Integrated Project Delivery for Transportation
1. Increase project efficiencies and avoid
cost and schedule overruns with
Increase project efficiencies and avoid
cost and schedule overruns with
Integrated
ProjectDelivery
Integrated
ProjectDelivery
2. Project owner hires a single
company to perform both the
design and construction.
Project owner contracts with
separate entities for the
design and construction.
Project owner hires a
contractor to provide feedback
during the design phase before
construction.
Design-Build Design-Bid-Build Construction Manager/
General Contractor
Traditional
integrated
integrated
One of the most important factors affecting a job's
success is the project delivery method.
3. The transportation
industry is moving from
linear project delivery
methods in favor of an
integrated approach;
allowing all stakeholders
to collaborate and offer
expertise in the early
stages of a project.
Keep projects within budget
Reduce the number of
change orders
Secure top choice trade partner
earlier in the process
Allow for faster delivery
Canyour
software
supportthis?
Integratedproject
deliverybenefits
5. easilycollaborate
With OpenRoads Designer, see and use everyone else's data within the confines of your own
application. This true integration helps you analyze, model, and report on all data within a singular
model. Combine 3D project data from any source to make better engineering decisions and reduce
risk by minimizing errors and omissions prior to construction.
1
Learn more: bit.ly/openroadsintegratedatawebinar
6. easily
manage
change
Change is a constant in the design and
production world, that's why
OpenRoads Designer was built to help
you easily, effectively, and dynamically
manage design changes.
2Reference outside data from other
consultants on adjacent projects to
prevent changes down the road.
Save money and time!
eliminatelagtime
minimize re-work
reduce tedious manual work
Minimize the gap in communication between
owners, designers, and contractors, to
reduce the need for change.
Work faster, better, and for less money!
Make changes and watch them automatically
update in all views without user intervention.
Continually refine your design without
frustration, error, or project delays!
Learn more: bit.ly/openroadschangevideo
7. OpenRoads Designer can produce a variety of construction documentation and data so
you can meet all your project requirements. Using design constraints, design-time
visualization, dynamic annotation, and automated plan production based on the live
model, you are assured that all project information is consistent and up to date.
3 Easily communicate deliverables
Learn more: bit.ly/openroadsdeliverables
8. See it in action
bit.ly/openroadsbusinessissueplaylist