SlideShare a Scribd company logo
1 of 5
Download to read offline
Page 1 of 5
CV
Mechanical Engineer
HVAC PROJECTS MANAGER
HVAC, SOLAR, PLUMBING & FIRE FIGHTING
Name: Nidal Ghawanmeh.
Nationality: Jordan
Date of birth: 29/11/1967
University: Far Eastern
Degree: B.Sc. Mechanical Engineer.
Graduation Year: June 1991
Languages: Arabic, English
Address: Amman- Jordan
Tel No.:
.: 00962 798770021 Amman – Jordan
00966 503942552 Saudi Arabia
E-mail: nidal70000@yahoo.com
Driving license : Saudi Arabia and Jordan driving license
Summary
 Design and installation of heating ventilation and air conditioning for
Industrial, residential and commercial projects.
 Selection of materials and equipment for HVAC system.
 Design and installation of chilled water system for air cooled water
Chillers and water cooled chillers.
 Design and installation of DX system such as package units central split,
Double skins AHU′S and VRF A/C UNITS.
 Design of Ducting layout and sizing for all type of building commercial and
Industrial based on SMACNA requirements.
 Knowledge of BMS ,control panels & monitoring panels based on the sequence of
Operation.
 Experience for the installation of ducting and piping layout including the testing
Commissioning and air balancing. (TAB)
 Design and installation of plumbing and fire fighting system.
Page 2 of 5
Sep-2013 up to date : ( LG . AL-HASSAN G.I. SHAKER CO.) SAUDI ARABIA….
HVAC PROJECT MANAGER…
MAJDOUL TOWER… 55 STORY BUILDING AT RIYADH CITY…
This commercial project comprising of car parks, complex floors, 45 story offices,
And other related floors to the MAJDOUL TOWER IN RIYADH CITY.
The design of the HVAC system for this tower based on the followings:
1. VRF A/C equipments for the typical floors.
2. Fresh air AHU’S located in the mechanical floors.
3. Supply and return AHU’S serving the ground and the mezzanine floors.
4. Car parks ventilation fans.
5. Smoke system.
PNUW SAUDI ARABIA SOLAR PROJECT…
Jan-2010-up to 2013 (Millennium Energy Industries-KSA)
Solar Energy Projects.
Project Manager for the following solar projects:
1. PNUW 35,000 M2 of solar collectors.
2. KAPSARC project solar system for 191 villas.
3. NESTLE factory solar system for thermal heating.
Page 3 of 5
1999 up Jan-2010: Zamil Air Conditioners Saudi Arabia
HVAC Design, project management & sales engineer
Projects:
1. SABIC, Petrochemical Plant (OLFINE III). (25,000 m2 petrochemical
Plants include admin building, S/S buildings, control room, and analyzer
rooms. Total capacity 1,450 tons of refrigeration chilled water and DX system.
2. SABIC, Hadeed (Steel Factory ) replacement of chilled water double skin
AHU'S and air cooled water chillers for S/S and admin buildings. Total
Capacity 2,500 tons of refrigerant.
3. SABIC, Housing Projects For Sharq petrochemical housing project 400
Villas package A/C units. Total capacity 1,100 tons of refrigerant.
4. SAFCO plant (14,000 m2 project include admin building, S/S buildings and
Control room, Total capacity 1,150 tons of refrigerant using chilled water and
DX system
5. Other projects Commercial & industrial in Saudi Arabia.
1995 up to 1997 &1998 up to 1999
Siqma Consulting Engineers Amman Jordan
(Design & Supervision Engineer for HVAC system, plumbing & fire fighting)
1. Design includes heat load calculation, A/C units selection preparation of
HVAC Drawings and BOQ.
2. Design of fire fighting and plumbing system:-
3. Supervision Engineer.
Projects:
1. Amman Grand Hyatt Hotel (Five Star Hotel).
2. Zara trade Centre N (Hyatt Tower) (Commercial High Rise Building).
3. Zara trade Centre S (Hyatt Tower) (Residential High Rise Building).
4. Movenpick Hotel Dead see.
5. British Bank Amman.
The above projects comprising of car parks, complex cinema, 17 storeys offices,
Apartments and other related to HYAT Amman Hotel.
All buildings contain of water cooled chillers using both (VAV &CAV).
-------------------------------------------------------------------------------------------------------------------------------
Page 4 of 5
1997 up to 1998 Meinhard Middle East Consulting (Qatar)
(Design of HVAC system, plumbing &Fire fighting)
Projects:
1. Qatar City Center (Shopping Mall)
Total area250,000 m2 comprising of 120 retail unit public areas anchor stores car
Parks, complex cinema and ice skating.
Using Air cooled water chillers and double skin AHU'S.
4. Commercial buildings as follows:-
a) Sulaity Tower Offices 16 storeys
b) Express Hotel 18 storeys
DX- system was used in the above projects.
1993 up to 1994 (Horizon Water Filtration CO. Amman-Jordan)
Projects Engineer
Projects:-
1. Jordan Spinning &Weaving Factory (Biological water treatment).
2. Jordan Chlorine Factory (water treatment plant).
3. AL-Hussien Thermal power Station ( R.O. System)
1991 up to 1993 (ISSA & NFFA CO. Amman- Jordan)
Projects Engineer
Projects:
1. North Ghore Conversation projects-Jordan Valley.
Thanks and best regards
Eng. Nidal Ghawanmeh
Nidal70000@yahoo.com
00966 503942552 Saudi Arabia
00962 798770021 Amman Jordan
Page 5 of 5

More Related Content

What's hot

head quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exphead quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years expsameh todary
 
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali GhalyCV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghalyaladin ghaly
 
Abdelrazek Kamal Ali C.V
Abdelrazek Kamal  Ali C.VAbdelrazek Kamal  Ali C.V
Abdelrazek Kamal Ali C.VAbdelrazek Ali
 
C V ALAA AMMAR 2
C V   ALAA AMMAR 2 C V   ALAA AMMAR 2
C V ALAA AMMAR 2 Alaa Ammar
 
Norman Simpson Latest Nov
Norman Simpson Latest NovNorman Simpson Latest Nov
Norman Simpson Latest NovNorman Simpson
 
Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHesham Fathy, PMP
 

What's hot (8)

head quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exphead quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exp
 
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali GhalyCV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
 
Abdelrazek Kamal Ali C.V
Abdelrazek Kamal  Ali C.VAbdelrazek Kamal  Ali C.V
Abdelrazek Kamal Ali C.V
 
C V ALAA AMMAR 2
C V   ALAA AMMAR 2 C V   ALAA AMMAR 2
C V ALAA AMMAR 2
 
Mohammed seddik-cv
Mohammed seddik-cvMohammed seddik-cv
Mohammed seddik-cv
 
Norman Simpson Latest Nov
Norman Simpson Latest NovNorman Simpson Latest Nov
Norman Simpson Latest Nov
 
Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.M
 
2016 Samir A. Fattah CV
2016 Samir A. Fattah CV2016 Samir A. Fattah CV
2016 Samir A. Fattah CV
 

Viewers also liked

Viewers also liked (9)

D Tiger Sharks
D   Tiger SharksD   Tiger Sharks
D Tiger Sharks
 
D Why Can't I
D   Why Can't ID   Why Can't I
D Why Can't I
 
E - The Contest
E -  The ContestE -  The Contest
E - The Contest
 
D swamp music
D   swamp musicD   swamp music
D swamp music
 
D Animal Horns
D   Animal HornsD   Animal Horns
D Animal Horns
 
H Grounded to Earth
H   Grounded to EarthH   Grounded to Earth
H Grounded to Earth
 
D Mud Balls
D   Mud BallsD   Mud Balls
D Mud Balls
 
E - Shoes Women Wear
E -  Shoes Women WearE -  Shoes Women Wear
E - Shoes Women Wear
 
E - When I Grow Up
E -  When I Grow UpE -  When I Grow Up
E - When I Grow Up
 

Similar to ENG NIDAL GHAWANMEH CV (MECHANICAL ENG.)

Similar to ENG NIDAL GHAWANMEH CV (MECHANICAL ENG.) (20)

Resume GMH
Resume GMHResume GMH
Resume GMH
 
HVAC Chiller BMS Engineer
HVAC Chiller BMS EngineerHVAC Chiller BMS Engineer
HVAC Chiller BMS Engineer
 
amr lashen
amr lashenamr lashen
amr lashen
 
New Microsoft Word Document
New Microsoft Word DocumentNew Microsoft Word Document
New Microsoft Word Document
 
Co Profile-Comfort Air Systems Fze
Co Profile-Comfort Air Systems FzeCo Profile-Comfort Air Systems Fze
Co Profile-Comfort Air Systems Fze
 
CV Aqeel
CV AqeelCV Aqeel
CV Aqeel
 
Morad Fathy c.v
Morad Fathy c.v Morad Fathy c.v
Morad Fathy c.v
 
Mechanical Hvac INMA 3117
Mechanical Hvac INMA 3117Mechanical Hvac INMA 3117
Mechanical Hvac INMA 3117
 
CV Sheren
CV SherenCV Sheren
CV Sheren
 
CV_AD1
CV_AD1CV_AD1
CV_AD1
 
.CV.
.CV..CV.
.CV.
 
Zac india presentation acretech
Zac india presentation   acretechZac india presentation   acretech
Zac india presentation acretech
 
HUSAM GH 2015
HUSAM GH 2015HUSAM GH 2015
HUSAM GH 2015
 
Pth series (1)
Pth series (1)Pth series (1)
Pth series (1)
 
A_Rashad_new_updateCV
A_Rashad_new_updateCVA_Rashad_new_updateCV
A_Rashad_new_updateCV
 
Mohammed Abdul Majeed CV- General Manager
Mohammed Abdul Majeed CV- General  ManagerMohammed Abdul Majeed CV- General  Manager
Mohammed Abdul Majeed CV- General Manager
 
M. Darwish CV 30-11-2015
M. Darwish CV 30-11-2015M. Darwish CV 30-11-2015
M. Darwish CV 30-11-2015
 
Prequalification%20document%20(final)
Prequalification%20document%20(final)Prequalification%20document%20(final)
Prequalification%20document%20(final)
 
Salah Salem CV
Salah Salem CVSalah Salem CV
Salah Salem CV
 
Ashraf cv
Ashraf cvAshraf cv
Ashraf cv
 

ENG NIDAL GHAWANMEH CV (MECHANICAL ENG.)

  • 1. Page 1 of 5 CV Mechanical Engineer HVAC PROJECTS MANAGER HVAC, SOLAR, PLUMBING & FIRE FIGHTING Name: Nidal Ghawanmeh. Nationality: Jordan Date of birth: 29/11/1967 University: Far Eastern Degree: B.Sc. Mechanical Engineer. Graduation Year: June 1991 Languages: Arabic, English Address: Amman- Jordan Tel No.: .: 00962 798770021 Amman – Jordan 00966 503942552 Saudi Arabia E-mail: nidal70000@yahoo.com Driving license : Saudi Arabia and Jordan driving license Summary  Design and installation of heating ventilation and air conditioning for Industrial, residential and commercial projects.  Selection of materials and equipment for HVAC system.  Design and installation of chilled water system for air cooled water Chillers and water cooled chillers.  Design and installation of DX system such as package units central split, Double skins AHU′S and VRF A/C UNITS.  Design of Ducting layout and sizing for all type of building commercial and Industrial based on SMACNA requirements.  Knowledge of BMS ,control panels & monitoring panels based on the sequence of Operation.  Experience for the installation of ducting and piping layout including the testing Commissioning and air balancing. (TAB)  Design and installation of plumbing and fire fighting system.
  • 2. Page 2 of 5 Sep-2013 up to date : ( LG . AL-HASSAN G.I. SHAKER CO.) SAUDI ARABIA…. HVAC PROJECT MANAGER… MAJDOUL TOWER… 55 STORY BUILDING AT RIYADH CITY… This commercial project comprising of car parks, complex floors, 45 story offices, And other related floors to the MAJDOUL TOWER IN RIYADH CITY. The design of the HVAC system for this tower based on the followings: 1. VRF A/C equipments for the typical floors. 2. Fresh air AHU’S located in the mechanical floors. 3. Supply and return AHU’S serving the ground and the mezzanine floors. 4. Car parks ventilation fans. 5. Smoke system. PNUW SAUDI ARABIA SOLAR PROJECT… Jan-2010-up to 2013 (Millennium Energy Industries-KSA) Solar Energy Projects. Project Manager for the following solar projects: 1. PNUW 35,000 M2 of solar collectors. 2. KAPSARC project solar system for 191 villas. 3. NESTLE factory solar system for thermal heating.
  • 3. Page 3 of 5 1999 up Jan-2010: Zamil Air Conditioners Saudi Arabia HVAC Design, project management & sales engineer Projects: 1. SABIC, Petrochemical Plant (OLFINE III). (25,000 m2 petrochemical Plants include admin building, S/S buildings, control room, and analyzer rooms. Total capacity 1,450 tons of refrigeration chilled water and DX system. 2. SABIC, Hadeed (Steel Factory ) replacement of chilled water double skin AHU'S and air cooled water chillers for S/S and admin buildings. Total Capacity 2,500 tons of refrigerant. 3. SABIC, Housing Projects For Sharq petrochemical housing project 400 Villas package A/C units. Total capacity 1,100 tons of refrigerant. 4. SAFCO plant (14,000 m2 project include admin building, S/S buildings and Control room, Total capacity 1,150 tons of refrigerant using chilled water and DX system 5. Other projects Commercial & industrial in Saudi Arabia. 1995 up to 1997 &1998 up to 1999 Siqma Consulting Engineers Amman Jordan (Design & Supervision Engineer for HVAC system, plumbing & fire fighting) 1. Design includes heat load calculation, A/C units selection preparation of HVAC Drawings and BOQ. 2. Design of fire fighting and plumbing system:- 3. Supervision Engineer. Projects: 1. Amman Grand Hyatt Hotel (Five Star Hotel). 2. Zara trade Centre N (Hyatt Tower) (Commercial High Rise Building). 3. Zara trade Centre S (Hyatt Tower) (Residential High Rise Building). 4. Movenpick Hotel Dead see. 5. British Bank Amman. The above projects comprising of car parks, complex cinema, 17 storeys offices, Apartments and other related to HYAT Amman Hotel. All buildings contain of water cooled chillers using both (VAV &CAV). -------------------------------------------------------------------------------------------------------------------------------
  • 4. Page 4 of 5 1997 up to 1998 Meinhard Middle East Consulting (Qatar) (Design of HVAC system, plumbing &Fire fighting) Projects: 1. Qatar City Center (Shopping Mall) Total area250,000 m2 comprising of 120 retail unit public areas anchor stores car Parks, complex cinema and ice skating. Using Air cooled water chillers and double skin AHU'S. 4. Commercial buildings as follows:- a) Sulaity Tower Offices 16 storeys b) Express Hotel 18 storeys DX- system was used in the above projects. 1993 up to 1994 (Horizon Water Filtration CO. Amman-Jordan) Projects Engineer Projects:- 1. Jordan Spinning &Weaving Factory (Biological water treatment). 2. Jordan Chlorine Factory (water treatment plant). 3. AL-Hussien Thermal power Station ( R.O. System) 1991 up to 1993 (ISSA & NFFA CO. Amman- Jordan) Projects Engineer Projects: 1. North Ghore Conversation projects-Jordan Valley. Thanks and best regards Eng. Nidal Ghawanmeh Nidal70000@yahoo.com 00966 503942552 Saudi Arabia 00962 798770021 Amman Jordan