PETROBRAS LNG Project
Antonio Luiz Fernandes dos Santos
General Manager
Gas&Power
PETROBRAS
2
Project Conception
3
Gasbol
In construction
built
At the beginning, the only complementary supply source to the
national production was Bolivian Gas
Urucu
Manaus
NG Sources E&P
National Gas Production
The Bolivian
supply
dependency
compromises
national Natural
Gas consumption
4
High variable demand
of Power market
dispatch
Flexible LNG Terminal
Low fix cost
required
Electric Power
High increase in
natural gas demand
Short term solution
required
Potential Demand
Restricted Supply
sources to domestic
market
Alternative sources
required
Offer
National NG market conditions leads to a flexibility concept
5
30 33 36 40 41 41 42 43 44 45 46 47
19
27
34
39
45 47 47 46 48 48 47 47
19
36
42
44
50 50
56
67
74 74 74 74
0
20
40
60
80
100
120
140
160
180
2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Industrial Demand Others Gas Fired Power Demand
Natural Gas: Supply x Demand Balance
2009 - 2020
millions m3/d @ 9.400 kcal/m3
SupplyxDemandBalance
PN 2009 - 2013
IndustrialOthersElectricGeneration
6
30 33 36 40 41 41 42 43 44 45 46 47
19
27
34
39
45 47 47 46 48 48 47 47
19
36
42
44
50 50
56
67
74 74 74 74
0
20
40
60
80
100
120
140
160
180
2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
National Supply Industrial Demand Others Gas Fired Power Demand
NationalSupply
millions m3/d @ 9.400 kcal/m3
Pre-Salt
PN 2009 - 2013
IndustrialOthersElectricGeneration
Natural Gas: Supply x Demand Balance
2009 - 2020
SupplyxDemandBalance
7
30 33 36 40 41 41 42 43 44 45 46 47
19
27
34
39
45 47 47 46 48 48 47 47
19
36
42
44
50 50
56
67
74 74 74 74
0
20
40
60
80
100
120
140
160
180
2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
National Supply Bolivian Supply LNG Additional LNG
Industrial Demand Others Gas Fired Powerplants
NationalSupplyBolívia
Pre-Salt
PN 2009 - 2013
IndustrialOthersGasFiredPower
Natural Gas: Supply x Demand Balance
2009 - 2020
SupplyxDemandBalance
millions m3/d @ 9.400 kcal/m3
8
30 33 36 40 41 41 42 43 44 45 46 47
19
27
34
39
45 47 47 46 48 48 47 47
19
36
42
44
50 50
56
67
74 74 74 74
0
20
40
60
80
100
120
140
160
180
2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
National Supply Bolivian Supply LNG Industrial Demand Others Gas Fired Power Demand
NationalSupplyBolíviaLNG
Pre-Salt
PN 2009 - 2013
IndustrialOthersElectricGeneration
SupplyxDemandBalance
millions m3/d @ 9.400 kcal/m3
Natural Gas: Supply x Demand Balance
2009 - 2020
9
30 33 36 40 41 41 42 43 44 45 46 47
19
27
34
39
45 47 47 46 48 48 47 47
19
36
42
44
50 50
56
67
74 74 74 74
0
20
40
60
80
100
120
140
160
180
2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
National Supply Bolivian Supply LNG Aditional LNG
Industrial Demand Others Gas Fire Power Demand
IndustrialOthersElectricPower
NationalSuppyBolíviaLNG
Aditional
LNG
Pré-Sal
PN 2009 - 2013
SupplyxDemandBalance
millions m3/d @ 9.400 kcal/m3
Natural Gas: Supply x Demand Balance
2009 - 2020
10
The Flexibility Concept
Supply adjustment following Gas-Fired Power Generation
seasonality : flexible offer adjusted to a flexible demand;
Terminal and Regas ship interchangeability;
Regular LNG shipping using Regas ships;
Storage Capacity acceptance for LNG Carriers from 75.000 to
218.000 m³.
11
Flexible and innovative Solution
LNG Carrier
FSRUJetty
Innovation:
• LNG Transfer between ships by a jetty
• First converted ship on the world.
12
Gasbol
In construction
Built
After the LNG terminals construction and the pipeline network growth,
the Brazilian natural gas logistic system becomes integrated.
Urucu
Manaus
NG supply Guanabara
Bay LNG
Pecém LNG
E&P
National Production
Transport Pipeline network expansion
in 2010: + 3.817 Km
Total = 9.288 Km
On 2006 Brazilian
Government
classified LNG
terminal projects
as Priority.
13
Termopernambuco
Gover. Leonel
BrizolaTermoceará
Terminal BGB
Fonte: Petrobras G&E
Regás BGB
Regás Pecém
16 a 26/01/2009 26 a 31/03/2009 14/04/2009 28 a 30/04/2009 16 a 30/06/2009
JAN MAR ABR ABR JUN JUL
UTE CE 633 290
ENDESA 821 440 1484 1403 1550
UTE PE 1155
UTE GLB 2503
UTE AC 980
JAN MAR ABR ABR JUN JUL
RegásPECEM 1355 780 880 2514 1872
Regás BGB 2955
Consumption Thermoelectrical mil m³/d CNG
Regasification mil m³/d CNG
MAR 09 ABR 09 JUL 09 JUL 09
Excellence → Golar Spirit 51946 50538
Golar Winter → Golar Spirit 18000
Shell Gemmata → Golar Spirit 124.340
LNG Transference m³
17/03/2009 21/04/2009
04 a 07/07/2009
Flexibility: All Operations until July 2009
Aureliano
Chaves
Transference
Regasification
Endesa
Fortaleza
Terminal Pecém
12 a16/07/2009
Regas + Transfer
14
Analysis for all project phases, focused in terminal operational
safety
Conceptual
Design
Basic
Design
Detailed
Design Assembly
Preliminary
Analysis
Hazop Hazid
Fluid Dynamics
Procedures
Operation Manual
TRANSPETRO
LNG Flexible Terminal
Jetty Risk analysis
Risk
Analisys
Project
Evolution
15
The Project was certified in all phases
Basic and Detailed Design
DNV Certification
Normas e padrões de entidades regulatórias
e da legislação brasileira
Jetty Construction
Commissioning and Tests
16
Gas&Energy Executive
Director
Critical analysis meetings
General
Coordination of
Project Interfaces
Gas&Energy MARKETING
Supply and Charting Contracts
ENGINEERING
Design
Construction
Commissioning
TAG
Business Model
TRANSPETRO
Pre-Operation and
Operation
Gas & Energy LOGISTICS
Scheduling and Quality
Control
Gas&Energy CORPORATIVE
Regulation, Licensing,
Organization and Managing,
SAP, Communication
LAW and TAXES
Project Leaders BGB and
PECEM
DISTRIBUTION
Tug Boat and Maneuvering
Multidisciplinary and matrix task-force mobilization
17
Main Milestones
Construction
Commissioning
Pre-Operation
18
Pecém LNG Terminal
Removal of liquid transfer loading arms for jetty conversion
27/01/2008
19
Pecém LNG Terminal
New lifted platform
24/04/2008
20
Pecém LNG Terminal
20 km length pipeline interconnection
30/4/2008
21
Pecém LNG Terminal
Control Room up-grade
10/05/2008
22
Pecém LNG Terminal
LNG Loading and CNG sendout arms and other facilities installed
22/7/2008
23
Pecém LNG Terminal
Control Room finished
28/07/2008
24
Pecém LNG Terminal
1st LNG regasification terminal: finished on October 2008, (spent 10 months)
02/04/2009
25
Pecém LNG Terminal
FRSU Golar Spirit and LNG Carrier Excellence docked
6/4/2009
26
Pecém LNG Terminal
FRSU Golar Spirit connected and Golar Winter as a Carrier, docking
4/7/2009
27
Pecém LNG Terminal
1st simultaneous operation of LNG Transference and Regasification
4/7/2009
28
Guanabara Bay LNG Terminal
Embedding of the first pile
28/1/2008
29
Guanabara Bay LNG Terminal
First piles installed. Terminal constructed over 266 piles
19/2/2008
30
Guanabara Bay LNG Terminal
Terminal platform construction
08/5/2008
31
Guanabara Bay LNG Terminal
Stretch of submersed gas pipeline: 10 km length
11/4/2008
32
Guanabara Bay LNG Terminal
Terminal Platform concreted
08/8/2008
33
Guanabara Bay LNG Terminal
LNG Loading and CNG sendout arms and other facilities installed
19/9/2008
34
Guanabara Bay LNG Terminal
Control Room : explosion proof building
28/1/2009
35
Guanabara Bay LNG Terminal
Concluded on January 2009, spending 12 months
28/1/2009
36
Guanabara Bay LNG Terminal
FRSU Golar Spirit docking for commissioning
11/3/2009
37
Guanabara Bay LNG Terminal
FRSU Golar Spirit and LNG Carrier Excellence docked on terminal
16/3/2009
38
Guanabara Bay LNG Terminal
1st LNG Transference between LNG Carrier Excellence and FRSU Golar Spirit
18/3/2009
39
Guanabara Bay LNG Terminal
1st Regasification using FRSU Golar Spirit
26/3/2009
40
Thank you !
PETROBRAS LNG Project

More Related Content

What's hot

Technical Prospects of Floating LNG
Technical Prospects of Floating LNGTechnical Prospects of Floating LNG
Technical Prospects of Floating LNGRonak Sani
 
Cingsa commonwealth north energy action coalition 11012012
Cingsa   commonwealth north energy action coalition 11012012Cingsa   commonwealth north energy action coalition 11012012
Cingsa commonwealth north energy action coalition 11012012Alaska Energy Dudes and Divas
 
LNG in Transportation Executive Summary
LNG in Transportation Executive SummaryLNG in Transportation Executive Summary
LNG in Transportation Executive SummaryPaul Cassar
 
130718 ditmeyer natural gas locomotives - trb
130718 ditmeyer   natural gas locomotives - trb 130718 ditmeyer   natural gas locomotives - trb
130718 ditmeyer natural gas locomotives - trb Stephanie Camay
 
Plg rail trends 2014 presentation final
Plg rail trends 2014 presentation finalPlg rail trends 2014 presentation final
Plg rail trends 2014 presentation finalPLG Consulting
 
Lng regasification asit
Lng regasification asitLng regasification asit
Lng regasification asitAsit Meher
 
FSRU Technology & Project Development
FSRU Technology & Project DevelopmentFSRU Technology & Project Development
FSRU Technology & Project DevelopmentWalter Lee
 
Introduction to Floating Storage & Regasification Unit (FSRU)
Introduction to Floating Storage & Regasification Unit (FSRU)Introduction to Floating Storage & Regasification Unit (FSRU)
Introduction to Floating Storage & Regasification Unit (FSRU)petroEDGE
 
alternative fuel for marine engines
alternative fuel for marine enginesalternative fuel for marine engines
alternative fuel for marine enginesDelwin CK
 
Stewart - Reducing Emissions in the Marine Transportation Sector
Stewart - Reducing Emissions in the Marine Transportation SectorStewart - Reducing Emissions in the Marine Transportation Sector
Stewart - Reducing Emissions in the Marine Transportation SectorEnvironmental Initiative
 
Lng bunkering china status report January 2016
Lng bunkering china status report January 2016Lng bunkering china status report January 2016
Lng bunkering china status report January 2016Dan-Hermann Thue
 
Man diesel & turbo – man 175 d
Man diesel & turbo – man 175 dMan diesel & turbo – man 175 d
Man diesel & turbo – man 175 dBeena Al
 
2014 Enbridge Day - Liquids Pipelines
2014 Enbridge Day - Liquids Pipelines2014 Enbridge Day - Liquids Pipelines
2014 Enbridge Day - Liquids PipelinesEnbridge Inc.
 

What's hot (20)

Technical Prospects of Floating LNG
Technical Prospects of Floating LNGTechnical Prospects of Floating LNG
Technical Prospects of Floating LNG
 
API CNG LNG
API CNG LNGAPI CNG LNG
API CNG LNG
 
Natural Gas Basics Webinar
Natural Gas Basics WebinarNatural Gas Basics Webinar
Natural Gas Basics Webinar
 
LNG Ready
LNG ReadyLNG Ready
LNG Ready
 
FSRU_projects
FSRU_projectsFSRU_projects
FSRU_projects
 
Lng use in trucking
Lng use in truckingLng use in trucking
Lng use in trucking
 
Cingsa commonwealth north energy action coalition 11012012
Cingsa   commonwealth north energy action coalition 11012012Cingsa   commonwealth north energy action coalition 11012012
Cingsa commonwealth north energy action coalition 11012012
 
Liquefied Natural Gas (LNG) Life Cycle
Liquefied Natural Gas (LNG) Life CycleLiquefied Natural Gas (LNG) Life Cycle
Liquefied Natural Gas (LNG) Life Cycle
 
LNG in Transportation Executive Summary
LNG in Transportation Executive SummaryLNG in Transportation Executive Summary
LNG in Transportation Executive Summary
 
130718 ditmeyer natural gas locomotives - trb
130718 ditmeyer   natural gas locomotives - trb 130718 ditmeyer   natural gas locomotives - trb
130718 ditmeyer natural gas locomotives - trb
 
Plg rail trends 2014 presentation final
Plg rail trends 2014 presentation finalPlg rail trends 2014 presentation final
Plg rail trends 2014 presentation final
 
Lng regasification asit
Lng regasification asitLng regasification asit
Lng regasification asit
 
FSRU Technology & Project Development
FSRU Technology & Project DevelopmentFSRU Technology & Project Development
FSRU Technology & Project Development
 
Introduction to Floating Storage & Regasification Unit (FSRU)
Introduction to Floating Storage & Regasification Unit (FSRU)Introduction to Floating Storage & Regasification Unit (FSRU)
Introduction to Floating Storage & Regasification Unit (FSRU)
 
alternative fuel for marine engines
alternative fuel for marine enginesalternative fuel for marine engines
alternative fuel for marine engines
 
Man diesel & turbo
Man diesel & turboMan diesel & turbo
Man diesel & turbo
 
Stewart - Reducing Emissions in the Marine Transportation Sector
Stewart - Reducing Emissions in the Marine Transportation SectorStewart - Reducing Emissions in the Marine Transportation Sector
Stewart - Reducing Emissions in the Marine Transportation Sector
 
Lng bunkering china status report January 2016
Lng bunkering china status report January 2016Lng bunkering china status report January 2016
Lng bunkering china status report January 2016
 
Man diesel & turbo – man 175 d
Man diesel & turbo – man 175 dMan diesel & turbo – man 175 d
Man diesel & turbo – man 175 d
 
2014 Enbridge Day - Liquids Pipelines
2014 Enbridge Day - Liquids Pipelines2014 Enbridge Day - Liquids Pipelines
2014 Enbridge Day - Liquids Pipelines
 

Viewers also liked

Alaska LNG Project Update (10.30.2015)
Alaska LNG Project Update (10.30.2015)Alaska LNG Project Update (10.30.2015)
Alaska LNG Project Update (10.30.2015)Brad Keithley
 
SMi Group's Oil and Gas Telecommunications conference 2016
SMi Group's Oil and Gas Telecommunications conference 2016SMi Group's Oil and Gas Telecommunications conference 2016
SMi Group's Oil and Gas Telecommunications conference 2016Dale Butler
 
Global LNG bunkering infrastructure as of January 2014
Global LNG bunkering infrastructure as of January 2014Global LNG bunkering infrastructure as of January 2014
Global LNG bunkering infrastructure as of January 2014Lars Petter Blikom
 
PD185 LNG Terminal Operations
PD185 LNG Terminal OperationsPD185 LNG Terminal Operations
PD185 LNG Terminal OperationspetroEDGE
 
Siemens oil and gas 2016 LACT unit
Siemens oil and gas 2016 LACT unitSiemens oil and gas 2016 LACT unit
Siemens oil and gas 2016 LACT unitDMC, Inc.
 
Cabot Oil & Gas EnerCom Presentation - Aug 2016
Cabot Oil & Gas EnerCom Presentation - Aug 2016Cabot Oil & Gas EnerCom Presentation - Aug 2016
Cabot Oil & Gas EnerCom Presentation - Aug 2016Marcellus Drilling News
 
Oil & Gas ICT 2015
Oil & Gas ICT 2015Oil & Gas ICT 2015
Oil & Gas ICT 2015Ray Bugg
 
Oil & Gas ICT Leader 2016
Oil & Gas ICT Leader 2016Oil & Gas ICT Leader 2016
Oil & Gas ICT Leader 2016Ray Bugg
 
“The Digital Oilfield” : Using IoT to reduce costs in an era of decreasing oi...
“The Digital Oilfield” : Using IoT to reduce costs in an era of decreasing oi...“The Digital Oilfield” : Using IoT to reduce costs in an era of decreasing oi...
“The Digital Oilfield” : Using IoT to reduce costs in an era of decreasing oi...Karthikeyan Rajamanickam
 
Digital Future of Oil & Gas
Digital Future of Oil & GasDigital Future of Oil & Gas
Digital Future of Oil & GasHarjit Birdi
 

Viewers also liked (10)

Alaska LNG Project Update (10.30.2015)
Alaska LNG Project Update (10.30.2015)Alaska LNG Project Update (10.30.2015)
Alaska LNG Project Update (10.30.2015)
 
SMi Group's Oil and Gas Telecommunications conference 2016
SMi Group's Oil and Gas Telecommunications conference 2016SMi Group's Oil and Gas Telecommunications conference 2016
SMi Group's Oil and Gas Telecommunications conference 2016
 
Global LNG bunkering infrastructure as of January 2014
Global LNG bunkering infrastructure as of January 2014Global LNG bunkering infrastructure as of January 2014
Global LNG bunkering infrastructure as of January 2014
 
PD185 LNG Terminal Operations
PD185 LNG Terminal OperationsPD185 LNG Terminal Operations
PD185 LNG Terminal Operations
 
Siemens oil and gas 2016 LACT unit
Siemens oil and gas 2016 LACT unitSiemens oil and gas 2016 LACT unit
Siemens oil and gas 2016 LACT unit
 
Cabot Oil & Gas EnerCom Presentation - Aug 2016
Cabot Oil & Gas EnerCom Presentation - Aug 2016Cabot Oil & Gas EnerCom Presentation - Aug 2016
Cabot Oil & Gas EnerCom Presentation - Aug 2016
 
Oil & Gas ICT 2015
Oil & Gas ICT 2015Oil & Gas ICT 2015
Oil & Gas ICT 2015
 
Oil & Gas ICT Leader 2016
Oil & Gas ICT Leader 2016Oil & Gas ICT Leader 2016
Oil & Gas ICT Leader 2016
 
“The Digital Oilfield” : Using IoT to reduce costs in an era of decreasing oi...
“The Digital Oilfield” : Using IoT to reduce costs in an era of decreasing oi...“The Digital Oilfield” : Using IoT to reduce costs in an era of decreasing oi...
“The Digital Oilfield” : Using IoT to reduce costs in an era of decreasing oi...
 
Digital Future of Oil & Gas
Digital Future of Oil & GasDigital Future of Oil & Gas
Digital Future of Oil & Gas
 

Similar to PETROBRAS LNG PROJECT

Options for gas to power in South Africa
Options for gas to power in South AfricaOptions for gas to power in South Africa
Options for gas to power in South AfricaNicholas Newman
 
Gasoducto Sur Peruano en Calgary
Gasoducto Sur Peruano en CalgaryGasoducto Sur Peruano en Calgary
Gasoducto Sur Peruano en CalgaryErnesto Linares
 
Pipeline Design Philosophy
Pipeline Design PhilosophyPipeline Design Philosophy
Pipeline Design PhilosophyRAPHAEL AGORUA
 
Xebec Biogas 2010 Presentation
Xebec Biogas 2010 PresentationXebec Biogas 2010 Presentation
Xebec Biogas 2010 Presentationsorschak
 
Karachaganak overview WKIF Aktau 25.09.12 Eng Rev-4
Karachaganak overview WKIF Aktau  25.09.12 Eng Rev-4Karachaganak overview WKIF Aktau  25.09.12 Eng Rev-4
Karachaganak overview WKIF Aktau 25.09.12 Eng Rev-4Mihai Dragne
 
Slides from Launch of Medium-Term Gas Market Report 2013
Slides from Launch of Medium-Term Gas Market Report 2013Slides from Launch of Medium-Term Gas Market Report 2013
Slides from Launch of Medium-Term Gas Market Report 2013Marcellus Drilling News
 
PIPELINE DESIGN, INTEGRITY AND RELIABILITY REPORT
PIPELINE DESIGN, INTEGRITY AND RELIABILITY REPORTPIPELINE DESIGN, INTEGRITY AND RELIABILITY REPORT
PIPELINE DESIGN, INTEGRITY AND RELIABILITY REPORTRAPHAEL AGORUA
 
Pipeline Design Report
Pipeline Design ReportPipeline Design Report
Pipeline Design ReportRAPHAEL AGORUA
 
David harbord (consultor creg) upstream issues in the colombian natural gas...
David harbord (consultor creg)   upstream issues in the colombian natural gas...David harbord (consultor creg)   upstream issues in the colombian natural gas...
David harbord (consultor creg) upstream issues in the colombian natural gas...Naturgas
 
Exploration & Production of Oil and Gas in Brazil no Offshore Technology Conf...
Exploration & Production of Oil and Gas in Brazil no Offshore Technology Conf...Exploration & Production of Oil and Gas in Brazil no Offshore Technology Conf...
Exploration & Production of Oil and Gas in Brazil no Offshore Technology Conf...ascommme
 
Eagle LNG Terminal and Pipeline - Efficient solutions for the Balkans
Eagle LNG Terminal and Pipeline - Efficient solutions for the BalkansEagle LNG Terminal and Pipeline - Efficient solutions for the Balkans
Eagle LNG Terminal and Pipeline - Efficient solutions for the BalkansAlbania Energy Association
 
Ensuring Affordable Fuel Security for NTPC - Presentation
Ensuring Affordable Fuel Security for NTPC - PresentationEnsuring Affordable Fuel Security for NTPC - Presentation
Ensuring Affordable Fuel Security for NTPC - PresentationSantosh Verma
 
565292229-Tenaris-Presentation-Sinopec-Nov-2019-rev2.pptx
565292229-Tenaris-Presentation-Sinopec-Nov-2019-rev2.pptx565292229-Tenaris-Presentation-Sinopec-Nov-2019-rev2.pptx
565292229-Tenaris-Presentation-Sinopec-Nov-2019-rev2.pptxLe Hoang Phong
 

Similar to PETROBRAS LNG PROJECT (20)

Platform for the Transformation of the Energy Sector: by Senator the Honourab...
Platform for the Transformation of the Energy Sector: by Senator the Honourab...Platform for the Transformation of the Energy Sector: by Senator the Honourab...
Platform for the Transformation of the Energy Sector: by Senator the Honourab...
 
Options for gas to power in South Africa
Options for gas to power in South AfricaOptions for gas to power in South Africa
Options for gas to power in South Africa
 
Gasoducto Sur Peruano en Calgary
Gasoducto Sur Peruano en CalgaryGasoducto Sur Peruano en Calgary
Gasoducto Sur Peruano en Calgary
 
Pipeline Design Philosophy
Pipeline Design PhilosophyPipeline Design Philosophy
Pipeline Design Philosophy
 
Pipeline Design
Pipeline Design Pipeline Design
Pipeline Design
 
Xebec Biogas 2010 Presentation
Xebec Biogas 2010 PresentationXebec Biogas 2010 Presentation
Xebec Biogas 2010 Presentation
 
Cook inlet natural gas the way forward
Cook inlet natural gas the way forwardCook inlet natural gas the way forward
Cook inlet natural gas the way forward
 
Karachaganak overview WKIF Aktau 25.09.12 Eng Rev-4
Karachaganak overview WKIF Aktau  25.09.12 Eng Rev-4Karachaganak overview WKIF Aktau  25.09.12 Eng Rev-4
Karachaganak overview WKIF Aktau 25.09.12 Eng Rev-4
 
Slides from Launch of Medium-Term Gas Market Report 2013
Slides from Launch of Medium-Term Gas Market Report 2013Slides from Launch of Medium-Term Gas Market Report 2013
Slides from Launch of Medium-Term Gas Market Report 2013
 
PIPELINE DESIGN, INTEGRITY AND RELIABILITY REPORT
PIPELINE DESIGN, INTEGRITY AND RELIABILITY REPORTPIPELINE DESIGN, INTEGRITY AND RELIABILITY REPORT
PIPELINE DESIGN, INTEGRITY AND RELIABILITY REPORT
 
Pipeline Design Report
Pipeline Design ReportPipeline Design Report
Pipeline Design Report
 
David harbord (consultor creg) upstream issues in the colombian natural gas...
David harbord (consultor creg)   upstream issues in the colombian natural gas...David harbord (consultor creg)   upstream issues in the colombian natural gas...
David harbord (consultor creg) upstream issues in the colombian natural gas...
 
LNG as fuel innovation 220618
LNG as fuel innovation 220618LNG as fuel innovation 220618
LNG as fuel innovation 220618
 
Exploration & Production of Oil and Gas in Brazil no Offshore Technology Conf...
Exploration & Production of Oil and Gas in Brazil no Offshore Technology Conf...Exploration & Production of Oil and Gas in Brazil no Offshore Technology Conf...
Exploration & Production of Oil and Gas in Brazil no Offshore Technology Conf...
 
Eagle LNG Terminal and Pipeline - Efficient solutions for the Balkans
Eagle LNG Terminal and Pipeline - Efficient solutions for the BalkansEagle LNG Terminal and Pipeline - Efficient solutions for the Balkans
Eagle LNG Terminal and Pipeline - Efficient solutions for the Balkans
 
DNV report: How LNG takes shape
DNV report: How LNG takes shapeDNV report: How LNG takes shape
DNV report: How LNG takes shape
 
Ensuring Affordable Fuel Security for NTPC - Presentation
Ensuring Affordable Fuel Security for NTPC - PresentationEnsuring Affordable Fuel Security for NTPC - Presentation
Ensuring Affordable Fuel Security for NTPC - Presentation
 
Mozambique the emergence of a giant in natural gas
Mozambique the emergence of a giant in natural gasMozambique the emergence of a giant in natural gas
Mozambique the emergence of a giant in natural gas
 
565292229-Tenaris-Presentation-Sinopec-Nov-2019-rev2.pptx
565292229-Tenaris-Presentation-Sinopec-Nov-2019-rev2.pptx565292229-Tenaris-Presentation-Sinopec-Nov-2019-rev2.pptx
565292229-Tenaris-Presentation-Sinopec-Nov-2019-rev2.pptx
 
QATAR GAS
QATAR GASQATAR GAS
QATAR GAS
 

PETROBRAS LNG PROJECT

  • 1. 1 PETROBRAS LNG Project Antonio Luiz Fernandes dos Santos General Manager Gas&Power PETROBRAS
  • 3. 3 Gasbol In construction built At the beginning, the only complementary supply source to the national production was Bolivian Gas Urucu Manaus NG Sources E&P National Gas Production The Bolivian supply dependency compromises national Natural Gas consumption
  • 4. 4 High variable demand of Power market dispatch Flexible LNG Terminal Low fix cost required Electric Power High increase in natural gas demand Short term solution required Potential Demand Restricted Supply sources to domestic market Alternative sources required Offer National NG market conditions leads to a flexibility concept
  • 5. 5 30 33 36 40 41 41 42 43 44 45 46 47 19 27 34 39 45 47 47 46 48 48 47 47 19 36 42 44 50 50 56 67 74 74 74 74 0 20 40 60 80 100 120 140 160 180 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Industrial Demand Others Gas Fired Power Demand Natural Gas: Supply x Demand Balance 2009 - 2020 millions m3/d @ 9.400 kcal/m3 SupplyxDemandBalance PN 2009 - 2013 IndustrialOthersElectricGeneration
  • 6. 6 30 33 36 40 41 41 42 43 44 45 46 47 19 27 34 39 45 47 47 46 48 48 47 47 19 36 42 44 50 50 56 67 74 74 74 74 0 20 40 60 80 100 120 140 160 180 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 National Supply Industrial Demand Others Gas Fired Power Demand NationalSupply millions m3/d @ 9.400 kcal/m3 Pre-Salt PN 2009 - 2013 IndustrialOthersElectricGeneration Natural Gas: Supply x Demand Balance 2009 - 2020 SupplyxDemandBalance
  • 7. 7 30 33 36 40 41 41 42 43 44 45 46 47 19 27 34 39 45 47 47 46 48 48 47 47 19 36 42 44 50 50 56 67 74 74 74 74 0 20 40 60 80 100 120 140 160 180 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 National Supply Bolivian Supply LNG Additional LNG Industrial Demand Others Gas Fired Powerplants NationalSupplyBolívia Pre-Salt PN 2009 - 2013 IndustrialOthersGasFiredPower Natural Gas: Supply x Demand Balance 2009 - 2020 SupplyxDemandBalance millions m3/d @ 9.400 kcal/m3
  • 8. 8 30 33 36 40 41 41 42 43 44 45 46 47 19 27 34 39 45 47 47 46 48 48 47 47 19 36 42 44 50 50 56 67 74 74 74 74 0 20 40 60 80 100 120 140 160 180 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 National Supply Bolivian Supply LNG Industrial Demand Others Gas Fired Power Demand NationalSupplyBolíviaLNG Pre-Salt PN 2009 - 2013 IndustrialOthersElectricGeneration SupplyxDemandBalance millions m3/d @ 9.400 kcal/m3 Natural Gas: Supply x Demand Balance 2009 - 2020
  • 9. 9 30 33 36 40 41 41 42 43 44 45 46 47 19 27 34 39 45 47 47 46 48 48 47 47 19 36 42 44 50 50 56 67 74 74 74 74 0 20 40 60 80 100 120 140 160 180 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 National Supply Bolivian Supply LNG Aditional LNG Industrial Demand Others Gas Fire Power Demand IndustrialOthersElectricPower NationalSuppyBolíviaLNG Aditional LNG Pré-Sal PN 2009 - 2013 SupplyxDemandBalance millions m3/d @ 9.400 kcal/m3 Natural Gas: Supply x Demand Balance 2009 - 2020
  • 10. 10 The Flexibility Concept Supply adjustment following Gas-Fired Power Generation seasonality : flexible offer adjusted to a flexible demand; Terminal and Regas ship interchangeability; Regular LNG shipping using Regas ships; Storage Capacity acceptance for LNG Carriers from 75.000 to 218.000 m³.
  • 11. 11 Flexible and innovative Solution LNG Carrier FSRUJetty Innovation: • LNG Transfer between ships by a jetty • First converted ship on the world.
  • 12. 12 Gasbol In construction Built After the LNG terminals construction and the pipeline network growth, the Brazilian natural gas logistic system becomes integrated. Urucu Manaus NG supply Guanabara Bay LNG Pecém LNG E&P National Production Transport Pipeline network expansion in 2010: + 3.817 Km Total = 9.288 Km On 2006 Brazilian Government classified LNG terminal projects as Priority.
  • 13. 13 Termopernambuco Gover. Leonel BrizolaTermoceará Terminal BGB Fonte: Petrobras G&E Regás BGB Regás Pecém 16 a 26/01/2009 26 a 31/03/2009 14/04/2009 28 a 30/04/2009 16 a 30/06/2009 JAN MAR ABR ABR JUN JUL UTE CE 633 290 ENDESA 821 440 1484 1403 1550 UTE PE 1155 UTE GLB 2503 UTE AC 980 JAN MAR ABR ABR JUN JUL RegásPECEM 1355 780 880 2514 1872 Regás BGB 2955 Consumption Thermoelectrical mil m³/d CNG Regasification mil m³/d CNG MAR 09 ABR 09 JUL 09 JUL 09 Excellence → Golar Spirit 51946 50538 Golar Winter → Golar Spirit 18000 Shell Gemmata → Golar Spirit 124.340 LNG Transference m³ 17/03/2009 21/04/2009 04 a 07/07/2009 Flexibility: All Operations until July 2009 Aureliano Chaves Transference Regasification Endesa Fortaleza Terminal Pecém 12 a16/07/2009 Regas + Transfer
  • 14. 14 Analysis for all project phases, focused in terminal operational safety Conceptual Design Basic Design Detailed Design Assembly Preliminary Analysis Hazop Hazid Fluid Dynamics Procedures Operation Manual TRANSPETRO LNG Flexible Terminal Jetty Risk analysis Risk Analisys Project Evolution
  • 15. 15 The Project was certified in all phases Basic and Detailed Design DNV Certification Normas e padrões de entidades regulatórias e da legislação brasileira Jetty Construction Commissioning and Tests
  • 16. 16 Gas&Energy Executive Director Critical analysis meetings General Coordination of Project Interfaces Gas&Energy MARKETING Supply and Charting Contracts ENGINEERING Design Construction Commissioning TAG Business Model TRANSPETRO Pre-Operation and Operation Gas & Energy LOGISTICS Scheduling and Quality Control Gas&Energy CORPORATIVE Regulation, Licensing, Organization and Managing, SAP, Communication LAW and TAXES Project Leaders BGB and PECEM DISTRIBUTION Tug Boat and Maneuvering Multidisciplinary and matrix task-force mobilization
  • 18. 18 Pecém LNG Terminal Removal of liquid transfer loading arms for jetty conversion 27/01/2008
  • 19. 19 Pecém LNG Terminal New lifted platform 24/04/2008
  • 20. 20 Pecém LNG Terminal 20 km length pipeline interconnection 30/4/2008
  • 21. 21 Pecém LNG Terminal Control Room up-grade 10/05/2008
  • 22. 22 Pecém LNG Terminal LNG Loading and CNG sendout arms and other facilities installed 22/7/2008
  • 23. 23 Pecém LNG Terminal Control Room finished 28/07/2008
  • 24. 24 Pecém LNG Terminal 1st LNG regasification terminal: finished on October 2008, (spent 10 months) 02/04/2009
  • 25. 25 Pecém LNG Terminal FRSU Golar Spirit and LNG Carrier Excellence docked 6/4/2009
  • 26. 26 Pecém LNG Terminal FRSU Golar Spirit connected and Golar Winter as a Carrier, docking 4/7/2009
  • 27. 27 Pecém LNG Terminal 1st simultaneous operation of LNG Transference and Regasification 4/7/2009
  • 28. 28 Guanabara Bay LNG Terminal Embedding of the first pile 28/1/2008
  • 29. 29 Guanabara Bay LNG Terminal First piles installed. Terminal constructed over 266 piles 19/2/2008
  • 30. 30 Guanabara Bay LNG Terminal Terminal platform construction 08/5/2008
  • 31. 31 Guanabara Bay LNG Terminal Stretch of submersed gas pipeline: 10 km length 11/4/2008
  • 32. 32 Guanabara Bay LNG Terminal Terminal Platform concreted 08/8/2008
  • 33. 33 Guanabara Bay LNG Terminal LNG Loading and CNG sendout arms and other facilities installed 19/9/2008
  • 34. 34 Guanabara Bay LNG Terminal Control Room : explosion proof building 28/1/2009
  • 35. 35 Guanabara Bay LNG Terminal Concluded on January 2009, spending 12 months 28/1/2009
  • 36. 36 Guanabara Bay LNG Terminal FRSU Golar Spirit docking for commissioning 11/3/2009
  • 37. 37 Guanabara Bay LNG Terminal FRSU Golar Spirit and LNG Carrier Excellence docked on terminal 16/3/2009
  • 38. 38 Guanabara Bay LNG Terminal 1st LNG Transference between LNG Carrier Excellence and FRSU Golar Spirit 18/3/2009
  • 39. 39 Guanabara Bay LNG Terminal 1st Regasification using FRSU Golar Spirit 26/3/2009