Off-grid
Dendro Power
DISTRICT BOUNDARY
PROVINCE BOUNDARY
LEGEND
STATUS OF ELECTRIFICATION
IN SRI LANKA 2000
BELOW 30%
JAFFNA
KILINOCHCHI
MULATHIVU
MANNAR
VAVUNIYA
ANURADHAPURA
TRINCOMALEE
PUTTALAM POLONNARUWA
BATTICALOA
KURUNEGALA MATALE
AMPARA
GAMPAHA
KEGALLE
KANDY
BADULLA
NUARAELIYA
MONARAGALA
COLOMBO
KALUTARA
RATNAPURA
GALLE
MATARA
HAMBANTOTA
91 - 95 %
81 - 90 %
71 - 80 %
61 - 70 %
51 - 60 %
41 - 50 %
31 - 40 %
96 - 100 %
DISTRICT BOUNDARY
PROVINCE BOUNDARY
LEGEND
STATUS OF ELECTRIFICATION
IN SRI LANKA 2005
JAFFNA
KILINOCHCHI
MULATHIVU
MANNAR
VAVUNIYA
ANURADHAPURA
TRINCOMALEE
PUTTALAM POLONNARUWA
BATTICALOA
KURUNEGALA MATALE
AMPARA
GAMPAHA
KEGALLE
KANDY
BADULLA
NUARAELIYA
MONARAGALA
COLOMBO
KALUTARA
RATNAPURA
GALLE
MATARA
HAMBANTOTA
11
91 - 95 %
81 - 90 %
71 - 80 %
61 - 70 %
51 - 60 %
41 - 50 %
31 - 40 %
96 - 100 %
Sri Lanka
About 1 - 1.5 million
households in Sri Lanka will
be left without grid-
connected electricity.
Off-grid electricity generating
technologies
The approximate cost comparison
Installation costs per 1kW
Micro-hydro Rs 200,000
Dendro Rs 300,000
Bio-gas Rs 300,000
Wind Rs 600,000
Solar PV Rs 1,000,000
Step 1: Moneragala District participatory
workshop for sensitising the district
government officials, community based
organisations and farmer groups - Nov 2001
Step 2: Pre-feasibility studies in four off-grid
villages
Step 3: Cross checking with CEB grid
extension plans
Step 4: Selection of a village for the feasibility
study
Pilot Dendro
Power Project in
Wadakahakiula
Overall objective of the feasibility study
To examine whether necessary social conditions
for setting up the proposed pilot plant exist in the
village of Wadakahakiula.
An implementation plan should be developed
with the active participation of intended
beneficiaries and other stakeholders.
Wadagahakiula Project feasibility study: 2002
December
Necessary conditions
• Social acceptability of the community
• Availability of the infrastructure for operation
and maintenance of the plant,
• Affordability of majority of the population to
pay for electricity,
• Enthusiasm of the community
• To identify fuel-wood species
• To assess the availability of fuel-wood in
required quantities for operation of the dendro
power plant.
• To assess the potential for growing the fuel-wood
if required
Necessary conditions
• To review and select the most appropriate energy
conversion technology
• To develop preliminary design of the dendro
powered electrification system
• To develop, the institutional mechanisms necessary
for implementation and post implementation
management
• To prepare cost estimates of the project
• To establish a tariff structure for sustainable
operation and management of the power plant
Study Methodology
• Social assessment – 2day participatory workshop with 60 households
• Questionnaire based survey of all households – survey carried out by
selected village members
• Fuelwood survey – based on field assessment.
• Distribution system design – based on field survey
• Siting of powerhouse – based on technical and social concerns
• Institutional and management system – developed through a
participatory workshop
Profile of the Village
• Suggested by CEB Uva office
• Situated in Badalkumbura DS area
• 3 km away from grid
• Permanent houses – 38%
• Semi-permanent houses – 36%
• Temporary houses – 26%
• Main source of income – Pepper cultivation (68% of
households)
• Land ownership – 1 to 3 acres per household (74%)
• Average monthly income – Rs.6000 per household
• Current monthly expenditure on energy –
approximately Rs.500 per household
Project Profile
• No. of beneficiary households – 100
• Max. demand – 250W per house
• Period of electricity demand – 5 to 7am and 6 to 10pm
• Main uses of electricity – lighting, TV, Radio, iron
• Technology – Gasifier system
• Mode of operation – 100% gas
• Fuelwood type – Gliricidia (Nanchi)
• Fuelwood availability – widely grown in the village for
fencing and pepper planting
Major Conclusions from the
Feasibility Study
• Community participation is active however there are no well
established CBOs exist in the village.
• Priority list 1- education 2- unemployment 3- electricity
• Willingness to obtain electricity – 94% of the households.
• Opportunities exist to initiate income-generating activities.
• Affordability of households to pay for electricity is high. At
least 90% of the households are able become its direct
beneficiaries.
• Availability of natural, human and financial resources is high.
• Fuelwood supply from existing plantations is more than
enough for the plant.
• Dendro technology is mature for deployment in a village
scheme.
Social Risks predicted
• Grid electricity may come to the
village through political
interventions.
• In the event of grid electricity is
provided to the village, potential
to access grid electricity is high
because of the high affordability
among people.
Project Parameters
Buildings
Power house (L x W x H) - 18m x 6m x 6m
Project Parameters
Buildings
Fuel wood store - 12m x 6m x 4m
Project Parameters
Buildings
Well (Diameter x depth) - 5m x 6m
Project Parameters
Distribution lines
Concrete Poles - 450 nos.
Three phase length - 600 m
Two phase length - 400 m
Single phase length - 8100 m
Service cables (Insulated) - 4000 m
Area targeted electrified - 2 km radius
Distribution losses @ 15% net - 4.5 kW
Per h/h power allocation - 250 W
Cables 1,352,622.00
Poles 1,021,500.00
Labor 112,935.00
Other 51,926.00
Total 2,538,983.00
Project Parameters
Power plant capacity - 35 kW
Net out put - 30 kW
Prime Generator - 10 kVA
Machinery
System Installation
Electrical equipment and installation
Accessory Diesel Gen set
Summary - Project Expenses (SLRs)
A. Feasibility study 778,077.43
B. Building construction 1,480,939.40
C. Distribution lines 2,538,983.00
D. Machinery installation 3,416,400.00
E. Administrative expenses 1,222,078.30
Total 9,436,478.13
E. Community Contribution 393,950.00
Contributors SLRs
1. UNDP - GEF/SGP 4,226,284.81
2. Ministry of Science and Technology (Machinery) 2,660,000.00
3. RERED 1,800,000.00
Project Preparation 600,000.00
Co-financing 1,200,000.00
4. Uva PC (Cables) 500,000.00
5. EF 250,193.32
Total 9,436,478.13
Dendro Power plant
Project Parameters
No of households
Planned - 100
Currently connected - 58
Total h/h requirements - 25 kW
Operation hours per day - 6 hours (4.45 a.m. to 6.45 a.m. &
6.30 p.m. to10.30 p.m.)
Fuel wood species - Gliricidia Sepium
Fuel wood requirement - 60kg/ hr
Fuel wood supplying area (Existing Plantations) - 2 km radius
Running Cost
1. Month - 15th April to 14th May 2005 (58 families)
Operating hours - 4 hours (6.30 pm to 10.30 pm)
Fuel wood - Rs. 11,250
Diesel (3Lts / hr) - Rs. 2,000
Wages - Operator & Helper - Rs. 11,000
Maintenance fund - Rs. 5,000
Society - Rs. 1,000
Total - Rs. 30,250
Monthly Electricity bill per household - Rs. 356 (84 houses)
Average income per household for supplying fuel wood - Rs. 70
2. Estimated cost for the month 15th May 2005 to 14th June 2005
Operating hours - 6 hours
Fuel wood - Rs. 16,875
Diesel (3Lts / hr) - Rs. 4,000
Wages - Operator & Helper - Rs. 15,625
Maintenance fund - Rs. 5,000
Society - Rs. 1,000
Total - Rs. 42,500
Fuel wood
Monthly Electricity bill per household - Rs. 500
Price of fuel wood at Farm gate - Rs. 200/ m3; Rs. 1/ kg
Price of fuel wood at Power house gate - Rs. 375/m3; Rs 1.88/kg
Monthly payment for fuel wood transportation - Rs. 7,875
Average income per household for supplying fuel wood - Rs. 106
•Rumor - politicians promises for grid
electricity supply
• Plant is not for the community but for
the EF -being a fully funded project
•The consumers concerns on high
electricity bill
•Resentment among some of the
consumers regarding the operator and
helper
•The enthusiasm among the others in
the dendro sector regarding the project
Issues
•The confrontation between the fuel wood supplier and the
farmers.
•President of the society did not get the electricity from the
system
Affordability of the households to pay for electricity
Total monthly cost incurred by a rich family on three energy
items (Kerosene, dry battery and car battery) is
approximately Rs.563/-
An average family, the monthly cost is around Rs.521/-.
The poor families spend approximately Rs.293/- per month.
At least the rich and the average families who constitute the
majority of the families in the three hamlets are able to afford
to pay for their electricity consumption if the cost to be
incurred by them is in the range of Rs.400-500 per month.
If other social benefits that a household would accrue from
using electricity such as better lighting, reduced risks of
accidents, use of other electric appliances, social status etc.
are also added to this economic cost, household expenditure
on electricity is very much compensated and justified.
Possible options
•Allow the community to explore the possibility of grid
extension
•Allow the community to explore the possibility of getting
subsidy from any agency
•Forget injustice and have a compromise with the supplier
•Explore the possibility of introducing an income generating
activity using day time power to lift the burden on the
consumer
Please give us 3 more months to rectify the situation.
Possible future options for off-grid dendro power
(We have a market of 20,000 villages)
• Try to establish a household level electrical appliance
package to reduce the capacity
• Try to integrate an income generating activity at the initial
stage itself
• Follow the grid connected dendro and approach the off-grid
villages which provide fuel wood to grid dendro plant

More Related Content

Similar to dendro_case_study_presentation.ppt

5.5 off main-grid technologies for power generation in rural contexts
5.5 off main-grid technologies for power generation in rural contexts5.5 off main-grid technologies for power generation in rural contexts
5.5 off main-grid technologies for power generation in rural contexts
LeNS_slide
 
power sector
power sectorpower sector
power sector
yzag66
 
Annex 20 (myanmar) renewable energy
Annex 20 (myanmar) renewable energyAnnex 20 (myanmar) renewable energy
Annex 20 (myanmar) renewable energy
MYO AUNG Myanmar
 
Non conventional energy sources
Non conventional energy sourcesNon conventional energy sources
Non conventional energy sources
Nirmal Kumar
 

Similar to dendro_case_study_presentation.ppt (20)

Ghana Priorities: Rural Electrification
Ghana Priorities: Rural ElectrificationGhana Priorities: Rural Electrification
Ghana Priorities: Rural Electrification
 
Professor Isam Shahrour Summer Course « Smart and Sustainable City » Chapter...
Professor Isam Shahrour Summer Course « Smart and Sustainable City »  Chapter...Professor Isam Shahrour Summer Course « Smart and Sustainable City »  Chapter...
Professor Isam Shahrour Summer Course « Smart and Sustainable City » Chapter...
 
5.5 off main-grid technologies for power generation in rural contexts
5.5 off main-grid technologies for power generation in rural contexts5.5 off main-grid technologies for power generation in rural contexts
5.5 off main-grid technologies for power generation in rural contexts
 
Kuching | Jan-15 | Sarawak Rural Electrification
Kuching | Jan-15 | Sarawak Rural Electrification   Kuching | Jan-15 | Sarawak Rural Electrification
Kuching | Jan-15 | Sarawak Rural Electrification
 
Bunaken Island | Nov-15 | The Sumba Iconic Island Initiative
Bunaken Island | Nov-15 | The Sumba Iconic Island InitiativeBunaken Island | Nov-15 | The Sumba Iconic Island Initiative
Bunaken Island | Nov-15 | The Sumba Iconic Island Initiative
 
Arusha | Jun-14 | Ewan Bloomfield, Village Level Energy Access in East Africa
Arusha | Jun-14 |  Ewan Bloomfield, Village Level Energy Access in East AfricaArusha | Jun-14 |  Ewan Bloomfield, Village Level Energy Access in East Africa
Arusha | Jun-14 | Ewan Bloomfield, Village Level Energy Access in East Africa
 
Energy cost and energy shortage in nepal potential of solar, wind and other f...
Energy cost and energy shortage in nepal potential of solar, wind and other f...Energy cost and energy shortage in nepal potential of solar, wind and other f...
Energy cost and energy shortage in nepal potential of solar, wind and other f...
 
WEBINAR | RESILIENCE RELIABILITY ENERGY PROJECTS NEPAL | Mini/Micro Hydropow...
 WEBINAR | RESILIENCE RELIABILITY ENERGY PROJECTS NEPAL | Mini/Micro Hydropow... WEBINAR | RESILIENCE RELIABILITY ENERGY PROJECTS NEPAL | Mini/Micro Hydropow...
WEBINAR | RESILIENCE RELIABILITY ENERGY PROJECTS NEPAL | Mini/Micro Hydropow...
 
Renewable Energy Project Development in Off-Grid Areas - Rene Fajigalutan, RO...
Renewable Energy Project Development in Off-Grid Areas - Rene Fajigalutan, RO...Renewable Energy Project Development in Off-Grid Areas - Rene Fajigalutan, RO...
Renewable Energy Project Development in Off-Grid Areas - Rene Fajigalutan, RO...
 
Sri dedeepya nandamuri solar policy ppt
Sri dedeepya nandamuri solar policy pptSri dedeepya nandamuri solar policy ppt
Sri dedeepya nandamuri solar policy ppt
 
Ebimene EE Poster
Ebimene EE PosterEbimene EE Poster
Ebimene EE Poster
 
Kigali | Nov-14 | Village Energy Access in East Africa
Kigali | Nov-14 | Village Energy Access in East AfricaKigali | Nov-14 | Village Energy Access in East Africa
Kigali | Nov-14 | Village Energy Access in East Africa
 
Planning for the Future: The Changing World of the Electric Transmission System
Planning for the Future: The Changing World of the Electric Transmission SystemPlanning for the Future: The Changing World of the Electric Transmission System
Planning for the Future: The Changing World of the Electric Transmission System
 
power sector
power sectorpower sector
power sector
 
Annex 20 (myanmar) renewable energy
Annex 20 (myanmar) renewable energyAnnex 20 (myanmar) renewable energy
Annex 20 (myanmar) renewable energy
 
Non conventional energy sources
Non conventional energy sourcesNon conventional energy sources
Non conventional energy sources
 
Power sector in india
Power sector in indiaPower sector in india
Power sector in india
 
Rural electrification in India: are mini-grids the answer?
Rural electrification in India: are mini-grids the answer?Rural electrification in India: are mini-grids the answer?
Rural electrification in India: are mini-grids the answer?
 
Energy sector of pakistan
Energy sector of pakistanEnergy sector of pakistan
Energy sector of pakistan
 
Stated Preferences of farmers for improved cookstoves in Malawi and Mozambique
Stated Preferences of farmers for improved cookstoves in Malawi and MozambiqueStated Preferences of farmers for improved cookstoves in Malawi and Mozambique
Stated Preferences of farmers for improved cookstoves in Malawi and Mozambique
 

Recently uploaded

Financial Accounting IFRS, 3rd Edition-dikompresi.pdf
Financial Accounting IFRS, 3rd Edition-dikompresi.pdfFinancial Accounting IFRS, 3rd Edition-dikompresi.pdf
Financial Accounting IFRS, 3rd Edition-dikompresi.pdf
MinawBelay
 
The basics of sentences session 4pptx.pptx
The basics of sentences session 4pptx.pptxThe basics of sentences session 4pptx.pptx
The basics of sentences session 4pptx.pptx
heathfieldcps1
 

Recently uploaded (20)

II BIOSENSOR PRINCIPLE APPLICATIONS AND WORKING II
II BIOSENSOR PRINCIPLE APPLICATIONS AND WORKING IIII BIOSENSOR PRINCIPLE APPLICATIONS AND WORKING II
II BIOSENSOR PRINCIPLE APPLICATIONS AND WORKING II
 
Software testing for project report .pdf
Software testing for project report .pdfSoftware testing for project report .pdf
Software testing for project report .pdf
 
MOOD STABLIZERS DRUGS.pptx
MOOD     STABLIZERS           DRUGS.pptxMOOD     STABLIZERS           DRUGS.pptx
MOOD STABLIZERS DRUGS.pptx
 
“O BEIJO” EM ARTE .
“O BEIJO” EM ARTE                       .“O BEIJO” EM ARTE                       .
“O BEIJO” EM ARTE .
 
Graduate Outcomes Presentation Slides - English (v3).pptx
Graduate Outcomes Presentation Slides - English (v3).pptxGraduate Outcomes Presentation Slides - English (v3).pptx
Graduate Outcomes Presentation Slides - English (v3).pptx
 
UChicago CMSC 23320 - The Best Commit Messages of 2024
UChicago CMSC 23320 - The Best Commit Messages of 2024UChicago CMSC 23320 - The Best Commit Messages of 2024
UChicago CMSC 23320 - The Best Commit Messages of 2024
 
An overview of the various scriptures in Hinduism
An overview of the various scriptures in HinduismAn overview of the various scriptures in Hinduism
An overview of the various scriptures in Hinduism
 
Financial Accounting IFRS, 3rd Edition-dikompresi.pdf
Financial Accounting IFRS, 3rd Edition-dikompresi.pdfFinancial Accounting IFRS, 3rd Edition-dikompresi.pdf
Financial Accounting IFRS, 3rd Edition-dikompresi.pdf
 
Removal Strategy _ FEFO _ Working with Perishable Products in Odoo 17
Removal Strategy _ FEFO _ Working with Perishable Products in Odoo 17Removal Strategy _ FEFO _ Working with Perishable Products in Odoo 17
Removal Strategy _ FEFO _ Working with Perishable Products in Odoo 17
 
Word Stress rules esl .pptx
Word Stress rules esl               .pptxWord Stress rules esl               .pptx
Word Stress rules esl .pptx
 
demyelinated disorder: multiple sclerosis.pptx
demyelinated disorder: multiple sclerosis.pptxdemyelinated disorder: multiple sclerosis.pptx
demyelinated disorder: multiple sclerosis.pptx
 
MichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdfMichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdf
 
Envelope of Discrepancy in Orthodontics: Enhancing Precision in Treatment
 Envelope of Discrepancy in Orthodontics: Enhancing Precision in Treatment Envelope of Discrepancy in Orthodontics: Enhancing Precision in Treatment
Envelope of Discrepancy in Orthodontics: Enhancing Precision in Treatment
 
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
 
Navigating the Misinformation Minefield: The Role of Higher Education in the ...
Navigating the Misinformation Minefield: The Role of Higher Education in the ...Navigating the Misinformation Minefield: The Role of Higher Education in the ...
Navigating the Misinformation Minefield: The Role of Higher Education in the ...
 
ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...
ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...
ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...
 
The Last Leaf, a short story by O. Henry
The Last Leaf, a short story by O. HenryThe Last Leaf, a short story by O. Henry
The Last Leaf, a short story by O. Henry
 
Mattingly "AI and Prompt Design: LLMs with Text Classification and Open Source"
Mattingly "AI and Prompt Design: LLMs with Text Classification and Open Source"Mattingly "AI and Prompt Design: LLMs with Text Classification and Open Source"
Mattingly "AI and Prompt Design: LLMs with Text Classification and Open Source"
 
The basics of sentences session 4pptx.pptx
The basics of sentences session 4pptx.pptxThe basics of sentences session 4pptx.pptx
The basics of sentences session 4pptx.pptx
 
IPL Online Quiz by Pragya; Question Set.
IPL Online Quiz by Pragya; Question Set.IPL Online Quiz by Pragya; Question Set.
IPL Online Quiz by Pragya; Question Set.
 

dendro_case_study_presentation.ppt

  • 2. DISTRICT BOUNDARY PROVINCE BOUNDARY LEGEND STATUS OF ELECTRIFICATION IN SRI LANKA 2000 BELOW 30% JAFFNA KILINOCHCHI MULATHIVU MANNAR VAVUNIYA ANURADHAPURA TRINCOMALEE PUTTALAM POLONNARUWA BATTICALOA KURUNEGALA MATALE AMPARA GAMPAHA KEGALLE KANDY BADULLA NUARAELIYA MONARAGALA COLOMBO KALUTARA RATNAPURA GALLE MATARA HAMBANTOTA 91 - 95 % 81 - 90 % 71 - 80 % 61 - 70 % 51 - 60 % 41 - 50 % 31 - 40 % 96 - 100 % DISTRICT BOUNDARY PROVINCE BOUNDARY LEGEND STATUS OF ELECTRIFICATION IN SRI LANKA 2005 JAFFNA KILINOCHCHI MULATHIVU MANNAR VAVUNIYA ANURADHAPURA TRINCOMALEE PUTTALAM POLONNARUWA BATTICALOA KURUNEGALA MATALE AMPARA GAMPAHA KEGALLE KANDY BADULLA NUARAELIYA MONARAGALA COLOMBO KALUTARA RATNAPURA GALLE MATARA HAMBANTOTA 11 91 - 95 % 81 - 90 % 71 - 80 % 61 - 70 % 51 - 60 % 41 - 50 % 31 - 40 % 96 - 100 % Sri Lanka About 1 - 1.5 million households in Sri Lanka will be left without grid- connected electricity.
  • 3. Off-grid electricity generating technologies The approximate cost comparison Installation costs per 1kW Micro-hydro Rs 200,000 Dendro Rs 300,000 Bio-gas Rs 300,000 Wind Rs 600,000 Solar PV Rs 1,000,000
  • 4. Step 1: Moneragala District participatory workshop for sensitising the district government officials, community based organisations and farmer groups - Nov 2001 Step 2: Pre-feasibility studies in four off-grid villages Step 3: Cross checking with CEB grid extension plans Step 4: Selection of a village for the feasibility study
  • 5. Pilot Dendro Power Project in Wadakahakiula
  • 6. Overall objective of the feasibility study To examine whether necessary social conditions for setting up the proposed pilot plant exist in the village of Wadakahakiula. An implementation plan should be developed with the active participation of intended beneficiaries and other stakeholders. Wadagahakiula Project feasibility study: 2002 December
  • 7. Necessary conditions • Social acceptability of the community • Availability of the infrastructure for operation and maintenance of the plant, • Affordability of majority of the population to pay for electricity, • Enthusiasm of the community • To identify fuel-wood species • To assess the availability of fuel-wood in required quantities for operation of the dendro power plant. • To assess the potential for growing the fuel-wood if required
  • 8. Necessary conditions • To review and select the most appropriate energy conversion technology • To develop preliminary design of the dendro powered electrification system • To develop, the institutional mechanisms necessary for implementation and post implementation management • To prepare cost estimates of the project • To establish a tariff structure for sustainable operation and management of the power plant
  • 9. Study Methodology • Social assessment – 2day participatory workshop with 60 households • Questionnaire based survey of all households – survey carried out by selected village members • Fuelwood survey – based on field assessment. • Distribution system design – based on field survey • Siting of powerhouse – based on technical and social concerns • Institutional and management system – developed through a participatory workshop
  • 10. Profile of the Village • Suggested by CEB Uva office • Situated in Badalkumbura DS area • 3 km away from grid • Permanent houses – 38% • Semi-permanent houses – 36% • Temporary houses – 26% • Main source of income – Pepper cultivation (68% of households) • Land ownership – 1 to 3 acres per household (74%) • Average monthly income – Rs.6000 per household • Current monthly expenditure on energy – approximately Rs.500 per household
  • 11. Project Profile • No. of beneficiary households – 100 • Max. demand – 250W per house • Period of electricity demand – 5 to 7am and 6 to 10pm • Main uses of electricity – lighting, TV, Radio, iron • Technology – Gasifier system • Mode of operation – 100% gas • Fuelwood type – Gliricidia (Nanchi) • Fuelwood availability – widely grown in the village for fencing and pepper planting
  • 12. Major Conclusions from the Feasibility Study • Community participation is active however there are no well established CBOs exist in the village. • Priority list 1- education 2- unemployment 3- electricity • Willingness to obtain electricity – 94% of the households. • Opportunities exist to initiate income-generating activities. • Affordability of households to pay for electricity is high. At least 90% of the households are able become its direct beneficiaries. • Availability of natural, human and financial resources is high. • Fuelwood supply from existing plantations is more than enough for the plant. • Dendro technology is mature for deployment in a village scheme.
  • 13. Social Risks predicted • Grid electricity may come to the village through political interventions. • In the event of grid electricity is provided to the village, potential to access grid electricity is high because of the high affordability among people.
  • 14. Project Parameters Buildings Power house (L x W x H) - 18m x 6m x 6m
  • 15. Project Parameters Buildings Fuel wood store - 12m x 6m x 4m
  • 17. Project Parameters Distribution lines Concrete Poles - 450 nos. Three phase length - 600 m Two phase length - 400 m Single phase length - 8100 m Service cables (Insulated) - 4000 m Area targeted electrified - 2 km radius Distribution losses @ 15% net - 4.5 kW Per h/h power allocation - 250 W Cables 1,352,622.00 Poles 1,021,500.00 Labor 112,935.00 Other 51,926.00 Total 2,538,983.00
  • 18. Project Parameters Power plant capacity - 35 kW Net out put - 30 kW Prime Generator - 10 kVA Machinery System Installation Electrical equipment and installation Accessory Diesel Gen set
  • 19. Summary - Project Expenses (SLRs) A. Feasibility study 778,077.43 B. Building construction 1,480,939.40 C. Distribution lines 2,538,983.00 D. Machinery installation 3,416,400.00 E. Administrative expenses 1,222,078.30 Total 9,436,478.13 E. Community Contribution 393,950.00
  • 20. Contributors SLRs 1. UNDP - GEF/SGP 4,226,284.81 2. Ministry of Science and Technology (Machinery) 2,660,000.00 3. RERED 1,800,000.00 Project Preparation 600,000.00 Co-financing 1,200,000.00 4. Uva PC (Cables) 500,000.00 5. EF 250,193.32 Total 9,436,478.13
  • 22. Project Parameters No of households Planned - 100 Currently connected - 58 Total h/h requirements - 25 kW Operation hours per day - 6 hours (4.45 a.m. to 6.45 a.m. & 6.30 p.m. to10.30 p.m.) Fuel wood species - Gliricidia Sepium Fuel wood requirement - 60kg/ hr Fuel wood supplying area (Existing Plantations) - 2 km radius
  • 23. Running Cost 1. Month - 15th April to 14th May 2005 (58 families) Operating hours - 4 hours (6.30 pm to 10.30 pm) Fuel wood - Rs. 11,250 Diesel (3Lts / hr) - Rs. 2,000 Wages - Operator & Helper - Rs. 11,000 Maintenance fund - Rs. 5,000 Society - Rs. 1,000 Total - Rs. 30,250 Monthly Electricity bill per household - Rs. 356 (84 houses) Average income per household for supplying fuel wood - Rs. 70 2. Estimated cost for the month 15th May 2005 to 14th June 2005 Operating hours - 6 hours Fuel wood - Rs. 16,875 Diesel (3Lts / hr) - Rs. 4,000 Wages - Operator & Helper - Rs. 15,625 Maintenance fund - Rs. 5,000 Society - Rs. 1,000 Total - Rs. 42,500
  • 24. Fuel wood Monthly Electricity bill per household - Rs. 500 Price of fuel wood at Farm gate - Rs. 200/ m3; Rs. 1/ kg Price of fuel wood at Power house gate - Rs. 375/m3; Rs 1.88/kg Monthly payment for fuel wood transportation - Rs. 7,875 Average income per household for supplying fuel wood - Rs. 106
  • 25. •Rumor - politicians promises for grid electricity supply • Plant is not for the community but for the EF -being a fully funded project •The consumers concerns on high electricity bill •Resentment among some of the consumers regarding the operator and helper •The enthusiasm among the others in the dendro sector regarding the project Issues •The confrontation between the fuel wood supplier and the farmers. •President of the society did not get the electricity from the system
  • 26. Affordability of the households to pay for electricity Total monthly cost incurred by a rich family on three energy items (Kerosene, dry battery and car battery) is approximately Rs.563/- An average family, the monthly cost is around Rs.521/-. The poor families spend approximately Rs.293/- per month. At least the rich and the average families who constitute the majority of the families in the three hamlets are able to afford to pay for their electricity consumption if the cost to be incurred by them is in the range of Rs.400-500 per month. If other social benefits that a household would accrue from using electricity such as better lighting, reduced risks of accidents, use of other electric appliances, social status etc. are also added to this economic cost, household expenditure on electricity is very much compensated and justified.
  • 27. Possible options •Allow the community to explore the possibility of grid extension •Allow the community to explore the possibility of getting subsidy from any agency •Forget injustice and have a compromise with the supplier •Explore the possibility of introducing an income generating activity using day time power to lift the burden on the consumer Please give us 3 more months to rectify the situation.
  • 28. Possible future options for off-grid dendro power (We have a market of 20,000 villages) • Try to establish a household level electrical appliance package to reduce the capacity • Try to integrate an income generating activity at the initial stage itself • Follow the grid connected dendro and approach the off-grid villages which provide fuel wood to grid dendro plant