DROMAS 2
Presentation to Stakeholder Meeting PMORALG August 2015
CARDNO-IT TRANSPORT/arnold
DROMAS 2 WHAT DOES IT DO?
• Defines and records the District Road,
bridge and culvert inventory in each
district.
• Shows roads on Map
• Records road condition and tracks
changes year by year.
• Records Traffic Data and tracks changes
year by year.
• Allows Engineer to enter Annual work
plan, agreed in Performance agreement.
CARDNO-IT TRANSPORT/arnold
DROMAS 2 WHAT DOES IT DO?
• Allows engineer to package work into contracts (using
MOW/TANROADS standard work items) and records contract details.
• Allows Engineer to enter contract awarded prices and details
• Allows engineer to Manage contracts and report progress. (can
output to HMS or MIS)
• Produces interim contract payment certificates
• Produces monthly and quarterly reports at district , region and
national level
• Shows contract progress on Map.
CARDNO-IT TRANSPORT/arnold
CARDNO-IT TRANSPORT/arnold
Admin Menu: Users must login, select Region, select District/LGA and Fiscal year,.
Passwords will be available to the DEs, RE, PMORALG HQ, and RFB. (different
permissions for different users)
Note: Different DC/TC/MC = Different user rights.
CARDNO-IT TRANSPORT/arnold
'Load Geometry' to load geometry for a selected road editing is required to prepare clean shapefile in GIS
from the GPS track. Engineer will use QGIS programme to do this and also add a column for the road code
and enter the proper road code number. The geometry should be a clean shapefile in single part.
Road Network
The road network menu gives the engineer ability to add roads to network and adjust details.
Geometry (shape line) of each road is also in this tool.
CARDNO-IT TRANSPORT/arnold
ARMP (Annual Road Maintenance Planning)
The annual maintenance plan, entered by the engineer when Performance agreement is signed.
includes the rates, systems for routine, recurrent, periodic, specific, bridge and emergency
maintenance.
Once entered view of summary of the annual maintenance works can be seen as list and on map.
CARDNO-IT TRANSPORT/arnold
ARMP-Annual Road Maintenance Program
• Armp Rates-Armp Budgetary Rates-An Engineer Input Rates with
relation to the respective rates for all activities.
• Routine-Select Road-Here you select a road(with road code) and
defining its work description with relation to the length covered of
that specific activity.(Fill in the spaces rounded Blue colour)
• Routine-Prepare Details-Here you prepare details of the activities and
we keep the quantities of the details Fill in the spaces rounded Blue
colour)
CARDNO-IT TRANSPORT/arnold
Summary Plan can be viewed at Regional and national level for overall picture
CARDNO-IT TRANSPORT/arnold
Contract Management
Engineer packages the work into contracts and enters details in DROMAS.
Details of the contract, BOQ, rates and contractor details are shown in the DROMAS and can be
reported.
CARDNO-IT TRANSPORT/arnold
QPR (Quarterly Progress Report);
Engineer puts in progress of work monthly and DROMAS automatically calculates payment due.
DROMAS 2 Then shows the Quarterly Report at council and regional level. These reports can be
viewed live by PMORALG HQ and RFB (view access only).
CARDNO-IT TRANSPORT/arnold
Cost System; Allows the Engineering to work out unit rates from basic costs, and adding
appropriate overheads. DROMAS 2 will track these unit rates across the regions.
CARDNO-IT TRANSPORT/arnold
• Quarterly report for whole country
CARDNO-IT TRANSPORT/arnold
DROMAS Tracks interim payment certificates and quantities from
contract paid for. As long as the Engineer has entered the figures into
the reporting system.
CARDNO-IT TRANSPORT/arnold
DROMAS Map,
DROMAS 2 is a GIS based system. That means all data stored is geo-referenced and can be shown
on the map. The road inventory once entered by the engineer shows on the map. The work plan in
the performance agreement APA shows on the map. Eventually as Engineer enters monthly progress
of contracts it will show on the map.
Map can be viewed with plain background or with, Google Physical, Google Streets, or google
satelite
CARDNO-IT TRANSPORT/arnold
CARDNO-IT TRANSPORT/arnold
CARDNO-IT TRANSPORT/arnold
CARDNO-IT TRANSPORT/arnold
Infrastructure Development Division:
Director’s Desk 2018
CARDNO-IT TRANSPORT/arnold
Better Clear Roads Ahead
Thank You
CARDNO-IT TRANSPORT/arnold

More Related Content

What's hot

surveying instruments
surveying instrumentssurveying instruments
surveying instrumentsSelf-employed
 
Theodolite seting up.pdf
Theodolite seting up.pdfTheodolite seting up.pdf
Theodolite seting up.pdfAlwandBarzani
 
Site location, map reading and lot plotting,
Site location, map reading and lot plotting, Site location, map reading and lot plotting,
Site location, map reading and lot plotting, Gus Agosto
 
dr. morales planning process
 dr. morales planning process dr. morales planning process
dr. morales planning processPrimum Nocere
 
ASSESSMENT OF THE BALANCED HOUSING DEVELOPMENT COMPLIANCE IN THE PHILIPPINE...
ASSESSMENT OF THE BALANCED HOUSING DEVELOPMENT COMPLIANCE IN   THE PHILIPPINE...ASSESSMENT OF THE BALANCED HOUSING DEVELOPMENT COMPLIANCE IN   THE PHILIPPINE...
ASSESSMENT OF THE BALANCED HOUSING DEVELOPMENT COMPLIANCE IN THE PHILIPPINE...Gus Agosto
 
Introduction to photogrammetry
Introduction to photogrammetryIntroduction to photogrammetry
Introduction to photogrammetryMaersk Line
 
L’ Osu Pardu N’ Asturies
L’ Osu Pardu  N’ AsturiesL’ Osu Pardu  N’ Asturies
L’ Osu Pardu N’ Asturiesguest1546da
 
New Land Surveying Key Point With Past Questions & Answers
New Land Surveying Key Point With Past Questions & AnswersNew Land Surveying Key Point With Past Questions & Answers
New Land Surveying Key Point With Past Questions & AnswersIzuchukwu Amaefula
 
Conventional and modern surveying instruments
Conventional and modern surveying instrumentsConventional and modern surveying instruments
Conventional and modern surveying instrumentssameedaslam
 
BLOOD DONATION.pptx
BLOOD DONATION.pptxBLOOD DONATION.pptx
BLOOD DONATION.pptxAncyJoseph21
 
Parliamentary Procedure Script National Convention 2011
Parliamentary Procedure Script National Convention 2011Parliamentary Procedure Script National Convention 2011
Parliamentary Procedure Script National Convention 2011Adrienne Homer
 
Module 1 -Real Estate Principles and Practice October 2015
Module 1 -Real Estate Principles and Practice October 2015 Module 1 -Real Estate Principles and Practice October 2015
Module 1 -Real Estate Principles and Practice October 2015 Rod Farthing
 
Naga City Comprehensive Development Plan, 2011-20
Naga City Comprehensive  Development  Plan, 2011-20Naga City Comprehensive  Development  Plan, 2011-20
Naga City Comprehensive Development Plan, 2011-20Willy Prilles
 

What's hot (17)

surveying instruments
surveying instrumentssurveying instruments
surveying instruments
 
Theodolite seting up.pdf
Theodolite seting up.pdfTheodolite seting up.pdf
Theodolite seting up.pdf
 
Regional Physical Framework Plan, 2004 2030 of SOCCSKSARGEN
Regional Physical Framework Plan, 2004 2030 of SOCCSKSARGENRegional Physical Framework Plan, 2004 2030 of SOCCSKSARGEN
Regional Physical Framework Plan, 2004 2030 of SOCCSKSARGEN
 
Site location, map reading and lot plotting,
Site location, map reading and lot plotting, Site location, map reading and lot plotting,
Site location, map reading and lot plotting,
 
dr. morales planning process
 dr. morales planning process dr. morales planning process
dr. morales planning process
 
ASSESSMENT OF THE BALANCED HOUSING DEVELOPMENT COMPLIANCE IN THE PHILIPPINE...
ASSESSMENT OF THE BALANCED HOUSING DEVELOPMENT COMPLIANCE IN   THE PHILIPPINE...ASSESSMENT OF THE BALANCED HOUSING DEVELOPMENT COMPLIANCE IN   THE PHILIPPINE...
ASSESSMENT OF THE BALANCED HOUSING DEVELOPMENT COMPLIANCE IN THE PHILIPPINE...
 
Introduction to photogrammetry
Introduction to photogrammetryIntroduction to photogrammetry
Introduction to photogrammetry
 
L’ Osu Pardu N’ Asturies
L’ Osu Pardu  N’ AsturiesL’ Osu Pardu  N’ Asturies
L’ Osu Pardu N’ Asturies
 
Surveying
SurveyingSurveying
Surveying
 
Traverse Calculation
Traverse Calculation Traverse Calculation
Traverse Calculation
 
New Land Surveying Key Point With Past Questions & Answers
New Land Surveying Key Point With Past Questions & AnswersNew Land Surveying Key Point With Past Questions & Answers
New Land Surveying Key Point With Past Questions & Answers
 
Conventional and modern surveying instruments
Conventional and modern surveying instrumentsConventional and modern surveying instruments
Conventional and modern surveying instruments
 
BLOOD DONATION.pptx
BLOOD DONATION.pptxBLOOD DONATION.pptx
BLOOD DONATION.pptx
 
Parliamentary Procedure Script National Convention 2011
Parliamentary Procedure Script National Convention 2011Parliamentary Procedure Script National Convention 2011
Parliamentary Procedure Script National Convention 2011
 
Module 1 -Real Estate Principles and Practice October 2015
Module 1 -Real Estate Principles and Practice October 2015 Module 1 -Real Estate Principles and Practice October 2015
Module 1 -Real Estate Principles and Practice October 2015
 
Naga City Comprehensive Development Plan, 2011-20
Naga City Comprehensive  Development  Plan, 2011-20Naga City Comprehensive  Development  Plan, 2011-20
Naga City Comprehensive Development Plan, 2011-20
 
Horgászat
HorgászatHorgászat
Horgászat
 

Similar to Dromas 2 presentation v4

CAV Smart Work Zones
CAV Smart Work ZonesCAV Smart Work Zones
CAV Smart Work ZonesAcey Roberts
 
IRJET- Review on Recent Traffic Signs in Lane Markings
IRJET- Review on Recent Traffic Signs in Lane MarkingsIRJET- Review on Recent Traffic Signs in Lane Markings
IRJET- Review on Recent Traffic Signs in Lane MarkingsIRJET Journal
 
DMUG 2016 - Michel Vedrenne, Ricardo Energy & Environment
DMUG 2016 - Michel Vedrenne, Ricardo Energy & EnvironmentDMUG 2016 - Michel Vedrenne, Ricardo Energy & Environment
DMUG 2016 - Michel Vedrenne, Ricardo Energy & EnvironmentIES / IAQM
 
Roadroid user guide version 2.3.2- pro 0.9, incl calibration appendix
Roadroid user guide version 2.3.2- pro 0.9, incl calibration appendixRoadroid user guide version 2.3.2- pro 0.9, incl calibration appendix
Roadroid user guide version 2.3.2- pro 0.9, incl calibration appendixLars Forslöf
 
Maximizing Conduit Manager For Electric Distribution
Maximizing Conduit Manager For Electric DistributionMaximizing Conduit Manager For Electric Distribution
Maximizing Conduit Manager For Electric DistributionSSP Innovations
 
Geometric pavement model for computer-aided design of pavement maintenance ac...
Geometric pavement model for computer-aided design of pavement maintenance ac...Geometric pavement model for computer-aided design of pavement maintenance ac...
Geometric pavement model for computer-aided design of pavement maintenance ac...Johan Granlund
 
Csr 2018-19-page-no-1-to-295
Csr 2018-19-page-no-1-to-295Csr 2018-19-page-no-1-to-295
Csr 2018-19-page-no-1-to-295Ramesh Meti
 
Diagrama electrico volvo c30 2008
Diagrama electrico volvo c30 2008Diagrama electrico volvo c30 2008
Diagrama electrico volvo c30 2008VicTanchez
 
Traffic Volume Study And Congestion Solution Using VisSim Software
Traffic Volume Study And Congestion Solution Using VisSim SoftwareTraffic Volume Study And Congestion Solution Using VisSim Software
Traffic Volume Study And Congestion Solution Using VisSim SoftwareIRJET Journal
 
Automatic Fetching of Vehicle details using ANPR Camera
Automatic Fetching of Vehicle details using ANPR CameraAutomatic Fetching of Vehicle details using ANPR Camera
Automatic Fetching of Vehicle details using ANPR CameraIRJET Journal
 
toyota-Challenges towards New Software Platform for Automated Driving.pdf
toyota-Challenges towards New Software Platform for Automated Driving.pdftoyota-Challenges towards New Software Platform for Automated Driving.pdf
toyota-Challenges towards New Software Platform for Automated Driving.pdfxmumiao
 
CHALLANGES IN URBAN WATER SUPPLY PRESENTATION 15-09-2017.ppt
CHALLANGES IN URBAN WATER SUPPLY PRESENTATION 15-09-2017.pptCHALLANGES IN URBAN WATER SUPPLY PRESENTATION 15-09-2017.ppt
CHALLANGES IN URBAN WATER SUPPLY PRESENTATION 15-09-2017.pptRajeshGangwal
 
TRAFFIC VOLUME STUDIES
TRAFFIC VOLUME STUDIESTRAFFIC VOLUME STUDIES
TRAFFIC VOLUME STUDIEStp jayamohan
 

Similar to Dromas 2 presentation v4 (20)

IRC 9
IRC 9IRC 9
IRC 9
 
IRC 9
IRC 9IRC 9
IRC 9
 
CAV Smart Work Zones
CAV Smart Work ZonesCAV Smart Work Zones
CAV Smart Work Zones
 
Bransys GPS
Bransys GPSBransys GPS
Bransys GPS
 
IRJET- Review on Recent Traffic Signs in Lane Markings
IRJET- Review on Recent Traffic Signs in Lane MarkingsIRJET- Review on Recent Traffic Signs in Lane Markings
IRJET- Review on Recent Traffic Signs in Lane Markings
 
Gdmp model workshop 5 - structure of tim
Gdmp model workshop   5 - structure of timGdmp model workshop   5 - structure of tim
Gdmp model workshop 5 - structure of tim
 
DMUG 2016 - Michel Vedrenne, Ricardo Energy & Environment
DMUG 2016 - Michel Vedrenne, Ricardo Energy & EnvironmentDMUG 2016 - Michel Vedrenne, Ricardo Energy & Environment
DMUG 2016 - Michel Vedrenne, Ricardo Energy & Environment
 
Roadroid user guide version 2.3.2- pro 0.9, incl calibration appendix
Roadroid user guide version 2.3.2- pro 0.9, incl calibration appendixRoadroid user guide version 2.3.2- pro 0.9, incl calibration appendix
Roadroid user guide version 2.3.2- pro 0.9, incl calibration appendix
 
Building ssr 2013-14
Building ssr 2013-14Building ssr 2013-14
Building ssr 2013-14
 
Maximizing Conduit Manager For Electric Distribution
Maximizing Conduit Manager For Electric DistributionMaximizing Conduit Manager For Electric Distribution
Maximizing Conduit Manager For Electric Distribution
 
Geometric pavement model for computer-aided design of pavement maintenance ac...
Geometric pavement model for computer-aided design of pavement maintenance ac...Geometric pavement model for computer-aided design of pavement maintenance ac...
Geometric pavement model for computer-aided design of pavement maintenance ac...
 
Gis for cgd
Gis for cgdGis for cgd
Gis for cgd
 
Csr 2018-19-page-no-1-to-295
Csr 2018-19-page-no-1-to-295Csr 2018-19-page-no-1-to-295
Csr 2018-19-page-no-1-to-295
 
Diagrama electrico volvo c30 2008
Diagrama electrico volvo c30 2008Diagrama electrico volvo c30 2008
Diagrama electrico volvo c30 2008
 
Traffic Volume Study And Congestion Solution Using VisSim Software
Traffic Volume Study And Congestion Solution Using VisSim SoftwareTraffic Volume Study And Congestion Solution Using VisSim Software
Traffic Volume Study And Congestion Solution Using VisSim Software
 
CSBU
CSBUCSBU
CSBU
 
Automatic Fetching of Vehicle details using ANPR Camera
Automatic Fetching of Vehicle details using ANPR CameraAutomatic Fetching of Vehicle details using ANPR Camera
Automatic Fetching of Vehicle details using ANPR Camera
 
toyota-Challenges towards New Software Platform for Automated Driving.pdf
toyota-Challenges towards New Software Platform for Automated Driving.pdftoyota-Challenges towards New Software Platform for Automated Driving.pdf
toyota-Challenges towards New Software Platform for Automated Driving.pdf
 
CHALLANGES IN URBAN WATER SUPPLY PRESENTATION 15-09-2017.ppt
CHALLANGES IN URBAN WATER SUPPLY PRESENTATION 15-09-2017.pptCHALLANGES IN URBAN WATER SUPPLY PRESENTATION 15-09-2017.ppt
CHALLANGES IN URBAN WATER SUPPLY PRESENTATION 15-09-2017.ppt
 
TRAFFIC VOLUME STUDIES
TRAFFIC VOLUME STUDIESTRAFFIC VOLUME STUDIES
TRAFFIC VOLUME STUDIES
 

Recently uploaded

Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 

Recently uploaded (20)

Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 

Dromas 2 presentation v4

  • 1. District Roads Management System version 2 DROMAS 2 Presentation to Stakeholder Meeting PMORALG August 2015 CARDNO-IT TRANSPORT/arnold
  • 2. DROMAS 2 WHAT DOES IT DO? • Defines and records the District Road, bridge and culvert inventory in each district. • Shows roads on Map • Records road condition and tracks changes year by year. • Records Traffic Data and tracks changes year by year. • Allows Engineer to enter Annual work plan, agreed in Performance agreement. CARDNO-IT TRANSPORT/arnold
  • 3. DROMAS 2 WHAT DOES IT DO? • Allows engineer to package work into contracts (using MOW/TANROADS standard work items) and records contract details. • Allows Engineer to enter contract awarded prices and details • Allows engineer to Manage contracts and report progress. (can output to HMS or MIS) • Produces interim contract payment certificates • Produces monthly and quarterly reports at district , region and national level • Shows contract progress on Map. CARDNO-IT TRANSPORT/arnold
  • 5. Admin Menu: Users must login, select Region, select District/LGA and Fiscal year,. Passwords will be available to the DEs, RE, PMORALG HQ, and RFB. (different permissions for different users) Note: Different DC/TC/MC = Different user rights. CARDNO-IT TRANSPORT/arnold
  • 6. 'Load Geometry' to load geometry for a selected road editing is required to prepare clean shapefile in GIS from the GPS track. Engineer will use QGIS programme to do this and also add a column for the road code and enter the proper road code number. The geometry should be a clean shapefile in single part. Road Network The road network menu gives the engineer ability to add roads to network and adjust details. Geometry (shape line) of each road is also in this tool. CARDNO-IT TRANSPORT/arnold
  • 7. ARMP (Annual Road Maintenance Planning) The annual maintenance plan, entered by the engineer when Performance agreement is signed. includes the rates, systems for routine, recurrent, periodic, specific, bridge and emergency maintenance. Once entered view of summary of the annual maintenance works can be seen as list and on map. CARDNO-IT TRANSPORT/arnold
  • 8. ARMP-Annual Road Maintenance Program • Armp Rates-Armp Budgetary Rates-An Engineer Input Rates with relation to the respective rates for all activities. • Routine-Select Road-Here you select a road(with road code) and defining its work description with relation to the length covered of that specific activity.(Fill in the spaces rounded Blue colour) • Routine-Prepare Details-Here you prepare details of the activities and we keep the quantities of the details Fill in the spaces rounded Blue colour) CARDNO-IT TRANSPORT/arnold
  • 9. Summary Plan can be viewed at Regional and national level for overall picture CARDNO-IT TRANSPORT/arnold
  • 10. Contract Management Engineer packages the work into contracts and enters details in DROMAS. Details of the contract, BOQ, rates and contractor details are shown in the DROMAS and can be reported. CARDNO-IT TRANSPORT/arnold
  • 11. QPR (Quarterly Progress Report); Engineer puts in progress of work monthly and DROMAS automatically calculates payment due. DROMAS 2 Then shows the Quarterly Report at council and regional level. These reports can be viewed live by PMORALG HQ and RFB (view access only). CARDNO-IT TRANSPORT/arnold
  • 12. Cost System; Allows the Engineering to work out unit rates from basic costs, and adding appropriate overheads. DROMAS 2 will track these unit rates across the regions. CARDNO-IT TRANSPORT/arnold
  • 13. • Quarterly report for whole country CARDNO-IT TRANSPORT/arnold
  • 14. DROMAS Tracks interim payment certificates and quantities from contract paid for. As long as the Engineer has entered the figures into the reporting system. CARDNO-IT TRANSPORT/arnold
  • 15. DROMAS Map, DROMAS 2 is a GIS based system. That means all data stored is geo-referenced and can be shown on the map. The road inventory once entered by the engineer shows on the map. The work plan in the performance agreement APA shows on the map. Eventually as Engineer enters monthly progress of contracts it will show on the map. Map can be viewed with plain background or with, Google Physical, Google Streets, or google satelite CARDNO-IT TRANSPORT/arnold
  • 19. Infrastructure Development Division: Director’s Desk 2018 CARDNO-IT TRANSPORT/arnold
  • 20. Better Clear Roads Ahead Thank You CARDNO-IT TRANSPORT/arnold