SlideShare a Scribd company logo
1 of 71
Meeting Equinor & Tenaris August 20th, 2019
Meeting Equinor & Tenaris August 20th, 2019 2
Techint Group
Worldwide (2018)
57,100
Permanent staff
23.5
billions dollars
annual revenue
3.6 million
Ton of SMLS and WLD
pipes shipped
927,000
Hospital admissions
13 million
Ton of steel* products shipped
124 thousand
equivalent barrels of oil
produced per day
1.2 billion
Dollars in backlog
1.6 billion
Dollars of anual sales
* Data from 2018. Does not include iron ore.
2
Meeting Equinor & Tenaris August 20th, 2019 3
Techint Group in Brazil
Since 1947, when Italian businessman Agostino Rocca
began Techint's activities in Brazil, Argentina and Mexico,
Techint Group companies share a long-term philosophy of
industrial development, commitment to the communities in
which they operate, integrity and a passion for quality.
Techint Group has as a priority the safety of its
employees, the care of the environment and the
continuous investment in its human resources, its
industrial facilities and the development of new
technologies.
First work:
Santos-São Paulo pipeline started
a series of projects in Brazil in 1950.
Present for over 70 years in the country
Meeting Equinor & Tenaris August 20th, 2019 4
Revenue
R$ million
Employees
direct
Tenaris 929 1,149
Ternium 10,000 3,794
Techint E&C 669.3 2,034
Tenova 18.6 28
R$ 11.6 bi 7,005
Usiminas* R$ 13.7 bi 13,405
* Techint Group is the largest shareholder of Usiminas with 38% of shares.
Exiros Purchases: R$ 8.2 billion in 2018
Revenue and Employment Generation in Brazil (2018)
Meeting Equinor & Tenaris August 20th, 2019 5
7
8,000 Employees: direct + outsourced
Slabs: 5 Mton/ year, 75% of it to exports to USA, Mexico and Europe
+ 10 Social projects focused on education, 5,000 people benefited
R$ 10 Bi Revenue*
Environment: R$ 280 Mi to be invested in the next 5 years
Ternium Brazil: Santa Cruz, Rio de Janeiro
490 MW of energy generated from the use of steam and gas generated by
the production
*2018 Results
Meeting Equinor & Tenaris August 20th, 2019 6
Increased capacity and dimensions at
Techint Offshore Unit in
Pontal do Paraná
R$ 300 mi
Techint E&C
Engineering, Supply, Construction, Operations and Project
Management Services. Participation in all refinery projects and
construction of more than 60% of the country's road network.
Meeting Equinor & Tenaris August 20th, 2019 7
Major Projects | Oil and Gas
7
OFFSHORE PLATFORM P-76
CLIENT
Petrobras
REACH
EPC
DESCRIPTION:
Integration and commissioning of
modules. Production capacity of
150,000 barrels/day of oil
and 7 million m³/day of gas.
Country CONCLUSION
2018
Gasbol
Gasup
NorAndino
Camisea Project
Projeto OCP
Cabiunas / Reduc
Urucú / Coari
FORTÍN DE PIEDRA - VACA MUERTA
CLIENT
Tecpetrol
REACH
EPC
Country CONCLUSION
2018
DESCRIPTION:
Facilities for drilling, gas treatment
and shipment. Processing capacity
17.5 MM m³/day.
+ 70.000 km
pipelines run in Latin
America, Canada and
Saudi Arabia
17 crosses
of the Andes
14
Natural gas
processing plants
Meeting Equinor & Tenaris August 20th, 2019 8
Usiminas Usiminas offers solutions to the most demanding
industrial challenges in the country. In the car, on the
ship. In the fridge in the stove. On the oil rig, in the
tractor. In industry machines and more. No wonder it is
one of the major steel complexes in the Americas.
With technology, knowledge and quality. This is how
Usiminas builds the future.
Meeting Equinor & Tenaris August 20th, 2019 9
Joint venture formed in
2010 from a partnership
with the Japanese group
Sumitomo Corporation
20% of voting capital
in MRS Logística Control Group.
4 mining assets
2 billion ton of Iron Ore
Reserves
Serra Azul Region,
Municipality of Mateus Leme/MG
Mining
Meeting Equinor & Tenaris August 20th, 2019 10
10 million
ton of steel / year
HOT ROLLED
STEEL PLATES
HOT ROLLED
STEEL COILS
COLD LAMINATED ELECTROGALVANIZED
HOT DIP
GALVANIZED
Offering a complete line of products to
domestic and international markets:
Cubatão
Ipatinga
INSTALLED CAPACITY
Steel Production
Meeting Equinor & Tenaris August 20th, 2019 11
TenarisUniversity | New UO Presses | R&D Center | Investment in the production line
R$ 2 bi
Tenaris Global leader in the manufacture and supply of tubular products and
services for O&G, Transportation, Processing, Energy and Industrial
Applications.
Meeting Equinor & Tenaris August 20th, 2019 12
550
kton/year of pipe
1.149
Employees
Other Plants
Coating: Anticorrosive, Flowcoat,
Thermal Insulation & Concrete
Rods
Services
R&D Center
Tenaris Brazil in Numbers
1.000.000
Man Hour/year
Confab Equipamentos
O&G / Petrochemical
Pulp & Paper
Mining & Steelmaking
Energy
Patio & Harbor Machines
Assembly & Services
Nuclear Power
Meeting Equinor & Tenaris August 20th, 2019 13
Comperj
Gasbol
Minas-Rio
Zohr
RNEST
Rotas 1, 2 e 3
Trust History
OCTG
Participation in 500+ offshore wells
450.000 ton onshore and offshore
17+ years of LTA contracts with Petrobras
Supply to all major oil bompanies
20.000 km of pipelines delivered to the world
Line Pipe and Industrial
GASENE
PLANGAS
Loops
Camisea
Gasplan
Logum
OCTP/Sankofa Alen Gas
Meeting Equinor & Tenaris August 20th, 2019 14
TSH BlueDock® Connector, made in Brazil
Strings run 177
Ultra DW 98
DW 19
SW 56
Onshore 4
Proven Track Record
Meeting Equinor & Tenaris August 20th, 2019 15
Proven Track Record
in most challenging deepwater projects
Zohr OD 30” | X60 | 3LPE | 457km | 316kton
OCTP/Sankofa OD 20/26” | X65 | 3LPE+CWC | 72km | 27kton
Alen Gas OD 24” | X65 | FBE+CWC | 25km | 20kton
Kaombo OD 18” | DNV450 | 3LPE | 61km | 15kton
Rotas 1/2/3 OD 18-24” | X65 |3LPE/3LPP+CWC | 860km | 297kton
Meeting Equinor & Tenaris August 20th, 2019 16
Rig Direct – Tenaris Services
Rio de Janeiro Port Açu Port Macaé Port
Most complex and complete contract in Tenaris Brazil:
• technical complexity of deepwater offshore
• bureaucracy of Brazilian law
Confab Pinda Confab Warehousing
Confab RDO
Meeting Equinor & Tenaris August 20th, 2019 17
New Services Facility in Brazil
Total Area: 30,530 m²:
Entry Platform
Total Inspection
Meeting Equinor & Tenaris August 20th, 2019 18
Customers
148
Globally
99.4%
1st Time Make-up
Of 1935 Joints Run For
Equinor
100%
Products Available
2.3/8” – 42”
All Grades
Tenaris Dopeless® Technology: Key Figures
38.5
Million Feet
Sold Worldwide
(Feb 2018)
22
Manufacturing
Facilities
12 in Tenaris Plants
10 Regional Support
75%
North Sea
TS Sales in tons
Sales by Region
North Sea
24%
Middle East
14%
Europe &
Caspian
12%
Russia
10%
Africa
10%
North America
15%
South America
13%
TenarisHydril EasyDock™ Connector – Version 01 / April 2019 19
Market Segments
Line Pipe Products
TenarisHydril EasyDock™ Connector – Version 01 / April 2019 20
TenarisConfab
Welded Pipe Production Capacity
Manufacturing Process Capacity
• ERW • 120 kton/year
• SAWL UOE • 400 kton/year
Total Capacity 520 kton/year
OD: 12 ¾” - 48”
WT: 0.250” - 1.575”
OD: 5 ½” - 20”
WT: 0.156” - 0.545”
TenarisHydril EasyDock™ Connector – Version 01 / April 2019 21
TenarisConfab
Recent Investments in Brazil
Investment plan in Brazil surpasses US$ 350 million, mainly:
 US$ 7 million in TenarisUniversity Campus (2011)
 BlueDockTM Weld-on Connectors Mill (2012)
 US$ 180 million in New U and O Press and additional Expander Head (2013)
 US$ 39 million in R&D Center in Rio de Janeiro (2014)
 Acquisition of remaining 50% from Socotherm Brazil (2014)
 US$ 11 million in improvements in SAWL-UOE and External Coating mills (2017)
 US$ 4 million in revamping Thermal Insulation Coating plant (2019)
 US$ 10 million in OCTG Services Base (2019)
TenarisHydril EasyDock™ Connector – Version 01 / April 2019 22
Production Process
UOE – SAW Longitudinal
OD: 12 ¾” – 48”
WT: 0.250” – 1.575”
Grades (5L): 5LB up to X100 (X120)
Special requirements: Sour Service (X65, X70, X80), Dimensional, High toughness,
offshore (DNV), High Collapse (Fab = 1)
Maximum Length: 12.5 m (41 ft)
TenarisHydril EasyDock™ Connector – Version 01 / April 2019 23
Production Process
UOE – SAW Longitudinal
Video
TenarisHydril EasyDock™ Connector – Version 01 / April 2019 24
Production Process
UOE – SAW Longitudinal
TenarisHydril EasyDock™ Connector – Version 01 / April 2019 25
Production Process
UOE – SAW Longitudinal
Outer Weld
Inner Weld
TenarisHydril EasyDock™ Connector – Version 01 / April 2019 26
Production Process
UOE – SAW Longitudinal
Cold Expansion – 2 Parallel Expanders
TenarisHydril EasyDock™ Connector – Version 01 / April 2019 27
Production Process
Coating
EXTERNAL:
• Fusion Bonded Epoxy
• Polyethylene Triple Layer
• Polypropylene Triple Layer
• Thermal Insulation (PUF and 5LPP)
• Concrete Weight Coating
INTERNAL:
• Epoxy
• Anti-abrasives
TenarisHydril EasyDock™ Connector – Version 01 / April 2019 29
Production Process
External Anticorrosive Coating – FBE (2 3/8” – 48”)
Steel Pipe
Fusion Bonded Epoxy
TenarisHydril EasyDock™ Connector – Version 01 / April 2019 30
Production Process
External Anticorrosive Coating – 3LPE & 3LPP (2 3/8” – 48”)
Steel Pipe
Primer (FBE)
Adhesive
PE / PP
TenarisHydril EasyDock™ Connector – Version 01 / April 2019 31
Production Process
Production Flow Chart
External Anticorrosive Coating – 3LPE & 3LPP (2 3/8” – 48”)
TenarisHydril EasyDock™ Connector – Version 01 / April 2019 32
Production Process
Internal Flow Coat – Liquid Epoxy (2 3/8” – 48”)
TenarisHydril EasyDock™ Connector – Version 01 / April 2019 33
Production Process
Production Flow Chart
Reception & Inspection
Steel Blasting
Inspection of blasted Surface
Coating Application
Thickness Measurement, Final
Inspection & Marking
Internal Flow Coat – Liquid Epoxy (2 3/8” – 48”)
TenarisHydril EasyDock™ Connector – Version 01 / April 2019 34
Production Process
Concrete Weight Coating
TenarisHydril EasyDock™ Connector – Version 01 / April 2019 35
Production Process
Concrete Weight Coating (6 5/8” – 48”)
Concrete thickness up to 5.5”
Concrete thickness up to 4.0”
TenarisHydril EasyDock™ Connector – Version 01 / April 2019 36
Production Process
Compression Process
Concrete Weight Coating (6 5/8” – 48”)
Entry Platform
Concrete and
Reinforcement
Application
Cutback &
Weighting
Cement
Anodes
Instalation &
Repair
Iron Ore/Sand & Grit
MOBILE
PLANT
TenarisHydril EasyDock™ Connector – Version 01 / April 2019 37
Production Process
Impingement Process
Concrete Weight Coating (6 5/8” – 48”)
Anodes Installation
& Repair
Cement
Reinforcement
Application
Entry Platform
Cutback
Holiday Inspection
Weighting
Iron Ore/Sand & Grit
Water Supply
Concrete Application
TenarisHydril EasyDock™ Connector – Version 01 / April 2019 38
Production Process
Thermal Insulation Coating – 5LPP Solid/Syntactic/Foam (6
5/8” – 24”)
Steel Pipe
Primer (FBE)
Adhesive
Solid PP
Solid/Syntactic PP
Solid PP
TenarisHydril EasyDock™ Connector – Version 01 / April 2019 39
Thermal Insulation Coating – 5LPP Solid/Syntactic/Foam (6
5/8” – 24”)
Production Process
Production Flow Chart
Pipe Washer
Infrared Oven
Extruder
Cooling Tunnel
Thickness
Inspection
Finishing/
Cutback
Final
Inspection
Production Flow Chart
TenarisHydril EasyDock™ Connector – Version 01 / April 2019 40
Logistics
Facilities & Operations
Brazil
City: Pindamonhangaba/SP
Area: 1.400.000 m²
Capacity: 550 kton/year coated pipe
City: Pindamonhangaba/SP
Area: 904.000 m²
Capacity: 1.200 Th MH/year equipment
TenarisConfab
Confab Equipamentos
TenarisHydril EasyDock™ Connector – Version 01 / April 2019 41
voestalpine – Austria
Posco – South Korea
Dillinger – Germany
Nippon Steel - Japan
Logistics
Main Steel Suppliers
800 km
250 km
Brazil
São Sebastião
180 km
500 km
Itaguaí
270 km
TenarisHydril EasyDock™ Connector – Version 01 / April 2019 42
Logistics
Main Ports
230 km
180 km
300 km
São Sebastião
Brazil
SANTOS:
13 berths / 24h operation
SÃO SEBASTIÃO:
1 berth / 24h operation
RIO DE JANEIRO:
12 berths / 24h operation
TenarisHydril EasyDock™ Connector – Version 01 / April 2019 43
Main Projects
TenarisConfab Main Offshore Line Pipe Projects
(SAWL)
Meeting Equinor & Tenaris August 20th, 2019 50
Market Segments
OCTG Products
Meeting Equinor & Tenaris August 20th, 2019 51
Premium Connections
A full range of products and services for ever more demanding E&P
applications and environments
• HP/HT & Deep Wells
• Deep Water
• Shallow Water
• Shales
• Horizontal & Extended Reach Wells
• Casing While Drilling
• Thermal (SAGD & CSS)
• Geothermal
• Workstrings
• Corrosion Protection & ID Coating
Wedge
Series 500
TM
Blue®
Series
Weld-on
Connectors
Legacy
Series
Wedge Series 600™
(with Dopeless®)
TenarisXP®
Buttress
connection
52
TenarisHydril EasyDock™ Connector – October/2019
TenarisHydril Large OD Portfolio (≥18”)
EasyDock™
BlueDock® Blue ® Quick
Seal
Easy Running™
OD range
Application
24” to 36”
18” to 42” 18” to 22” 7” to 24½”
Onshore, Offshore
Offshore Onshore, offshore Onshore, offshore
Joint type Weld-on connector
Weld-on connector Threaded & coupled Threaded & coupled
Seal ELS
ELS, M-t-M (up to 26”),
SWS (optional)
M-t-M -
Fatigue -
High performance - -
Under development
Under development
Comes with
Dopeless® Tech. Available
Dopeless® Tech.
Testing API RP 5C5 (Series B)
API RP 5C5 CAL I API RP 5C5 CAL I -
Note: Tenaris LOD offer includes some integral connections -threaded on the pipe body- from the recognized Wedge Series 500 as follows:
Wedge 511® 18” and 18 ⅝”, Wedge 513® 18” and Wedge 521® 18” and 18 ⅝”. All available with Dopeless® Technology.
Service severity High Medium Medium Mid-low
TenarisHydril EasyDock™ Connector – Version 01 / April 2019 53
Integrated
Mills and
Quality
Manageme
nt System +
Value added to final customer
Tenaris can supply complete well requirements, from Conductors to Production Tubing
• Complete service offering through Rig Direct™ model
• Extensive expertise in proprietary manufacturing
• Unique global infraestructure
Tenaris Integrated Solution
+
54
TenarisHydril EasyDock™ Connector – October/2019
Agenda
• TenarisHydril Large OD Portfolio
• TenarisHydril EasyDock™ Connector
• Tenarishydril BlueDock® Connector
• Tenaris Integrated Solution
• Manufacturing
55
TenarisHydril EasyDock™ Connector – October/2019
TenarisHydril EasyDock™ Connector
• Safe, robust, quick and easy to operate
• Engineered to assure trouble-free MU even under
highly demanding installation conditions
• Visual MU reference with no need of torque-turns graph
• Field proven and easy to operate Anti Rotational Keys
(ARKs) to prevent back-off
• High structural capacity, with liquid tightness
under combined load conditions validated under API RP
5C5
• Driveable
Its design stems from the extensively tested and field-
proven TenarisHydril BlueDock® Connector
56
TenarisHydril EasyDock™ Connector – October/2019
TenarisHydril EasyDock™ Connector
Main Features:
• OD range: 24” to 36”
• Pipe WT: Up to 1.5”
• Int. profile: Internal Flush
• Seal: Internal Elastomeric
• ARKs: up to 2 per connector
• Forging: 70-90ksi (110Ksi available)
Ratings:
• 85-100% - Pipe Body Tension, Compression and Bending Capacity
• 100% - Pipe Body Minimum Internal Yield Pressure
• 100% - Pipe Body Collapse Pressure
Product Overview
Note: Other dimensions may be developed if required
57
TenarisHydril EasyDock™ Connector – October/2019
Onshore
typical well
Production zone
Casing
strings
always
protected
inside the
well bore
NOT
EXPOSED
REGULAR CASING
REQUIREMENTS
Structural Loads
TenarisHydril EasyDock™ Applicable Scenario
TenarisHydril EasyDock™ Connector
Application
58
TenarisHydril EasyDock™ Connector – October/2019
Shallow Water:
Jack-up or Platform
Sea surface
Seabed
Production zone
Casing
strings up
to the
surface
EXPOSED
Casing
strings
inside the
well bore
RISER FUNCTION
No demanding
sea conditions
TenarisHydril EasyDock™ Applicable Scenario
TenarisHydril EasyDock™ Connector
Application
60
TenarisHydril EasyDock™ Connector – October/2019
Product Features
• Proprietary BTC modified crest-to-root hook thread assures structural capacity
• Fast thread taper (~30%) for deep and easy stabbing
• Low TPI design to minimize cross-threading risk
• Multiple thread starts (3) for fast MU
• Final MU position achieved with 3/4 of a turn (1/2 to hand-tight + 1/4 power-
tight)
• Allows for multiple M&B without damage
Thread Profile
BOX
PIN Crest to Root Contact
Hook Effect
61
TenarisHydril EasyDock™ Connector – October/2019
• Groove dimensioning and positioning optimized by Finite Element Analysis
• Safe O-ring retention during handling, cleaning and M&B operations assured by
dovetailed groove profile
• Tapered pin nose geometry reduces O-ring dragging and/or damaging during
MU assuring ideal final squeezing and positioning
• Mill pre-installed box O-ring protected by thread protector
Product Features
Internal Elastomeric Seal (ELS)
Video
63
TenarisHydril EasyDock™ Connector – October/2019
Product Features
• Internal and external guides provide self-alignment of pin and box during
stabbing, avoiding the possibility of crossed threading.
• Cylindrical surfaces of the guides get in contact for ~1/2” axial distance before
the first threads engage
• Pin and box threads misalignment is not physically possible
Self-alignment Guides
180° connector’s cut view shows resulting relative pin-box
positioning due to self-alignment guides effect.
Video
64
TenarisHydril EasyDock™ Connector – October/2019
• Safe, quick and easy to operate (up to 90% faster than other market solutions)
• Extra assurance against connector accidental back-off
• Pre-installed in manufacturing facilities, housed and bolted (no loose parts)
• No need for special tools for operation
• Not sensitive to axial loads or external shoulder opening
• Designed to allow multiple activations
• Up to 2 ARKs may be installed in one connector
Product Features
Anti Rotational Keys (ARKs)
Video
68
TenarisHydril EasyDock™ Connector – October/2019
TenarisHydril BlueDock® Connector
This development draws on our extensive expertise in proprietary
thread design and experience in welding and pipe manufacturing.
Designed for offshore applications:
• Available in sizes from 18" to 42" – up to 2,0" wt.
• Easy and safe stabbing, minimized cross-threading risk.
• Outstanding structural capacity, with gas/water tightness
under extreme combined load conditions.
• Drivable
• High fatigue performance under bending or
tension-compression cycling loads.
• Minimized risk of buck-off.
• High over-torque capacity.
• Minimized risk of dope overpressure.
• High sealability performance according to API RP 5C5 CAL I.
• Its design relies on the extensively tested TenarisHydril Blue® Series.
69
TenarisHydril EasyDock™ Connector – October/2019
TenarisHydril BlueDock® Connector
Main Features:
• Pipe OD: 18” to 42”
• Pipe WT: Up to 2”
• Int. profile: Internal flush - as standard
External flush - if required
• Seal: Metal to Metal - up to 26”
Elastomeric - for all sizes
Sea Water Exclusion - optional
• ARKs: up to 3 per connector
• Forging: 70-90ksi
Ratings:
• 100% - Pipe Body Tension, Compression and Bending Capacity
• 100% - Pipe Body Minimum Internal Yield Pressure
• 100% - Pipe Body Collapse Pressure
Product Overview
Note: Other dimensions may be developed if required
70
TenarisHydril EasyDock™ Connector – October/2019
TenarisHydril BlueDock® Connector
Product Family, Released sizes and Alternatives
ELS Options MTM Options
Connector´s Grades
• 70.3Ksi up to X65 pipes
• 90.6Ksi up to X80 pipes
Fatigue Application
• Enhanced thread profile
• Improved Girth Weld
• WPS
• Weld grinding
Connector´s Designs
• LR: Low pipe wt range.
• HR: Heavy pipe wt range.
72
TenarisHydril EasyDock™ Connector – October/2019
Rig motion
and bending
loads
Long
Production
Life
Increasing
fatigue risk
Shallow water Fatigue driven by
Wave dynamics
TenarisHydril BlueDock® Connector
Application – Shallow Water
73
TenarisHydril EasyDock™ Connector – October/2019
Parameters affecting Conductor and Surface Casing
definition during the design stage:
 Harsher Environmental Conditions
 Higher current velocities
 Waves
 Weaker/Softer soil
 Water Depth
 Rig Type (RAO)
 BOP size
 VIV
 Time Drilling the well
 Wellhead Stick-up / Cement level
RISER ANALYSYS WITH ENGINEERING COMPANIES
Operators are normally assuming a conservative
approach on the selection of Wellhead, Conductor and
Surface Casing systems.
Critical Loads
Fatigue and Bending
TenarisHydril BlueDock® Connector
Application – Deep & Ultra-Deep Water
75
TenarisHydril EasyDock™ Connector – October/2019
Wellhead System VIV Fatigue
76
TenarisHydril EasyDock™ Connector – October/2019
Product Features
• Proprietary BTC modified crest-to-root thread
assures structural capacity
• Fast thread taper (~30%) for deep and
easy stabbing
• Low TPI design to minimize cross-threading risk:
– 3 TPI for OD from 18" to 28"
– 2 TPI for OD for 30” and larger.
• Multiple thread starts (3) for fast MU
• Final MU position achieved with 3/4 of a turn (1/2 to hand-tight + 1/4 power-
tight)
• Designed for high fatigue performance, no stress risers on flank-to-root
transitions
• Allows for multiple M&B without damage
Thread Profile
BOX
PIN Crest to Root Contact
Hook Effect
80
TenarisHydril EasyDock™ Connector – October/2019
Product Features
Self-alignment Guides
• Internal and external guides to steer the connector during stabbing, preventing
cross threading
• Cylindrical surfaces of the guides get in contact for ~1/2” axial distance before
the first threads engage
• Pin and box threads misalignment is not physically possible
180°connector’s cut view
shows resulting relative pin-
box positioning due to self-
alignment guides effect.
81
TenarisHydril EasyDock™ Connector – October/2019
• Safe, quick and easy to operate (up to 90% faster than other market solutions)
• Extra assurance against connector accidental back-off
• Pre-installed in manufacturing facilities, housed and bolted (no loose parts)
• No need for special tools for operation
• Not sensitive to axial loads or external shoulder opening
• Designed to allow multiple activations
• Up to 3 ARKs may be installed in one connector
Product Features
Anti Rotational Keys (ARKs)
83
TenarisHydril EasyDock™ Connector – October/2019
• Finite Element Analysis (FEA) Program
• Full Scale Testing (FST) Program
– M&B validation
– Sealability tests – Conductor casing
– Sealability tests – Surface casing
– Fatigue
– Driving Assessment
Design Verification
84
TenarisHydril EasyDock™ Connector – October/2019
TenarisHydril BlueDock® Connector
Product Roll Out - Full Scale Tests
Water Sealability
Series B to 95%
PB VME
Series A to 95%
PB VME
Series B to 95%
PB VME
20” BlueDock LR 70 MTM • • •
20” BlueDock LR 70 ELS • •
20” BlueDock HR 90 MTM • • •
20” BlueDock HR 90 MTM DPLS • • •
20” BlueDock HR 90 MTM • • •
20” BlueDock HR 90 MTM - SWS • • •
22” BlueDock HR 90 MTM • • • •
22” BlueDock HR 90 ELS •
22” BlueDock HR 90 MTM-SWS • • • •
24” BlueDock HR 70 MTM-SWS • •
26” BlueDock LR 70 ELS-EF • •
28” BlueDock LR 70 ELS-SWS •
30” BlueDock LR 70 ELS • • • •
30” BlueDock LR 70 ELS DPLS • •
36” BlueDock HR 70 ELS • • •
30” EasyDock 70 ELS • • •
36” EasyDock 70 ELS •
24” DesertDock 70 •
• Completed • Ogoing • On Hold
*Hammering Test
Product M&Bs
Gas Sealability
Series C
Resonant
Fatigue
Hammering
85
TenarisHydril EasyDock™ Connector – October/2019
TSH BlueDock® | Worldwide Field Experience
Summary
• More than +200 operations, with field experience constantly being increased. (from 20” up to 36”)
• BlueDock® connectors run in different water conditions & Installations methods (Shallow, Deep and Ultra-Deep water).
• Different installation methods (Hammering, Jetting, Drilling& Cemented)
TenarisHydril EasyDock™ Connector – Version 01 / April 2019 86
• Location
– Pindamonhangaba, Brazil
• Process
– Pipe (UOE)
– Connector
– Welding and Final Conditioning
Only supplier in the industry with fully integrated production &
quality system
Pipe + Connector + Welding Process
Manufacturing
TenarisHydril EasyDock™ Connector – Version 01 / April 2019 88
Blank
- Seamless pipe
- Forging
Machining cone and bevel Threading, finishing and gauging
Connector Manufacturing Process - Overview
Connector Manufacturing
TenarisHydril EasyDock™ Connector – Version 01 / April 2019 89
Final Inspection and RFS
Storage Compound
O-ring and ARKs Installation
Marking
NDT
Grinding (if applicable)
SAW + PWHT
Tack Welding
Assembly
Initial Inspection and Cleaning
Tack Welding
Submerged Arc Welding
Manufacturing
Welding Process and Final Conditioning
Video
Meeting Equinor & Tenaris August 20th, 2019

More Related Content

Similar to 565292229-Tenaris-Presentation-Sinopec-Nov-2019-rev2.pptx

Archirodon presentation - Job Fair Xanthi 6-7 May.pptx
Archirodon presentation - Job Fair Xanthi 6-7 May.pptxArchirodon presentation - Job Fair Xanthi 6-7 May.pptx
Archirodon presentation - Job Fair Xanthi 6-7 May.pptxClioLinaraki1
 
Amal modular yard rev03 20150921 -pdf
Amal modular yard rev03 20150921 -pdfAmal modular yard rev03 20150921 -pdf
Amal modular yard rev03 20150921 -pdfTiago Alvarez
 
ERIKS Know+How Issue 23, Energy Conservation
ERIKS Know+How Issue 23, Energy ConservationERIKS Know+How Issue 23, Energy Conservation
ERIKS Know+How Issue 23, Energy ConservationERIKS UK
 
Rotor Blades: The use of composites in rotor blade design
Rotor Blades: The use of composites in rotor blade designRotor Blades: The use of composites in rotor blade design
Rotor Blades: The use of composites in rotor blade designTorben Haagh
 
170123_REE_sesión trabajo OWF_R01.pptx
170123_REE_sesión trabajo OWF_R01.pptx170123_REE_sesión trabajo OWF_R01.pptx
170123_REE_sesión trabajo OWF_R01.pptxtonigonzalez29
 
Apres padrao mrsa_2_q10_eng
Apres padrao mrsa_2_q10_engApres padrao mrsa_2_q10_eng
Apres padrao mrsa_2_q10_engMagnesita_ri
 
Kelvion Oil and Gas Brochure 2017.pdf
Kelvion Oil and Gas Brochure 2017.pdfKelvion Oil and Gas Brochure 2017.pdf
Kelvion Oil and Gas Brochure 2017.pdfRoy Niekerk
 
Richards Bay Industrial Development Zone
Richards Bay Industrial Development ZoneRichards Bay Industrial Development Zone
Richards Bay Industrial Development ZoneTristan Wiggill
 
Accelerate Australia & NZ - Summer 2019
Accelerate Australia & NZ - Summer 2019Accelerate Australia & NZ - Summer 2019
Accelerate Australia & NZ - Summer 2019Andrew Williams
 
CRESS energy storage for industrial efficiency | Investment Pitch
CRESS energy storage for industrial efficiency | Investment PitchCRESS energy storage for industrial efficiency | Investment Pitch
CRESS energy storage for industrial efficiency | Investment PitchRichard Bradshaw
 
Osx institutional eng_november_final
Osx institutional eng_november_finalOsx institutional eng_november_final
Osx institutional eng_november_finalosxri
 
Cross-Sector Battery Systems Innovation Network: Batteries for...Maritime
Cross-Sector Battery Systems Innovation Network: Batteries for...MaritimeCross-Sector Battery Systems Innovation Network: Batteries for...Maritime
Cross-Sector Battery Systems Innovation Network: Batteries for...MaritimeKTN
 
Innovation and Sustainability Presentation - October 23 2015
Innovation and Sustainability Presentation - October 23 2015Innovation and Sustainability Presentation - October 23 2015
Innovation and Sustainability Presentation - October 23 2015gstubel
 
hydrogen-brochure.pdf
hydrogen-brochure.pdfhydrogen-brochure.pdf
hydrogen-brochure.pdfOmymaAttia
 
1961spm oi land_gas
1961spm oi land_gas1961spm oi land_gas
1961spm oi land_gasTran Vinh
 
ERIKS Know How Issue 17 Chemical
ERIKS Know How Issue 17 ChemicalERIKS Know How Issue 17 Chemical
ERIKS Know How Issue 17 ChemicalSarah Evans
 

Similar to 565292229-Tenaris-Presentation-Sinopec-Nov-2019-rev2.pptx (20)

Archirodon presentation - Job Fair Xanthi 6-7 May.pptx
Archirodon presentation - Job Fair Xanthi 6-7 May.pptxArchirodon presentation - Job Fair Xanthi 6-7 May.pptx
Archirodon presentation - Job Fair Xanthi 6-7 May.pptx
 
Petromin marine and offshore
Petromin marine and offshore Petromin marine and offshore
Petromin marine and offshore
 
Amal modular yard rev03 20150921 -pdf
Amal modular yard rev03 20150921 -pdfAmal modular yard rev03 20150921 -pdf
Amal modular yard rev03 20150921 -pdf
 
ERIKS Know+How Issue 23, Energy Conservation
ERIKS Know+How Issue 23, Energy ConservationERIKS Know+How Issue 23, Energy Conservation
ERIKS Know+How Issue 23, Energy Conservation
 
Rotor Blades: The use of composites in rotor blade design
Rotor Blades: The use of composites in rotor blade designRotor Blades: The use of composites in rotor blade design
Rotor Blades: The use of composites in rotor blade design
 
170123_REE_sesión trabajo OWF_R01.pptx
170123_REE_sesión trabajo OWF_R01.pptx170123_REE_sesión trabajo OWF_R01.pptx
170123_REE_sesión trabajo OWF_R01.pptx
 
Apres padrao mrsa_2_q10_eng
Apres padrao mrsa_2_q10_engApres padrao mrsa_2_q10_eng
Apres padrao mrsa_2_q10_eng
 
ENERGIAS-MARINAS_CAT_EN
ENERGIAS-MARINAS_CAT_ENENERGIAS-MARINAS_CAT_EN
ENERGIAS-MARINAS_CAT_EN
 
Kelvion Oil and Gas Brochure 2017.pdf
Kelvion Oil and Gas Brochure 2017.pdfKelvion Oil and Gas Brochure 2017.pdf
Kelvion Oil and Gas Brochure 2017.pdf
 
International paint surfaces 23
International paint surfaces 23International paint surfaces 23
International paint surfaces 23
 
Richards Bay Industrial Development Zone
Richards Bay Industrial Development ZoneRichards Bay Industrial Development Zone
Richards Bay Industrial Development Zone
 
Accelerate Australia & NZ - Summer 2019
Accelerate Australia & NZ - Summer 2019Accelerate Australia & NZ - Summer 2019
Accelerate Australia & NZ - Summer 2019
 
CRESS energy storage for industrial efficiency | Investment Pitch
CRESS energy storage for industrial efficiency | Investment PitchCRESS energy storage for industrial efficiency | Investment Pitch
CRESS energy storage for industrial efficiency | Investment Pitch
 
Osx institutional eng_november_final
Osx institutional eng_november_finalOsx institutional eng_november_final
Osx institutional eng_november_final
 
Cross-Sector Battery Systems Innovation Network: Batteries for...Maritime
Cross-Sector Battery Systems Innovation Network: Batteries for...MaritimeCross-Sector Battery Systems Innovation Network: Batteries for...Maritime
Cross-Sector Battery Systems Innovation Network: Batteries for...Maritime
 
Jorge luis sousa escandon cv february 2020
Jorge luis sousa escandon cv february 2020Jorge luis sousa escandon cv february 2020
Jorge luis sousa escandon cv february 2020
 
Innovation and Sustainability Presentation - October 23 2015
Innovation and Sustainability Presentation - October 23 2015Innovation and Sustainability Presentation - October 23 2015
Innovation and Sustainability Presentation - October 23 2015
 
hydrogen-brochure.pdf
hydrogen-brochure.pdfhydrogen-brochure.pdf
hydrogen-brochure.pdf
 
1961spm oi land_gas
1961spm oi land_gas1961spm oi land_gas
1961spm oi land_gas
 
ERIKS Know How Issue 17 Chemical
ERIKS Know How Issue 17 ChemicalERIKS Know How Issue 17 Chemical
ERIKS Know How Issue 17 Chemical
 

Recently uploaded

CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 

Recently uploaded (20)

CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 

565292229-Tenaris-Presentation-Sinopec-Nov-2019-rev2.pptx

  • 1. Meeting Equinor & Tenaris August 20th, 2019
  • 2. Meeting Equinor & Tenaris August 20th, 2019 2 Techint Group Worldwide (2018) 57,100 Permanent staff 23.5 billions dollars annual revenue 3.6 million Ton of SMLS and WLD pipes shipped 927,000 Hospital admissions 13 million Ton of steel* products shipped 124 thousand equivalent barrels of oil produced per day 1.2 billion Dollars in backlog 1.6 billion Dollars of anual sales * Data from 2018. Does not include iron ore. 2
  • 3. Meeting Equinor & Tenaris August 20th, 2019 3 Techint Group in Brazil Since 1947, when Italian businessman Agostino Rocca began Techint's activities in Brazil, Argentina and Mexico, Techint Group companies share a long-term philosophy of industrial development, commitment to the communities in which they operate, integrity and a passion for quality. Techint Group has as a priority the safety of its employees, the care of the environment and the continuous investment in its human resources, its industrial facilities and the development of new technologies. First work: Santos-São Paulo pipeline started a series of projects in Brazil in 1950. Present for over 70 years in the country
  • 4. Meeting Equinor & Tenaris August 20th, 2019 4 Revenue R$ million Employees direct Tenaris 929 1,149 Ternium 10,000 3,794 Techint E&C 669.3 2,034 Tenova 18.6 28 R$ 11.6 bi 7,005 Usiminas* R$ 13.7 bi 13,405 * Techint Group is the largest shareholder of Usiminas with 38% of shares. Exiros Purchases: R$ 8.2 billion in 2018 Revenue and Employment Generation in Brazil (2018)
  • 5. Meeting Equinor & Tenaris August 20th, 2019 5 7 8,000 Employees: direct + outsourced Slabs: 5 Mton/ year, 75% of it to exports to USA, Mexico and Europe + 10 Social projects focused on education, 5,000 people benefited R$ 10 Bi Revenue* Environment: R$ 280 Mi to be invested in the next 5 years Ternium Brazil: Santa Cruz, Rio de Janeiro 490 MW of energy generated from the use of steam and gas generated by the production *2018 Results
  • 6. Meeting Equinor & Tenaris August 20th, 2019 6 Increased capacity and dimensions at Techint Offshore Unit in Pontal do Paraná R$ 300 mi Techint E&C Engineering, Supply, Construction, Operations and Project Management Services. Participation in all refinery projects and construction of more than 60% of the country's road network.
  • 7. Meeting Equinor & Tenaris August 20th, 2019 7 Major Projects | Oil and Gas 7 OFFSHORE PLATFORM P-76 CLIENT Petrobras REACH EPC DESCRIPTION: Integration and commissioning of modules. Production capacity of 150,000 barrels/day of oil and 7 million m³/day of gas. Country CONCLUSION 2018 Gasbol Gasup NorAndino Camisea Project Projeto OCP Cabiunas / Reduc Urucú / Coari FORTÍN DE PIEDRA - VACA MUERTA CLIENT Tecpetrol REACH EPC Country CONCLUSION 2018 DESCRIPTION: Facilities for drilling, gas treatment and shipment. Processing capacity 17.5 MM m³/day. + 70.000 km pipelines run in Latin America, Canada and Saudi Arabia 17 crosses of the Andes 14 Natural gas processing plants
  • 8. Meeting Equinor & Tenaris August 20th, 2019 8 Usiminas Usiminas offers solutions to the most demanding industrial challenges in the country. In the car, on the ship. In the fridge in the stove. On the oil rig, in the tractor. In industry machines and more. No wonder it is one of the major steel complexes in the Americas. With technology, knowledge and quality. This is how Usiminas builds the future.
  • 9. Meeting Equinor & Tenaris August 20th, 2019 9 Joint venture formed in 2010 from a partnership with the Japanese group Sumitomo Corporation 20% of voting capital in MRS Logística Control Group. 4 mining assets 2 billion ton of Iron Ore Reserves Serra Azul Region, Municipality of Mateus Leme/MG Mining
  • 10. Meeting Equinor & Tenaris August 20th, 2019 10 10 million ton of steel / year HOT ROLLED STEEL PLATES HOT ROLLED STEEL COILS COLD LAMINATED ELECTROGALVANIZED HOT DIP GALVANIZED Offering a complete line of products to domestic and international markets: Cubatão Ipatinga INSTALLED CAPACITY Steel Production
  • 11. Meeting Equinor & Tenaris August 20th, 2019 11 TenarisUniversity | New UO Presses | R&D Center | Investment in the production line R$ 2 bi Tenaris Global leader in the manufacture and supply of tubular products and services for O&G, Transportation, Processing, Energy and Industrial Applications.
  • 12. Meeting Equinor & Tenaris August 20th, 2019 12 550 kton/year of pipe 1.149 Employees Other Plants Coating: Anticorrosive, Flowcoat, Thermal Insulation & Concrete Rods Services R&D Center Tenaris Brazil in Numbers 1.000.000 Man Hour/year Confab Equipamentos O&G / Petrochemical Pulp & Paper Mining & Steelmaking Energy Patio & Harbor Machines Assembly & Services Nuclear Power
  • 13. Meeting Equinor & Tenaris August 20th, 2019 13 Comperj Gasbol Minas-Rio Zohr RNEST Rotas 1, 2 e 3 Trust History OCTG Participation in 500+ offshore wells 450.000 ton onshore and offshore 17+ years of LTA contracts with Petrobras Supply to all major oil bompanies 20.000 km of pipelines delivered to the world Line Pipe and Industrial GASENE PLANGAS Loops Camisea Gasplan Logum OCTP/Sankofa Alen Gas
  • 14. Meeting Equinor & Tenaris August 20th, 2019 14 TSH BlueDock® Connector, made in Brazil Strings run 177 Ultra DW 98 DW 19 SW 56 Onshore 4 Proven Track Record
  • 15. Meeting Equinor & Tenaris August 20th, 2019 15 Proven Track Record in most challenging deepwater projects Zohr OD 30” | X60 | 3LPE | 457km | 316kton OCTP/Sankofa OD 20/26” | X65 | 3LPE+CWC | 72km | 27kton Alen Gas OD 24” | X65 | FBE+CWC | 25km | 20kton Kaombo OD 18” | DNV450 | 3LPE | 61km | 15kton Rotas 1/2/3 OD 18-24” | X65 |3LPE/3LPP+CWC | 860km | 297kton
  • 16. Meeting Equinor & Tenaris August 20th, 2019 16 Rig Direct – Tenaris Services Rio de Janeiro Port Açu Port Macaé Port Most complex and complete contract in Tenaris Brazil: • technical complexity of deepwater offshore • bureaucracy of Brazilian law Confab Pinda Confab Warehousing Confab RDO
  • 17. Meeting Equinor & Tenaris August 20th, 2019 17 New Services Facility in Brazil Total Area: 30,530 m²: Entry Platform Total Inspection
  • 18. Meeting Equinor & Tenaris August 20th, 2019 18 Customers 148 Globally 99.4% 1st Time Make-up Of 1935 Joints Run For Equinor 100% Products Available 2.3/8” – 42” All Grades Tenaris Dopeless® Technology: Key Figures 38.5 Million Feet Sold Worldwide (Feb 2018) 22 Manufacturing Facilities 12 in Tenaris Plants 10 Regional Support 75% North Sea TS Sales in tons Sales by Region North Sea 24% Middle East 14% Europe & Caspian 12% Russia 10% Africa 10% North America 15% South America 13%
  • 19. TenarisHydril EasyDock™ Connector – Version 01 / April 2019 19 Market Segments Line Pipe Products
  • 20. TenarisHydril EasyDock™ Connector – Version 01 / April 2019 20 TenarisConfab Welded Pipe Production Capacity Manufacturing Process Capacity • ERW • 120 kton/year • SAWL UOE • 400 kton/year Total Capacity 520 kton/year OD: 12 ¾” - 48” WT: 0.250” - 1.575” OD: 5 ½” - 20” WT: 0.156” - 0.545”
  • 21. TenarisHydril EasyDock™ Connector – Version 01 / April 2019 21 TenarisConfab Recent Investments in Brazil Investment plan in Brazil surpasses US$ 350 million, mainly:  US$ 7 million in TenarisUniversity Campus (2011)  BlueDockTM Weld-on Connectors Mill (2012)  US$ 180 million in New U and O Press and additional Expander Head (2013)  US$ 39 million in R&D Center in Rio de Janeiro (2014)  Acquisition of remaining 50% from Socotherm Brazil (2014)  US$ 11 million in improvements in SAWL-UOE and External Coating mills (2017)  US$ 4 million in revamping Thermal Insulation Coating plant (2019)  US$ 10 million in OCTG Services Base (2019)
  • 22. TenarisHydril EasyDock™ Connector – Version 01 / April 2019 22 Production Process UOE – SAW Longitudinal OD: 12 ¾” – 48” WT: 0.250” – 1.575” Grades (5L): 5LB up to X100 (X120) Special requirements: Sour Service (X65, X70, X80), Dimensional, High toughness, offshore (DNV), High Collapse (Fab = 1) Maximum Length: 12.5 m (41 ft)
  • 23. TenarisHydril EasyDock™ Connector – Version 01 / April 2019 23 Production Process UOE – SAW Longitudinal Video
  • 24. TenarisHydril EasyDock™ Connector – Version 01 / April 2019 24 Production Process UOE – SAW Longitudinal
  • 25. TenarisHydril EasyDock™ Connector – Version 01 / April 2019 25 Production Process UOE – SAW Longitudinal Outer Weld Inner Weld
  • 26. TenarisHydril EasyDock™ Connector – Version 01 / April 2019 26 Production Process UOE – SAW Longitudinal Cold Expansion – 2 Parallel Expanders
  • 27. TenarisHydril EasyDock™ Connector – Version 01 / April 2019 27 Production Process Coating EXTERNAL: • Fusion Bonded Epoxy • Polyethylene Triple Layer • Polypropylene Triple Layer • Thermal Insulation (PUF and 5LPP) • Concrete Weight Coating INTERNAL: • Epoxy • Anti-abrasives
  • 28. TenarisHydril EasyDock™ Connector – Version 01 / April 2019 29 Production Process External Anticorrosive Coating – FBE (2 3/8” – 48”) Steel Pipe Fusion Bonded Epoxy
  • 29. TenarisHydril EasyDock™ Connector – Version 01 / April 2019 30 Production Process External Anticorrosive Coating – 3LPE & 3LPP (2 3/8” – 48”) Steel Pipe Primer (FBE) Adhesive PE / PP
  • 30. TenarisHydril EasyDock™ Connector – Version 01 / April 2019 31 Production Process Production Flow Chart External Anticorrosive Coating – 3LPE & 3LPP (2 3/8” – 48”)
  • 31. TenarisHydril EasyDock™ Connector – Version 01 / April 2019 32 Production Process Internal Flow Coat – Liquid Epoxy (2 3/8” – 48”)
  • 32. TenarisHydril EasyDock™ Connector – Version 01 / April 2019 33 Production Process Production Flow Chart Reception & Inspection Steel Blasting Inspection of blasted Surface Coating Application Thickness Measurement, Final Inspection & Marking Internal Flow Coat – Liquid Epoxy (2 3/8” – 48”)
  • 33. TenarisHydril EasyDock™ Connector – Version 01 / April 2019 34 Production Process Concrete Weight Coating
  • 34. TenarisHydril EasyDock™ Connector – Version 01 / April 2019 35 Production Process Concrete Weight Coating (6 5/8” – 48”) Concrete thickness up to 5.5” Concrete thickness up to 4.0”
  • 35. TenarisHydril EasyDock™ Connector – Version 01 / April 2019 36 Production Process Compression Process Concrete Weight Coating (6 5/8” – 48”) Entry Platform Concrete and Reinforcement Application Cutback & Weighting Cement Anodes Instalation & Repair Iron Ore/Sand & Grit MOBILE PLANT
  • 36. TenarisHydril EasyDock™ Connector – Version 01 / April 2019 37 Production Process Impingement Process Concrete Weight Coating (6 5/8” – 48”) Anodes Installation & Repair Cement Reinforcement Application Entry Platform Cutback Holiday Inspection Weighting Iron Ore/Sand & Grit Water Supply Concrete Application
  • 37. TenarisHydril EasyDock™ Connector – Version 01 / April 2019 38 Production Process Thermal Insulation Coating – 5LPP Solid/Syntactic/Foam (6 5/8” – 24”) Steel Pipe Primer (FBE) Adhesive Solid PP Solid/Syntactic PP Solid PP
  • 38. TenarisHydril EasyDock™ Connector – Version 01 / April 2019 39 Thermal Insulation Coating – 5LPP Solid/Syntactic/Foam (6 5/8” – 24”) Production Process Production Flow Chart Pipe Washer Infrared Oven Extruder Cooling Tunnel Thickness Inspection Finishing/ Cutback Final Inspection Production Flow Chart
  • 39. TenarisHydril EasyDock™ Connector – Version 01 / April 2019 40 Logistics Facilities & Operations Brazil City: Pindamonhangaba/SP Area: 1.400.000 m² Capacity: 550 kton/year coated pipe City: Pindamonhangaba/SP Area: 904.000 m² Capacity: 1.200 Th MH/year equipment TenarisConfab Confab Equipamentos
  • 40. TenarisHydril EasyDock™ Connector – Version 01 / April 2019 41 voestalpine – Austria Posco – South Korea Dillinger – Germany Nippon Steel - Japan Logistics Main Steel Suppliers 800 km 250 km Brazil São Sebastião 180 km 500 km Itaguaí 270 km
  • 41. TenarisHydril EasyDock™ Connector – Version 01 / April 2019 42 Logistics Main Ports 230 km 180 km 300 km São Sebastião Brazil SANTOS: 13 berths / 24h operation SÃO SEBASTIÃO: 1 berth / 24h operation RIO DE JANEIRO: 12 berths / 24h operation
  • 42. TenarisHydril EasyDock™ Connector – Version 01 / April 2019 43 Main Projects TenarisConfab Main Offshore Line Pipe Projects (SAWL)
  • 43. Meeting Equinor & Tenaris August 20th, 2019 50 Market Segments OCTG Products
  • 44. Meeting Equinor & Tenaris August 20th, 2019 51 Premium Connections A full range of products and services for ever more demanding E&P applications and environments • HP/HT & Deep Wells • Deep Water • Shallow Water • Shales • Horizontal & Extended Reach Wells • Casing While Drilling • Thermal (SAGD & CSS) • Geothermal • Workstrings • Corrosion Protection & ID Coating Wedge Series 500 TM Blue® Series Weld-on Connectors Legacy Series Wedge Series 600™ (with Dopeless®) TenarisXP® Buttress connection
  • 45. 52 TenarisHydril EasyDock™ Connector – October/2019 TenarisHydril Large OD Portfolio (≥18”) EasyDock™ BlueDock® Blue ® Quick Seal Easy Running™ OD range Application 24” to 36” 18” to 42” 18” to 22” 7” to 24½” Onshore, Offshore Offshore Onshore, offshore Onshore, offshore Joint type Weld-on connector Weld-on connector Threaded & coupled Threaded & coupled Seal ELS ELS, M-t-M (up to 26”), SWS (optional) M-t-M - Fatigue - High performance - - Under development Under development Comes with Dopeless® Tech. Available Dopeless® Tech. Testing API RP 5C5 (Series B) API RP 5C5 CAL I API RP 5C5 CAL I - Note: Tenaris LOD offer includes some integral connections -threaded on the pipe body- from the recognized Wedge Series 500 as follows: Wedge 511® 18” and 18 ⅝”, Wedge 513® 18” and Wedge 521® 18” and 18 ⅝”. All available with Dopeless® Technology. Service severity High Medium Medium Mid-low
  • 46. TenarisHydril EasyDock™ Connector – Version 01 / April 2019 53 Integrated Mills and Quality Manageme nt System + Value added to final customer Tenaris can supply complete well requirements, from Conductors to Production Tubing • Complete service offering through Rig Direct™ model • Extensive expertise in proprietary manufacturing • Unique global infraestructure Tenaris Integrated Solution +
  • 47. 54 TenarisHydril EasyDock™ Connector – October/2019 Agenda • TenarisHydril Large OD Portfolio • TenarisHydril EasyDock™ Connector • Tenarishydril BlueDock® Connector • Tenaris Integrated Solution • Manufacturing
  • 48. 55 TenarisHydril EasyDock™ Connector – October/2019 TenarisHydril EasyDock™ Connector • Safe, robust, quick and easy to operate • Engineered to assure trouble-free MU even under highly demanding installation conditions • Visual MU reference with no need of torque-turns graph • Field proven and easy to operate Anti Rotational Keys (ARKs) to prevent back-off • High structural capacity, with liquid tightness under combined load conditions validated under API RP 5C5 • Driveable Its design stems from the extensively tested and field- proven TenarisHydril BlueDock® Connector
  • 49. 56 TenarisHydril EasyDock™ Connector – October/2019 TenarisHydril EasyDock™ Connector Main Features: • OD range: 24” to 36” • Pipe WT: Up to 1.5” • Int. profile: Internal Flush • Seal: Internal Elastomeric • ARKs: up to 2 per connector • Forging: 70-90ksi (110Ksi available) Ratings: • 85-100% - Pipe Body Tension, Compression and Bending Capacity • 100% - Pipe Body Minimum Internal Yield Pressure • 100% - Pipe Body Collapse Pressure Product Overview Note: Other dimensions may be developed if required
  • 50. 57 TenarisHydril EasyDock™ Connector – October/2019 Onshore typical well Production zone Casing strings always protected inside the well bore NOT EXPOSED REGULAR CASING REQUIREMENTS Structural Loads TenarisHydril EasyDock™ Applicable Scenario TenarisHydril EasyDock™ Connector Application
  • 51. 58 TenarisHydril EasyDock™ Connector – October/2019 Shallow Water: Jack-up or Platform Sea surface Seabed Production zone Casing strings up to the surface EXPOSED Casing strings inside the well bore RISER FUNCTION No demanding sea conditions TenarisHydril EasyDock™ Applicable Scenario TenarisHydril EasyDock™ Connector Application
  • 52. 60 TenarisHydril EasyDock™ Connector – October/2019 Product Features • Proprietary BTC modified crest-to-root hook thread assures structural capacity • Fast thread taper (~30%) for deep and easy stabbing • Low TPI design to minimize cross-threading risk • Multiple thread starts (3) for fast MU • Final MU position achieved with 3/4 of a turn (1/2 to hand-tight + 1/4 power- tight) • Allows for multiple M&B without damage Thread Profile BOX PIN Crest to Root Contact Hook Effect
  • 53. 61 TenarisHydril EasyDock™ Connector – October/2019 • Groove dimensioning and positioning optimized by Finite Element Analysis • Safe O-ring retention during handling, cleaning and M&B operations assured by dovetailed groove profile • Tapered pin nose geometry reduces O-ring dragging and/or damaging during MU assuring ideal final squeezing and positioning • Mill pre-installed box O-ring protected by thread protector Product Features Internal Elastomeric Seal (ELS) Video
  • 54. 63 TenarisHydril EasyDock™ Connector – October/2019 Product Features • Internal and external guides provide self-alignment of pin and box during stabbing, avoiding the possibility of crossed threading. • Cylindrical surfaces of the guides get in contact for ~1/2” axial distance before the first threads engage • Pin and box threads misalignment is not physically possible Self-alignment Guides 180° connector’s cut view shows resulting relative pin-box positioning due to self-alignment guides effect. Video
  • 55. 64 TenarisHydril EasyDock™ Connector – October/2019 • Safe, quick and easy to operate (up to 90% faster than other market solutions) • Extra assurance against connector accidental back-off • Pre-installed in manufacturing facilities, housed and bolted (no loose parts) • No need for special tools for operation • Not sensitive to axial loads or external shoulder opening • Designed to allow multiple activations • Up to 2 ARKs may be installed in one connector Product Features Anti Rotational Keys (ARKs) Video
  • 56. 68 TenarisHydril EasyDock™ Connector – October/2019 TenarisHydril BlueDock® Connector This development draws on our extensive expertise in proprietary thread design and experience in welding and pipe manufacturing. Designed for offshore applications: • Available in sizes from 18" to 42" – up to 2,0" wt. • Easy and safe stabbing, minimized cross-threading risk. • Outstanding structural capacity, with gas/water tightness under extreme combined load conditions. • Drivable • High fatigue performance under bending or tension-compression cycling loads. • Minimized risk of buck-off. • High over-torque capacity. • Minimized risk of dope overpressure. • High sealability performance according to API RP 5C5 CAL I. • Its design relies on the extensively tested TenarisHydril Blue® Series.
  • 57. 69 TenarisHydril EasyDock™ Connector – October/2019 TenarisHydril BlueDock® Connector Main Features: • Pipe OD: 18” to 42” • Pipe WT: Up to 2” • Int. profile: Internal flush - as standard External flush - if required • Seal: Metal to Metal - up to 26” Elastomeric - for all sizes Sea Water Exclusion - optional • ARKs: up to 3 per connector • Forging: 70-90ksi Ratings: • 100% - Pipe Body Tension, Compression and Bending Capacity • 100% - Pipe Body Minimum Internal Yield Pressure • 100% - Pipe Body Collapse Pressure Product Overview Note: Other dimensions may be developed if required
  • 58. 70 TenarisHydril EasyDock™ Connector – October/2019 TenarisHydril BlueDock® Connector Product Family, Released sizes and Alternatives ELS Options MTM Options Connector´s Grades • 70.3Ksi up to X65 pipes • 90.6Ksi up to X80 pipes Fatigue Application • Enhanced thread profile • Improved Girth Weld • WPS • Weld grinding Connector´s Designs • LR: Low pipe wt range. • HR: Heavy pipe wt range.
  • 59. 72 TenarisHydril EasyDock™ Connector – October/2019 Rig motion and bending loads Long Production Life Increasing fatigue risk Shallow water Fatigue driven by Wave dynamics TenarisHydril BlueDock® Connector Application – Shallow Water
  • 60. 73 TenarisHydril EasyDock™ Connector – October/2019 Parameters affecting Conductor and Surface Casing definition during the design stage:  Harsher Environmental Conditions  Higher current velocities  Waves  Weaker/Softer soil  Water Depth  Rig Type (RAO)  BOP size  VIV  Time Drilling the well  Wellhead Stick-up / Cement level RISER ANALYSYS WITH ENGINEERING COMPANIES Operators are normally assuming a conservative approach on the selection of Wellhead, Conductor and Surface Casing systems. Critical Loads Fatigue and Bending TenarisHydril BlueDock® Connector Application – Deep & Ultra-Deep Water
  • 61. 75 TenarisHydril EasyDock™ Connector – October/2019 Wellhead System VIV Fatigue
  • 62. 76 TenarisHydril EasyDock™ Connector – October/2019 Product Features • Proprietary BTC modified crest-to-root thread assures structural capacity • Fast thread taper (~30%) for deep and easy stabbing • Low TPI design to minimize cross-threading risk: – 3 TPI for OD from 18" to 28" – 2 TPI for OD for 30” and larger. • Multiple thread starts (3) for fast MU • Final MU position achieved with 3/4 of a turn (1/2 to hand-tight + 1/4 power- tight) • Designed for high fatigue performance, no stress risers on flank-to-root transitions • Allows for multiple M&B without damage Thread Profile BOX PIN Crest to Root Contact Hook Effect
  • 63. 80 TenarisHydril EasyDock™ Connector – October/2019 Product Features Self-alignment Guides • Internal and external guides to steer the connector during stabbing, preventing cross threading • Cylindrical surfaces of the guides get in contact for ~1/2” axial distance before the first threads engage • Pin and box threads misalignment is not physically possible 180°connector’s cut view shows resulting relative pin- box positioning due to self- alignment guides effect.
  • 64. 81 TenarisHydril EasyDock™ Connector – October/2019 • Safe, quick and easy to operate (up to 90% faster than other market solutions) • Extra assurance against connector accidental back-off • Pre-installed in manufacturing facilities, housed and bolted (no loose parts) • No need for special tools for operation • Not sensitive to axial loads or external shoulder opening • Designed to allow multiple activations • Up to 3 ARKs may be installed in one connector Product Features Anti Rotational Keys (ARKs)
  • 65. 83 TenarisHydril EasyDock™ Connector – October/2019 • Finite Element Analysis (FEA) Program • Full Scale Testing (FST) Program – M&B validation – Sealability tests – Conductor casing – Sealability tests – Surface casing – Fatigue – Driving Assessment Design Verification
  • 66. 84 TenarisHydril EasyDock™ Connector – October/2019 TenarisHydril BlueDock® Connector Product Roll Out - Full Scale Tests Water Sealability Series B to 95% PB VME Series A to 95% PB VME Series B to 95% PB VME 20” BlueDock LR 70 MTM • • • 20” BlueDock LR 70 ELS • • 20” BlueDock HR 90 MTM • • • 20” BlueDock HR 90 MTM DPLS • • • 20” BlueDock HR 90 MTM • • • 20” BlueDock HR 90 MTM - SWS • • • 22” BlueDock HR 90 MTM • • • • 22” BlueDock HR 90 ELS • 22” BlueDock HR 90 MTM-SWS • • • • 24” BlueDock HR 70 MTM-SWS • • 26” BlueDock LR 70 ELS-EF • • 28” BlueDock LR 70 ELS-SWS • 30” BlueDock LR 70 ELS • • • • 30” BlueDock LR 70 ELS DPLS • • 36” BlueDock HR 70 ELS • • • 30” EasyDock 70 ELS • • • 36” EasyDock 70 ELS • 24” DesertDock 70 • • Completed • Ogoing • On Hold *Hammering Test Product M&Bs Gas Sealability Series C Resonant Fatigue Hammering
  • 67. 85 TenarisHydril EasyDock™ Connector – October/2019 TSH BlueDock® | Worldwide Field Experience Summary • More than +200 operations, with field experience constantly being increased. (from 20” up to 36”) • BlueDock® connectors run in different water conditions & Installations methods (Shallow, Deep and Ultra-Deep water). • Different installation methods (Hammering, Jetting, Drilling& Cemented)
  • 68. TenarisHydril EasyDock™ Connector – Version 01 / April 2019 86 • Location – Pindamonhangaba, Brazil • Process – Pipe (UOE) – Connector – Welding and Final Conditioning Only supplier in the industry with fully integrated production & quality system Pipe + Connector + Welding Process Manufacturing
  • 69. TenarisHydril EasyDock™ Connector – Version 01 / April 2019 88 Blank - Seamless pipe - Forging Machining cone and bevel Threading, finishing and gauging Connector Manufacturing Process - Overview Connector Manufacturing
  • 70. TenarisHydril EasyDock™ Connector – Version 01 / April 2019 89 Final Inspection and RFS Storage Compound O-ring and ARKs Installation Marking NDT Grinding (if applicable) SAW + PWHT Tack Welding Assembly Initial Inspection and Cleaning Tack Welding Submerged Arc Welding Manufacturing Welding Process and Final Conditioning Video
  • 71. Meeting Equinor & Tenaris August 20th, 2019