1. Mohamed Salem MohamedMohamed Salem Mohamed
2 Ellethi from Elfadl St, Elsayda Zeinab– Cairo, Egypt
Date of Birth: 12 DEC. 1983
Marital Status: Married
Military Status: Exempt
Mobile: +01123210077
Email: ms.farag2013@gmail.com
An enthusiastic engineer with proper technical qualifications and soft skills. Eager to gain entry to a
career in a world-class engineering environment. A hard-working and dependable engineer who
enjoys meeting new challenges. A position allowing me to utilize my academic background & skills in
different areas of HVAC field.
Mechanical Engineering
Faculty of Engineering - Cairo University
Graduation Year Grade: - Good (72.24%) Rank (16)
Graduation project:
-Educational heat exchangers (shell &tube, double pipe, cross flow) HEX
This project mainly consists of:
- Double Pipe study and Design - Measurement system
- Pumping and Tank calculation -Fabrication Process
Graduation project grade: Excellent
2001–2006
Revit MEP Diploma 2016
Seminar for Quality Management System(ISO 9001) & Internal Auditor Course 2015
Basic and Advanced A/C Course-Cairo Engineers Syndicate 2008
Basic Plumbing Course- Cairo Engineers Syndicate 2008
AutoCAD Course –Cairo University-Faculty of Engineering 2004
Microsoft word, Microsoft Excel, Microsoft PowerPoint 2002
Very Good Experience in The Following Branches of HVAC Field:
-A/C systems (DX & Chilled) & Ventilation Systems.
-Smoke Management System Calculations and design.
-Clean Rooms & Data Processing Center design fundamentals.
-Coordination, Workshop Drawing and Quantity Survey.
- Knowledge with LEED
Very Good Experience in The Following HVAC Software:
-Carrier Hourly Analysis Program (HAP 4.9).
-Elite Thermal Load Estimation.
-Carrier E-20 Duct & Chilled pipe Design.
-Various A/C Equipment Selection Programs.
11
PROFISSIONAL COURSES
PROFISSIONAL WORK SKILLS
EDUCATION/DEGREES
JOB OBJECTIVE
2. Saud Consult (SC)–Cairo 7/2010 Till Now
Position: HVAC Design Engineer & Electro Mechanical Coordinator.
-Preparing All Design Calculations, Documents, Quantity Survey and Cost Estimation.
- Preparing Coordination and Quantity Evaluation.
KEM Consultant Electromechanical Consulting Engineers 3/2010 to 7/2010
Position: HVAC Design Engineer & Electro Mechanical Coordinator.
-Preparing All Design Calculations, Documents, Quantity Survey and Cost Estimation.
- Preparing Coordination, Workshop Drawing and Quantity Evaluation.
-Checking MEP Drawings with the Consultants before submitting and Issued for Construction in the site
-Owners meetings
Global Design–(JeddahMakkah)-MEP Coordinator Engineer 6/2009 to 8/2009
Position: HVAC Design Engineer & Electro Mechanical Coordinator.
-Preparing All Design Calculations, Documents, Quantity Survey and Cost Estimation.
- Preparing Coordination, Workshop Drawing and Quantity Evaluation.
-Checking MEP Drawings with the Consultants before submitting and Issued for Construction in the site
-Owners meetings
-HVAC site engineer.
Global Design–Cairo 11/2007 to 3/2010
Position: HVAC Design Engineer & Electro Mechanical Coordinator.
-Preparing All Design Calculations, Documents, Quantity Survey and Cost Estimation.
- Preparing Coordination, Workshop Drawing and Quantity Evaluation.
NOBEL – Cairo 8/2006 to 10/2007
Position: HVAC Design Engineer , Electro Mechanical Coordinator & site HVAC office engineer
-Preparing All Design Calculations, Documents, Quantity Survey and Cost Estimation.
- Preparing Coordination, Workshop Drawing and Quantity Evaluation.
-HVAC site engineer.
22
PROFISSIONAL WORK HISTORY
3. Novatel Hotel: 2006:2007
Location: Cairo-Egypt
Description: Commercial Towers
System: -Chilled water System (Central district cooling).
THE PEARL-PARCEL 6-SABBAN TOWERS : 2007
Location: Doha-Qatar
Description: THREE Residential Towers - Every Tower consists of 26 floors with total build up area 200,000
SQ.M – the total project budget is 900,000,000 QR.
System: -Chilled water System (Central district cooling).
-Smoke management system (Parking, Stairs and Lifts).
THE PEARL-PARCEL 16B-JUMANA TOWER : 2008
Location: Doha-Qatar
Description: ONE Residential Tower - Tower consists of 26 floors with total build up area 72,500 SQ.M – the
total project budget is 350,000,000 QR.
System: -Chilled water System (Central district cooling).
-Smoke management system (Parking, Stairs and Lifts).
SUADNESE EGYPTIAN STEEL FACTORY: 2008
Location: Khartoum-Sudan
Description: TWO Industrial Buildings – The total build up area 50,000 SQ.M.
System: -DX System and Mechanical Ventilation System.
Microsoft Headquarter (Administration building). 2009
Location: Cairo-Egypt
Description: Office.
System: -DX System and Mechanical Ventilation System.
Tahgig Hotel Saudi Arabia. 2009
Location: Makkah –KSA
Description: Residential Building.
System: -DX System and Mechanical Ventilation System.
RABIGH CABLE FACTORY-ENERGYA: 2009
Location: Rabigh-KSA
Description: TWO Residential Buildings and FOUR Industrial Buildings.
System: -Chilled water System (Central Chillers Plant).
-Smoke management system (Stairs).
-Clean Rooms Air System Regarding to Various Air Classes.
-Mechanical Ventilation and Exhaust System.
Sheraton tower: 2010
Location: Cairo-Egypt
Description: Offices and Commercial Building (6 floors + basement parking)
System: -Chilled water System (Central Chillers Plant).
-Smoke management system (parking).
-Mechanical Ventilation and Exhaust System.
33
PROFISSIONAL PROJECTS EXPERIENCE
4. Genana Mall: 2010
Location: Cairo-Egypt
Description: Offices and Commercial Building (6 floors + basement parking)
System: -Chilled water System (Central Chillers Plant).
-Smoke management system (parking).
-Mechanical Ventilation and Exhaust System.
Bio-farm: 2010
Location: Cairo-Egypt
Description: Medical Building (4 floors)
System: -Chilled water System (Central Chillers Plant).
-Smoke management system.
-Clean Rooms Air System Regarding to Various Air Classes.
-Mechanical Ventilation and Exhaust System.
Residential Buildings: 2010
Location: Cairo-Egypt
Description: Residential Buildings (12 floors + basement parking).
System: - DX System.
-Smoke management system (parking).
-Mechanical Ventilation and Exhaust System.
Osis theater: 2010
Location: Cairo-Egypt
Description: Theater building
System: - DX System.
-Smoke management system.
-Mechanical Ventilation and Exhaust System.
JUBAIL INDUSTRIIAL COLLEGE FOR ROYAL COMMISSION: 2010
Location: Jubail-KSA
Description: THREE Educational Buildings with total build up area 46,000 SQ.M- the total Project budget is
204,000,000 SR.
System: -Chilled water System (Central district cooling).
-Smoke management system (Stairs and Lifts).
JUBAIL UNIVERSITY COLLEGE FOR ROYAL COMMISSION: 2010
Location: Jubail-KSA
Description: Core Administration Building with total build up area 151,700 SQ.M- the total Project budget is
580,000,000 SR.
System: -Chilled water System (Central district cooling).
-Smoke management system (Atrium, Parking, Stairs and Lifts).
-Data Processing Center A/C Systems.
TABOUK HOTEL: 2011
Location: Tabouk-KSA
Description: Hotel consists of sixth floors and 30 attached villas - the total Project budget is 297,000,000
SR.
System: -Chilled water System (Central district cooling).
-Smoke management system (Atrium, Stairs and Lifts).
44
5. BAHA HOTEL: 2011
Location: Baha-KSA
Description: Hotel consists of twelve floors and 38 attached villas - the total Project budget is 293,000,000
SR.
System: -Chilled water System (Central district cooling).
-Smoke management system (Atrium, Stairs and Lifts).
LABOR CAMP FOR ROYALCOMMISSION: 2011
Location: Jubail-KSA
Description: 11 Pre-engineered Steel buildings (Bakery, Gym, Dining hall, Laundry,...etc)- the total Project
budget is 287,000,000 SR.
System: -DX System and Mechanical Ventilation System.
-Smoke management and Exhaust System.
NEW CAIRO-EMAAR: 2012
Location: Cairo-Egypt
Description: Miscellaneous Electrical buildings.
System: -DX System and Mechanical Ventilation System.
DAMMAM UNIVERSITY: 2013
Location: Dammam-KSA
Description: 3-Medical & Educational buildings (Labs, seminars, admins,...etc)- the total Project budget is
240,000,000 SR.
System: - Chilled water System (Central district cooling).
-Smoke management and Exhaust System.
DAMMAM UNIVERSITY: 2014
Location: Dammam-KSA
Description: 6-Medical & Educational buildings - the total Project budget is 400,000,000 SR.
System: - Chilled water System (Central district cooling).
-Smoke management and Exhaust System.
ISKAN UTILITIES: 2014
Location: Dubai-UAE
Description: Various Utilities Public buildings
System: -DX System and Mechanical Ventilation System.
KING FAISAL AIR ACADEMY: 2015
Location: MAJMAAH-KSA
Description: 18-Multifunctions buildings - the total Project budget is 600,000,000 SR.
System: - DX Package System.
-Smoke management and Mechanical Ventilation System.
Palm Hills : 2016
Location: Cairo-Egypt
Description: Residential buildings
System: - DX System.
- Mechanical Ventilation System.
55
6. Arabic Mother tongue.
English Good.
♦ All References are available on request.
66
LANGUAGES KNOWLEDGE
7. Arabic Mother tongue.
English Good.
♦ All References are available on request.
66
LANGUAGES KNOWLEDGE