SlideShare a Scribd company logo
1 of 31
CE 642A
Laboratory course in Infrastructure
Engineering & Management
Instructor โ€“ Prof. Balaji Devaraju
Submitted by-
Abhijeet Prataprao More
Arun Pratap Singh
Harsh Kumar Manav
Nihal Navin
Lab1: Map Reading
Objective- To understand map numbering system and to study various details on
topographic map.
โ€ข Topographic maps provides the graphical portrayal of objects present on the surface of
the earth. These maps provide the preliminary information about a terrain and thus very
useful for engineering works. For most part of India, topographic maps are available
which are prepared by the Survey of India. To identify a map of a particular area, a map
numbering system has been adopted by Survey of India. The system of identification is as
follows:
โ€ข An International Series (within 4ยฐ N to 40ยฐ N Latitude and 44ยฐ E to 124ยฐ E Longitude) at the
scale of 1: 1,000,000 is being considered as base map. The base map is divided into
sections of 4ยฐ latitude x 4ยฐ longitude and designated from 1 (at the extreme north-west)
to 136, covering only land areas and leaving any 4ยฐ square if it falls completely in the sea
โ€ข For Indian Topographic maps, each section is further divided into 16 sections (4 rows by 4
columns), each of 1ยฐ latitude x 1ยฐ longitude (1:250,000), staring from a letter A (North-West
corner) and ending on P, column-wise. These degree sheets are designated by a number and
an alphabet
โ€ข These degree sheets are further sub-divided in the following ways:
Each sheet is divided into four parts (2 rows by 2 columns),, each of 30' latitude x 30' longitude
(1:100,000) designating them by cardinal directions NW, NE, SW, and SE.
โ€ข Degree sheets have also been divided into 16 sheets (4 rows by 4 columns), each 15' latitude x 15'
longitude (1:50,000) and numbered from 1 (at the north-west corner of the particular degree sheet)
to 16 column wise.
โ€ข Each 1:50,000 scale sheet contains four (2 rows by 2 columns) 1:25,000 sheet ( 7' 1/2 latitude x 7' 1/2
longitude ) which are numbered NW, NE, SW, and SE.
Conventional Symbols:
Lab 2: Reconnaissance and handheld GNSS
survey
Objective: To perform a reconnaissance survey using traditional methods and using a
handheld GNSS receiver.
โ€ข Before any survey work is done, it is important to know about the area that needs to be
surveyed. this procedure is called reconnaissance.
Trimble Juno 3B :The Trimble Juno 3B handheld computer is an
economical solution that includes an integrated GPS, digital camera,
and optional cellular connectivity.
โ€ข We have three option in the juno 3B for data collection in the form of
of point generic, line generic and polygon generic.
โ€ข Accuracy of juno 3B is in the few metres, it is the single frequency device.
Procedure:
โ€ข First we will establish the step length of each person that can be later used to
reckon the distance travelled.
โ€ข We can download the compass app.
โ€ข Go around the area to find out the points which are intervisible to each other and
at the same time provide the access to the features which we want to map.
โ€ข Now using the trimble juno handheld GNSS receiver mark the control points.
โ€ข Mark the features that are visible from each of the handheld GNSS receiver.
N
Lab 3: Levelling using Autolevel
โ€ข Objective: To carry out levelling operation using Automatic level and familiarize
with the operation of the instrument.
โ€ข Equipment : Nikon/ Leica autolevel , levelling staff , tripod.
โ€ข Theory - Levelling is a branch of surveying, the object of which is to find the
elevations of given points with respect to a given or assumed datum, and to
establish points at a given or assumed datum. Use to draw the contour map.
Procedure :
1. Identify the benchmark and put the levelling staff at bench mark.
2. Calculate the distance from the benchmark and installed the tripod, autolevel
3. After instrument installment levelling was done.
4. After levelling of instrument we take the back sight reading.
5. After Back sight reading taken , Intermediate sight reading were taken if
required. Lastly Fore sight were taken at the changing point or turning point.
Illustration:
Lab 3 โ€“ Levelling using Autolevel
Station Point B.S I.S F.S H.I R.L Remark
A B.M. 1.07 129.479 128.409B.M=128.409m
TP2 1.485 127.994
B TP2 1.52 129.514 127.994Change point
TP3 1.46 128.054
C TP3 1.535 129.589 128.054Change point
TP4 1.66 127.929
D TP4 1.45 129.379 127.929Change point
CP1 1.3 128.079
CP2 1.385 127.994
CP10 1.265 128.114
CP3 1.255 128.124
Note: All dimensions are in meter.
โ€ข Arithmetic check for Level
โ€ข Source of error
1. Instrumental Errors- Under sensitive bubble, Errors in staff graduation, Loose
tripod head, Telescope not parallel to bubble tube
2. Collimation Error- Collimation error occurs when the collimation axis is not truly
horizontal when the instrument is level.
3. Error due to Curvature & Refraction
4. Other Errors
sum of B.S. โˆ’ sum of F.S. = last RL - First RL
17.510 -17.505 = 0.005 = 128.414-128.409
Lab 4:Control Survey using traverse with
Total Station
โ€ข Objective- To carry out a traverse survey using a total station to establish control for
mapping the features and also familiarize with the operation of the instrument.
โ€ข Equipment- Total station.
It uses electronic transit theodolite in conjunction with electronic distance meter (EDM).
It is also integrated with microprocessor, electronic data collector and storage system.
The instrument is used to measure- sloping distance, horizontal angles, vertical angles
and elevation.
Magnification: 30X
Display: QVGA, 16 bit colour, TFT LCD, Backlit (320 X 240 pixel)
โ€ข Accuracy-
length- 1.5 mm + 2 parts per million over a distance of up to 1,500m
angle โ€“ 1โ€
Set up & level at CP
1
Choose the
reference direction
Angle
measurement with
respect to the
reference line.
Measurement of
horizontal angle &
elevation.
Set up & level at CP
2
Take the backsight
reading from the
next control point
Repeat the
procedure.
Computation of
interior and
exterior angles.
Compute the
departure and
latitude.
Compute the
closure error.
Distribute the error
using Bowditch
method.
Flowchart
โ€ข Closure error - Sum of all interior angles = (n-2)180ึฏ
Sum of exterior angle = (n+2)180ึฏ
โ€ข Latitudes and Departures-
Departure (x) = d sin A
Latitude (y) = d cos A
Sum of all latitudes = 0
Sum of all departures = 0
Let P denote the perimeter of the traverse survey and ex and ey denote the closure
error in departures and latitudes, respectively, then the quality of the survey can be
reported as-
linear error of closure (e)
Relative precision= 1:
๐‘
๐‘’
= ๐‘’ ๐‘ฅ
2 + ๐‘’ ๐‘ฆ
2
โ€ข Distribution of closure error by Bowditch method-
Bowditch rule is applied for corrections in latitude and departure. As per this rule,
the error is proportional to the length of the side.
Correction in latitude/northing =
โˆ’๐‘’๐‘ฆ
๐‘
ร— d
Correction in departure/easting =
โˆ’๐‘’๐‘ฅ
๐‘
ร— d
Illustration:
Total error in latitude= -0.001969
Total error in departure= -0.019164
Total parameter= 364.58
Correction in latitude =
0.001969
364.58
ร— 38.959 = 0.0002104
Note: Correction value is added to the observed value to get the corrected value.
CP POINT LINE DISTANCE ANGLE LATITUDE DEPARTURE
CORRECTION IN
LATITUDE
CORRECTION IN
DEPARTURE
4 B BC 38.959
68.51277
8 14.270 36.251 0.000210444 0.002047894
5 C BD 48.358
18.41861
1 45.880 15.279 0.000261211 0.00254193
6 D DE 123.181
257.1236
11 -27.451 -120.083 0.00066538 0.006475028
8 E EF 69.69
159.7847
22 -65.397 24.081 0.000376442 0.00366328
9 F FA 44.96
98.61916
7 -6.738 44.452 0.000242859 0.002363339
3 A AB 39.433 0.000000 39.433 0 0.000213004 0.00207281
SUM 364.58 -0.001969 -0.019164 0.001969 0.019164
Lab 5 & 6: Total station feature mapping
Set up the total station.
Key in the coordinates of
CP
Enter the coordinates of
back sight and measure
the error
Take as it is reference
Take the reading of all
near features from control
point using measure topo.
Lab 7: GNSS Surveying
Objective: To take GNSS reading on control points.
Trimble R-10 GNSS Receivers
Trimble R-10 collects more accurate data faster and easier.
This system provides surveyors with a powerful way to increase data collection.
It have improved protection against sources of interference and spoofed
signals.
GNSS processing engine enables surveyors to measure points more quickly.
R10 can survey previously inaccessible points, reduce occupation time and
record faster and safer measurements than ever before.
Connected the R-10
with the controller using
Bluetooth.
Perform reading for near
about 20 to 30 minutes.
The GNSS data (in a
static mode) of the
control points.
The data in Trimble
Business Center (TBC) is
processed by using the
R3 base station data.
The detailed report is
generated with TBC.
Procedure:
Data from TBC
Vector Components (Mark to Mark)
From: ZIITK
Grid Local Global
Easting 423466.408 m Latitude N26ยฐ31'09.43601" Latitude N26ยฐ31'09.43601"
Northing 2933422.826 m Longitude E80ยฐ13'54.70799" Longitude E80ยฐ13'54.70799"
Elevation 66.777 m Height 66.777 m Height 66.777 m
To: cp3
Grid Local Global
Easting 423600.490 m Latitude N26ยฐ30'42.82907" Latitude N26ยฐ30'42.82907"
Northing 2932603.405 m Longitude E80ยฐ13'59.72913" Longitude E80ยฐ13'59.72913"
Elevation 63.966 m Height 63.966 m Height 63.966 m
Vector
ฮ”Easting 134.082 m NS Fwd Azimuth 170ยฐ21'51" ฮ”X -75.417 m
ฮ”Northing -819.421 m Ellipsoid Dist. 830.590 m ฮ”Y 381.390 m
ฮ”Elevation -2.811 m ฮ”Height -2.811 m ฮ”Z -734.000 m
Transformation of coordinates from Local to
UTM
The transformation formula is:
UTM = M x TS + Translation
Since this is a 2-D transformation, the translation is two parameters and the
rotation matrix M is four parameters.
So, in total there are six parameters to % be estimated. Therefore, we will need
atleast six equations.
๐ธ
๐‘
=
๐‘€11 ๐‘€12
๐‘€21 ๐‘€22
๐‘’
๐‘›
+
๐‘‡1
๐‘‡2
๏ƒž๐ธ1 = ๐‘€11 ๐‘’1 + ๐‘€12 ๐‘›1 + ๐‘‡1 (eq.1)
๐ธ2 = ๐‘€11 ๐‘’2 + ๐‘€12 ๐‘›2 + ๐‘‡1 (eq.2)
๐ธ3 = ๐‘€11 ๐‘’3 + ๐‘€12 ๐‘›3 + ๐‘‡1 (eq.3)
๐‘1 = ๐‘€21 ๐‘’1 + ๐‘€22 ๐‘›1 + ๐‘‡2 (eq.4)
๐‘2 = ๐‘€21 ๐‘’2 + ๐‘€22 ๐‘›2 + ๐‘‡2 (eq.5)
๐‘3 = ๐‘€21 ๐‘’3 + ๐‘€22 ๐‘›3 + ๐‘‡2 (eq.6)
Translation
Rotation TS readings
UTM
coordinates
Lab 8 & 9: Mapping with QGIS
โ€ข QGIS is a free and open-source cross-platform desktop geographic information
system (GIS) application that supports viewing, editing, and analysis of geospatial
data.
โ€ข Developer(s): QGIS Development Team
โ€ข Initial release: July 2002
โ€ข Version : 3.4.1 "Madeira" (November 2, 2018; 2 months ago)
Survey work presentation
Survey work presentation

More Related Content

What's hot

Total Station Topographic Survey
Total Station Topographic Survey Total Station Topographic Survey
Total Station Topographic Survey
haroldtaylor1113
ย 
Total station
Total stationTotal station
Total station
lbbinh
ย 
Total station topcon exp procedures
Total station topcon exp proceduresTotal station topcon exp procedures
Total station topcon exp procedures
NAGESH KUMAR GUTURU
ย 
4. lecture 3 data capturing techniques - total station and gps
4. lecture 3   data capturing techniques - total station and gps4. lecture 3   data capturing techniques - total station and gps
4. lecture 3 data capturing techniques - total station and gps
FenTaHun6
ย 
EDM and Total Stations
EDM and Total StationsEDM and Total Stations
EDM and Total Stations
haroldtaylor1113
ย 
Surveying instruments
Surveying instrumentsSurveying instruments
Surveying instruments
ShanALi
ย 
Total station setup and operation
Total station setup and operationTotal station setup and operation
Total station setup and operation
Muhammad Adi K
ย 

What's hot (20)

Total station, digital self leveling levels,
Total station, digital self leveling levels,Total station, digital self leveling levels,
Total station, digital self leveling levels,
ย 
Total Station Topographic Survey
Total Station Topographic Survey Total Station Topographic Survey
Total Station Topographic Survey
ย 
Total station
Total stationTotal station
Total station
ย 
Total station survey
Total station surveyTotal station survey
Total station survey
ย 
Modern surveying methods and instruments
Modern surveying methods and instrumentsModern surveying methods and instruments
Modern surveying methods and instruments
ย 
Total station
Total stationTotal station
Total station
ย 
Total station topcon exp procedures
Total station topcon exp proceduresTotal station topcon exp procedures
Total station topcon exp procedures
ย 
Total Station surveying
Total Station surveyingTotal Station surveying
Total Station surveying
ย 
4. lecture 3 data capturing techniques - total station and gps
4. lecture 3   data capturing techniques - total station and gps4. lecture 3   data capturing techniques - total station and gps
4. lecture 3 data capturing techniques - total station and gps
ย 
Total station
Total stationTotal station
Total station
ย 
Modern Surveying
Modern Surveying Modern Surveying
Modern Surveying
ย 
EDM and Total Stations
EDM and Total StationsEDM and Total Stations
EDM and Total Stations
ย 
Engineering surveying-ii
Engineering surveying-iiEngineering surveying-ii
Engineering surveying-ii
ย 
Lecture 1 precise levelling
Lecture 1 precise levellingLecture 1 precise levelling
Lecture 1 precise levelling
ย 
Surveying instruments
Surveying instrumentsSurveying instruments
Surveying instruments
ย 
Total station setup and operation
Total station setup and operationTotal station setup and operation
Total station setup and operation
ย 
Total station
Total stationTotal station
Total station
ย 
Laboratory manual surveying_ii
Laboratory manual surveying_iiLaboratory manual surveying_ii
Laboratory manual surveying_ii
ย 
Modern Survey Techniques
Modern Survey TechniquesModern Survey Techniques
Modern Survey Techniques
ย 
Modern Surveying & Mapping
Modern Surveying & MappingModern Surveying & Mapping
Modern Surveying & Mapping
ย 

Similar to Survey work presentation

Modern Surveying Instrument.pptx
Modern Surveying Instrument.pptxModern Surveying Instrument.pptx
Modern Surveying Instrument.pptx
mrunmayee20
ย 
Practical 2 Chain and Compass Surveying - Computation of areas.ppt
Practical 2 Chain and Compass Surveying - Computation of areas.pptPractical 2 Chain and Compass Surveying - Computation of areas.ppt
Practical 2 Chain and Compass Surveying - Computation of areas.ppt
GopalSubash
ย 
S2 5 traverses
S2 5 traversesS2 5 traverses
S2 5 traverses
Est
ย 
Week1 introductiontobasicsurveying
Week1 introductiontobasicsurveyingWeek1 introductiontobasicsurveying
Week1 introductiontobasicsurveying
Jackie Arul
ย 
TECHNIQUES IN BASIC SURVEYING.ppt
TECHNIQUES IN BASIC SURVEYING.pptTECHNIQUES IN BASIC SURVEYING.ppt
TECHNIQUES IN BASIC SURVEYING.ppt
ArisamTom
ย 

Similar to Survey work presentation (20)

Total station .pptx
Total station .pptxTotal station .pptx
Total station .pptx
ย 
Total station .pdf
Total station .pdfTotal station .pdf
Total station .pdf
ย 
Traversing Notes |surveying II | Sudip khadka
Traversing Notes |surveying II | Sudip khadka Traversing Notes |surveying II | Sudip khadka
Traversing Notes |surveying II | Sudip khadka
ย 
group-3-a21-traverse-report.pdf
group-3-a21-traverse-report.pdfgroup-3-a21-traverse-report.pdf
group-3-a21-traverse-report.pdf
ย 
Total Station.pptx
Total Station.pptxTotal Station.pptx
Total Station.pptx
ย 
Advanced surveying instruments
Advanced surveying instrumentsAdvanced surveying instruments
Advanced surveying instruments
ย 
Advanced surveying equipment ppt
Advanced surveying equipment pptAdvanced surveying equipment ppt
Advanced surveying equipment ppt
ย 
Modern Survey Techniques
Modern Survey TechniquesModern Survey Techniques
Modern Survey Techniques
ย 
Modern Surveying Instrument.pptx
Modern Surveying Instrument.pptxModern Surveying Instrument.pptx
Modern Surveying Instrument.pptx
ย 
Practical 2 Chain and Compass Surveying - Computation of areas.ppt
Practical 2 Chain and Compass Surveying - Computation of areas.pptPractical 2 Chain and Compass Surveying - Computation of areas.ppt
Practical 2 Chain and Compass Surveying - Computation of areas.ppt
ย 
total station topo III.pptx
total station topo III.pptxtotal station topo III.pptx
total station topo III.pptx
ย 
S2 5 traverses
S2 5 traversesS2 5 traverses
S2 5 traverses
ย 
Week1 introductiontobasicsurveying
Week1 introductiontobasicsurveyingWeek1 introductiontobasicsurveying
Week1 introductiontobasicsurveying
ย 
Traversing
TraversingTraversing
Traversing
ย 
Surveying_en.pdf
Surveying_en.pdfSurveying_en.pdf
Surveying_en.pdf
ย 
Surveying_en.pdf
Surveying_en.pdfSurveying_en.pdf
Surveying_en.pdf
ย 
TECHNIQUES IN BASIC SURVEYING.ppt
TECHNIQUES IN BASIC SURVEYING.pptTECHNIQUES IN BASIC SURVEYING.ppt
TECHNIQUES IN BASIC SURVEYING.ppt
ย 
Modern survey Instruments (2).pdf
Modern survey Instruments (2).pdfModern survey Instruments (2).pdf
Modern survey Instruments (2).pdf
ย 
Total station
Total station Total station
Total station
ย 
surveying ii
surveying iisurveying ii
surveying ii
ย 

Recently uploaded

VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
SUHANI PANDEY
ย 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
ย 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
ย 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
ย 

Recently uploaded (20)

VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
ย 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
ย 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
ย 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
ย 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
ย 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
ย 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
ย 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
ย 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
ย 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
ย 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
ย 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
ย 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
ย 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
ย 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
ย 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
ย 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
ย 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
ย 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
ย 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ย 

Survey work presentation

  • 1. CE 642A Laboratory course in Infrastructure Engineering & Management Instructor โ€“ Prof. Balaji Devaraju Submitted by- Abhijeet Prataprao More Arun Pratap Singh Harsh Kumar Manav Nihal Navin
  • 2. Lab1: Map Reading Objective- To understand map numbering system and to study various details on topographic map. โ€ข Topographic maps provides the graphical portrayal of objects present on the surface of the earth. These maps provide the preliminary information about a terrain and thus very useful for engineering works. For most part of India, topographic maps are available which are prepared by the Survey of India. To identify a map of a particular area, a map numbering system has been adopted by Survey of India. The system of identification is as follows: โ€ข An International Series (within 4ยฐ N to 40ยฐ N Latitude and 44ยฐ E to 124ยฐ E Longitude) at the scale of 1: 1,000,000 is being considered as base map. The base map is divided into sections of 4ยฐ latitude x 4ยฐ longitude and designated from 1 (at the extreme north-west) to 136, covering only land areas and leaving any 4ยฐ square if it falls completely in the sea
  • 3.
  • 4. โ€ข For Indian Topographic maps, each section is further divided into 16 sections (4 rows by 4 columns), each of 1ยฐ latitude x 1ยฐ longitude (1:250,000), staring from a letter A (North-West corner) and ending on P, column-wise. These degree sheets are designated by a number and an alphabet
  • 5. โ€ข These degree sheets are further sub-divided in the following ways: Each sheet is divided into four parts (2 rows by 2 columns),, each of 30' latitude x 30' longitude (1:100,000) designating them by cardinal directions NW, NE, SW, and SE.
  • 6. โ€ข Degree sheets have also been divided into 16 sheets (4 rows by 4 columns), each 15' latitude x 15' longitude (1:50,000) and numbered from 1 (at the north-west corner of the particular degree sheet) to 16 column wise. โ€ข Each 1:50,000 scale sheet contains four (2 rows by 2 columns) 1:25,000 sheet ( 7' 1/2 latitude x 7' 1/2 longitude ) which are numbered NW, NE, SW, and SE.
  • 7.
  • 9. Lab 2: Reconnaissance and handheld GNSS survey Objective: To perform a reconnaissance survey using traditional methods and using a handheld GNSS receiver. โ€ข Before any survey work is done, it is important to know about the area that needs to be surveyed. this procedure is called reconnaissance. Trimble Juno 3B :The Trimble Juno 3B handheld computer is an economical solution that includes an integrated GPS, digital camera, and optional cellular connectivity. โ€ข We have three option in the juno 3B for data collection in the form of of point generic, line generic and polygon generic. โ€ข Accuracy of juno 3B is in the few metres, it is the single frequency device.
  • 10. Procedure: โ€ข First we will establish the step length of each person that can be later used to reckon the distance travelled. โ€ข We can download the compass app. โ€ข Go around the area to find out the points which are intervisible to each other and at the same time provide the access to the features which we want to map. โ€ข Now using the trimble juno handheld GNSS receiver mark the control points. โ€ข Mark the features that are visible from each of the handheld GNSS receiver.
  • 11. N
  • 12. Lab 3: Levelling using Autolevel โ€ข Objective: To carry out levelling operation using Automatic level and familiarize with the operation of the instrument. โ€ข Equipment : Nikon/ Leica autolevel , levelling staff , tripod. โ€ข Theory - Levelling is a branch of surveying, the object of which is to find the elevations of given points with respect to a given or assumed datum, and to establish points at a given or assumed datum. Use to draw the contour map.
  • 13. Procedure : 1. Identify the benchmark and put the levelling staff at bench mark. 2. Calculate the distance from the benchmark and installed the tripod, autolevel 3. After instrument installment levelling was done. 4. After levelling of instrument we take the back sight reading. 5. After Back sight reading taken , Intermediate sight reading were taken if required. Lastly Fore sight were taken at the changing point or turning point.
  • 14. Illustration: Lab 3 โ€“ Levelling using Autolevel Station Point B.S I.S F.S H.I R.L Remark A B.M. 1.07 129.479 128.409B.M=128.409m TP2 1.485 127.994 B TP2 1.52 129.514 127.994Change point TP3 1.46 128.054 C TP3 1.535 129.589 128.054Change point TP4 1.66 127.929 D TP4 1.45 129.379 127.929Change point CP1 1.3 128.079 CP2 1.385 127.994 CP10 1.265 128.114 CP3 1.255 128.124 Note: All dimensions are in meter.
  • 15. โ€ข Arithmetic check for Level โ€ข Source of error 1. Instrumental Errors- Under sensitive bubble, Errors in staff graduation, Loose tripod head, Telescope not parallel to bubble tube 2. Collimation Error- Collimation error occurs when the collimation axis is not truly horizontal when the instrument is level. 3. Error due to Curvature & Refraction 4. Other Errors sum of B.S. โˆ’ sum of F.S. = last RL - First RL 17.510 -17.505 = 0.005 = 128.414-128.409
  • 16. Lab 4:Control Survey using traverse with Total Station โ€ข Objective- To carry out a traverse survey using a total station to establish control for mapping the features and also familiarize with the operation of the instrument. โ€ข Equipment- Total station. It uses electronic transit theodolite in conjunction with electronic distance meter (EDM). It is also integrated with microprocessor, electronic data collector and storage system. The instrument is used to measure- sloping distance, horizontal angles, vertical angles and elevation. Magnification: 30X Display: QVGA, 16 bit colour, TFT LCD, Backlit (320 X 240 pixel) โ€ข Accuracy- length- 1.5 mm + 2 parts per million over a distance of up to 1,500m angle โ€“ 1โ€
  • 17. Set up & level at CP 1 Choose the reference direction Angle measurement with respect to the reference line. Measurement of horizontal angle & elevation. Set up & level at CP 2 Take the backsight reading from the next control point Repeat the procedure. Computation of interior and exterior angles. Compute the departure and latitude. Compute the closure error. Distribute the error using Bowditch method. Flowchart
  • 18. โ€ข Closure error - Sum of all interior angles = (n-2)180ึฏ Sum of exterior angle = (n+2)180ึฏ โ€ข Latitudes and Departures- Departure (x) = d sin A Latitude (y) = d cos A Sum of all latitudes = 0 Sum of all departures = 0 Let P denote the perimeter of the traverse survey and ex and ey denote the closure error in departures and latitudes, respectively, then the quality of the survey can be reported as- linear error of closure (e) Relative precision= 1: ๐‘ ๐‘’ = ๐‘’ ๐‘ฅ 2 + ๐‘’ ๐‘ฆ 2
  • 19. โ€ข Distribution of closure error by Bowditch method- Bowditch rule is applied for corrections in latitude and departure. As per this rule, the error is proportional to the length of the side. Correction in latitude/northing = โˆ’๐‘’๐‘ฆ ๐‘ ร— d Correction in departure/easting = โˆ’๐‘’๐‘ฅ ๐‘ ร— d Illustration: Total error in latitude= -0.001969 Total error in departure= -0.019164 Total parameter= 364.58 Correction in latitude = 0.001969 364.58 ร— 38.959 = 0.0002104 Note: Correction value is added to the observed value to get the corrected value.
  • 20. CP POINT LINE DISTANCE ANGLE LATITUDE DEPARTURE CORRECTION IN LATITUDE CORRECTION IN DEPARTURE 4 B BC 38.959 68.51277 8 14.270 36.251 0.000210444 0.002047894 5 C BD 48.358 18.41861 1 45.880 15.279 0.000261211 0.00254193 6 D DE 123.181 257.1236 11 -27.451 -120.083 0.00066538 0.006475028 8 E EF 69.69 159.7847 22 -65.397 24.081 0.000376442 0.00366328 9 F FA 44.96 98.61916 7 -6.738 44.452 0.000242859 0.002363339 3 A AB 39.433 0.000000 39.433 0 0.000213004 0.00207281 SUM 364.58 -0.001969 -0.019164 0.001969 0.019164
  • 21.
  • 22.
  • 23. Lab 5 & 6: Total station feature mapping Set up the total station. Key in the coordinates of CP Enter the coordinates of back sight and measure the error Take as it is reference Take the reading of all near features from control point using measure topo.
  • 24. Lab 7: GNSS Surveying Objective: To take GNSS reading on control points. Trimble R-10 GNSS Receivers Trimble R-10 collects more accurate data faster and easier. This system provides surveyors with a powerful way to increase data collection. It have improved protection against sources of interference and spoofed signals. GNSS processing engine enables surveyors to measure points more quickly. R10 can survey previously inaccessible points, reduce occupation time and record faster and safer measurements than ever before.
  • 25. Connected the R-10 with the controller using Bluetooth. Perform reading for near about 20 to 30 minutes. The GNSS data (in a static mode) of the control points. The data in Trimble Business Center (TBC) is processed by using the R3 base station data. The detailed report is generated with TBC. Procedure:
  • 26. Data from TBC Vector Components (Mark to Mark) From: ZIITK Grid Local Global Easting 423466.408 m Latitude N26ยฐ31'09.43601" Latitude N26ยฐ31'09.43601" Northing 2933422.826 m Longitude E80ยฐ13'54.70799" Longitude E80ยฐ13'54.70799" Elevation 66.777 m Height 66.777 m Height 66.777 m To: cp3 Grid Local Global Easting 423600.490 m Latitude N26ยฐ30'42.82907" Latitude N26ยฐ30'42.82907" Northing 2932603.405 m Longitude E80ยฐ13'59.72913" Longitude E80ยฐ13'59.72913" Elevation 63.966 m Height 63.966 m Height 63.966 m Vector ฮ”Easting 134.082 m NS Fwd Azimuth 170ยฐ21'51" ฮ”X -75.417 m ฮ”Northing -819.421 m Ellipsoid Dist. 830.590 m ฮ”Y 381.390 m ฮ”Elevation -2.811 m ฮ”Height -2.811 m ฮ”Z -734.000 m
  • 27. Transformation of coordinates from Local to UTM The transformation formula is: UTM = M x TS + Translation Since this is a 2-D transformation, the translation is two parameters and the rotation matrix M is four parameters. So, in total there are six parameters to % be estimated. Therefore, we will need atleast six equations.
  • 28. ๐ธ ๐‘ = ๐‘€11 ๐‘€12 ๐‘€21 ๐‘€22 ๐‘’ ๐‘› + ๐‘‡1 ๐‘‡2 ๏ƒž๐ธ1 = ๐‘€11 ๐‘’1 + ๐‘€12 ๐‘›1 + ๐‘‡1 (eq.1) ๐ธ2 = ๐‘€11 ๐‘’2 + ๐‘€12 ๐‘›2 + ๐‘‡1 (eq.2) ๐ธ3 = ๐‘€11 ๐‘’3 + ๐‘€12 ๐‘›3 + ๐‘‡1 (eq.3) ๐‘1 = ๐‘€21 ๐‘’1 + ๐‘€22 ๐‘›1 + ๐‘‡2 (eq.4) ๐‘2 = ๐‘€21 ๐‘’2 + ๐‘€22 ๐‘›2 + ๐‘‡2 (eq.5) ๐‘3 = ๐‘€21 ๐‘’3 + ๐‘€22 ๐‘›3 + ๐‘‡2 (eq.6) Translation Rotation TS readings UTM coordinates
  • 29. Lab 8 & 9: Mapping with QGIS โ€ข QGIS is a free and open-source cross-platform desktop geographic information system (GIS) application that supports viewing, editing, and analysis of geospatial data. โ€ข Developer(s): QGIS Development Team โ€ข Initial release: July 2002 โ€ข Version : 3.4.1 "Madeira" (November 2, 2018; 2 months ago)