Historical Overview of Project Management in Nepal
Nepal is a landlocked
country. It is one of the
poorest countries in the
world. It is one of the
lowest indices of the
Human development Index
of UNO. Nepal had only the
least effect on world map
prior to the establishment
of UNO. Actual concept of
Project began in Nepal in
1951 with a grant
assistance of US$ 100,000
by USA.Project
Management Model
appeared in Nepal during
1970’s,for establishing
“Development committee”
Pharping hydro-
electricity project was the
first project in the field of
hydro electricity in the
context of Nepal.
http://www.wisenepali.com/2014/11/history-of-project-
management-in-nepal.html
Project management in developing
countries:
• First appeared in the centralised
planning model of the Soviet Union
in 1930’s.
• Increased flow of foreign assistance
from developing countries during
1950s and 1960s gave impetus to the
project model.
• By 1970s pure project and matrix
project organisation started to be
used.
Current Status
Nepal runs projects by using mainly three models.
Turnkey project
Generally, there are investments of foreign
countries or of donor agencies in such projects.
When an international tender is requested to
conduct such project, it is known as Turnkey
Project, Melamchi Drinking water project is its
examples.
Donor Executed project
The donor agency invests all the amount required
in such project and executes all the works by itself
until the project completes. All the investments
and executions are conducted by the donor agency
itself and after the completion of the project it is
handed over to the concerned party and such
project is known as Donor Executed project,
Marsyangdi Hydro electricity project, Lumbini
Drinking water and Cleanliness program, etc are
its examples.
Nationally Executed Project
The national entrepreneurs themselves prepare and
execute such projects. Both the public and private
sectors invest in such projects. No matter whether
the investors are national or international citizens,
if the project is executed by the Nepali (national)
entrepreneurs, then such project is called the
nationally executed project.
BOT(Build,operate,Transfer)
modality has emerged for
road construction.
Eg: Kathmandu-Hetauda fast
track
Foreign Direct Investment
has led to greated use of
Project Management.
Implementation of Nepal’s
development plan depends
upon Project Management
approach.
Source: Project Management in Nepal by Govind Ram Agrawal
http://www.wisenepali.com/2014/11/project-management-in-developing.html
Benefits
• Goal Oriented
• Change management
• Integration of
resources
• Maximum utilization
of limited resources
• Infrastructural
development
• Human resource
development
• Consumer
satisfaction
• Effective Control
Limitations
• Political instability
• Political influence
• Lack of trained
manpower
• Lack of
Entrepreneurship
• Lack of appropriate
rules and
regulations
• Lack of market
availability
• Ignorance of
Research &
Development
Sources:
http://www.wisenepali.com/2014/11/li
mitation-of-project-management-
in.html
Any Questions / Queries

More Related Content

What's hot

Explain the link between disasters and development.
Explain the link between disasters and development.Explain the link between disasters and development.
Explain the link between disasters and development.Turja Deb
 
(integrated area development)
(integrated area development)(integrated area development)
(integrated area development)Primum Nocere
 
Project monitoring and evaluation by Samuel Obino Mokaya
Project monitoring and evaluation by Samuel Obino MokayaProject monitoring and evaluation by Samuel Obino Mokaya
Project monitoring and evaluation by Samuel Obino MokayaDiscover JKUAT
 
Participatory planning
Participatory planning Participatory planning
Participatory planning Ankit Gola
 
International Non Government Organizations (INGOs) in Nepal
International Non Government Organizations (INGOs) in NepalInternational Non Government Organizations (INGOs) in Nepal
International Non Government Organizations (INGOs) in NepalPrabesh Ghimire
 
PCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on EvaluationPCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on Evaluationrexcris
 
Lfa Logical Framework Analysis
Lfa   Logical Framework AnalysisLfa   Logical Framework Analysis
Lfa Logical Framework AnalysisJFM Lohith Shetty
 
Bilateral and Multilateral Organizations in Nepal
Bilateral and Multilateral Organizations in NepalBilateral and Multilateral Organizations in Nepal
Bilateral and Multilateral Organizations in NepalPrabesh Ghimire
 
development administration
 development administration  development administration
development administration joseph masango
 
Function of social welfare administration
Function of social welfare administrationFunction of social welfare administration
Function of social welfare administrationKamran Khan
 

What's hot (20)

Explain the link between disasters and development.
Explain the link between disasters and development.Explain the link between disasters and development.
Explain the link between disasters and development.
 
(integrated area development)
(integrated area development)(integrated area development)
(integrated area development)
 
Participatory planning
Participatory planningParticipatory planning
Participatory planning
 
Project evaluation
Project evaluationProject evaluation
Project evaluation
 
Project monitoring and evaluation by Samuel Obino Mokaya
Project monitoring and evaluation by Samuel Obino MokayaProject monitoring and evaluation by Samuel Obino Mokaya
Project monitoring and evaluation by Samuel Obino Mokaya
 
Participatory planning
Participatory planning Participatory planning
Participatory planning
 
International Non Government Organizations (INGOs) in Nepal
International Non Government Organizations (INGOs) in NepalInternational Non Government Organizations (INGOs) in Nepal
International Non Government Organizations (INGOs) in Nepal
 
Project Management
Project ManagementProject Management
Project Management
 
Logical framework
Logical frameworkLogical framework
Logical framework
 
PCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on EvaluationPCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on Evaluation
 
Lfa Logical Framework Analysis
Lfa   Logical Framework AnalysisLfa   Logical Framework Analysis
Lfa Logical Framework Analysis
 
Bilateral and Multilateral Organizations in Nepal
Bilateral and Multilateral Organizations in NepalBilateral and Multilateral Organizations in Nepal
Bilateral and Multilateral Organizations in Nepal
 
Project Monitoring & Evaluation
Project Monitoring & EvaluationProject Monitoring & Evaluation
Project Monitoring & Evaluation
 
development administration
 development administration  development administration
development administration
 
Project Planning & Management
Project Planning & ManagementProject Planning & Management
Project Planning & Management
 
Disaster management through community participation
Disaster management through community participationDisaster management through community participation
Disaster management through community participation
 
Project cycle
Project cycleProject cycle
Project cycle
 
Policy Implementation
Policy ImplementationPolicy Implementation
Policy Implementation
 
Gantt
GanttGantt
Gantt
 
Function of social welfare administration
Function of social welfare administrationFunction of social welfare administration
Function of social welfare administration
 

Similar to Project management in nepal

(C) Regmi_Public Private Partnership
(C) Regmi_Public Private Partnership(C) Regmi_Public Private Partnership
(C) Regmi_Public Private PartnershipRegmi Milan
 
Shen-Hao Chang Portfolio
Shen-Hao Chang PortfolioShen-Hao Chang Portfolio
Shen-Hao Chang PortfolioShen-Hao Chang
 
Impact of road extension project on the residents of ktm
Impact of road extension project on the residents of ktmImpact of road extension project on the residents of ktm
Impact of road extension project on the residents of ktmNabin Bhattarai
 
20100629 public engagement strategy and action plan
20100629 public engagement strategy and action plan20100629 public engagement strategy and action plan
20100629 public engagement strategy and action planRiddhi Dash
 
Lesson 2.2 (ten social)
Lesson 2.2 (ten social)Lesson 2.2 (ten social)
Lesson 2.2 (ten social)sharadnp
 
Regional Planning in Nepal: Prospects and Challenges
Regional Planning in Nepal: Prospects and ChallengesRegional Planning in Nepal: Prospects and Challenges
Regional Planning in Nepal: Prospects and ChallengesAshishDangal1
 
Cba icps report eng- may18
Cba   icps report eng- may18Cba   icps report eng- may18
Cba icps report eng- may18cbaorgua
 
Empowering The Urban Poor Through Participatory Planning Process: A Case From...
Empowering The Urban Poor Through Participatory Planning Process: A Case From...Empowering The Urban Poor Through Participatory Planning Process: A Case From...
Empowering The Urban Poor Through Participatory Planning Process: A Case From...Journal of Contemporary Urban Affairs
 
A case study of melamchi water supply project(mwsp)
A case study of melamchi water supply project(mwsp)A case study of melamchi water supply project(mwsp)
A case study of melamchi water supply project(mwsp)Mahesh Raj Bhatt
 
20100608 Pres Dgis Examples
20100608 Pres Dgis Examples20100608 Pres Dgis Examples
20100608 Pres Dgis ExamplesIRC
 
Researchon Monograph: "Traffic Jam in Dhaka City"
Researchon Monograph: "Traffic Jam in Dhaka City"Researchon Monograph: "Traffic Jam in Dhaka City"
Researchon Monograph: "Traffic Jam in Dhaka City"Asian Paint Bangladesh Ltd
 
Power to the people: crowdfunding for renewable energy
Power to the people: crowdfunding for renewable energyPower to the people: crowdfunding for renewable energy
Power to the people: crowdfunding for renewable energyMak ?ukan
 
Development and prosperity of nepal
Development and prosperity of nepalDevelopment and prosperity of nepal
Development and prosperity of nepalMukunda12345
 
MANAGEMENT STRATEGIES FOR URBAN RENEWAL PROJECTS
MANAGEMENT STRATEGIES  FOR URBAN RENEWAL PROJECTSMANAGEMENT STRATEGIES  FOR URBAN RENEWAL PROJECTS
MANAGEMENT STRATEGIES FOR URBAN RENEWAL PROJECTSShashank Arun
 
PPP Project Development Fund Initiative-PbyR
PPP Project Development Fund Initiative-PbyRPPP Project Development Fund Initiative-PbyR
PPP Project Development Fund Initiative-PbyRAkwu OKOLO
 
Sivananthan Pathmanathan Assignment 1 for MDS
Sivananthan Pathmanathan Assignment 1 for MDSSivananthan Pathmanathan Assignment 1 for MDS
Sivananthan Pathmanathan Assignment 1 for MDSSivananthan Pathmanathan
 
GCoM National Workshop in Malaysia: Green Technology and Innovations to Accel...
GCoM National Workshop in Malaysia: Green Technology and Innovations to Accel...GCoM National Workshop in Malaysia: Green Technology and Innovations to Accel...
GCoM National Workshop in Malaysia: Green Technology and Innovations to Accel...UCLGASPAC1
 
UNEP / UNDP / WRI Green Climate Fund Readiness Programme
UNEP / UNDP / WRIGreen Climate FundReadiness ProgrammeUNEP / UNDP / WRIGreen Climate FundReadiness Programme
UNEP / UNDP / WRI Green Climate Fund Readiness ProgrammeOECD Environment
 
Energy safe cities program by ICLEI East Asian secretariat and Mongolian ener...
Energy safe cities program by ICLEI East Asian secretariat and Mongolian ener...Energy safe cities program by ICLEI East Asian secretariat and Mongolian ener...
Energy safe cities program by ICLEI East Asian secretariat and Mongolian ener...Orgiltsogtslokh Enkhbaatar
 

Similar to Project management in nepal (20)

(C) Regmi_Public Private Partnership
(C) Regmi_Public Private Partnership(C) Regmi_Public Private Partnership
(C) Regmi_Public Private Partnership
 
Shen-Hao Chang Portfolio
Shen-Hao Chang PortfolioShen-Hao Chang Portfolio
Shen-Hao Chang Portfolio
 
Impact of road extension project on the residents of ktm
Impact of road extension project on the residents of ktmImpact of road extension project on the residents of ktm
Impact of road extension project on the residents of ktm
 
20100629 public engagement strategy and action plan
20100629 public engagement strategy and action plan20100629 public engagement strategy and action plan
20100629 public engagement strategy and action plan
 
Lesson 2.2 (ten social)
Lesson 2.2 (ten social)Lesson 2.2 (ten social)
Lesson 2.2 (ten social)
 
Regional Planning in Nepal: Prospects and Challenges
Regional Planning in Nepal: Prospects and ChallengesRegional Planning in Nepal: Prospects and Challenges
Regional Planning in Nepal: Prospects and Challenges
 
Cba icps report eng- may18
Cba   icps report eng- may18Cba   icps report eng- may18
Cba icps report eng- may18
 
Empowering The Urban Poor Through Participatory Planning Process: A Case From...
Empowering The Urban Poor Through Participatory Planning Process: A Case From...Empowering The Urban Poor Through Participatory Planning Process: A Case From...
Empowering The Urban Poor Through Participatory Planning Process: A Case From...
 
A case study of melamchi water supply project(mwsp)
A case study of melamchi water supply project(mwsp)A case study of melamchi water supply project(mwsp)
A case study of melamchi water supply project(mwsp)
 
Bangladesh Country Presentation at ACEF 2014
Bangladesh Country Presentation at ACEF 2014Bangladesh Country Presentation at ACEF 2014
Bangladesh Country Presentation at ACEF 2014
 
20100608 Pres Dgis Examples
20100608 Pres Dgis Examples20100608 Pres Dgis Examples
20100608 Pres Dgis Examples
 
Researchon Monograph: "Traffic Jam in Dhaka City"
Researchon Monograph: "Traffic Jam in Dhaka City"Researchon Monograph: "Traffic Jam in Dhaka City"
Researchon Monograph: "Traffic Jam in Dhaka City"
 
Power to the people: crowdfunding for renewable energy
Power to the people: crowdfunding for renewable energyPower to the people: crowdfunding for renewable energy
Power to the people: crowdfunding for renewable energy
 
Development and prosperity of nepal
Development and prosperity of nepalDevelopment and prosperity of nepal
Development and prosperity of nepal
 
MANAGEMENT STRATEGIES FOR URBAN RENEWAL PROJECTS
MANAGEMENT STRATEGIES  FOR URBAN RENEWAL PROJECTSMANAGEMENT STRATEGIES  FOR URBAN RENEWAL PROJECTS
MANAGEMENT STRATEGIES FOR URBAN RENEWAL PROJECTS
 
PPP Project Development Fund Initiative-PbyR
PPP Project Development Fund Initiative-PbyRPPP Project Development Fund Initiative-PbyR
PPP Project Development Fund Initiative-PbyR
 
Sivananthan Pathmanathan Assignment 1 for MDS
Sivananthan Pathmanathan Assignment 1 for MDSSivananthan Pathmanathan Assignment 1 for MDS
Sivananthan Pathmanathan Assignment 1 for MDS
 
GCoM National Workshop in Malaysia: Green Technology and Innovations to Accel...
GCoM National Workshop in Malaysia: Green Technology and Innovations to Accel...GCoM National Workshop in Malaysia: Green Technology and Innovations to Accel...
GCoM National Workshop in Malaysia: Green Technology and Innovations to Accel...
 
UNEP / UNDP / WRI Green Climate Fund Readiness Programme
UNEP / UNDP / WRIGreen Climate FundReadiness ProgrammeUNEP / UNDP / WRIGreen Climate FundReadiness Programme
UNEP / UNDP / WRI Green Climate Fund Readiness Programme
 
Energy safe cities program by ICLEI East Asian secretariat and Mongolian ener...
Energy safe cities program by ICLEI East Asian secretariat and Mongolian ener...Energy safe cities program by ICLEI East Asian secretariat and Mongolian ener...
Energy safe cities program by ICLEI East Asian secretariat and Mongolian ener...
 

Recently uploaded

POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Science lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonScience lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonJericReyAuditor
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerunnathinaik
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxAnaBeatriceAblay2
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,Virag Sontakke
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 

Recently uploaded (20)

POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Science lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonScience lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lesson
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developer
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 

Project management in nepal

  • 1. PROJECT MANAGEMENT IN NEPAL:AN OVERVIEW Group A Amar Kumar Nepal Debendra Shrestha Sapana Thapaliya
  • 2. Historical Overview of Project Management in Nepal Nepal is a landlocked country. It is one of the poorest countries in the world. It is one of the lowest indices of the Human development Index of UNO. Nepal had only the least effect on world map prior to the establishment of UNO. Actual concept of Project began in Nepal in 1951 with a grant assistance of US$ 100,000 by USA.Project Management Model appeared in Nepal during 1970’s,for establishing “Development committee” Pharping hydro- electricity project was the first project in the field of hydro electricity in the context of Nepal. http://www.wisenepali.com/2014/11/history-of-project- management-in-nepal.html Project management in developing countries: • First appeared in the centralised planning model of the Soviet Union in 1930’s. • Increased flow of foreign assistance from developing countries during 1950s and 1960s gave impetus to the project model. • By 1970s pure project and matrix project organisation started to be used.
  • 3. Current Status Nepal runs projects by using mainly three models. Turnkey project Generally, there are investments of foreign countries or of donor agencies in such projects. When an international tender is requested to conduct such project, it is known as Turnkey Project, Melamchi Drinking water project is its examples. Donor Executed project The donor agency invests all the amount required in such project and executes all the works by itself until the project completes. All the investments and executions are conducted by the donor agency itself and after the completion of the project it is handed over to the concerned party and such project is known as Donor Executed project, Marsyangdi Hydro electricity project, Lumbini Drinking water and Cleanliness program, etc are its examples. Nationally Executed Project The national entrepreneurs themselves prepare and execute such projects. Both the public and private sectors invest in such projects. No matter whether the investors are national or international citizens, if the project is executed by the Nepali (national) entrepreneurs, then such project is called the nationally executed project. BOT(Build,operate,Transfer) modality has emerged for road construction. Eg: Kathmandu-Hetauda fast track Foreign Direct Investment has led to greated use of Project Management. Implementation of Nepal’s development plan depends upon Project Management approach. Source: Project Management in Nepal by Govind Ram Agrawal http://www.wisenepali.com/2014/11/project-management-in-developing.html
  • 4. Benefits • Goal Oriented • Change management • Integration of resources • Maximum utilization of limited resources • Infrastructural development • Human resource development • Consumer satisfaction • Effective Control Limitations • Political instability • Political influence • Lack of trained manpower • Lack of Entrepreneurship • Lack of appropriate rules and regulations • Lack of market availability • Ignorance of Research & Development Sources: http://www.wisenepali.com/2014/11/li mitation-of-project-management- in.html
  • 5. Any Questions / Queries