3. 3
Gasbol
In construction
built
At the beginning, the only complementary supply source to the
national production was Bolivian Gas
Urucu
Manaus
NG Sources E&P
National Gas Production
The Bolivian
supply
dependency
compromises
national Natural
Gas consumption
4. 4
High variable demand
of Power market
dispatch
Flexible LNG Terminal
Low fix cost
required
Electric Power
High increase in
natural gas demand
Short term solution
required
Potential Demand
Restricted Supply
sources to domestic
market
Alternative sources
required
Offer
National NG market conditions leads to a flexibility concept
10. 10
The Flexibility Concept
Supply adjustment following Gas-Fired Power Generation
seasonality : flexible offer adjusted to a flexible demand;
Terminal and Regas ship interchangeability;
Regular LNG shipping using Regas ships;
Storage Capacity acceptance for LNG Carriers from 75.000 to
218.000 m³.
11. 11
Flexible and innovative Solution
LNG Carrier
FSRUJetty
Innovation:
• LNG Transfer between ships by a jetty
• First converted ship on the world.
12. 12
Gasbol
In construction
Built
After the LNG terminals construction and the pipeline network growth,
the Brazilian natural gas logistic system becomes integrated.
Urucu
Manaus
NG supply Guanabara
Bay LNG
Pecém LNG
E&P
National Production
Transport Pipeline network expansion
in 2010: + 3.817 Km
Total = 9.288 Km
On 2006 Brazilian
Government
classified LNG
terminal projects
as Priority.
13. 13
Termopernambuco
Gover. Leonel
BrizolaTermoceará
Terminal BGB
Fonte: Petrobras G&E
Regás BGB
Regás Pecém
16 a 26/01/2009 26 a 31/03/2009 14/04/2009 28 a 30/04/2009 16 a 30/06/2009
JAN MAR ABR ABR JUN JUL
UTE CE 633 290
ENDESA 821 440 1484 1403 1550
UTE PE 1155
UTE GLB 2503
UTE AC 980
JAN MAR ABR ABR JUN JUL
RegásPECEM 1355 780 880 2514 1872
Regás BGB 2955
Consumption Thermoelectrical mil m³/d CNG
Regasification mil m³/d CNG
MAR 09 ABR 09 JUL 09 JUL 09
Excellence → Golar Spirit 51946 50538
Golar Winter → Golar Spirit 18000
Shell Gemmata → Golar Spirit 124.340
LNG Transference m³
17/03/2009 21/04/2009
04 a 07/07/2009
Flexibility: All Operations until July 2009
Aureliano
Chaves
Transference
Regasification
Endesa
Fortaleza
Terminal Pecém
12 a16/07/2009
Regas + Transfer
15. 15
The Project was certified in all phases
Basic and Detailed Design
DNV Certification
Normas e padrões de entidades regulatórias
e da legislação brasileira
Jetty Construction
Commissioning and Tests
16. 16
Gas&Energy Executive
Director
Critical analysis meetings
General
Coordination of
Project Interfaces
Gas&Energy MARKETING
Supply and Charting Contracts
ENGINEERING
Design
Construction
Commissioning
TAG
Business Model
TRANSPETRO
Pre-Operation and
Operation
Gas & Energy LOGISTICS
Scheduling and Quality
Control
Gas&Energy CORPORATIVE
Regulation, Licensing,
Organization and Managing,
SAP, Communication
LAW and TAXES
Project Leaders BGB and
PECEM
DISTRIBUTION
Tug Boat and Maneuvering
Multidisciplinary and matrix task-force mobilization