i.e. under Roads and Highways Department of the Government 
of Bangladesh (Feb 2012 to October 2012, 4 months, intermittent); Responsible for conducting 
detailed field and desk studies leading to the submission of all necessary statutory and other required 
documents to achieve environmental clearance for the project, preparation of scoping document, 
Advising and guiding the Design Consultants for EIA and EMP preparation in making extensive use of 
current international best practice. 
Environmental Specialist, Feasibility study for construction of Dam to provide safe water to 
the Teknaf Pourashava under Cox’s Bazar funded by UNICEF. (November 2011 to January 
2012). Works includes: Review the preliminary design specifications pertaining to the project, collect 
baseline information on the physical, biological and socio-economic environment of the project area; 
Identify and recommend the mitigation measures with respect to potential environmental impacts 
basically to minimize or eliminate the adverse/negative impacts, Prepare environmental management 
plan to implement the suggested mitigation measures during project implementation, prepare IEE 
Report 
Environmental Specialist, (International), Preparation of Detailed Design and Bidding 
Documents for Kobuleti Bypass Road, Kobuleti-Batumi Section and Batumi Bypass road, by 
Road Department of The Ministry of Regional Development and Infrastructure of Georgia, funded by 
ADB (February 2011 to October 2011 over a period of 4 months). Works includes: conduct further 
detailed field and desk studies that will lead to the submission of all necessary statutory and other 
required documents to achieve environmental clearance for the project ensure that all potential 
contractors are made aware of requirements for all environmental mitigation measures including EIA 
and EMP through the tender documentation. 
Environmental Specialist, Feasibility Study for Multilane Road Tunnel under the River 
Karnaphuli, Chittagong; (June 2011 to February 2012 over a period of 4 months); Works include: 
Responsible for Rapid Environmental Assessment, Reconnaissance Survey, Determining proposed 
route on satellite imagery; Ground Truth Verification of Satellite Imagery on various bio-physical 
environment along the predetermined route; Preparation of Decision Matrix for different Alternative 
Alignments; Selection of Preferred Alignment from Environmental Consideration in Conjunction with 
Engineering, Indicative Cost and Socio-Economic Aspects and Preparation of Environmental Impact 
assessment for the proposed selected options.
Abu Nahid Munir Uddin Environmental Engineer Page 6 of 12 
Environmental Specialist, (National), Power System Efficiency Improvement Project (ADB TA- 
7242-BAN) (September 2010 to May 2011 over a period of 4 months). Works includes: Review of 
institutional capacity of the proposed executing and implementing agencies to prepare environmental 
impact assessment (EIA) reports for the future project components and the required Environmental 
Management Plan to determine mitigation measures in the design, construction, and maintenance 
phases of the future investment subprojects, their components and national regulatory requirements 
in accordance with the ADB's Safeguard Policy (2009) and the ADB's Environmental Assessment 
Guidelines (2006); Prepare Rapid Environmental Assessment Checklist and determine environmental 
category for each project component; Prepare project descriptions and a summary of environmental 
issues identified for each project component to support the determination of the project environmental 
categorization; Prepare Environmental Impact Assessments or Initial Environmental Examinations 
depending on the subproject categorization (environmental category A or B) assigned by ADB in 
accordance with the 2006 ADB Environmental Assessment Guidelines; Prepare Environmental 
Management and Monitoring Plan (EMP and MP) for the project component specifying requirements 
for each subproject as well as for the entire project; Assist the Energy Efficiency Policy Specialist 
(separately recruited) in identification of potential financing through the Clean Development 
Mechanism (CDM) or sales of Verified Emissions Reduction Credits in non-CDM carbon markets. 
Environmental Specialist, Socioeconomic Study, EIA and Detail Engineering Survey, Investigation & 
Design under Ground Water Management and Feasibility Study of 148 Pourashavas of Department of 
Public Health Engineering (February 2010 to December 2013 over a period of 18 months). Works 
includes: Development of questionnaire for carrying out an environment baseline survey in the project 
area, carry out extensive field survey both during reconnaissance and field survey and PRA in 
connection with the tasks define, carryout Environmental Impact Assessment (EIA) for the various 
options developed for water supply, sanitation, drainage and solid waste management, prepare an 
outline on the Environmental Management and Monitoring Plan (EMP), Prepare training modules on 
EIA and SIA and take participation in the training program for implementation monitoring of EMP and 
preparation of report, assisting Team Leader in all related works. 
Environmental Specialist, Second Sector Development Programme (SDP) for the Water and 
Sanitation Sector in Bangladesh under GoB-Danida (July 2009 to December 2009) 
Works includes: Environmental assessment of the intervention proposed in the SIP, ways to make 
plan more environmental impacts of existing Water Supply and Sanitation interventions, assess the 
impact of climate change and other phenomenon in the future technological options. 
Environmental Specialist, Detail Technical Economic Feasibility Study of 3rd Shitalakhya Bridge at 
Bandar, Narayanganj (August 2009 to January 2010). Works includes: Preparation of initial 
environmental examination of three alternative sites, preparation of environmental baseline analysis, 
environmental impact assessment and management plan of proposed selected site (Madanganj- 
Syedpur crossing, The total bridge length including viaduct is 1.33km) 
Environmental Engineer, Detailed Design of Padma Multipurpose Bridge Project of 
Bangladesh Bridge Authority funded by ADB with MAUNSELL-nhc-SMEC-ACE consortium. As a 
Environmental Engineer responsibilities included: preparation of Community Environmental 
Management plan (CEMP) of three Resettlement sites for construction and post implementation 
phase. (August 2009 to September 2009) 
Environmental Engineer, Preparation of Environmental and Social Assessment of Private Sector 
Development Support Project (PSDSP)- EZ Development funded by DFID. (June 2008 to August 
2009). Activities performed: preparation of environmental baselines analysis, environmental 
management framework, Coordinate environmental safeguards into civil engineering works, Define 
environmental management requirements in bidding documents, preparation of Environmental Impact 
assessment and Environmental Management plan for Hitech park, Comilla EPZ Expansion and 
proposed Meghna EPZ . 
Period : March 2002 to March 2009 
Employer : Freelance Consultant 
Position held : Environmental Engineer/Environmental Specialist 
Description of duties :
Abu Nahid Munir Uddin Environmental Engineer Page 7 of 12 
Team Leader, Monitoring of Environmental Management Plan Implementation and Other 
Environmental activities under four (4) sub projects for Gas Transmission Company Ltd. With 
Resource Control Company (RCC) Ltd. (March 2008 to March 2009) 
Activities performed: reviewing the contractor’s EMP implementation plans, providing 
recommendations on preventive and corrective actions for effective EMP implementation, supervising 
the environmental performance of the contractors at the project site, assist in preparation of contract 
for implementation of periodic environmental monitoring (air, noise, water etc.) programmes to ensure 
compliance with the GoB as well as ADB requirements and the EMP, reporting the EMP 
implementation progress and compliances, prepare monthly Environmental Monitoring Report, 
monitoring all environmental, health and safety activities carried out by the contractors as outlined in 
the EMMP. . 
Environmental Engineer, Preparation of IEE and EIA of Minerals Sands Mining at Teknaf Beach, 
Premier Minerals Ltd.(Feb. 2008 to June 2008). Responsible for detailed operational procedures of 
Mining process, waste generation and sources, disposal system, Identification and evaluation of 
potential impacts and mitigation measures, Assisting the Team Leader in the preparation of the 
reports 
Team Leader, Preparation of EMP for Drilling Wells at Kailashtilla, (Well No. 5 &6); Sylhet Gas Fields 
Ltd. (July to September 2008). Works include; Gather necessary environmental data and describe 
systematically the environmental conditions of the study area, Review the existing ambient air quality 
and water quality, noise level of the project area and justify the sampling point of these elements, 
chemical analysis of the collected samples, Responsible for the baseline ecological features of the 
proposed sites within 5 km radius etc. 
Environmental Specialist, Bangladesh Railway Sector Improvement Project- Implementation 
Consulting Services with SMEC-Balaji-ACE Consortium funded by ADB. (Dec. 2007 to June 2008). 
Works includes Preparation of Environmental Impact Assessment and Environmental Management 
and Monitoring Plan of the construction of 95 km long Dhaka –Laksam Chord Line. The work will 
involve construction of railway embankments, placement of ballast, laying of sleepers and tracks, 
construction of bridges, culverts, underpasses and flyovers, installation of signaling system, 
construction of station buildings, passengers’ waiting rooms, rail ticket counters, platforms, platform 
sheds and warehouses, station access roads and infrastructure and other associated civil works. 
Team Leader, Preparation of Environmental Management Plan for the Expansion of Clinker Capacity 
from 1.15 MT to 2.30 MT for the Lafarge Surma Cement’s Existing Plant. Works includes: Mitigation 
measures to reduce or eliminate negative impacts; Measures to off-set or compensate irreversible 
and residual negative impacts; Enhancement measures to maximize the positive impacts; Institutional 
arrangement for implementation of the EMP; Monitoring requirements; Implementation schedule of 
the EMP; and Cost Estimates for EMP implementation. (April 2007 to November 2007) 
EIA Expert , Preparation of EIA for the proposed Housing Project entitled “SAGUPTA N.M. HOUSING 
LTD” located at Pallabi, Mirpur. Works includes: Review of regulatory environmental framework for 
housing development project, generation of baseline data to describe the study area for physical, 
biological and social environment, identification and evaluation of probable impacts, data analysis and 
technical editing of the EIA report. Prepare waste management, formulate environmental management 
plan, design a plan to monitor implementation of mitigatory or compensatory measures and project 
impacts during construction and operation of the units/facility (Jan. to Jul. 2007). 
Environmental Engineer, Preparation of Initial Environmental Examination, Environmental Impact 
Assessment and Resettlement Action Plan of 495 MW Combined Cycle Power Plant (Phase II) for 
BON Consortium Bangladesh with Dillon-RCC Consortium. Works includes responsible for preparing 
EIA tools, reviewing Environmental legislation, Collection baseline information (physical, biological, 
socio-economic) , conducting environmental monitoring (air, noise, water) quality, and assisting team 
leader for preparation of Environmental Assessment report, Resettlement Action plan report and 
Environmental Management and Monitoring Plan report. (Jan to June 2006).
Abu Nahid Munir Uddin Environmental Engineer Page 8 of 12 
Environmental Specialist, Construction Supervision of Two Bridges (3rd Buriganga Bridge (708 m 
long) at Basila & 2nd Shitalakhya Bridge (772 m long) at Demra of RHD funded by KFAED. Works 
included: Review EMP and ensure that are adequate to comply with GoB environmental safeguard; Develop 
Environmental Monitoring Plan that include appropriate monitoring activities, indicators, and parameters; 
Develop safety hazard mitigation plan and prepare a procedure and mechanism that the plan is followed 
accurately at every stage of the bridge construction; Carry out necessary tests of environmental parameters 
such as surface water quality, air, soil, noise etc.; Review and assess that the post construction activities are 
carried out in conformity with the EMP; Supervise and monitor the implementation of environmental mitigation 
measures for adverse environmental impacts and overall environmental management; Submit quarterly 
progress report to PMU containing progress made in EMP implementation (6 mm over a period of 3 years From 
July 2006 to Aug. 2009) 
Environmental Engineer, Detailed Design and Supervision for Civil Works of Connector Road under 
Chittagong Port Trade Facilitation Project (ADB Loan No. 2147 –BAN) with SMEC-HPR-ACE-ESL 
Consortium. Works includes reviewing IEE report, field visit to the proposed Flyover site and adjacent 
neighborhood, preparation of environmental management action plan comprising environmental 
mitigation measures along with specification, drawings, BOQ and cost estimates, preparation of 
environmental monitoring plan and Bid document integrating environmental safeguard measures. 
(September to December 2006) 
Environmental Expert, 4 Laning of Dhaka Chittagong Highway Project (Daudkandi-Chittagong 
Section) of RHD with NESPAK-MEPC-DPC-KPL consortium. Responsibilities included: Environmental 
data collection and analysis, Legislative review, Consultation with public/stakeholders, Identification 
and assessment of the potential impacts associated with road improvement activities within the study 
area on the natural and human environment, development of an Environmental Management Plan 
(EMP) including mitigation measures for negative impacts, measures for pollution control and 
environmental monitoring (May to August 2006). 
Team Leader/Environmental Engineer, Preparation of Environmental Impact Assessment Study 
(EIA) Report of Benapole Land Port Master Plan Project of Bangladesh Sthala Bandar Katripaksha 
(BSBK) with Modern Engineers Planners and Consultants Ltd. (May 2006 to June 2006). 
Environmental Specialist, Construction Supervision Consultancy Services for Bridge Replacement 
Project of RHD funded by DFID (Work Package 3). The project involves Works includes: 
Environmental supervision and monitoring for the construction of three bridges at Nondakuja, Natore, 
Noahatta, Rajshahi and Gabura, Dinajpur. As Environmental Specialist, responsible for Evolving 
guidelines to assist contractor in implementing Environmental Management Plan (EMP), assist in 
preparation of contract for implementation of periodic environmental monitoring (air, noise, water etc.) 
programmes to ensure compliance with the GoB as well as Donor requirements and the EMP, assist 
in preparing and submitting environmental monitoring and implementation progress reports, assist 
PIU in setting up and implementation of EMP, develop and organise programs and seminars, 
workshops, environmental training programs for staff and site engineers, review the contractors’ 
environmental implementation plans to ensure compliance of EMP (8 mm over a period of 20 months 
from May 2005 to Dec. 2006) 
Environmental Specialist, Preparation of Environmental and Social Assessment of Road Sector 
Reform Project (RSRP) under RHD, funded by World Bank with Operational Research Group 
(ORG), India. Activities performed: responsible for preparing EIA tools, reviewing Environmental 
management framework and codes of practice, preparation of Environmental Assessment and EMP 
report based on Word Bank’s safeguard policies for Tongi-Mymensingh (99.668 km), Mainamoti- 
Brahmanbaria (82.225 km) and Sylhet-Sunamganj (68 km) road under network package (July 2005- 
Dec.2005). 
Environmental Engineer / Project Manager, Preparation of Environmental Impact Assessment 
Study for Offshore Drilling over Hatiya-Manpura prospects, offshore, Block-16 of Cairn Energy Sangu 
Field Limited. Responsibilities included work closely with Team Leader in day-to-day activities of the 
project, involved in planning works and reassessment the planning option developed during the 
project period, liaise with all the team members/experts throughout the project and maintain 
necessary coordination with Company and relevant authorities/department to carry out unhindered 
team work for the EIA preparation, prepare regulatory framework, baseline information and assist 
Team Leader for the preparation of environmental management and monitoring plan of the proposed 
project intervention(July-October 2005).
Abu Nahid Munir Uddin Environmental Engineer Page 9 of 12 
Environmental Expert, Feasibility Study of Network Improvement for the Proposed Road Sector 
Reform Project (RSRP) of Road & Highways Department funded by World Bank. Works included: 
investigation of environmental screening of various road corridors; carry out initial environmental 
examination (IEE) for the proposed selected corridors; prepare environmental management and 
monitoring plan, and formulate environmental management plan for various performance indicators of 
selected proposed road corridors (Feb. –June 2005) 
Environmental Specialist with TERA International Inc. USA for Chittagong Port Trade 
Facilitation Project in Bangladesh under Chittagong Port Authority by ADB (TA 4136-BAN). Works 
included: Identification of point source pollution within the port limits of CPA, Identification of 
hazardous materials and dangerous cargo of CPA, Preparation of local contingency plan and 
environmental action plan to handle any environmental emergency in the port area, preparation of 
Environmental impact assessment study for all proposed development works (port connecting road, 
bridge, flyover, waste reception facilities etc.) suggested for CPA as per ADB safeguard policies, 
preparation of Initial Environmental Examination (IEE) and SIEE report as per ADB guidelines, 
preparation of various training and operation manual to handle oily wastes, hazardous and dangerous 
material, carrying out preliminary engineering design for oil reception and disposal facilities at CPA 
and preparation final report (Feb .to Jun 2004). 
Environmental Specialist, Preparation of environmental impact assessment of Bridge Replacement 
Project of RHD funded by DFID (Work Package 3). Works included: Environmental screening, 
collection of baseline data, identify potential impacts of the project activity based on analysis of rated 
matrix and formulation of environmental management and monitoring plan, preparation of 
environmental specification which included Bid document integrating environmental safeguard 
measures for the contractors for proposed three replacement bridges (March-December 2003) 
Team Leader, Environmental Studies for Lafarge Surma Cement Ltd. at Chhatak in Sunamganj 
District funded by IFC. Prepared the following environmental and RAP reports: 
· Monitoring of Resettlement Action Plan (RAP) for Long Belt Conveyor, Connecting Road and 
Housing areas (6 mm over a period of 27 months from Oct. 2002 to Dec. 2004); 
· Environmental Impact Assessment Study of Overland Elevated Long Belt Conveyor (10 km) 
Project (Aug. 2003 to Jan. 2004); 
· IEE of Connecting Access Road Project (Apr. to July 2002) 
Works included identification of probable impacts and detail management plan for construction of long 
belt conveyor. Review of regulatory frame work for resettlement action plan, comparison of laws for social 
and environmental aspects between National (DOE) and Donor agency (WB/IFC). Preparation of detail 
compensation and implementation plan for project affected people for the implementation of connecting 
road, long belt conveyor and housing. 
Environmental Engineer, Conducted IEE/EIA of land development project Ashulia Model Town at Savar, 
Green Model Town at Matual and Baro Awolia Housing Society at Sitakunda, Chittagong undertaken by 
Private Developers including review of regulatory environmental framework for infrastructure development 
project, collection of baseline data and analysis, identification and evaluation of probable impacts, 
technical editing of IEE/EIA report, preparation of waste management plan, formulation of environmental 
management and monitoring plans (June to Aug. 2003). 
Environmental Engineer, Baseline Fisheries Study at Upper Meghna river system for 450 MW Power 
Plant (CCGT) of AES Meghnaghat Ltd. Works included: Review of regulatory frame work for fisheries 
sector, preparation of baseline environmental conditions of the study area, identification of fisheries 
impacts due to pollutants (BOD5, Oil & grease, heavy metals etc.), assisting the team with primary data 
collection and interpretation of data analysis(3 mm over a period of 12 months Apr. 2001 to Mar. 
2002). 
From August 2001 to February 2002 : Research Fellow (Environmental Engineer), 
Bangladesh Centre of Advanced Studies (BCAS) 
Management of Aquatic Eco System through Community Husbandry (MACH) at Kaliakhair, 
Gazipur district (funded by USAID) being threatened by effluent from leather tanning, textile finishing 
and dyeing, poultry farm and metal anodizing plants. Works included: 
- review all available data on the effluents from the industries located at Kaliakoir; 
- provide technical assistance to the industries for the implementation of Cleaner 
Production Program;
Abu Nahid Munir Uddin Environmental Engineer Page 10 of 12 
- monitoring and awareness building in beneficiary community; 
- workshops and seminars with different stakeholders, govt. officials, and representatives 
from civil societies to review MACH activities and suggest ways to further abate the pollution 
problems 
- review, edit and finalize the pollution report (Phase-I). 
- Organize consultative meetings with industrialist, stakeholder, local community to make 
them aware of the pollution problem and mitigation options like cleaner production and 
Environmental Management System (EMS). 
From Oct 1996 to July 2001 : Resident Technical Manager/ Environmental 
Engineer, Resource Control Company 
Environmental Management Action Plan (E-MAP) Study for Khulna and Rajshahi cities under 
Municipal Services Project of LGED funded by World Bank. Assisted the Team Leader in developing an 
environmental management action plan to ensure community involvement in the design, O&M of 
environmental sanitation including water supply, sewage disposal, wastewater management, solid 
waste management and sanitary landfill operations, review environmental legislation for urban 
sanitation, solid waste and wastewater disposal; study to facilitate involvement of local level NGOs, 
CBOs in application of the PPA in water supply, public toilets, solid waste and drainage; investigate 
O&M of existing public toilets, examine on –site sanitation in examine present state of maintenance of 
small bore sewerage system in Khulna (Khalishpur), examine the existing solid waste management in 
Rajshahi and Khulna City and suggest and design improved management plans including organizational 
improvement. (Sep. 2000-Mar. 2001) 
Community Based Water Supply and Sanitation Project (CWSSP) of DPHE funded by UNDP for 
the arsenic affected villages in the district of Kishoreganj, Chandpur, Shariatpur and Manikganj. 
Review of existing water supply pattern and arsenic contamination, suitable water supply options, cost 
estimate of each option, operating expenses, preliminary design of selected water supply options, 
conduct EIA and recommend future action plan (Feb-Jun 2000). 
Team Leader, Preparation of Environmental Monitoring Report on Post Halda Drilling Operation at 
Halda for Shell/Cairn. Works included: reconnaissance/field visit to the drilling site to examine/assess 
the current state of affaires prevalent in and around the drilling site, select sampling locations and 
coordinate works of water/soil/air sampling, organize analytical examination of the collected samples 
from the respective laboratory, interpret laboratory test results and prepare environmental monitoring 
report. (Jan.1999-Jan. 2000). 
Environmental Engineer/Specialist for the following environmental assessment study of various 
Power, Gas and Energy sector projects in Bangladesh: 
- IEE and EIA of Baghabari Barge Mounted Power Plant (130 MW, combined cycle),, 
Westmont Power (BD) Private Ltd; (June-Dec 98’). 
- IEE of 360 MW land based gas fired (combined cycle) power plant, AES Haripur Private 
Ltd. (July 98’- March 99’) 
- IEE and EIA of MB-2 Drilling Operation, Occidental of Bangladesh Ltd., Block-14 (Jul to 
Sept. 1998) 
- Post EIA of Bibiyana Well-2 Drilling Operation (Nov. to Dec. 1998). 
- EIA of Seismic Acquisition Program and IEE and EIA for Kasalong Drilling operation by 
UMC Bangladesh Corporation in Block-22; (Dec. 1997 to Feb. 1998) 
- EIA of South Sangu Drilling Operation, Shell Bangladesh Exploration and Development 
BV (Jan. to April 1999) 
- IEE and EIA of LPG Plant at Chittagong of Mobil Jamuna Fuel Ltd 
- IEE and EIA of Lubricating Plant (Blending and Packaging) at Chittagong of Mobil 
Jamuna Lubricants Ltd. 
- IEE and EIA of LPG Bottling Plant at Mongla, Summit United Petroleum Company Ltd. 
Works included: Conduct EIA, its survey tool preparation, survey planning and portfolio distribution, data 
analysis and technical editing of the EIA report. Prepare Waste Management, Formulate Environmental 
Management and Monitoring Plan of the project. 
Team Leader of various industrial EIA assignments including technical editing of the EIA studies, 
formulation of environmental management and monitoring plans of: 
- Padma Textile Mills Ltd. at Gazipur and Narayanganj; 
- Russel Corporation Bangladesh Ltd. at Gazipur;
Abu Nahid Munir Uddin Environmental Engineer Page 11 of 12 
- Cemcor Cement Clinker and Grinding Plant at Munshiganj; 
Socio-economic baseline survey of Sangu Onshore Environmental Studies undertaken by Brown & 
Roots Ltd. (UK). Works included: Data collection for the relevant environmental impact assessment; 
surface water quality in the vicinity of the landfall, the pipe line route, proposed terminal site and 
drinking water sources in the vicinity of the area. (Nov. to Dec. 1996) 
Preparation of Sector-wise Industrial Guidelines and Standards for the Department of Environment, 
DoE (IDA credit 2340-BD) in association with AIC Watson India. (Oct. 1996 to June 1997).Works 
included: 
- review of the existing industrial environmental situation and develop standards for 
fertilizer, cement, textile and pulp and paper sectors. 
- review of environmental quality standards in general; 
- review of environmental regulatory framework in Bangladesh and identify gaps; 
- assess waste management and control practice and compared with Regional practice; 
- review of organizational capability of DoE and suggest improvement required; 
- prepare report on recommended EIA procedures and strategies for environmental 
protection 
- train industrial entrepreneur in environmental monitoring and compliance. 
Also worked as Task manager for all environmental related activities of the firm. Overall responsible 
for preparing EIA tools, reviewing Environmental Assessment Policies and Procedures for 
Development Assistance Activities by Bilateral and Multilateral Development Agencies, conducting 
EIAs, its survey tool preparation, survey planning and portfolio distribution, data analysis and 
engagement in preparation of different technical proposals and project formulation. Responsible for 
the design, implementation and technical editing of the EIA studies. Provides supervision of other 
members of the EIA Team and arrange inputs into Industrial Waste Management and Environmental 
Management Plan formulation and implementation. 
From Oct 1995 to Oct 1996 : Pursued Post Graduation studies at IHE, Delft, The 
Netherlands 
From Sep 1993 to Sep 1995 : Sanitary Engineer/ Civil Engineer, AQUA Consultant & 
Associates Ltd. 
Environmental Engineer, Dhaka Urban Infrastructure Improvement Project (DWASA Component) 
funded by ADB. Responsibilities included periodic site inspections to ensure that construction of 
water, sewerage systems are in accordance with the design specification; design modification of small 
bore sewerage system, water storage tanks, water supply distribution system, sewage collection and 
treatment / disposal system as per site condition at Mirpur complying with all ADB and WHO 
environmental guidelines on health and hygiene. (Sept.1994 to Sep 1995). 
Environmental Engineer, Industrial Pollution Control Management Bangladesh under 
Department of Environment and Ministry of Industries financed by ADB (TA No. 1769 BAN). The 
objective of the project was to assist the Government in strengthening the existing framework to 
improve the industrial environment & to monitor industrial pollution control measures. Works included 
inventory of industries, their processes and waste outputs; identify process types and characteristics 
of waste, improvement of process, pollution control measures and waste treatment (Mar. to Sep 
1995). 
From Mar 1993 to Aug 1993 : HSE Engineer, National Transport & Contracting Co., 
Abu Dhabi, UAE 
Activities performed: Reviewing the contractor’s EMP implementation plans; Supervising the 
environmental performance of the contractors at the project site; Reviewing safety issues (Occupational 
Health and Safety), Preparation of risk and disaster assessment; Reporting the EMP implementation 
progress and compliances; Preparation of Environmental Monitoring Report for construction of 18 
storied building in Abu Dhabi. 
From May 1991 to Mar 1993 : Water Supply Engineer, AQUA Consultant & 
Associates Ltd.
Abu Nahid Munir Uddin Environmental Engineer Page 12 of 12 
Water Supply Engineer, Feasibility of Second Water Supply and Sanitation Project of DPHE 
financed by ADB (TA No. 1684 BAN) for nine district towns. Study and review of existing water supply 
systems, leakage and wastage inventory, systems performance evaluation, inventory at production wells 
and distribution system. 
Secondary Towns Infrastructure Development Project (Phase-I) of LGED funded by ADB; 
involved in the preparation of the following sub-project: 
- Drainage system Master Plan of 10 Towns: works included hydrological data collection 
and analysis, preparation of frequency duration curves, division of catchment area, estimation of 
storm runoff, selection of drain size, drainage system layout and cost estimates. 
- Water System Improvement in 3 Towns: Field inventory of distribution system, sluice 
valves, washouts, street hydrants, flow and pressure at present condition, leaks and wastage, 
service connections. 
Languages: 
Speak Read Write 
English Excellent Excellent Excellent 
Bengali Excellent Excellent Excellent

More Related Content

Viewers also liked

151111_shahriar_esri_australia
151111_shahriar_esri_australia151111_shahriar_esri_australia
151111_shahriar_esri_australia
Md. Shahriar Alam
 
Updated CV-MPJ 010416.DOC
Updated CV-MPJ 010416.DOCUpdated CV-MPJ 010416.DOC
Updated CV-MPJ 010416.DOC
Madhav Joshi
 
Cv of md zahidul islam 120316
Cv of md zahidul islam 120316Cv of md zahidul islam 120316
Cv of md zahidul islam 120316
Zahidul Islam
 
Name of the Assignment
Name of the AssignmentName of the Assignment
Name of the Assignment
Anik Mondal
 
Dr. Ramanand Jadhav_CV
Dr. Ramanand Jadhav_CVDr. Ramanand Jadhav_CV
Dr. Ramanand Jadhav_CV
Dr. RAMANAND JADHAV
 
CV Dr. Pant June 2016
CV Dr. Pant June 2016CV Dr. Pant June 2016
CV Dr. Pant June 2016
prakash pant
 
Revised CV_Np Gyawali latest
Revised CV_Np Gyawali latestRevised CV_Np Gyawali latest
Revised CV_Np Gyawali latest
Narayan Gyawali
 
Work Experiment Certificate From SRTPPF-2 Team Leader
Work Experiment Certificate From SRTPPF-2 Team LeaderWork Experiment Certificate From SRTPPF-2 Team Leader
Work Experiment Certificate From SRTPPF-2 Team Leader
B. M. Nural Absar
 
Wood CV_short_Sept 2015
Wood CV_short_Sept 2015Wood CV_short_Sept 2015
Wood CV_short_Sept 2015
Joe Wood
 
CV for Irshad Anwer, Operations & Finance
CV for Irshad Anwer, Operations & FinanceCV for Irshad Anwer, Operations & Finance
CV for Irshad Anwer, Operations & Finance
Irshad Anwer
 

Viewers also liked (20)

151111_shahriar_esri_australia
151111_shahriar_esri_australia151111_shahriar_esri_australia
151111_shahriar_esri_australia
 
Updated CV-MPJ 010416.DOC
Updated CV-MPJ 010416.DOCUpdated CV-MPJ 010416.DOC
Updated CV-MPJ 010416.DOC
 
Land and Soil Resources Database for Grass‐Root Agricultural Development in B...
Land and Soil Resources Database for Grass‐Root Agricultural Development in B...Land and Soil Resources Database for Grass‐Root Agricultural Development in B...
Land and Soil Resources Database for Grass‐Root Agricultural Development in B...
 
CV 2016 Oct 31
CV 2016 Oct 31CV 2016 Oct 31
CV 2016 Oct 31
 
vishnu resume (1)
vishnu resume (1)vishnu resume (1)
vishnu resume (1)
 
Cv of md zahidul islam 120316
Cv of md zahidul islam 120316Cv of md zahidul islam 120316
Cv of md zahidul islam 120316
 
Name of the Assignment
Name of the AssignmentName of the Assignment
Name of the Assignment
 
Dr. Ramanand Jadhav_CV
Dr. Ramanand Jadhav_CVDr. Ramanand Jadhav_CV
Dr. Ramanand Jadhav_CV
 
CV Dr. Pant June 2016
CV Dr. Pant June 2016CV Dr. Pant June 2016
CV Dr. Pant June 2016
 
Publications_NishadW
Publications_NishadWPublications_NishadW
Publications_NishadW
 
Revised CV_Np Gyawali latest
Revised CV_Np Gyawali latestRevised CV_Np Gyawali latest
Revised CV_Np Gyawali latest
 
CV_Uddin
CV_UddinCV_Uddin
CV_Uddin
 
CV_Dilip_General
CV_Dilip_GeneralCV_Dilip_General
CV_Dilip_General
 
Work Experiment Certificate From SRTPPF-2 Team Leader
Work Experiment Certificate From SRTPPF-2 Team LeaderWork Experiment Certificate From SRTPPF-2 Team Leader
Work Experiment Certificate From SRTPPF-2 Team Leader
 
CV- Mowdudur RAHMAN
CV- Mowdudur RAHMANCV- Mowdudur RAHMAN
CV- Mowdudur RAHMAN
 
Wood CV_short_Sept 2015
Wood CV_short_Sept 2015Wood CV_short_Sept 2015
Wood CV_short_Sept 2015
 
CV_Birara
CV_BiraraCV_Birara
CV_Birara
 
CV-_Dr_S_K_Singh -Nov. 2016
CV-_Dr_S_K_Singh -Nov. 2016CV-_Dr_S_K_Singh -Nov. 2016
CV-_Dr_S_K_Singh -Nov. 2016
 
Wijdan Hussain CV
Wijdan Hussain CVWijdan Hussain CV
Wijdan Hussain CV
 
CV for Irshad Anwer, Operations & Finance
CV for Irshad Anwer, Operations & FinanceCV for Irshad Anwer, Operations & Finance
CV for Irshad Anwer, Operations & Finance
 

Similar to Abu_Nahid_-Env. Engineer.doc(December 14 )

Abu_Nahid_-Env. Engineer.doc(October 15 )
Abu_Nahid_-Env. Engineer.doc(October 15  )Abu_Nahid_-Env. Engineer.doc(October 15  )
Abu_Nahid_-Env. Engineer.doc(October 15 )
Abu Muniruddin
 
environmental impact assessment(919857132323)Kira 3
environmental impact assessment(919857132323)Kira 3environmental impact assessment(919857132323)Kira 3
environmental impact assessment(919857132323)Kira 3
MANOJ THAKUR
 
Resume_SHASHI RANJAN CHOUDHARY
Resume_SHASHI RANJAN CHOUDHARYResume_SHASHI RANJAN CHOUDHARY
Resume_SHASHI RANJAN CHOUDHARY
Shashi Choudhary
 
Richelle_Libut_CV
Richelle_Libut_CVRichelle_Libut_CV
Richelle_Libut_CV
richelle521
 
Cv for Bui Nguyen Pho - Envir Engineer (19.12.2016)
Cv for Bui Nguyen Pho - Envir Engineer (19.12.2016)Cv for Bui Nguyen Pho - Envir Engineer (19.12.2016)
Cv for Bui Nguyen Pho - Envir Engineer (19.12.2016)
Pho Bui Nguyen
 

Similar to Abu_Nahid_-Env. Engineer.doc(December 14 ) (20)

Abu_Nahid_-Env. Engineer.doc(October 15 )
Abu_Nahid_-Env. Engineer.doc(October 15  )Abu_Nahid_-Env. Engineer.doc(October 15  )
Abu_Nahid_-Env. Engineer.doc(October 15 )
 
Cv govind acharya
Cv  govind acharyaCv  govind acharya
Cv govind acharya
 
CV Govind Acharya
CV  Govind AcharyaCV  Govind Acharya
CV Govind Acharya
 
Cv govind acharya for senior engineer
Cv  govind acharya for senior engineerCv  govind acharya for senior engineer
Cv govind acharya for senior engineer
 
Question
QuestionQuestion
Question
 
Md._Habibur_Rahman_CV
Md._Habibur_Rahman_CVMd._Habibur_Rahman_CV
Md._Habibur_Rahman_CV
 
Shakil_CV_ADB_June 28, 2021
Shakil_CV_ADB_June 28, 2021Shakil_CV_ADB_June 28, 2021
Shakil_CV_ADB_June 28, 2021
 
FA-EIA-GUIDELINE-IN-MALAYSIA-1.pdf
FA-EIA-GUIDELINE-IN-MALAYSIA-1.pdfFA-EIA-GUIDELINE-IN-MALAYSIA-1.pdf
FA-EIA-GUIDELINE-IN-MALAYSIA-1.pdf
 
Basic concept of environment safeguard
Basic concept of environment safeguardBasic concept of environment safeguard
Basic concept of environment safeguard
 
CV_Shakil_vApr-2020
CV_Shakil_vApr-2020CV_Shakil_vApr-2020
CV_Shakil_vApr-2020
 
kira 3
kira 3kira 3
kira 3
 
environmental impact assessment(919857132323)Kira 3
environmental impact assessment(919857132323)Kira 3environmental impact assessment(919857132323)Kira 3
environmental impact assessment(919857132323)Kira 3
 
Resume_SHASHI RANJAN CHOUDHARY
Resume_SHASHI RANJAN CHOUDHARYResume_SHASHI RANJAN CHOUDHARY
Resume_SHASHI RANJAN CHOUDHARY
 
Richelle_Libut_CV
Richelle_Libut_CVRichelle_Libut_CV
Richelle_Libut_CV
 
Sr Environmental Manager , HSE , Dr In Civil Environmental Engineering
Sr Environmental Manager , HSE , Dr In Civil Environmental Engineering Sr Environmental Manager , HSE , Dr In Civil Environmental Engineering
Sr Environmental Manager , HSE , Dr In Civil Environmental Engineering
 
ICEM - Promoting Climate Resilient Rural Infrastructure in Northern Viet Nam
ICEM - Promoting Climate Resilient Rural Infrastructure in Northern Viet NamICEM - Promoting Climate Resilient Rural Infrastructure in Northern Viet Nam
ICEM - Promoting Climate Resilient Rural Infrastructure in Northern Viet Nam
 
TOR for EBA MTR 2014.pdf
TOR for EBA MTR 2014.pdfTOR for EBA MTR 2014.pdf
TOR for EBA MTR 2014.pdf
 
Cv for Bui Nguyen Pho - Envir Engineer (19.12.2016)
Cv for Bui Nguyen Pho - Envir Engineer (19.12.2016)Cv for Bui Nguyen Pho - Envir Engineer (19.12.2016)
Cv for Bui Nguyen Pho - Envir Engineer (19.12.2016)
 
Environmental Audits
Environmental AuditsEnvironmental Audits
Environmental Audits
 
ROSTAM HAMZA_CV
ROSTAM HAMZA_CVROSTAM HAMZA_CV
ROSTAM HAMZA_CV
 

Abu_Nahid_-Env. Engineer.doc(December 14 )

  • 1. Name of Staff : ABU NAHID MUNIR UDDIN Profession : Environmental Engineer/Environmental Specialist Date of Birth : July 22, 1964 Nationality : Bangladeshi Membership in Professional Societies : - Fellow (F-8995), Institution of Engineers Bangladesh - Member, National EIA Association of Bangladesh - Registered Consultant with ADB CMS (# 054060). Contact Address : 10 Segunbaghicha, ‘Bashati’, Apt # B-1, 1st Floor, Ramna, Dhaka- 1000, Bangladesh; Telephone: +88-02-8315704(Res), +88-01715- 452920(cell); Skype address: aantara.anjum Key Qualifications More than Twenty two years total experiences with more than eighteen (18) years professional experience in the field of environmental engineering, environmental safeguard and management, environmental assessment, preparation of Environmental Management Framework, Environmental Management Plan (EMP), preparation and implementation of Code of Practices on various safeguard measures, supervising and monitoring EMP implementation. Has gained extensive experience in environmental management through all cycles of project i.e. pre-feasibility, feasibility, detailed project preparation and construction supervision on projects funded by various multilateral funding agencies like World Bank, Asian Development Bank, JBIC, DFID etc. Has thorough knowledge and experience of Word Bank’s safeguard policies such as OP/BP 4.01 (Environmental Assessment), OP/BP 4.04 (Natural Habitat), OP 4.12 (Resettlement Policy) and ADB Safeguard Policies- Environment, Social Resettlement and Indigenous people) .
  • 2. Abu Nahid Munir Uddin Environmental Engineer Page 2 of 12 Familiar with outline and outcome of various international conventions on environmental issues and sustainable development, global laws, regulations, standards, trends and practices. Familiar with regulations and standards of USEPA, OSHA etc. and has extensive experience in environmental management complying with GoB environmental legislations as well as operational policies of multilateral funding agencies. Education - Post Graduation Degree (equivalent to Masters) (1996) in Environmental Engineering, at the Institute of Infrastructure, Hydraulic and Environment (IHE) Delft, The Netherlands. - BSc in Civil Engg. (1991), Bangladesh University of Engineering & Technology (BUET), Dhaka. Training - EIA Training Workshops in Selected Sectors (Oil & Gas, Power, and Industry) organized by National EIA Association of Bangladesh (NEAB) held in Dhaka during 13-20 March, 10-17 April and 8-15 May 1999. - Training on Environmental Management with special emphasis on ISO 14001 Environmental management System, (EMS) organized by the Institution of Engineers, Bangladesh (IEB), August 2003, under Bridge Replacement Project, funded by DFID. - Environmental Management conducted by Bangladesh University of Engineering & Technology (BUET), Dhaka, 1994 in cooperation with Environment Unit of Jamuna Multipurpose Bridge Authority and Sponsored by World Bank. - Participated in a field work programme on Operation and maintenance of Waste Water Treatment Plants at Pilot and full scale in the Department of Environmental Technology of Wageningen University, The Netherlands Countries of work Experience : Bangladesh, Kazakhstan, Georgia, UAE, Countries Visited : India, United Arab Emirates, Netherlands, Germany, Belgium, France, Switzerland, London, Luxemburg
  • 3. Abu Nahid Munir Uddin Environmental Engineer Page 3 of 12 Employment Record Period : April 2009 to Date Employer : DevConsultants Ltd. Position held : Environmental Manager Description of duties : Tracking business opportunities for consultancy services in public and private sector; Preparation of project proposals; Undertaking detailed project planning, resource mobilization, monitoring and execution; Providing direction, guidance, and formulating structure and programs on issues of monitoring and evaluation of projects. Environmental Engineer, Bangladesh Rural Water Supply and Sanitation Project of Department of Public Health Engineering, funded by World Bank (January 2014 to date) Carry out Environmental assessment in the form of IEE for each of the schemes; Develop Environmental and Social Management Plans in connection with Environmental Management Framework and Social Development Framework developed for the project; Assist to prepare standard Bid documents integration environmental safeguard measures of 125 WSS. Environmental Specialist, Urban Dredging Demonstration Project with Viten Evides International (September 2013 to December 2013) Responsible for assessing both positive and negative environmental impacts due to each project activities; assess the impacts and recommend appropriate mitigation measures during operation and post operation phases to minimize negative impacts of the Project to acceptable levels; prepare EIA and EMP in compliance with the Government and other co-financiers’ requirements.
  • 4. Abu Nahid Munir Uddin Environmental Engineer Page 4 of 12 Environmental Specialist, Financial Sector Project for Development Small and Medium Sized Enterprises (FSPDSME) of Bangladesh Bank funded by JICA.. Responsabilités includes : Assistance to BB-PIU in carrying out the capacity development for BB-PIU and PFIs in respect to JICA’s guidelines on environmental and social consideration; monitoring and évaluation activities in particular monitoring of the sub projects/sub loans in terms of their compliance with JICA’s guidelines on environment and social considerations. (July 2013 to December 2013) Environmental Specialist, Preparation of Water Supply Master Plan for Dhaka City for Dhaka Water Supply and Sewerage Authority (March 2013 to June 2013; intermittent). Responsible for Provide advice and direction to the environmental study groups and specially lead the EIA study team; Establish the modalities, organization and empowerment of a monitoring and execution environmental protection unit; Formulate sustainable option for protection of raw water quality; Prepare Strategic Environmental Assessment and suggest and formulate option scenarios for the study; Prepare project plan, schedules and time frame work for the publications of reports; Attend meetings as and when required. Environmental Specialist, CAREC 2 Corridor (MANGISTAU OBLAST Section) Investment Program, Project 1 Construction Supervision Consultant , Loan No. 2728- KZ, funded by ADB (July 2013 to December 2014 intermittent); Responsabilités inclue: (a) to ensure implementation of environmental mitigation measures in the contract documents; (b) to supervise and monitor the implementation of environmental mitigation measures as per contract; and (c) in the event of occurrence of any unexpected environmental impacts, coordinate with the EA/PD to provide necessary mitigation measures for submission to the Committee of Roads and ADB; (d) preparation of bi-annual environmental monitoring report.; Assisting in identification of social environment parameters including loss of assets of project affected people and preparation of resettlement action plan as a part of EIA and EMP Environmental Specialist, ADB Loan #:2772-UZB, Second CAREC Corridor 2 Road Investment Program-Project 1, Project Management and Construction Supervision Consultant (74km), funded by ADB (May to June 2014) ; Responsabilités includes preparation of due diligence report in respect of environnemental compliance. Environmental Specialist, Loan No. 2562-KAZ CAREC Transport Corridor 1 (Taraz-Korday Section) Investment Program – Project 2 of Ministry of Transport and Communication (MOTC) funded by ADB (May 2012 to March 2014; intermittent); Responsabilités includes (a) ensure that all the environmental mitigation measures required to be implemented are incorporated in the contract documents; (b) supervise and monitor the implementation of environmental mitigation measures required; and (c) in the event of occurrence of any unexpected environmental impacts, coordinate with the EA/PD to provide necessary mitigation measures for submission to the Committee of Roads and ADB. Environmental Specialist, Loan No. 2560-GEO Road Corridor Investment Program- Project 1- Supervision of the construction of bypass roads around Batumi and Kobuleti for Trench 1 funded by ADB. (September to October 2012;); Responsabilités includes (a) checking of required permits and licenses; checking of management documentation(Health and Safety Procedures and records, Environmental Management Plans, Training and instructions records for personnel etc.); Waste management in camps, offices and at the construction sites; Top soil protection and management measures; Traffic safety; Fuel spill prevention measures; noise, dust and emissions at workings, maintenance of equipments, quarries and borrow pits, top soil prevention and all other measures and actions to be implemented and monitored according to the EMPs.
  • 5. Abu Nahid Munir Uddin Environmental Engineer Page 5 of 12 Environmental Specialist, Updating Bangladesh Profile regarding Environment and Social Consideration of JICA (May 2012) Responsabilités include : Update and revise the current profile by checking the change in the domestic regulatory system relevant to environment and social consideration items from November 2006 when the current environmental profile was created to the present; Work on practical information-gathering via additional local consultants who have abundant experience in environmental and social considerations-related projects and a strong network of local experts; Conduct research on natural environment, pollution, and environmental contamination again by working closely with the local consultants. Recently, in Bangladesh in particular, loss of natural environmental resources caused by urbanization and the impact of climate change are remarkable. Detailed information gathering is to be conducted for these issues; Conduct gap analysis between the local regulatory system pertinent to the environmental and social considerations identified above vis-a- vis the Guideline and the World Bank’s Safeguard Policies. Environmental Specialist, Dhaka-Chittagong National Highway (N-1) Bridge Construction and Rehabilitation Project of Road & Highways Department under Special Assistance for Project Formulation (SAPROF) study of JICA i.e. under Roads and Highways Department of the Government of Bangladesh (Feb 2012 to October 2012, 4 months, intermittent); Responsible for conducting detailed field and desk studies leading to the submission of all necessary statutory and other required documents to achieve environmental clearance for the project, preparation of scoping document, Advising and guiding the Design Consultants for EIA and EMP preparation in making extensive use of current international best practice. Environmental Specialist, Feasibility study for construction of Dam to provide safe water to the Teknaf Pourashava under Cox’s Bazar funded by UNICEF. (November 2011 to January 2012). Works includes: Review the preliminary design specifications pertaining to the project, collect baseline information on the physical, biological and socio-economic environment of the project area; Identify and recommend the mitigation measures with respect to potential environmental impacts basically to minimize or eliminate the adverse/negative impacts, Prepare environmental management plan to implement the suggested mitigation measures during project implementation, prepare IEE Report Environmental Specialist, (International), Preparation of Detailed Design and Bidding Documents for Kobuleti Bypass Road, Kobuleti-Batumi Section and Batumi Bypass road, by Road Department of The Ministry of Regional Development and Infrastructure of Georgia, funded by ADB (February 2011 to October 2011 over a period of 4 months). Works includes: conduct further detailed field and desk studies that will lead to the submission of all necessary statutory and other required documents to achieve environmental clearance for the project ensure that all potential contractors are made aware of requirements for all environmental mitigation measures including EIA and EMP through the tender documentation. Environmental Specialist, Feasibility Study for Multilane Road Tunnel under the River Karnaphuli, Chittagong; (June 2011 to February 2012 over a period of 4 months); Works include: Responsible for Rapid Environmental Assessment, Reconnaissance Survey, Determining proposed route on satellite imagery; Ground Truth Verification of Satellite Imagery on various bio-physical environment along the predetermined route; Preparation of Decision Matrix for different Alternative Alignments; Selection of Preferred Alignment from Environmental Consideration in Conjunction with Engineering, Indicative Cost and Socio-Economic Aspects and Preparation of Environmental Impact assessment for the proposed selected options.
  • 6. Abu Nahid Munir Uddin Environmental Engineer Page 6 of 12 Environmental Specialist, (National), Power System Efficiency Improvement Project (ADB TA- 7242-BAN) (September 2010 to May 2011 over a period of 4 months). Works includes: Review of institutional capacity of the proposed executing and implementing agencies to prepare environmental impact assessment (EIA) reports for the future project components and the required Environmental Management Plan to determine mitigation measures in the design, construction, and maintenance phases of the future investment subprojects, their components and national regulatory requirements in accordance with the ADB's Safeguard Policy (2009) and the ADB's Environmental Assessment Guidelines (2006); Prepare Rapid Environmental Assessment Checklist and determine environmental category for each project component; Prepare project descriptions and a summary of environmental issues identified for each project component to support the determination of the project environmental categorization; Prepare Environmental Impact Assessments or Initial Environmental Examinations depending on the subproject categorization (environmental category A or B) assigned by ADB in accordance with the 2006 ADB Environmental Assessment Guidelines; Prepare Environmental Management and Monitoring Plan (EMP and MP) for the project component specifying requirements for each subproject as well as for the entire project; Assist the Energy Efficiency Policy Specialist (separately recruited) in identification of potential financing through the Clean Development Mechanism (CDM) or sales of Verified Emissions Reduction Credits in non-CDM carbon markets. Environmental Specialist, Socioeconomic Study, EIA and Detail Engineering Survey, Investigation & Design under Ground Water Management and Feasibility Study of 148 Pourashavas of Department of Public Health Engineering (February 2010 to December 2013 over a period of 18 months). Works includes: Development of questionnaire for carrying out an environment baseline survey in the project area, carry out extensive field survey both during reconnaissance and field survey and PRA in connection with the tasks define, carryout Environmental Impact Assessment (EIA) for the various options developed for water supply, sanitation, drainage and solid waste management, prepare an outline on the Environmental Management and Monitoring Plan (EMP), Prepare training modules on EIA and SIA and take participation in the training program for implementation monitoring of EMP and preparation of report, assisting Team Leader in all related works. Environmental Specialist, Second Sector Development Programme (SDP) for the Water and Sanitation Sector in Bangladesh under GoB-Danida (July 2009 to December 2009) Works includes: Environmental assessment of the intervention proposed in the SIP, ways to make plan more environmental impacts of existing Water Supply and Sanitation interventions, assess the impact of climate change and other phenomenon in the future technological options. Environmental Specialist, Detail Technical Economic Feasibility Study of 3rd Shitalakhya Bridge at Bandar, Narayanganj (August 2009 to January 2010). Works includes: Preparation of initial environmental examination of three alternative sites, preparation of environmental baseline analysis, environmental impact assessment and management plan of proposed selected site (Madanganj- Syedpur crossing, The total bridge length including viaduct is 1.33km) Environmental Engineer, Detailed Design of Padma Multipurpose Bridge Project of Bangladesh Bridge Authority funded by ADB with MAUNSELL-nhc-SMEC-ACE consortium. As a Environmental Engineer responsibilities included: preparation of Community Environmental Management plan (CEMP) of three Resettlement sites for construction and post implementation phase. (August 2009 to September 2009) Environmental Engineer, Preparation of Environmental and Social Assessment of Private Sector Development Support Project (PSDSP)- EZ Development funded by DFID. (June 2008 to August 2009). Activities performed: preparation of environmental baselines analysis, environmental management framework, Coordinate environmental safeguards into civil engineering works, Define environmental management requirements in bidding documents, preparation of Environmental Impact assessment and Environmental Management plan for Hitech park, Comilla EPZ Expansion and proposed Meghna EPZ . Period : March 2002 to March 2009 Employer : Freelance Consultant Position held : Environmental Engineer/Environmental Specialist Description of duties :
  • 7. Abu Nahid Munir Uddin Environmental Engineer Page 7 of 12 Team Leader, Monitoring of Environmental Management Plan Implementation and Other Environmental activities under four (4) sub projects for Gas Transmission Company Ltd. With Resource Control Company (RCC) Ltd. (March 2008 to March 2009) Activities performed: reviewing the contractor’s EMP implementation plans, providing recommendations on preventive and corrective actions for effective EMP implementation, supervising the environmental performance of the contractors at the project site, assist in preparation of contract for implementation of periodic environmental monitoring (air, noise, water etc.) programmes to ensure compliance with the GoB as well as ADB requirements and the EMP, reporting the EMP implementation progress and compliances, prepare monthly Environmental Monitoring Report, monitoring all environmental, health and safety activities carried out by the contractors as outlined in the EMMP. . Environmental Engineer, Preparation of IEE and EIA of Minerals Sands Mining at Teknaf Beach, Premier Minerals Ltd.(Feb. 2008 to June 2008). Responsible for detailed operational procedures of Mining process, waste generation and sources, disposal system, Identification and evaluation of potential impacts and mitigation measures, Assisting the Team Leader in the preparation of the reports Team Leader, Preparation of EMP for Drilling Wells at Kailashtilla, (Well No. 5 &6); Sylhet Gas Fields Ltd. (July to September 2008). Works include; Gather necessary environmental data and describe systematically the environmental conditions of the study area, Review the existing ambient air quality and water quality, noise level of the project area and justify the sampling point of these elements, chemical analysis of the collected samples, Responsible for the baseline ecological features of the proposed sites within 5 km radius etc. Environmental Specialist, Bangladesh Railway Sector Improvement Project- Implementation Consulting Services with SMEC-Balaji-ACE Consortium funded by ADB. (Dec. 2007 to June 2008). Works includes Preparation of Environmental Impact Assessment and Environmental Management and Monitoring Plan of the construction of 95 km long Dhaka –Laksam Chord Line. The work will involve construction of railway embankments, placement of ballast, laying of sleepers and tracks, construction of bridges, culverts, underpasses and flyovers, installation of signaling system, construction of station buildings, passengers’ waiting rooms, rail ticket counters, platforms, platform sheds and warehouses, station access roads and infrastructure and other associated civil works. Team Leader, Preparation of Environmental Management Plan for the Expansion of Clinker Capacity from 1.15 MT to 2.30 MT for the Lafarge Surma Cement’s Existing Plant. Works includes: Mitigation measures to reduce or eliminate negative impacts; Measures to off-set or compensate irreversible and residual negative impacts; Enhancement measures to maximize the positive impacts; Institutional arrangement for implementation of the EMP; Monitoring requirements; Implementation schedule of the EMP; and Cost Estimates for EMP implementation. (April 2007 to November 2007) EIA Expert , Preparation of EIA for the proposed Housing Project entitled “SAGUPTA N.M. HOUSING LTD” located at Pallabi, Mirpur. Works includes: Review of regulatory environmental framework for housing development project, generation of baseline data to describe the study area for physical, biological and social environment, identification and evaluation of probable impacts, data analysis and technical editing of the EIA report. Prepare waste management, formulate environmental management plan, design a plan to monitor implementation of mitigatory or compensatory measures and project impacts during construction and operation of the units/facility (Jan. to Jul. 2007). Environmental Engineer, Preparation of Initial Environmental Examination, Environmental Impact Assessment and Resettlement Action Plan of 495 MW Combined Cycle Power Plant (Phase II) for BON Consortium Bangladesh with Dillon-RCC Consortium. Works includes responsible for preparing EIA tools, reviewing Environmental legislation, Collection baseline information (physical, biological, socio-economic) , conducting environmental monitoring (air, noise, water) quality, and assisting team leader for preparation of Environmental Assessment report, Resettlement Action plan report and Environmental Management and Monitoring Plan report. (Jan to June 2006).
  • 8. Abu Nahid Munir Uddin Environmental Engineer Page 8 of 12 Environmental Specialist, Construction Supervision of Two Bridges (3rd Buriganga Bridge (708 m long) at Basila & 2nd Shitalakhya Bridge (772 m long) at Demra of RHD funded by KFAED. Works included: Review EMP and ensure that are adequate to comply with GoB environmental safeguard; Develop Environmental Monitoring Plan that include appropriate monitoring activities, indicators, and parameters; Develop safety hazard mitigation plan and prepare a procedure and mechanism that the plan is followed accurately at every stage of the bridge construction; Carry out necessary tests of environmental parameters such as surface water quality, air, soil, noise etc.; Review and assess that the post construction activities are carried out in conformity with the EMP; Supervise and monitor the implementation of environmental mitigation measures for adverse environmental impacts and overall environmental management; Submit quarterly progress report to PMU containing progress made in EMP implementation (6 mm over a period of 3 years From July 2006 to Aug. 2009) Environmental Engineer, Detailed Design and Supervision for Civil Works of Connector Road under Chittagong Port Trade Facilitation Project (ADB Loan No. 2147 –BAN) with SMEC-HPR-ACE-ESL Consortium. Works includes reviewing IEE report, field visit to the proposed Flyover site and adjacent neighborhood, preparation of environmental management action plan comprising environmental mitigation measures along with specification, drawings, BOQ and cost estimates, preparation of environmental monitoring plan and Bid document integrating environmental safeguard measures. (September to December 2006) Environmental Expert, 4 Laning of Dhaka Chittagong Highway Project (Daudkandi-Chittagong Section) of RHD with NESPAK-MEPC-DPC-KPL consortium. Responsibilities included: Environmental data collection and analysis, Legislative review, Consultation with public/stakeholders, Identification and assessment of the potential impacts associated with road improvement activities within the study area on the natural and human environment, development of an Environmental Management Plan (EMP) including mitigation measures for negative impacts, measures for pollution control and environmental monitoring (May to August 2006). Team Leader/Environmental Engineer, Preparation of Environmental Impact Assessment Study (EIA) Report of Benapole Land Port Master Plan Project of Bangladesh Sthala Bandar Katripaksha (BSBK) with Modern Engineers Planners and Consultants Ltd. (May 2006 to June 2006). Environmental Specialist, Construction Supervision Consultancy Services for Bridge Replacement Project of RHD funded by DFID (Work Package 3). The project involves Works includes: Environmental supervision and monitoring for the construction of three bridges at Nondakuja, Natore, Noahatta, Rajshahi and Gabura, Dinajpur. As Environmental Specialist, responsible for Evolving guidelines to assist contractor in implementing Environmental Management Plan (EMP), assist in preparation of contract for implementation of periodic environmental monitoring (air, noise, water etc.) programmes to ensure compliance with the GoB as well as Donor requirements and the EMP, assist in preparing and submitting environmental monitoring and implementation progress reports, assist PIU in setting up and implementation of EMP, develop and organise programs and seminars, workshops, environmental training programs for staff and site engineers, review the contractors’ environmental implementation plans to ensure compliance of EMP (8 mm over a period of 20 months from May 2005 to Dec. 2006) Environmental Specialist, Preparation of Environmental and Social Assessment of Road Sector Reform Project (RSRP) under RHD, funded by World Bank with Operational Research Group (ORG), India. Activities performed: responsible for preparing EIA tools, reviewing Environmental management framework and codes of practice, preparation of Environmental Assessment and EMP report based on Word Bank’s safeguard policies for Tongi-Mymensingh (99.668 km), Mainamoti- Brahmanbaria (82.225 km) and Sylhet-Sunamganj (68 km) road under network package (July 2005- Dec.2005). Environmental Engineer / Project Manager, Preparation of Environmental Impact Assessment Study for Offshore Drilling over Hatiya-Manpura prospects, offshore, Block-16 of Cairn Energy Sangu Field Limited. Responsibilities included work closely with Team Leader in day-to-day activities of the project, involved in planning works and reassessment the planning option developed during the project period, liaise with all the team members/experts throughout the project and maintain necessary coordination with Company and relevant authorities/department to carry out unhindered team work for the EIA preparation, prepare regulatory framework, baseline information and assist Team Leader for the preparation of environmental management and monitoring plan of the proposed project intervention(July-October 2005).
  • 9. Abu Nahid Munir Uddin Environmental Engineer Page 9 of 12 Environmental Expert, Feasibility Study of Network Improvement for the Proposed Road Sector Reform Project (RSRP) of Road & Highways Department funded by World Bank. Works included: investigation of environmental screening of various road corridors; carry out initial environmental examination (IEE) for the proposed selected corridors; prepare environmental management and monitoring plan, and formulate environmental management plan for various performance indicators of selected proposed road corridors (Feb. –June 2005) Environmental Specialist with TERA International Inc. USA for Chittagong Port Trade Facilitation Project in Bangladesh under Chittagong Port Authority by ADB (TA 4136-BAN). Works included: Identification of point source pollution within the port limits of CPA, Identification of hazardous materials and dangerous cargo of CPA, Preparation of local contingency plan and environmental action plan to handle any environmental emergency in the port area, preparation of Environmental impact assessment study for all proposed development works (port connecting road, bridge, flyover, waste reception facilities etc.) suggested for CPA as per ADB safeguard policies, preparation of Initial Environmental Examination (IEE) and SIEE report as per ADB guidelines, preparation of various training and operation manual to handle oily wastes, hazardous and dangerous material, carrying out preliminary engineering design for oil reception and disposal facilities at CPA and preparation final report (Feb .to Jun 2004). Environmental Specialist, Preparation of environmental impact assessment of Bridge Replacement Project of RHD funded by DFID (Work Package 3). Works included: Environmental screening, collection of baseline data, identify potential impacts of the project activity based on analysis of rated matrix and formulation of environmental management and monitoring plan, preparation of environmental specification which included Bid document integrating environmental safeguard measures for the contractors for proposed three replacement bridges (March-December 2003) Team Leader, Environmental Studies for Lafarge Surma Cement Ltd. at Chhatak in Sunamganj District funded by IFC. Prepared the following environmental and RAP reports: · Monitoring of Resettlement Action Plan (RAP) for Long Belt Conveyor, Connecting Road and Housing areas (6 mm over a period of 27 months from Oct. 2002 to Dec. 2004); · Environmental Impact Assessment Study of Overland Elevated Long Belt Conveyor (10 km) Project (Aug. 2003 to Jan. 2004); · IEE of Connecting Access Road Project (Apr. to July 2002) Works included identification of probable impacts and detail management plan for construction of long belt conveyor. Review of regulatory frame work for resettlement action plan, comparison of laws for social and environmental aspects between National (DOE) and Donor agency (WB/IFC). Preparation of detail compensation and implementation plan for project affected people for the implementation of connecting road, long belt conveyor and housing. Environmental Engineer, Conducted IEE/EIA of land development project Ashulia Model Town at Savar, Green Model Town at Matual and Baro Awolia Housing Society at Sitakunda, Chittagong undertaken by Private Developers including review of regulatory environmental framework for infrastructure development project, collection of baseline data and analysis, identification and evaluation of probable impacts, technical editing of IEE/EIA report, preparation of waste management plan, formulation of environmental management and monitoring plans (June to Aug. 2003). Environmental Engineer, Baseline Fisheries Study at Upper Meghna river system for 450 MW Power Plant (CCGT) of AES Meghnaghat Ltd. Works included: Review of regulatory frame work for fisheries sector, preparation of baseline environmental conditions of the study area, identification of fisheries impacts due to pollutants (BOD5, Oil & grease, heavy metals etc.), assisting the team with primary data collection and interpretation of data analysis(3 mm over a period of 12 months Apr. 2001 to Mar. 2002). From August 2001 to February 2002 : Research Fellow (Environmental Engineer), Bangladesh Centre of Advanced Studies (BCAS) Management of Aquatic Eco System through Community Husbandry (MACH) at Kaliakhair, Gazipur district (funded by USAID) being threatened by effluent from leather tanning, textile finishing and dyeing, poultry farm and metal anodizing plants. Works included: - review all available data on the effluents from the industries located at Kaliakoir; - provide technical assistance to the industries for the implementation of Cleaner Production Program;
  • 10. Abu Nahid Munir Uddin Environmental Engineer Page 10 of 12 - monitoring and awareness building in beneficiary community; - workshops and seminars with different stakeholders, govt. officials, and representatives from civil societies to review MACH activities and suggest ways to further abate the pollution problems - review, edit and finalize the pollution report (Phase-I). - Organize consultative meetings with industrialist, stakeholder, local community to make them aware of the pollution problem and mitigation options like cleaner production and Environmental Management System (EMS). From Oct 1996 to July 2001 : Resident Technical Manager/ Environmental Engineer, Resource Control Company Environmental Management Action Plan (E-MAP) Study for Khulna and Rajshahi cities under Municipal Services Project of LGED funded by World Bank. Assisted the Team Leader in developing an environmental management action plan to ensure community involvement in the design, O&M of environmental sanitation including water supply, sewage disposal, wastewater management, solid waste management and sanitary landfill operations, review environmental legislation for urban sanitation, solid waste and wastewater disposal; study to facilitate involvement of local level NGOs, CBOs in application of the PPA in water supply, public toilets, solid waste and drainage; investigate O&M of existing public toilets, examine on –site sanitation in examine present state of maintenance of small bore sewerage system in Khulna (Khalishpur), examine the existing solid waste management in Rajshahi and Khulna City and suggest and design improved management plans including organizational improvement. (Sep. 2000-Mar. 2001) Community Based Water Supply and Sanitation Project (CWSSP) of DPHE funded by UNDP for the arsenic affected villages in the district of Kishoreganj, Chandpur, Shariatpur and Manikganj. Review of existing water supply pattern and arsenic contamination, suitable water supply options, cost estimate of each option, operating expenses, preliminary design of selected water supply options, conduct EIA and recommend future action plan (Feb-Jun 2000). Team Leader, Preparation of Environmental Monitoring Report on Post Halda Drilling Operation at Halda for Shell/Cairn. Works included: reconnaissance/field visit to the drilling site to examine/assess the current state of affaires prevalent in and around the drilling site, select sampling locations and coordinate works of water/soil/air sampling, organize analytical examination of the collected samples from the respective laboratory, interpret laboratory test results and prepare environmental monitoring report. (Jan.1999-Jan. 2000). Environmental Engineer/Specialist for the following environmental assessment study of various Power, Gas and Energy sector projects in Bangladesh: - IEE and EIA of Baghabari Barge Mounted Power Plant (130 MW, combined cycle),, Westmont Power (BD) Private Ltd; (June-Dec 98’). - IEE of 360 MW land based gas fired (combined cycle) power plant, AES Haripur Private Ltd. (July 98’- March 99’) - IEE and EIA of MB-2 Drilling Operation, Occidental of Bangladesh Ltd., Block-14 (Jul to Sept. 1998) - Post EIA of Bibiyana Well-2 Drilling Operation (Nov. to Dec. 1998). - EIA of Seismic Acquisition Program and IEE and EIA for Kasalong Drilling operation by UMC Bangladesh Corporation in Block-22; (Dec. 1997 to Feb. 1998) - EIA of South Sangu Drilling Operation, Shell Bangladesh Exploration and Development BV (Jan. to April 1999) - IEE and EIA of LPG Plant at Chittagong of Mobil Jamuna Fuel Ltd - IEE and EIA of Lubricating Plant (Blending and Packaging) at Chittagong of Mobil Jamuna Lubricants Ltd. - IEE and EIA of LPG Bottling Plant at Mongla, Summit United Petroleum Company Ltd. Works included: Conduct EIA, its survey tool preparation, survey planning and portfolio distribution, data analysis and technical editing of the EIA report. Prepare Waste Management, Formulate Environmental Management and Monitoring Plan of the project. Team Leader of various industrial EIA assignments including technical editing of the EIA studies, formulation of environmental management and monitoring plans of: - Padma Textile Mills Ltd. at Gazipur and Narayanganj; - Russel Corporation Bangladesh Ltd. at Gazipur;
  • 11. Abu Nahid Munir Uddin Environmental Engineer Page 11 of 12 - Cemcor Cement Clinker and Grinding Plant at Munshiganj; Socio-economic baseline survey of Sangu Onshore Environmental Studies undertaken by Brown & Roots Ltd. (UK). Works included: Data collection for the relevant environmental impact assessment; surface water quality in the vicinity of the landfall, the pipe line route, proposed terminal site and drinking water sources in the vicinity of the area. (Nov. to Dec. 1996) Preparation of Sector-wise Industrial Guidelines and Standards for the Department of Environment, DoE (IDA credit 2340-BD) in association with AIC Watson India. (Oct. 1996 to June 1997).Works included: - review of the existing industrial environmental situation and develop standards for fertilizer, cement, textile and pulp and paper sectors. - review of environmental quality standards in general; - review of environmental regulatory framework in Bangladesh and identify gaps; - assess waste management and control practice and compared with Regional practice; - review of organizational capability of DoE and suggest improvement required; - prepare report on recommended EIA procedures and strategies for environmental protection - train industrial entrepreneur in environmental monitoring and compliance. Also worked as Task manager for all environmental related activities of the firm. Overall responsible for preparing EIA tools, reviewing Environmental Assessment Policies and Procedures for Development Assistance Activities by Bilateral and Multilateral Development Agencies, conducting EIAs, its survey tool preparation, survey planning and portfolio distribution, data analysis and engagement in preparation of different technical proposals and project formulation. Responsible for the design, implementation and technical editing of the EIA studies. Provides supervision of other members of the EIA Team and arrange inputs into Industrial Waste Management and Environmental Management Plan formulation and implementation. From Oct 1995 to Oct 1996 : Pursued Post Graduation studies at IHE, Delft, The Netherlands From Sep 1993 to Sep 1995 : Sanitary Engineer/ Civil Engineer, AQUA Consultant & Associates Ltd. Environmental Engineer, Dhaka Urban Infrastructure Improvement Project (DWASA Component) funded by ADB. Responsibilities included periodic site inspections to ensure that construction of water, sewerage systems are in accordance with the design specification; design modification of small bore sewerage system, water storage tanks, water supply distribution system, sewage collection and treatment / disposal system as per site condition at Mirpur complying with all ADB and WHO environmental guidelines on health and hygiene. (Sept.1994 to Sep 1995). Environmental Engineer, Industrial Pollution Control Management Bangladesh under Department of Environment and Ministry of Industries financed by ADB (TA No. 1769 BAN). The objective of the project was to assist the Government in strengthening the existing framework to improve the industrial environment & to monitor industrial pollution control measures. Works included inventory of industries, their processes and waste outputs; identify process types and characteristics of waste, improvement of process, pollution control measures and waste treatment (Mar. to Sep 1995). From Mar 1993 to Aug 1993 : HSE Engineer, National Transport & Contracting Co., Abu Dhabi, UAE Activities performed: Reviewing the contractor’s EMP implementation plans; Supervising the environmental performance of the contractors at the project site; Reviewing safety issues (Occupational Health and Safety), Preparation of risk and disaster assessment; Reporting the EMP implementation progress and compliances; Preparation of Environmental Monitoring Report for construction of 18 storied building in Abu Dhabi. From May 1991 to Mar 1993 : Water Supply Engineer, AQUA Consultant & Associates Ltd.
  • 12. Abu Nahid Munir Uddin Environmental Engineer Page 12 of 12 Water Supply Engineer, Feasibility of Second Water Supply and Sanitation Project of DPHE financed by ADB (TA No. 1684 BAN) for nine district towns. Study and review of existing water supply systems, leakage and wastage inventory, systems performance evaluation, inventory at production wells and distribution system. Secondary Towns Infrastructure Development Project (Phase-I) of LGED funded by ADB; involved in the preparation of the following sub-project: - Drainage system Master Plan of 10 Towns: works included hydrological data collection and analysis, preparation of frequency duration curves, division of catchment area, estimation of storm runoff, selection of drain size, drainage system layout and cost estimates. - Water System Improvement in 3 Towns: Field inventory of distribution system, sluice valves, washouts, street hydrants, flow and pressure at present condition, leaks and wastage, service connections. Languages: Speak Read Write English Excellent Excellent Excellent Bengali Excellent Excellent Excellent