DNV GL © 2016 04 April 2016 SAFER, SMARTER, GREENER
DNV GL © 2016
SOFTWARE
Synergi Plant
1
A holistic plant integrity and reliability management platform
Tommy Tang
Plant Integrity Software product architect
DNV GL Software
DNV GL © 2016 04 April 2016
Question:
How do you
predict and monitor
potential damages, impacts and financial losses
for your assets in the plant,
and
make sure the risk is reduced continuously?
2
DNV GL © 2016 04 April 2016
Did you know …
 A proper implementation of asset integrity/reliability software solution
can help you to prevent more than USD 100M potential financial loss
every year?
 You may waste 90% effort doing unnecessary inspections and
maintenances, while the most critical 10% are missed?
 You can plan the plant inspection and maintenance based on
quantitative risk, predict and monitor the risk change in the coming
years on a management dashboard?
3
DNV GL © 2016 04 April 2016
What if you can …
 Get help to know about the available software in the market, and assess the
level of depth you need to implement an asset integrity/reliability software
with a prototype or pilot study
 Save more than 50% of your inspection cost and prevent more than 50% risk,
and at the same time measure and justify your return on investment for the
asset integrity/reliability solution in a dashboard
 Manage future asset risk quantitatively, plan your inspection and maintenance
efficiently, and change the software configuration easily, all by open your
browser anytime, anywhere
4
DNV GL © 2016 04 April 2016
5
Before doing it, do you know how to measure your success?
Financial Return$
Reduce 1 unplanned shutdown
x 1 day production
x 150,000 bpd
x 50 USD
= 7,500,000 USD
Risk reduction (Potential risk cost)
Extend 1 year production
x 365 days
x 150,000 bpd
x 50 USD
= 2,737,500,000 USD
Life and inspection extension (Potential revenue)
- Reduce inspection cost
- Reduce maintenance cost
- Improve efficiency
Operational cost (Current cost)
5
DNV GL © 2016 04 April 2016
6
Asset integrity and reliability overview
DNV GL © 2016 04 April 2016
Did you know this is possible?
7
DNV GL © 2016 04 April 2016
Do you know where you are, and where you want to go?
8
DNV GL © 2016 04 April 2016
Are you doing everything risk-based on your way?
9
DNV GL © 2016 04 April 2016
Synergi Plant – Managing risk in your plant continuously
1
Asset Data
RBI Scope RBI Analysis
Regulation Scope Regulation Schedule
Insp. &
Maint. Packages
Insp.
Recording &
Integrity
Assessment
Anomaly &
Notification
Maint.
Work order
(SAP,EAM)
Dashboard
and KPI
RCM / SIL
Analysis
RCM / SIL
Scope
Maint.
Recording
DNV GL © 2016 04 April 2016
You may want to know and focus on your goals beforehand
13
No. Driver Count
1 Work planning - Risk based 33
2 Managing information verification and traceability 18
3 Work planning - Regular/Time based 14
4 Managing plant inspection and maintenance work process 13
5 Reliability based 10
6 Change in integrity best practice 9
7 Reports: Technical compliance management reports 9
8 Introduce new system to get higher position in the organization 6
9 Managing aging assets 6
10 Alleviate manpower or skill shortage 5
DNV GL © 2016 04 April 2016
16
Synergi Plant
- A holistic software platform from DNV GL
for integrity and reliability management
DNV GL © 2016 04 April 2016
What we can offer for asset integrity and reliability
17
SYNERGI PLANT
• Facility management
• RBI, RCM and SIL
• Inspection and maintenance plan
• Work packaging and execution
• Integrity assessment and anomaly
• KPI, traffic light, and report
• Integration interface
SYNERGI STRUCTURE
• Structure data and model
• Structure RBI
• Inspection planning and recording
• 3D viewer
• KPI, traffic light, and report
• Integration interface
SYNERGI PIPELINE
• Pipeline data management
• Pipeline risk assessment
• Inspection data management
• Integrity and anomaly
• GIS and spatial
• KPI, traffic light, and report
• Integration interface
SYNERGI DASHBOARD
• Management overview
• Risk summary and trend
• Geographical risk view
• Integration and drilldown
DNV GL © 2016 04 April 2016
If you are one of these operators, Synergi Plant is for you
18
Exploration
and Gathering
• Platform Topside
• FPSO, FSO, FLNG Topside
• Onshore Gathering Unit
• Terminal
• Storage Tank Farm
• Process Unit & Station
along the pipelines
• Refinery
• Chemical Plant
• LNG Plant
• Power and Utility Plant
Transportation
and Storage
Refine
and Production
DNV GL © 2016 04 April 2016
Synergi Plant today
19
• Fully web-based and cross
browser, can be hosted on
cloud
• 48 customers in 20+
countries, use IDMS and
other modules like RCM or
MMS, with 100+
customers using the
standard RBI module.
• 4 major types of SAP
integration
• 1 system supporting
various configurations for
all customers
• Link from expert tools to
management dashboard
• Migrated modules from
GL’s Galiom AIMS
software
DNV GL © 2016 04 April 2016
We respect and learn from our customers
20
CPC
USI
KOC
SAMIR
INEOS ABS
CNPC
GS CALTAX
DONG
ENERGY
STAATSOLIE
GNPOC
CAIRN
ENERGY
SALALAH SMC
SCG
(REPCO)
ADMA OPCO
BW OFFSHORE
PCS
STATOIL
BP NCSP &
GUPCO
SINOPEC
INEOS
PTT
MURPHY OIL CARIGALI HESS VICO PEMEX QAPCO
PREMIER OIL
BANGCHAK
INDIAN OIL
TIGF
SAMARA
NAFTA
GDC ADGAS CENTRICA
EMAS
OFFSHORE
DNV GL © 2016 04 April 2016
Dashboard
Fit for purpose – Select the modules you need
22
Hierarchy and
Asset Model
Technical
Detail
Document
and Drawing
Onshore RBI
(API 581)
Offshore RBI
(DNV G 101)
Tank RBI
(AST RBI)
Bespoke RBI
Regulation &
Scheduling
Package
Report
Inspection
Detail Scope
RCM
SIL
PM & TPM
Scheduling
Maintenance
Packaging
Inspection
Job and Task
Inspection
Recording
Inspection
Attachment
Maintenance
Job and Task
Maintenance
Recording
Security and
Admin
Integration
Data Loading
Formula and
Rules
Reference
Data
UOM and
Currency
Asset Report
Anomaly
Management
Layout Design
Workflow
Engine
KPI and
Traffic Light
Inspection
Report SAP
Interface
Maximo
Interface
Data Logger
Interface
Scada / MES
Interface
Asset Data
Management
Integrity
Assessment
Inspection
Work
Management
Reporting
Supporting
Functions
Inspection
Planning
Safety Critical
Reliability
Assessment
Maintenance
Planning
Maintenance
Work
PSV
Management
Integrity OP.
Window
Formatted
Key
Management
of Change
Power Plant
RBI
Maintenance
Detail Scope
Maintenance
Attachment
To Do List
Dashboard
Interface
Safety Critical
Element
Inspection
Packaging
DNV GL © 2016 04 April 2016
Usability – Use your browser anytime, anywhere
23
- User definable themes
- Toolbar and buttons
- Matrix layout - Combination of function driven and data driven usages
- Cloud enabled
DNV GL © 2016 04 April 2016
Usability – The comprehensive offline RBI tools
24
- Convenient data population and editing
- Easy calculation
- Aggregated output reports
- Integrated with Synergi Plant web modules
DNV GL © 2016 04 April 2016
Flexibility – Define the practices and libraries for your needs
25
Reference codes
RBI Configuration
RCM and SIL Configuration
Property and datasheets
Security and Admin
DNV GL © 2016 04 April 2016
Visible success - Build your own KPI dashboard
26
Asset conditions
Assessment Results
Inspection and Maintenance Status
DNV GL © 2016 04 April 2016
Industry 4.0 – “Cyber-physical” digital asset eco-system
27
Harvesting
environment data
(weather, population …)
Harvesting
inspection data
Harvesting
sensor data
Harvesting
Production data,
Reliability data, …
RAM analysis Risk analysis
Risk-Based Inspection
Reliability Centred
Maintenance
Analytics
Digital
Asset
Custodian
DNV GL © 2016 04 April 2016
Plant Ecosystem
- Core Processes & Analytics
Analytics
28
QRA RAM SIL
RBI
RCM
Support for key
work processes
• HSEQ
• Asset
Integrity
Interfaces to
external systems
• SAP/CMMS
• SCADA/PCS
• CAD
Asset Centric
Digital Twin
Shared data
utilised by all
analyses
Results passed
back to digital
twin
DNV GL © 2016 04 April 2016
The Power of the Cloud
 Utilise the power of industrial cloud
investment in cyber security
– With thousands of companies using the
cloud, investment in security is many
times more and takes a holistic approach
 Only pay for what you use
– Scalable storage
– Scalable processing power
 Reduce overall costs of IT infrastructure
and software deployment
– Reduced hardware costs
– Reduced IT function costs
– Faster deployment to the business
29
DNV GL © 2016 04 April 2016
30
Synergi Plant RBI, RCM, SIL
and Inspection & Maintenance Management
DNV GL © 2016 04 April 2016
Fully quantitative RBI (risk-based inspection)
31
Synergi Plant
RBI data and process
Configuration on Web
RBI standalong
Applications on PC
1. RBI Onshore (API 581)
2. RBI Offshore (RP G101)
3. RBI Power Plant
DNV GL © 2016 04 April 2016
Risk Based Inspection “Driving Factor”
Version
Slide
32
% of Total Risk Vs % of Equipment Items
Plant Unit, ~500 Total Items
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
% of Equipment
%
of
Total
Risk
•Risk is not equally distributed among the individual pieces of
equipment.
•A large percent of the total unit risk is concentrated in a small
percent of the equipment.
DNV GL © 2016 04 April 2016
Risk Target and Inspection Planning
Slide
33
Inspection
Target
Risk
/
Damage
Factor
(DF)
Predicted Risk
Increase
Now
Time to next
inspection
Highly Effective
Risk / DF
1st
Turnaround
Fairly Effective
2nd
Turnaround
Time
DNV GL © 2016 04 April 2016
Quantitative Risk-Based Inspection (RBI)
34
Equipment Data and Inspection/Measurement History
(Pressured Vessel, Piping, Heater, Heat Exchanger, Tank, Compressor, PRV)
Risk Risk Risk Risk Risk
Inspection
Plan
Inspection
Plan
Inspection
Plan
Inspection
Plan
Inspection
Plan
Thinning SCC
External
Damage
HTHA,
Liner, etc
PRV
PoF CoF PoF CoF PoF CoF PoF CoF PoF CoF
Overall
Total
PoF
Total
CoF
Overall Risk
Overall
Insp. Plan
DNV GL © 2016 04 April 2016
Semi-quantitative and qualitative RBI (Bespoke RBI)
35
1. Create RBI assessment 2. Select method and scope 3. Damage allocation
and pre-POF formula
4. PoF assessment 5. CoF assessment 6. Task selection
and approval
DNV GL © 2016 04 April 2016
RCM (reliability-centered maintenance)
36
1. Assessment and scope 2. RCM screening 3. FMEA/FMECA/Risk
4. Logic tree analysis 5. Task selection
roadmap
6. Task selection
and approval
DNV GL © 2016 04 April 2016
CSS (critical safety system)
37
1. Critical safety systems 2. PM cond. assessment 3. CM cond. assessment
4. Technical diagnostics 5. Assurance tasks 6. Work orders & records
DNV GL © 2016 04 April 2016
Inspection and maintenance planning
38
Scheduling
Packaging
DNV GL © 2016 04 April 2016
Consolidate time-based and risk-based schedules
with packaging and re-grouping
39
Schedule
Ad-hoc Job
Tag01-V3Y
Next 2010-08-01
Tag02-P1Y
Next 2010-09-02
Tag20-V3Y
Next 2010-08-15
EleX-Thinning
Next 2010-10-30
EleY-SCC
Next 2010-11-25
Execution Plan
TeamA-INSP-Q34
TeamB-INSP-Q34
VT-601
MUT-602
FollowUp-1
FollowUp-2
Master Plan
PlantA-INSP-Q34
Job-0001-Tag01
2010-08-01
Job-0002-Tag02
2010-09-02
PlantB-INSP-Q34
Job-0003-Tag20
2010-08-15
Job-0004-TagX
2010-10-30
Job-0005-TagY
2010-11-25
Job-0006-Tag30
2010-11-16
Generating Jobs
DNV GL © 2016 04 April 2016
Inspection and maintenance job execution
40
Work recording
Anomaly and follow-up
DNV GL © 2016 04 April 2016
Configurable Workflow
41
Inspection Job
Inspection Task
(UT, RT, etc.)
Follow-up
Task Selection
(Insp. Planner)
History Reporting
(Insp. Reporter)
Task Accepting
(Insp. Accepter)
Follow-up Request
(Insp. Reporter)
Follow-up Progress
(Insp. Reporter)
Follow-up Closure
(Insp. Reviewer)
End
End End
Task-out Task-out
Done
Approve
Re-do
Close
Redo
Done
Done
Task Review
(Insp. Reviewer)
Re-do Reject
Reject
Execution Plan
(Package)
Create
Execution Plan
Plan
Execution Plan
Approve
Execution Plan
Confirm
Execution Plan
End
Done
Done
Approve
Close Close
Complete
Create
Scheduled Job
Create
Ad-hoc Job
Add
Existing Job
Optional Optional
Optional
DNV GL © 2016 04 April 2016
Using Excel Templates for Offline Recording
42
DNV GL © 2016 04 April 2016
User-designable Task Reports
43
DNV GL © 2016 04 April 2016
Integrity and condition assessment
44
Metal Loss and Remaining Life Corrosion Trending
Follow-up and Maintenance Notification
Risk re-calculation
New Risk and Inspection Plan
DNV GL © 2016 04 April 2016
Synergi Plant – Managing risk continuously
45
Asset Data
RBI Scope RBI Analysis
Regulation Scope Regulation Schedule
Insp. &
Maint. Packages
Insp.
Recording &
Integrity
Assessment
Anomaly &
Notification
Maint.
Work order
(SAP,EAM)
Dashboard
and KPI
RCM / SIL
Analysis
RCM / SIL
Scope
Maint.
Recording
DNV GL © 2016 04 April 2016
SAFER, SMARTER, GREENER
www.dnvgl.com
Thank you !
46
Tommy Tang
Tommy.Tang@dnvgl.com
+65-8699-5620

More Related Content

What's hot

Perhitungan Workload Analysis
Perhitungan Workload AnalysisPerhitungan Workload Analysis
Perhitungan Workload AnalysisSeta Wicaksana
 
Management of document control
Management of document controlManagement of document control
Management of document controlToyo Gustaman
 
Effective reliability testing to drive design improvement
Effective reliability testing to drive design improvementEffective reliability testing to drive design improvement
Effective reliability testing to drive design improvementASQ Reliability Division
 
Lampiran kepmen 186 th 1999
Lampiran kepmen 186 th 1999Lampiran kepmen 186 th 1999
Lampiran kepmen 186 th 1999Al Marson
 
Basic engineering design_guide_r_0
Basic engineering design_guide_r_0Basic engineering design_guide_r_0
Basic engineering design_guide_r_0Antonio Bove
 
Pelatihan dokumentasi iso
Pelatihan dokumentasi isoPelatihan dokumentasi iso
Pelatihan dokumentasi isoDevi Triyadi
 
SNI 09-7118.2-2005 tentang Emisi Gas Buang - Sumber Bergerak - Bagian 2: Cara...
SNI 09-7118.2-2005 tentang Emisi Gas Buang - Sumber Bergerak - Bagian 2: Cara...SNI 09-7118.2-2005 tentang Emisi Gas Buang - Sumber Bergerak - Bagian 2: Cara...
SNI 09-7118.2-2005 tentang Emisi Gas Buang - Sumber Bergerak - Bagian 2: Cara...Muhamad Imam Khairy
 
K3 UAP & BT_K3 K.pptx
K3 UAP & BT_K3 K.pptxK3 UAP & BT_K3 K.pptx
K3 UAP & BT_K3 K.pptxalam8313
 
Pengantar Keselamatan Kerja Lepas Pantai
Pengantar Keselamatan Kerja Lepas PantaiPengantar Keselamatan Kerja Lepas Pantai
Pengantar Keselamatan Kerja Lepas PantaiSyamsul Arifin
 
Scrum und User Centered Design – wie geht das?, Usability Coffee, Bern, 12.04...
Scrum und User Centered Design – wie geht das?, Usability Coffee, Bern, 12.04...Scrum und User Centered Design – wie geht das?, Usability Coffee, Bern, 12.04...
Scrum und User Centered Design – wie geht das?, Usability Coffee, Bern, 12.04...soultank AG
 
Contoh Soal-soal Essay Ahli K3 Umum
Contoh Soal-soal Essay Ahli K3 UmumContoh Soal-soal Essay Ahli K3 Umum
Contoh Soal-soal Essay Ahli K3 UmumSafetyInspectorDaop7
 
Presentasi iso 9001 2015 pendahuluan
Presentasi iso 9001 2015 pendahuluanPresentasi iso 9001 2015 pendahuluan
Presentasi iso 9001 2015 pendahuluanExemplar Solution
 
K3 Pesawat Tenaga dan Produksi
K3 Pesawat Tenaga dan ProduksiK3 Pesawat Tenaga dan Produksi
K3 Pesawat Tenaga dan ProduksiAl Marson
 
Pengawasan K3 pesawat uap dan bejana tekan
Pengawasan K3 pesawat uap dan bejana tekanPengawasan K3 pesawat uap dan bejana tekan
Pengawasan K3 pesawat uap dan bejana tekanAl Marson
 
Introducing about Spar platform
Introducing about Spar platformIntroducing about Spar platform
Introducing about Spar platformAgus Madatama Puja
 
Bahan evaluasi pembelajarann 2
Bahan evaluasi pembelajarann   2Bahan evaluasi pembelajarann   2
Bahan evaluasi pembelajarann 2Eko Supriyadi
 
Precommissioning and Commissioning
Precommissioning and CommissioningPrecommissioning and Commissioning
Precommissioning and CommissioningWendy Soerachman
 

What's hot (20)

Boiler sop 20100217
Boiler sop 20100217Boiler sop 20100217
Boiler sop 20100217
 
Perhitungan Workload Analysis
Perhitungan Workload AnalysisPerhitungan Workload Analysis
Perhitungan Workload Analysis
 
Management of document control
Management of document controlManagement of document control
Management of document control
 
Effective reliability testing to drive design improvement
Effective reliability testing to drive design improvementEffective reliability testing to drive design improvement
Effective reliability testing to drive design improvement
 
Lampiran kepmen 186 th 1999
Lampiran kepmen 186 th 1999Lampiran kepmen 186 th 1999
Lampiran kepmen 186 th 1999
 
Basic engineering design_guide_r_0
Basic engineering design_guide_r_0Basic engineering design_guide_r_0
Basic engineering design_guide_r_0
 
Pelatihan dokumentasi iso
Pelatihan dokumentasi isoPelatihan dokumentasi iso
Pelatihan dokumentasi iso
 
SNI 09-7118.2-2005 tentang Emisi Gas Buang - Sumber Bergerak - Bagian 2: Cara...
SNI 09-7118.2-2005 tentang Emisi Gas Buang - Sumber Bergerak - Bagian 2: Cara...SNI 09-7118.2-2005 tentang Emisi Gas Buang - Sumber Bergerak - Bagian 2: Cara...
SNI 09-7118.2-2005 tentang Emisi Gas Buang - Sumber Bergerak - Bagian 2: Cara...
 
K3 UAP & BT_K3 K.pptx
K3 UAP & BT_K3 K.pptxK3 UAP & BT_K3 K.pptx
K3 UAP & BT_K3 K.pptx
 
Pengantar Keselamatan Kerja Lepas Pantai
Pengantar Keselamatan Kerja Lepas PantaiPengantar Keselamatan Kerja Lepas Pantai
Pengantar Keselamatan Kerja Lepas Pantai
 
Scrum und User Centered Design – wie geht das?, Usability Coffee, Bern, 12.04...
Scrum und User Centered Design – wie geht das?, Usability Coffee, Bern, 12.04...Scrum und User Centered Design – wie geht das?, Usability Coffee, Bern, 12.04...
Scrum und User Centered Design – wie geht das?, Usability Coffee, Bern, 12.04...
 
Contoh Soal-soal Essay Ahli K3 Umum
Contoh Soal-soal Essay Ahli K3 UmumContoh Soal-soal Essay Ahli K3 Umum
Contoh Soal-soal Essay Ahli K3 Umum
 
Presentasi iso 9001 2015 pendahuluan
Presentasi iso 9001 2015 pendahuluanPresentasi iso 9001 2015 pendahuluan
Presentasi iso 9001 2015 pendahuluan
 
K3 Pesawat Tenaga dan Produksi
K3 Pesawat Tenaga dan ProduksiK3 Pesawat Tenaga dan Produksi
K3 Pesawat Tenaga dan Produksi
 
Pengawasan K3 pesawat uap dan bejana tekan
Pengawasan K3 pesawat uap dan bejana tekanPengawasan K3 pesawat uap dan bejana tekan
Pengawasan K3 pesawat uap dan bejana tekan
 
Introducing about Spar platform
Introducing about Spar platformIntroducing about Spar platform
Introducing about Spar platform
 
Bahan evaluasi pembelajarann 2
Bahan evaluasi pembelajarann   2Bahan evaluasi pembelajarann   2
Bahan evaluasi pembelajarann 2
 
Artikel Kebakaran Pabrik
Artikel Kebakaran PabrikArtikel Kebakaran Pabrik
Artikel Kebakaran Pabrik
 
Precommissioning and Commissioning
Precommissioning and CommissioningPrecommissioning and Commissioning
Precommissioning and Commissioning
 
25-ISO 9000
25-ISO 900025-ISO 9000
25-ISO 9000
 

Similar to Synergi Plant - Intro.pptx

Russia CEE-SECR 2014 - Leveraging SAP Hana
Russia CEE-SECR 2014  - Leveraging SAP HanaRussia CEE-SECR 2014  - Leveraging SAP Hana
Russia CEE-SECR 2014 - Leveraging SAP HanaSergey Gelmetdinov
 
Strategic Sourcing: It's Not Just About the Price
Strategic Sourcing: It's Not Just About the PriceStrategic Sourcing: It's Not Just About the Price
Strategic Sourcing: It's Not Just About the PriceSAP Ariba
 
What Your Spend Data Is Telling You and Why It’s Worth Listening
What Your Spend Data Is Telling You and Why It’s Worth ListeningWhat Your Spend Data Is Telling You and Why It’s Worth Listening
What Your Spend Data Is Telling You and Why It’s Worth ListeningSAP Ariba
 
What Your Spend Data Is Telling You and Why It’s Worth Listening
What Your Spend Data Is Telling You and Why It’s Worth ListeningWhat Your Spend Data Is Telling You and Why It’s Worth Listening
What Your Spend Data Is Telling You and Why It’s Worth ListeningSAP Ariba
 
What's New in Primavera Prime 16.1
What's New in Primavera Prime 16.1What's New in Primavera Prime 16.1
What's New in Primavera Prime 16.1p6academy
 
Growing with SAP Ariba Solutions
Growing with SAP Ariba SolutionsGrowing with SAP Ariba Solutions
Growing with SAP Ariba SolutionsSAP Ariba
 
SOP Planning and Optimization Solution-as-a-Service.pdf
SOP Planning and Optimization Solution-as-a-Service.pdfSOP Planning and Optimization Solution-as-a-Service.pdf
SOP Planning and Optimization Solution-as-a-Service.pdfDavid Barbieri Kennedy
 
SAP Database Platform, ASE & IoT Roadmap
SAP Database Platform, ASE & IoT RoadmapSAP Database Platform, ASE & IoT Roadmap
SAP Database Platform, ASE & IoT RoadmapPaul Marriott
 
CA Performance Management 2.6 Deep Dive
CA Performance Management 2.6 Deep DiveCA Performance Management 2.6 Deep Dive
CA Performance Management 2.6 Deep DiveCA Technologies
 
Securing Your Digital Transformation: Cybersecurity and You
Securing Your Digital Transformation: Cybersecurity and YouSecuring Your Digital Transformation: Cybersecurity and You
Securing Your Digital Transformation: Cybersecurity and YouSAP Ariba
 
SAP Active Global Support - Support for Innovation - Quality Assurance at Cus...
SAP Active Global Support - Support for Innovation - Quality Assurance at Cus...SAP Active Global Support - Support for Innovation - Quality Assurance at Cus...
SAP Active Global Support - Support for Innovation - Quality Assurance at Cus...Bernhard Luecke
 
Oracle Primavera Roadmap 2015
Oracle Primavera Roadmap 2015Oracle Primavera Roadmap 2015
Oracle Primavera Roadmap 2015p6academy
 
Eh p8 sp10_delta_scope_final
Eh p8 sp10_delta_scope_finalEh p8 sp10_delta_scope_final
Eh p8 sp10_delta_scope_finalClara Sack
 
Latest_Trends_in_ERP___Manufacturing_v2
Latest_Trends_in_ERP___Manufacturing_v2Latest_Trends_in_ERP___Manufacturing_v2
Latest_Trends_in_ERP___Manufacturing_v2Debashis Majumder
 
Sourcing and Procurement Excellence in a Networked World
Sourcing and Procurement Excellence in a Networked WorldSourcing and Procurement Excellence in a Networked World
Sourcing and Procurement Excellence in a Networked WorldSAP Ariba
 
Synegys - mobile Field Data Collection
Synegys - mobile Field Data CollectionSynegys - mobile Field Data Collection
Synegys - mobile Field Data CollectionmApplications
 
The Case for Value Stream Architecture
The Case for Value Stream ArchitectureThe Case for Value Stream Architecture
The Case for Value Stream ArchitectureTasktop
 
First to market on demand platform-as-a-service for SAP - Discover London 201...
First to market on demand platform-as-a-service for SAP - Discover London 201...First to market on demand platform-as-a-service for SAP - Discover London 201...
First to market on demand platform-as-a-service for SAP - Discover London 201...Joachim Mayer
 

Similar to Synergi Plant - Intro.pptx (20)

Russia CEE-SECR 2014 - Leveraging SAP Hana
Russia CEE-SECR 2014  - Leveraging SAP HanaRussia CEE-SECR 2014  - Leveraging SAP Hana
Russia CEE-SECR 2014 - Leveraging SAP Hana
 
Strategic Sourcing: It's Not Just About the Price
Strategic Sourcing: It's Not Just About the PriceStrategic Sourcing: It's Not Just About the Price
Strategic Sourcing: It's Not Just About the Price
 
What Your Spend Data Is Telling You and Why It’s Worth Listening
What Your Spend Data Is Telling You and Why It’s Worth ListeningWhat Your Spend Data Is Telling You and Why It’s Worth Listening
What Your Spend Data Is Telling You and Why It’s Worth Listening
 
What Your Spend Data Is Telling You and Why It’s Worth Listening
What Your Spend Data Is Telling You and Why It’s Worth ListeningWhat Your Spend Data Is Telling You and Why It’s Worth Listening
What Your Spend Data Is Telling You and Why It’s Worth Listening
 
What's New in Primavera Prime 16.1
What's New in Primavera Prime 16.1What's New in Primavera Prime 16.1
What's New in Primavera Prime 16.1
 
Growing with SAP Ariba Solutions
Growing with SAP Ariba SolutionsGrowing with SAP Ariba Solutions
Growing with SAP Ariba Solutions
 
SOP Planning and Optimization Solution-as-a-Service.pdf
SOP Planning and Optimization Solution-as-a-Service.pdfSOP Planning and Optimization Solution-as-a-Service.pdf
SOP Planning and Optimization Solution-as-a-Service.pdf
 
SAP Vehicle Insights
SAP Vehicle InsightsSAP Vehicle Insights
SAP Vehicle Insights
 
SAP Database Platform, ASE & IoT Roadmap
SAP Database Platform, ASE & IoT RoadmapSAP Database Platform, ASE & IoT Roadmap
SAP Database Platform, ASE & IoT Roadmap
 
CA Performance Management 2.6 Deep Dive
CA Performance Management 2.6 Deep DiveCA Performance Management 2.6 Deep Dive
CA Performance Management 2.6 Deep Dive
 
Securing Your Digital Transformation: Cybersecurity and You
Securing Your Digital Transformation: Cybersecurity and YouSecuring Your Digital Transformation: Cybersecurity and You
Securing Your Digital Transformation: Cybersecurity and You
 
SAP Active Global Support - Support for Innovation - Quality Assurance at Cus...
SAP Active Global Support - Support for Innovation - Quality Assurance at Cus...SAP Active Global Support - Support for Innovation - Quality Assurance at Cus...
SAP Active Global Support - Support for Innovation - Quality Assurance at Cus...
 
Oracle Primavera Roadmap 2015
Oracle Primavera Roadmap 2015Oracle Primavera Roadmap 2015
Oracle Primavera Roadmap 2015
 
Eh p8 sp10_delta_scope_final
Eh p8 sp10_delta_scope_finalEh p8 sp10_delta_scope_final
Eh p8 sp10_delta_scope_final
 
Latest_Trends_in_ERP___Manufacturing_v2
Latest_Trends_in_ERP___Manufacturing_v2Latest_Trends_in_ERP___Manufacturing_v2
Latest_Trends_in_ERP___Manufacturing_v2
 
Sap safe haborstatement
Sap safe haborstatementSap safe haborstatement
Sap safe haborstatement
 
Sourcing and Procurement Excellence in a Networked World
Sourcing and Procurement Excellence in a Networked WorldSourcing and Procurement Excellence in a Networked World
Sourcing and Procurement Excellence in a Networked World
 
Synegys - mobile Field Data Collection
Synegys - mobile Field Data CollectionSynegys - mobile Field Data Collection
Synegys - mobile Field Data Collection
 
The Case for Value Stream Architecture
The Case for Value Stream ArchitectureThe Case for Value Stream Architecture
The Case for Value Stream Architecture
 
First to market on demand platform-as-a-service for SAP - Discover London 201...
First to market on demand platform-as-a-service for SAP - Discover London 201...First to market on demand platform-as-a-service for SAP - Discover London 201...
First to market on demand platform-as-a-service for SAP - Discover London 201...
 

Recently uploaded

Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Recently uploaded (20)

Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

Synergi Plant - Intro.pptx

  • 1. DNV GL © 2016 04 April 2016 SAFER, SMARTER, GREENER DNV GL © 2016 SOFTWARE Synergi Plant 1 A holistic plant integrity and reliability management platform Tommy Tang Plant Integrity Software product architect DNV GL Software
  • 2. DNV GL © 2016 04 April 2016 Question: How do you predict and monitor potential damages, impacts and financial losses for your assets in the plant, and make sure the risk is reduced continuously? 2
  • 3. DNV GL © 2016 04 April 2016 Did you know …  A proper implementation of asset integrity/reliability software solution can help you to prevent more than USD 100M potential financial loss every year?  You may waste 90% effort doing unnecessary inspections and maintenances, while the most critical 10% are missed?  You can plan the plant inspection and maintenance based on quantitative risk, predict and monitor the risk change in the coming years on a management dashboard? 3
  • 4. DNV GL © 2016 04 April 2016 What if you can …  Get help to know about the available software in the market, and assess the level of depth you need to implement an asset integrity/reliability software with a prototype or pilot study  Save more than 50% of your inspection cost and prevent more than 50% risk, and at the same time measure and justify your return on investment for the asset integrity/reliability solution in a dashboard  Manage future asset risk quantitatively, plan your inspection and maintenance efficiently, and change the software configuration easily, all by open your browser anytime, anywhere 4
  • 5. DNV GL © 2016 04 April 2016 5 Before doing it, do you know how to measure your success? Financial Return$ Reduce 1 unplanned shutdown x 1 day production x 150,000 bpd x 50 USD = 7,500,000 USD Risk reduction (Potential risk cost) Extend 1 year production x 365 days x 150,000 bpd x 50 USD = 2,737,500,000 USD Life and inspection extension (Potential revenue) - Reduce inspection cost - Reduce maintenance cost - Improve efficiency Operational cost (Current cost) 5
  • 6. DNV GL © 2016 04 April 2016 6 Asset integrity and reliability overview
  • 7. DNV GL © 2016 04 April 2016 Did you know this is possible? 7
  • 8. DNV GL © 2016 04 April 2016 Do you know where you are, and where you want to go? 8
  • 9. DNV GL © 2016 04 April 2016 Are you doing everything risk-based on your way? 9
  • 10. DNV GL © 2016 04 April 2016 Synergi Plant – Managing risk in your plant continuously 1 Asset Data RBI Scope RBI Analysis Regulation Scope Regulation Schedule Insp. & Maint. Packages Insp. Recording & Integrity Assessment Anomaly & Notification Maint. Work order (SAP,EAM) Dashboard and KPI RCM / SIL Analysis RCM / SIL Scope Maint. Recording
  • 11. DNV GL © 2016 04 April 2016 You may want to know and focus on your goals beforehand 13 No. Driver Count 1 Work planning - Risk based 33 2 Managing information verification and traceability 18 3 Work planning - Regular/Time based 14 4 Managing plant inspection and maintenance work process 13 5 Reliability based 10 6 Change in integrity best practice 9 7 Reports: Technical compliance management reports 9 8 Introduce new system to get higher position in the organization 6 9 Managing aging assets 6 10 Alleviate manpower or skill shortage 5
  • 12. DNV GL © 2016 04 April 2016 16 Synergi Plant - A holistic software platform from DNV GL for integrity and reliability management
  • 13. DNV GL © 2016 04 April 2016 What we can offer for asset integrity and reliability 17 SYNERGI PLANT • Facility management • RBI, RCM and SIL • Inspection and maintenance plan • Work packaging and execution • Integrity assessment and anomaly • KPI, traffic light, and report • Integration interface SYNERGI STRUCTURE • Structure data and model • Structure RBI • Inspection planning and recording • 3D viewer • KPI, traffic light, and report • Integration interface SYNERGI PIPELINE • Pipeline data management • Pipeline risk assessment • Inspection data management • Integrity and anomaly • GIS and spatial • KPI, traffic light, and report • Integration interface SYNERGI DASHBOARD • Management overview • Risk summary and trend • Geographical risk view • Integration and drilldown
  • 14. DNV GL © 2016 04 April 2016 If you are one of these operators, Synergi Plant is for you 18 Exploration and Gathering • Platform Topside • FPSO, FSO, FLNG Topside • Onshore Gathering Unit • Terminal • Storage Tank Farm • Process Unit & Station along the pipelines • Refinery • Chemical Plant • LNG Plant • Power and Utility Plant Transportation and Storage Refine and Production
  • 15. DNV GL © 2016 04 April 2016 Synergi Plant today 19 • Fully web-based and cross browser, can be hosted on cloud • 48 customers in 20+ countries, use IDMS and other modules like RCM or MMS, with 100+ customers using the standard RBI module. • 4 major types of SAP integration • 1 system supporting various configurations for all customers • Link from expert tools to management dashboard • Migrated modules from GL’s Galiom AIMS software
  • 16. DNV GL © 2016 04 April 2016 We respect and learn from our customers 20 CPC USI KOC SAMIR INEOS ABS CNPC GS CALTAX DONG ENERGY STAATSOLIE GNPOC CAIRN ENERGY SALALAH SMC SCG (REPCO) ADMA OPCO BW OFFSHORE PCS STATOIL BP NCSP & GUPCO SINOPEC INEOS PTT MURPHY OIL CARIGALI HESS VICO PEMEX QAPCO PREMIER OIL BANGCHAK INDIAN OIL TIGF SAMARA NAFTA GDC ADGAS CENTRICA EMAS OFFSHORE
  • 17. DNV GL © 2016 04 April 2016 Dashboard Fit for purpose – Select the modules you need 22 Hierarchy and Asset Model Technical Detail Document and Drawing Onshore RBI (API 581) Offshore RBI (DNV G 101) Tank RBI (AST RBI) Bespoke RBI Regulation & Scheduling Package Report Inspection Detail Scope RCM SIL PM & TPM Scheduling Maintenance Packaging Inspection Job and Task Inspection Recording Inspection Attachment Maintenance Job and Task Maintenance Recording Security and Admin Integration Data Loading Formula and Rules Reference Data UOM and Currency Asset Report Anomaly Management Layout Design Workflow Engine KPI and Traffic Light Inspection Report SAP Interface Maximo Interface Data Logger Interface Scada / MES Interface Asset Data Management Integrity Assessment Inspection Work Management Reporting Supporting Functions Inspection Planning Safety Critical Reliability Assessment Maintenance Planning Maintenance Work PSV Management Integrity OP. Window Formatted Key Management of Change Power Plant RBI Maintenance Detail Scope Maintenance Attachment To Do List Dashboard Interface Safety Critical Element Inspection Packaging
  • 18. DNV GL © 2016 04 April 2016 Usability – Use your browser anytime, anywhere 23 - User definable themes - Toolbar and buttons - Matrix layout - Combination of function driven and data driven usages - Cloud enabled
  • 19. DNV GL © 2016 04 April 2016 Usability – The comprehensive offline RBI tools 24 - Convenient data population and editing - Easy calculation - Aggregated output reports - Integrated with Synergi Plant web modules
  • 20. DNV GL © 2016 04 April 2016 Flexibility – Define the practices and libraries for your needs 25 Reference codes RBI Configuration RCM and SIL Configuration Property and datasheets Security and Admin
  • 21. DNV GL © 2016 04 April 2016 Visible success - Build your own KPI dashboard 26 Asset conditions Assessment Results Inspection and Maintenance Status
  • 22. DNV GL © 2016 04 April 2016 Industry 4.0 – “Cyber-physical” digital asset eco-system 27 Harvesting environment data (weather, population …) Harvesting inspection data Harvesting sensor data Harvesting Production data, Reliability data, … RAM analysis Risk analysis Risk-Based Inspection Reliability Centred Maintenance Analytics Digital Asset Custodian
  • 23. DNV GL © 2016 04 April 2016 Plant Ecosystem - Core Processes & Analytics Analytics 28 QRA RAM SIL RBI RCM Support for key work processes • HSEQ • Asset Integrity Interfaces to external systems • SAP/CMMS • SCADA/PCS • CAD Asset Centric Digital Twin Shared data utilised by all analyses Results passed back to digital twin
  • 24. DNV GL © 2016 04 April 2016 The Power of the Cloud  Utilise the power of industrial cloud investment in cyber security – With thousands of companies using the cloud, investment in security is many times more and takes a holistic approach  Only pay for what you use – Scalable storage – Scalable processing power  Reduce overall costs of IT infrastructure and software deployment – Reduced hardware costs – Reduced IT function costs – Faster deployment to the business 29
  • 25. DNV GL © 2016 04 April 2016 30 Synergi Plant RBI, RCM, SIL and Inspection & Maintenance Management
  • 26. DNV GL © 2016 04 April 2016 Fully quantitative RBI (risk-based inspection) 31 Synergi Plant RBI data and process Configuration on Web RBI standalong Applications on PC 1. RBI Onshore (API 581) 2. RBI Offshore (RP G101) 3. RBI Power Plant
  • 27. DNV GL © 2016 04 April 2016 Risk Based Inspection “Driving Factor” Version Slide 32 % of Total Risk Vs % of Equipment Items Plant Unit, ~500 Total Items 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% % of Equipment % of Total Risk •Risk is not equally distributed among the individual pieces of equipment. •A large percent of the total unit risk is concentrated in a small percent of the equipment.
  • 28. DNV GL © 2016 04 April 2016 Risk Target and Inspection Planning Slide 33 Inspection Target Risk / Damage Factor (DF) Predicted Risk Increase Now Time to next inspection Highly Effective Risk / DF 1st Turnaround Fairly Effective 2nd Turnaround Time
  • 29. DNV GL © 2016 04 April 2016 Quantitative Risk-Based Inspection (RBI) 34 Equipment Data and Inspection/Measurement History (Pressured Vessel, Piping, Heater, Heat Exchanger, Tank, Compressor, PRV) Risk Risk Risk Risk Risk Inspection Plan Inspection Plan Inspection Plan Inspection Plan Inspection Plan Thinning SCC External Damage HTHA, Liner, etc PRV PoF CoF PoF CoF PoF CoF PoF CoF PoF CoF Overall Total PoF Total CoF Overall Risk Overall Insp. Plan
  • 30. DNV GL © 2016 04 April 2016 Semi-quantitative and qualitative RBI (Bespoke RBI) 35 1. Create RBI assessment 2. Select method and scope 3. Damage allocation and pre-POF formula 4. PoF assessment 5. CoF assessment 6. Task selection and approval
  • 31. DNV GL © 2016 04 April 2016 RCM (reliability-centered maintenance) 36 1. Assessment and scope 2. RCM screening 3. FMEA/FMECA/Risk 4. Logic tree analysis 5. Task selection roadmap 6. Task selection and approval
  • 32. DNV GL © 2016 04 April 2016 CSS (critical safety system) 37 1. Critical safety systems 2. PM cond. assessment 3. CM cond. assessment 4. Technical diagnostics 5. Assurance tasks 6. Work orders & records
  • 33. DNV GL © 2016 04 April 2016 Inspection and maintenance planning 38 Scheduling Packaging
  • 34. DNV GL © 2016 04 April 2016 Consolidate time-based and risk-based schedules with packaging and re-grouping 39 Schedule Ad-hoc Job Tag01-V3Y Next 2010-08-01 Tag02-P1Y Next 2010-09-02 Tag20-V3Y Next 2010-08-15 EleX-Thinning Next 2010-10-30 EleY-SCC Next 2010-11-25 Execution Plan TeamA-INSP-Q34 TeamB-INSP-Q34 VT-601 MUT-602 FollowUp-1 FollowUp-2 Master Plan PlantA-INSP-Q34 Job-0001-Tag01 2010-08-01 Job-0002-Tag02 2010-09-02 PlantB-INSP-Q34 Job-0003-Tag20 2010-08-15 Job-0004-TagX 2010-10-30 Job-0005-TagY 2010-11-25 Job-0006-Tag30 2010-11-16 Generating Jobs
  • 35. DNV GL © 2016 04 April 2016 Inspection and maintenance job execution 40 Work recording Anomaly and follow-up
  • 36. DNV GL © 2016 04 April 2016 Configurable Workflow 41 Inspection Job Inspection Task (UT, RT, etc.) Follow-up Task Selection (Insp. Planner) History Reporting (Insp. Reporter) Task Accepting (Insp. Accepter) Follow-up Request (Insp. Reporter) Follow-up Progress (Insp. Reporter) Follow-up Closure (Insp. Reviewer) End End End Task-out Task-out Done Approve Re-do Close Redo Done Done Task Review (Insp. Reviewer) Re-do Reject Reject Execution Plan (Package) Create Execution Plan Plan Execution Plan Approve Execution Plan Confirm Execution Plan End Done Done Approve Close Close Complete Create Scheduled Job Create Ad-hoc Job Add Existing Job Optional Optional Optional
  • 37. DNV GL © 2016 04 April 2016 Using Excel Templates for Offline Recording 42
  • 38. DNV GL © 2016 04 April 2016 User-designable Task Reports 43
  • 39. DNV GL © 2016 04 April 2016 Integrity and condition assessment 44 Metal Loss and Remaining Life Corrosion Trending Follow-up and Maintenance Notification Risk re-calculation New Risk and Inspection Plan
  • 40. DNV GL © 2016 04 April 2016 Synergi Plant – Managing risk continuously 45 Asset Data RBI Scope RBI Analysis Regulation Scope Regulation Schedule Insp. & Maint. Packages Insp. Recording & Integrity Assessment Anomaly & Notification Maint. Work order (SAP,EAM) Dashboard and KPI RCM / SIL Analysis RCM / SIL Scope Maint. Recording
  • 41. DNV GL © 2016 04 April 2016 SAFER, SMARTER, GREENER www.dnvgl.com Thank you ! 46 Tommy Tang Tommy.Tang@dnvgl.com +65-8699-5620