UKAN Case Study
UKAN Ltd is a multinational manufacturer that
makes hundreds of products ranging from
auto parts to electrical products & computer
components.
Electric Motor and Components division:
It had six manufacturing facilities focused
on specific products types , the different
products made at each plant.
Production processes were similar in terms
of different products.
UKAN found itself becoming less and less
competitive in world wide markets.
A study of its competitors found that UKAN :
–higher production costs
–carried higher inventories per unit sales,
– more quality complaints,
–longer lead time for delivery of its products
–More late deliveries
The most notifiable symptoms:
1. Avg inventories :
$56 million= $9 million unprocessed + $27
million in-process + $20 million finished prod.
2. Nearly $15 million in–process + $3 million
unprocessed materials - component wiring
dept, appeared to be bottle neck.
$8million in process + $3.5 millions
unprocessed materials were in front of the Final
assembly.
4. Defects rates for item shipped to customers
were twice those of leading competitors &
especially high for lower volume special
products.
5. Demand service level is below those of
competitors
6. Internal defects rates based on samples very
high
Overtime and Quality control:
Short term solution:
Component inspection before major
components went to cleaning department.

Extra inspection was estimated to cost
approx $120,000 per year.
Benefits:
1. Approximately 1 million defective component
would not have to be cleaned or wired.
2. Overtime in the cleaning and component wiring
departments was cut by more than half , and
overtime in the sub-assembly is eliminated.
3. Annual overtime cost would drop by almost $7
million to approx $5 million.
4. Over $1 million in material costs would be saved
by not assembling small components with
defective major components in the sub
assemblies.
Long term solution:
Focused on job redesign, training, mistake
proofing, employees suggestions were
implemented.
Standardizing setups, marking calibrations
clearly on machines, and changing tool more
frequently and instituting a simple inspection
machine operator.
Benefits;
1. similar programs in other departments
reduced defects generated in those
departments at-least by half.
2. In the sub assembly and assembly
departments mistake proofing techniques
eliminate defects due to using wrong
components.
3.After all these changes, major cause of the
remaining defects was found to be defective
components from supplier.
Process Reorganization and Job design;
The workers were further divided into who worked
primarily on seven major motor components.
Similarly who worked on the 9 major control units.
A small number of workers inn the department
were put into separate work cell that handled only
the low volume motors and control units.
Benefits:
1. Productivity has increased by 30% because of
less product changes.
2. Wiring defects were reduced to 0.05% and
job satisfaction surveys indicated a
sustainable improvements.
JIT scheduling and lot sizing:
The classical push scheduling was using based on
speculative demand.

Long production run of one product might be
scheduled for wiring and assembly while demand for
different product create shortage.
The team decided to implement JIT pull system
wherever possible and reduce production lot sizes.
SMED was used in the cleaning process to eliminate time
spent on cleaning process.
Result:
• Inventories and stock-outs began to decrease.
• As lot sizes reduced , UKAN made a special
effort to work with suppliers to provide
frequent JIT deliveries of high quality
components.
• UKAN now had a best quality and delivery
performance of any company in their markets,
result in large increase in market share.
• The large reduction in labor cost due to
elimination of overtime production.

More Related Content

What's hot

Software maintenance service strategies
Software maintenance service strategiesSoftware maintenance service strategies
Software maintenance service strategiesSIS Tech
 
Challenges of pharma industry
Challenges of pharma industryChallenges of pharma industry
Challenges of pharma industrySuman Sirur
 
BIS Export Management and Compliance Program Self-Assessment Toolkit
BIS Export Management and Compliance Program Self-Assessment ToolkitBIS Export Management and Compliance Program Self-Assessment Toolkit
BIS Export Management and Compliance Program Self-Assessment ToolkitPrep4Audit
 
Analytical Instrument Qualification - USP chapter 1058 revision
Analytical Instrument Qualification - USP chapter 1058 revisionAnalytical Instrument Qualification - USP chapter 1058 revision
Analytical Instrument Qualification - USP chapter 1058 revisionpi
 

What's hot (7)

Rajesh mba resume - dubai
Rajesh mba resume - dubaiRajesh mba resume - dubai
Rajesh mba resume - dubai
 
Software maintenance service strategies
Software maintenance service strategiesSoftware maintenance service strategies
Software maintenance service strategies
 
Resume
ResumeResume
Resume
 
Challenges of pharma industry
Challenges of pharma industryChallenges of pharma industry
Challenges of pharma industry
 
BIS Export Management and Compliance Program Self-Assessment Toolkit
BIS Export Management and Compliance Program Self-Assessment ToolkitBIS Export Management and Compliance Program Self-Assessment Toolkit
BIS Export Management and Compliance Program Self-Assessment Toolkit
 
Analytical Instrument Qualification - USP chapter 1058 revision
Analytical Instrument Qualification - USP chapter 1058 revisionAnalytical Instrument Qualification - USP chapter 1058 revision
Analytical Instrument Qualification - USP chapter 1058 revision
 
Executive Summary El
Executive Summary ElExecutive Summary El
Executive Summary El
 

Viewers also liked

Toyota Presentation
Toyota PresentationToyota Presentation
Toyota PresentationSamir Anand
 
JIT case study of Toyota
JIT case study of ToyotaJIT case study of Toyota
JIT case study of Toyotaaneela yousaf
 
Toyota's jit revolution ppt
Toyota's jit revolution pptToyota's jit revolution ppt
Toyota's jit revolution pptAkshay Jain
 
Jit & Lean Operations
Jit & Lean OperationsJit & Lean Operations
Jit & Lean Operationskahogan62
 
Top 8 loss prevention officer resume samples
Top 8 loss prevention officer resume samplesTop 8 loss prevention officer resume samples
Top 8 loss prevention officer resume samplesferguporich
 
Информационная безопасность
Информационная безопасностьИнформационная безопасность
Информационная безопасностьmilushaaa
 
Cinefòrum Eth Haro
Cinefòrum Eth HaroCinefòrum Eth Haro
Cinefòrum Eth Harohugo2cv
 
Industrias e espazos
Industrias e espazosIndustrias e espazos
Industrias e espazosalborada3
 

Viewers also liked (14)

Toyota Presentation
Toyota PresentationToyota Presentation
Toyota Presentation
 
JIT case study of Toyota
JIT case study of ToyotaJIT case study of Toyota
JIT case study of Toyota
 
Toyota's jit revolution ppt
Toyota's jit revolution pptToyota's jit revolution ppt
Toyota's jit revolution ppt
 
Jit And Lean
Jit And LeanJit And Lean
Jit And Lean
 
Jit & Lean Operations
Jit & Lean OperationsJit & Lean Operations
Jit & Lean Operations
 
Top 8 loss prevention officer resume samples
Top 8 loss prevention officer resume samplesTop 8 loss prevention officer resume samples
Top 8 loss prevention officer resume samples
 
CV dika Indonesia
CV dika IndonesiaCV dika Indonesia
CV dika Indonesia
 
Информационная безопасность
Информационная безопасностьИнформационная безопасность
Информационная безопасность
 
File 04 Speaking
File 04 SpeakingFile 04 Speaking
File 04 Speaking
 
Cinefòrum Eth Haro
Cinefòrum Eth HaroCinefòrum Eth Haro
Cinefòrum Eth Haro
 
CESCM - CEnter for Supply Chain Management - UCL
CESCM - CEnter for Supply Chain Management - UCLCESCM - CEnter for Supply Chain Management - UCL
CESCM - CEnter for Supply Chain Management - UCL
 
Tuberculina vs IGRA
Tuberculina vs IGRATuberculina vs IGRA
Tuberculina vs IGRA
 
RESEARCH PAPER 2013
RESEARCH PAPER 2013RESEARCH PAPER 2013
RESEARCH PAPER 2013
 
Industrias e espazos
Industrias e espazosIndustrias e espazos
Industrias e espazos
 

Similar to Ukan case study

Michigan manufacturing corporation. case pptx
Michigan manufacturing corporation. case pptxMichigan manufacturing corporation. case pptx
Michigan manufacturing corporation. case pptxAnkush Agrawal
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET Journal
 
E11 1 intro to operational-excellence_final-web
E11 1 intro to operational-excellence_final-webE11 1 intro to operational-excellence_final-web
E11 1 intro to operational-excellence_final-webDir Jan
 
Manufacturing Automation.pdf
Manufacturing Automation.pdfManufacturing Automation.pdf
Manufacturing Automation.pdfzain kirmani
 
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...IRJET Journal
 
IRJET- Productivity Improvement by Implementing Lean Manufacturing Tools ...
IRJET-  	  Productivity Improvement by Implementing Lean Manufacturing Tools ...IRJET-  	  Productivity Improvement by Implementing Lean Manufacturing Tools ...
IRJET- Productivity Improvement by Implementing Lean Manufacturing Tools ...IRJET Journal
 
Concept of production
Concept of productionConcept of production
Concept of productionKeshav Bhatia
 
“Development of automatic feeder system in cellular manufacturing to improve ...
“Development of automatic feeder system in cellular manufacturing to improve ...“Development of automatic feeder system in cellular manufacturing to improve ...
“Development of automatic feeder system in cellular manufacturing to improve ...IRJET Journal
 
PrimeControls_Metrics_OEE
PrimeControls_Metrics_OEEPrimeControls_Metrics_OEE
PrimeControls_Metrics_OEEPeter Tiagunov
 
Six sigma in various industries
Six sigma in various industriesSix sigma in various industries
Six sigma in various industriesAamir chouhan
 
Business Plan Sample By Alan Ray
Business Plan Sample By Alan RayBusiness Plan Sample By Alan Ray
Business Plan Sample By Alan RayAlan Ray
 
FALLSEM2022-23_MCDM505L_TH_VL2022230106501_Reference_Material_I_27-09-2022_Mo...
FALLSEM2022-23_MCDM505L_TH_VL2022230106501_Reference_Material_I_27-09-2022_Mo...FALLSEM2022-23_MCDM505L_TH_VL2022230106501_Reference_Material_I_27-09-2022_Mo...
FALLSEM2022-23_MCDM505L_TH_VL2022230106501_Reference_Material_I_27-09-2022_Mo...JothiSankar7
 
Industrial Internet of Things in a Box
Industrial Internet of Things in a BoxIndustrial Internet of Things in a Box
Industrial Internet of Things in a BoxEurotech
 
Automation in Manufacturing (Unit-4) by Varun Pratap Singh.pdf
Automation in Manufacturing (Unit-4) by Varun Pratap Singh.pdfAutomation in Manufacturing (Unit-4) by Varun Pratap Singh.pdf
Automation in Manufacturing (Unit-4) by Varun Pratap Singh.pdfVarun Pratap Singh
 
134 Lean Thinking and Lean Systems Chapter outline .docx
134 Lean Thinking and Lean Systems Chapter outline .docx134 Lean Thinking and Lean Systems Chapter outline .docx
134 Lean Thinking and Lean Systems Chapter outline .docxhyacinthshackley2629
 
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A ReviewIRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A ReviewIRJET Journal
 

Similar to Ukan case study (20)

Michigan manufacturing corporation. case pptx
Michigan manufacturing corporation. case pptxMichigan manufacturing corporation. case pptx
Michigan manufacturing corporation. case pptx
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
 
Chapter 7.pptx
Chapter 7.pptxChapter 7.pptx
Chapter 7.pptx
 
E11 1 intro to operational-excellence_final-web
E11 1 intro to operational-excellence_final-webE11 1 intro to operational-excellence_final-web
E11 1 intro to operational-excellence_final-web
 
Manufacturing Automation.pdf
Manufacturing Automation.pdfManufacturing Automation.pdf
Manufacturing Automation.pdf
 
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
 
IRJET- Productivity Improvement by Implementing Lean Manufacturing Tools ...
IRJET-  	  Productivity Improvement by Implementing Lean Manufacturing Tools ...IRJET-  	  Productivity Improvement by Implementing Lean Manufacturing Tools ...
IRJET- Productivity Improvement by Implementing Lean Manufacturing Tools ...
 
Analytics in the Manufacturing industry
Analytics in the Manufacturing industryAnalytics in the Manufacturing industry
Analytics in the Manufacturing industry
 
Concept of production
Concept of productionConcept of production
Concept of production
 
“Development of automatic feeder system in cellular manufacturing to improve ...
“Development of automatic feeder system in cellular manufacturing to improve ...“Development of automatic feeder system in cellular manufacturing to improve ...
“Development of automatic feeder system in cellular manufacturing to improve ...
 
PrimeControls_Metrics_OEE
PrimeControls_Metrics_OEEPrimeControls_Metrics_OEE
PrimeControls_Metrics_OEE
 
Six sigma in various industries
Six sigma in various industriesSix sigma in various industries
Six sigma in various industries
 
Business Plan Sample By Alan Ray
Business Plan Sample By Alan RayBusiness Plan Sample By Alan Ray
Business Plan Sample By Alan Ray
 
FALLSEM2022-23_MCDM505L_TH_VL2022230106501_Reference_Material_I_27-09-2022_Mo...
FALLSEM2022-23_MCDM505L_TH_VL2022230106501_Reference_Material_I_27-09-2022_Mo...FALLSEM2022-23_MCDM505L_TH_VL2022230106501_Reference_Material_I_27-09-2022_Mo...
FALLSEM2022-23_MCDM505L_TH_VL2022230106501_Reference_Material_I_27-09-2022_Mo...
 
Company Presentation.pptx
Company Presentation.pptxCompany Presentation.pptx
Company Presentation.pptx
 
Industrial Internet of Things in a Box
Industrial Internet of Things in a BoxIndustrial Internet of Things in a Box
Industrial Internet of Things in a Box
 
Automation in Manufacturing (Unit-4) by Varun Pratap Singh.pdf
Automation in Manufacturing (Unit-4) by Varun Pratap Singh.pdfAutomation in Manufacturing (Unit-4) by Varun Pratap Singh.pdf
Automation in Manufacturing (Unit-4) by Varun Pratap Singh.pdf
 
Toyota case
Toyota caseToyota case
Toyota case
 
134 Lean Thinking and Lean Systems Chapter outline .docx
134 Lean Thinking and Lean Systems Chapter outline .docx134 Lean Thinking and Lean Systems Chapter outline .docx
134 Lean Thinking and Lean Systems Chapter outline .docx
 
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A ReviewIRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
 

Recently uploaded

Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 

Recently uploaded (20)

Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 

Ukan case study

  • 1. UKAN Case Study UKAN Ltd is a multinational manufacturer that makes hundreds of products ranging from auto parts to electrical products & computer components.
  • 2. Electric Motor and Components division: It had six manufacturing facilities focused on specific products types , the different products made at each plant. Production processes were similar in terms of different products.
  • 3. UKAN found itself becoming less and less competitive in world wide markets. A study of its competitors found that UKAN : –higher production costs –carried higher inventories per unit sales, – more quality complaints, –longer lead time for delivery of its products –More late deliveries
  • 4. The most notifiable symptoms: 1. Avg inventories : $56 million= $9 million unprocessed + $27 million in-process + $20 million finished prod. 2. Nearly $15 million in–process + $3 million unprocessed materials - component wiring dept, appeared to be bottle neck. $8million in process + $3.5 millions unprocessed materials were in front of the Final assembly.
  • 5. 4. Defects rates for item shipped to customers were twice those of leading competitors & especially high for lower volume special products. 5. Demand service level is below those of competitors 6. Internal defects rates based on samples very high
  • 6. Overtime and Quality control: Short term solution: Component inspection before major components went to cleaning department. Extra inspection was estimated to cost approx $120,000 per year.
  • 7. Benefits: 1. Approximately 1 million defective component would not have to be cleaned or wired. 2. Overtime in the cleaning and component wiring departments was cut by more than half , and overtime in the sub-assembly is eliminated. 3. Annual overtime cost would drop by almost $7 million to approx $5 million. 4. Over $1 million in material costs would be saved by not assembling small components with defective major components in the sub assemblies.
  • 8. Long term solution: Focused on job redesign, training, mistake proofing, employees suggestions were implemented. Standardizing setups, marking calibrations clearly on machines, and changing tool more frequently and instituting a simple inspection machine operator.
  • 9. Benefits; 1. similar programs in other departments reduced defects generated in those departments at-least by half. 2. In the sub assembly and assembly departments mistake proofing techniques eliminate defects due to using wrong components. 3.After all these changes, major cause of the remaining defects was found to be defective components from supplier.
  • 10. Process Reorganization and Job design; The workers were further divided into who worked primarily on seven major motor components. Similarly who worked on the 9 major control units. A small number of workers inn the department were put into separate work cell that handled only the low volume motors and control units.
  • 11. Benefits: 1. Productivity has increased by 30% because of less product changes. 2. Wiring defects were reduced to 0.05% and job satisfaction surveys indicated a sustainable improvements.
  • 12. JIT scheduling and lot sizing: The classical push scheduling was using based on speculative demand. Long production run of one product might be scheduled for wiring and assembly while demand for different product create shortage. The team decided to implement JIT pull system wherever possible and reduce production lot sizes. SMED was used in the cleaning process to eliminate time spent on cleaning process.
  • 13. Result: • Inventories and stock-outs began to decrease. • As lot sizes reduced , UKAN made a special effort to work with suppliers to provide frequent JIT deliveries of high quality components. • UKAN now had a best quality and delivery performance of any company in their markets, result in large increase in market share. • The large reduction in labor cost due to elimination of overtime production.