MS.CPS3 Carport to be designed and installed Rev0.pdf
1. All details and information contained in this document are the property of Janwa General Contracting and Consultant Ltd. and cannot be used,
reproduced in whole or in part, without the written consent from the Managing Director.
JGC-19-PJT-2LD-001
Work Method Statement
CPS3 Carport to be designed and installed
01 3.3.2024 Mohammad Baqir Naji Raheem
Rev. Description Prepared Checked Approved ROO Approved
2. All details and information contained in this document are the property of Janwa General Contracting and Consultant Ltd. and cannot be used,
reproduced in whole or in part, without the written consent from the Managing Director.
Document ID Document Index Sheet of Sheets
JGC-19-PJT-2LD-001 REV01 03.03.2024 2 of 9
CPS3 Carport to be designed and installed
CONTENTS
1 TIMESCALE/RESOURCES.............................................................................................................................3
2 DEFINITIONS...................................................................................................................................................3
3 REFERENCES DOCUMENTS.........................................................................................................................3
4 TRAINING REQUIREMENTS..........................................................................................................................4
5 PERSONNEL ....................................................................................................................................................4
6 BASIC EQUIPMENTS.....................................................................................................................................4
7 PERSONAL PROTECTIVE EQUIPMENT.....................................................................................................5
8 WORK SEQUENCE.........................................................................................................................................5
9 METHODOLGY ...............................................................................................................................................5
10 GENERAL HEALTH AND RULES................................................................................................................6
3. All details and information contained in this document are the property of Janwa General Contracting and Consultant Ltd. and cannot be used,
reproduced in whole or in part, without the written consent from the Managing Director.
Document ID Document Index Sheet of Sheets
JGC-19-PJT-2LD-001 REV01 03.03.2024 3 of 9
Mechanical and Hot work at CPS's Station Pumps for support
correction and section, discharge lines
1 TIMESCALE/RESOURCES
a) Project duration is expected to be as table below:
Activity Estimate work days
Lifting Operation …asper L3P
Mechanical work …asper L3p
Hot work …asper L3p
b) Start date: ASAP from the client request
2 DEFINITIONS
Definitions
COMPANY BP Iraq (ROO)
PROJECT QA/WTP Injection and Water Treatment Plant CN103110
CONTRACTOR Janwa General Contracting & Consultancy Eng. Co. Ltd
3 REFERENCES DOCUMENTS
Doc Number Title
JGC-18-QPOL-01 JANWA Quality Policy
JGC-18-QM-01 JANWA Quality Manual
JGC-18-HSEPOL-01 Health Safety & Environment Policy
JGC-18-HSEM-01 Health Safety & Environment manual
Codes and Standards:
ISO 9000:2005 Quality management systems - Fundamentals and vocabulary
ISO 9001:2008 Quality management systems – Requirements
ISO 19011:2012 Guidelines for Quality and/or environmental management
system Auditing
4. All details and information contained in this document are the property of Janwa General Contracting and Consultant Ltd. and cannot be used,
reproduced in whole or in part, without the written consent from the Managing Director.
Document ID Document Index Sheet of Sheets
JGC-19-PJT-2LD-001 REV01 03.03.2024 4 of 9
Mechanical and Hot work at CPS's Station Pumps for support
correction and section, discharge lines
4 TRAINING REQUIREMENTS
a) Site OH&S Induction
b) MS induction training prior to the start of these works
c) Daily ‘Tool Box’ briefings before the start of work each day
5 PERSONNEL
The following personnel have been identified as required in order to carry out this work activity:
a) Site engineer
b) PA
c) Site HSE supervisor
d) Lifting Supervisor
e) Riggers
f) First Aider
g) Fire watcher
h) Scaffolder
i) Civil supervisor
j) carpenter
k) Fabricator
l) Welders and Grinders
m) Hiab operator
n) Flange managements team
o) Rescue team
p) Helpers
q) Electrical
7 BASIC EQUIPMENTS
1) Pick up, Starex, Pingo,
2) heab
3) manlift
4) Trailer
5. All details and information contained in this document are the property of Janwa General Contracting and Consultant Ltd. and cannot be used,
reproduced in whole or in part, without the written consent from the Managing Director.
Document ID Document Index Sheet of Sheets
JGC-19-PJT-2LD-001 REV01 03.03.2024 5 of 9
Mechanical and Hot work at CPS's Station Pumps for support
correction and section, discharge lines
5) Rescue equipes
6) Hiab
7) Kit first aider
8) Hand tools
9) Concrete mixer
10) Concreate pump
11) Generator and electrical power tools
12) Torque Equipment
6. All details and information contained in this document are the property of Janwa General Contracting and Consultant Ltd. and cannot be used,
reproduced in whole or in part, without the written consent from the Managing Director.
Document ID Document Index Sheet of Sheets
JGC-19-PJT-2LD-001 REV01 03.03.2024 6 of 9
Mechanical and Hot work at CPS's Station Pumps for support
correction and section, discharge lines
8 PERSONAL PROTECTIVE EQUIPMENT
Safety
Gloves
Hearing
Protection
Eye
Protection
Respiratory
Protection
Coveralls Other
Hi Vis-Vest
Hard Hats
Boots
Compactor Where
required
Yes Whdump
trucked
Yes Yes
9 WORK SEQUENCE
1. preparing all required and approve DOCs and design drawings
2. new design DWG has been released and approved by Roo (please see it below
3. clean and prepare the are -One caravan (4width*6length) lifting plan approved are required before lifting and
clean the area to be lifted (lifting plan is needed) to another area as shown by site manager
4. the old sunshield park needs to be HOT works cutting and removed to the scrap area.
5. cutting and removing the old existing carport as shown during site survey
6. civil works for foundation footing and strip foundation need to be done asper the designed DWG (5ranks of
car was requested and approved during site survey
7. delivering all prefab materials to the workshop
8. prefabrication works of sunshield need to be done asper the detailing DWG
(fabrication/welding/NDT/sandblast and painting)
9. car park shied will be contain 5 car rank (lenght-17.5meter /wide- 6meter Hight -3meter) with drain quitter at
the middle
10. -required casting floor concrete 20mx6m 15cm thick covering area below sunshield 20cm Thick with RC
meshing
11. installing all the prefab sunshield after finish all NDT and painting works
12. scaffolding towers for rescue platform and for attaching line during installation are required
13. HOT works during installation with Hiab lifting activity are required during installation
14. Bolt fixing and Paint touch and handover
15. job completion and handover work
7. All details and information contained in this document are the property of Janwa General Contracting and Consultant Ltd. and cannot be used,
reproduced in whole or in part, without the written consent from the Managing Director.
Document ID Document Index Sheet of Sheets
JGC-19-PJT-2LD-001 REV01 03.03.2024 7 of 9
Mechanical and Hot work at CPS's Station Pumps for support
correction and section, discharge lines
10 METHODOLGY
General
• All personnel entering the site shall have received a site safety induction and have attended a
job toolbox talk.
• Before any activity shall commence a work, a permit shall be issued by a site engineer, and all
persons involved in the task shall be fully briefed.
8. All details and information contained in this document are the property of Janwa General Contracting and Consultant Ltd. and cannot be used,
reproduced in whole or in part, without the written consent from the Managing Director.
Document ID Document Index Sheet of Sheets
JGC-19-PJT-2LD-001 REV01 03.03.2024 8 of 9
Mechanical and Hot work at CPS's Station Pumps for support
correction and section, discharge lines
Mobilization
• Upon Call- off received, Janwa start, mobilizing all equipment (including spare parts) and
personnel and tools to work locations.
• All equipment required at the clients’ location to perform the scope of works will be mobilized
from Janwa.
• While the equipment in on their relevant location is shall be visually inspected for damage in
transit.
• All Personnel will be mobilized to the Works location by road transport organized by Janwa.
• Logistical and Operational support will be provided from Janwa office in Basra, Iraq or from
our camp in North Rumaila during the operation.
Completion and Demobilization
• When all work was completed, and the task was successfully done remove all equipment and
tools from work area.
• Mobilize all equipment and personal from work location.
• Make sure housekeeping is done properly.
11 GENERAL HEALTH AND RULES
Training, Competence and Supervision
Janwa will ensure that all persons employed:
• Are trained and competent to carry out their duties.
• Provided with comprehensible information on the risks to health and safety.
• Instructed in the use of personal protective equipment.
• Fully consulted on all matters relating to the work that may affect their Health and
Safety.
Supervision
9. All details and information contained in this document are the property of Janwa General Contracting and Consultant Ltd. and cannot be used,
reproduced in whole or in part, without the written consent from the Managing Director.
Document ID Document Index Sheet of Sheets
JGC-19-PJT-2LD-001 REV01 03.03.2024 9 of 9
Mechanical and Hot work at CPS's Station Pumps for support
correction and section, discharge lines
The work will be under the supervision of:
1. Site engineer
2. PA
3. Site HSE supervisor
4. Lifting Supervisor
Communication
The Site Supervisor will communicate working method statements to all operatives and ensure
that the work is carried out safely according to written procedures. All site personnel will be
given site induction training covering all aspects of Health and Safety, relating to the relevant
tasks being undertaken. All personnel undergoing this training will sign to confirm that they
have received the induction. Induction records will be held on site. All Visitors will receive a
basic safety induction including site specific rules and emergency procedures.
Permits to work
The PA will issue the permit.
Working at height/R
N/A
First Aid
A fully stocked first aid box and eye wash will be kept on site for the treatment of minor
injuries. Injuries must be treated immediately and recorded in the accident book.
Monitoring
The Company’s Health & Safety Advisors will carry out Health & Safety Audits On a regular
basis with a written report. The Supervisor will carry out Tool Box Talks.
10. Tekla
structures
Drawing:
Status:
Project:
Size:
A3
CPS3-car park
DWG-JAN-002
ISO. VIEWS
3d View model
sheet3/3
SUBJECT:
PROJECT:
Date:
Designer:
Scale:
BUILDER:
19.02.2024
janwa company for oil and gas servises
1/105
CPS3-5 car ranks park sunshied Janwa desinger-MHR
Execution class:
Fabrication and erection acc. to
Effective tolerance class:
NEN-EN 1090-2:2018
XXX
XXX
View_03 (basic View)
1:13
A
A
B
B
C
C
D
D
E
E
F
1
1
2
2
3
3
11. Tekla
structures
Drawing:
Status:
Project:
Size:
A3
CPS3-car park
DWG-JAN-002
ISO. VIEWS
3d View model
sheet3/3
SUBJECT:
PROJECT:
Date:
Designer:
Scale:
BUILDER:
19.02.2024
janwa company for oil and gas servises
1/105
CPS3-5 car ranks park sunshied Janwa desinger-MHR
Execution class:
Fabrication and erection acc. to
Effective tolerance class:
NEN-EN 1090-2:2018
XXX
XXX
View_07 (basic View)
1:25
AXIS A
1:15 Detail A , 1:10
section B - B , 1:10
A
A
B
B
C
C
D
D
E
E
F
F
1 1
2 2
3 3
1
1
2
2
3
3
0 0
3.00 3.00
3.24 3.24
D
D
2 2
A A
2
2
940
402
3500 3500
3500
896
563
1012
DETAIL A
958
554
510
3500
3500
17500
926
main pipe coloumn 6inch pipe OD150*6 S235JR 4529
905 951 517
wave beam 2.5inch pipe 2039
1010
concreat foundation 750*750*500 500 750*750
12°
565
wave beam 2.5inch pipe 4171
R
4952
OD150*6
R
2015
B B
403
567
433
253
5000 1000
4478
981
611
3867
1296
2751
350
75
anchore bolt M22L225 250
main pipe coloumn 6inch pipe 4529 OD150*6
base plate 500x500x20 500 FLAT20*500
175
Nut anchore bolt 25 NUT_M22
concreat foundation 750*750*500 500 750*750 175
75
75
75
12. Tekla
structures
Drawing:
Status:
Project:
Size:
A3
CPS3-car park
DWG-JAN-002
ISO. VIEWS
3d View model
sheet3/3
SUBJECT:
PROJECT:
Date:
Designer:
Scale:
BUILDER:
19.02.2024
janwa company for oil and gas servises
1/105
CPS3-5 car ranks park sunshied Janwa desinger-MHR
Execution class:
Fabrication and erection acc. to
Effective tolerance class:
NEN-EN 1090-2:2018
XXX
XXX
0
1:50
3D
1:20
A
A
B
B
C
C
D
D
E
E
F
F
1 1
2 2
3 3
A
A
B
B
C
C
D
D
E
E
F
F
1 1
2 2
3 3
3151
1348
2750
OD150*6
main
pipe
coloumn
6inch
pipe
3500
3500
3500
3500
3500