Quantity Surveyor
INTRODUCTION TO CONSTRUCTION INDUSTRY
+
INTRODUCTION TO DRAWING
GROUP:
• CH’NG PHEI WOON(LEADER)
• CHRISTINA CHUA
• BOON LI YING
• ALISON TANG
• CHONG YI HUI
ASSIGNMENT 1
Mind Map
Definition of Quantity Surveyor
• Providing advices on
procurement, contracts and
project cost management.
• Work as consultants or be
employed by a contractor or sub-
contractor.
Quantity Surveyor Certified board
• The Board of Quantity Surveyors Malaysia was set up by an Act of
Parliament, i.e. Quantity Surveyors Act 1967 (revised 2002). The Board
consists of a President, a Registrar and sixteen (16) members appointed by
the Minister of Works, Malaysia.
• to approve or reject applications for registration or approval to practise
under this Act or to approve any such application subject to such conditions
or restrictions as it may deem fit to impose
• to order the issuance of a written warning or reprimand, the imposition of a
fine, suspension, cancellation, removal or reinstatement in accordance with
Part III and IV Quantity Surveyors Act
Scope of Work Handled by 

Quantity Surveyors
• Cost Planning
• To help the design team to
keep within the budget from
start to the end of the project
• Preliminary Cost Advice
•Give practical advice on
comparative costs of alternative
layouts, materials, components
& methods of construction.
•Contractual Methods
• Advise on the best form of contract
for a specific project.
•Tendering
•Calculating the cost and risk to
tender for the project.
• Choice of Contractor
• Quantity surveyor makes recommendation
of contractors base on past performances
to the employers.
•Valuation of Construction Work
•Quantity surveyor evaluates work
carried out before making certified
payment.
•Increase Efficiency
•Making sure that fairness
exists between employer
and contractors to make
work smoother and easier.
Responsibilities & Tasks at
Different Stages of Construction
• Monitor cost at different stages of project.
• Certify payment and invoices.
• Negotiating disputes.
• Advising on budgets and costs.
• Giving advice for disputes on contracts.
Daily Activities
Construction starts…
• Feasibility studies of a project
• Roughly estimate what’s involve in the project
(Measurement of Sketches)
• Study architects’ and engineers’ plans
• Identify cost and overall budget
(Value Engineering)
• Final detailed estimate is prepared by Quantity
Surveyor and Architect
•During Construction…
• Provide flow of cash data
• Can access cost effects when change of project occur
•After Construction…
•Quantity Surveyor prepare
statement of final account
(Records actual cost for all
sections of job)
Stages that involve in cost planning during
design and construction
Tender
Reconciliation
Comparing tender price
with final cost
Post-Contract Cost
Control
Controlling cost at different
stages of construction
Preliminary Estimate
Using research market price to
estimate
Cost Plan
Calculating project cost
according to elemental
analysis
Cost Check
Evaluating the work
done according to
cost
TYPE

OF
Preliminary Drawing
DRAWING
Tender Drawing
Contract
Drawing
AS-Built
Drawing
Preliminary Drawing
• A rough design with less detail
• Estimate the budget of a project
• Can be used to prepared cost plan
Tender Drawing
• A complete design with full details by Architects
and Structural engineer
• Comprise of architectural and structural drawings
• Can be used to prepare Bills of Quantities
STRUCTURAL DRAWING
By Structural Engineer
Column
Beam
• Between 2 column
Slab
(Floor)
Structural Drawing by Structural Engineer
Architectural Drawingby Architect
Description &
material
rate
Measurement
Quantity
Total Cost
EXAMPLE OF BILLS OF QUANTITIES
Quantity Surveyors ‘Bible book’

SMM2
• Latest edition : SMM2
• SMM 1 Slightly different from
SMM2
• This book is guide for calculation
and format of BILLS OF
QUANTITIES
Contract Drawing
• Same drawing as tender drawings
Contract Drawing = Construction Drawing
Used to prepare contract document
Construction Drawing
As-Built Drawing
• A finalise drawing
Any changes in example Type of tile ,paint
Commonly by Clients or Architects

More Related Content

What's hot

Tendering in Construction
Tendering in ConstructionTendering in Construction
Tendering in Construction
shillier38
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
AYM1979
 
Tendering Bidding & Award of Contract Final Draft
Tendering Bidding & Award of Contract Final DraftTendering Bidding & Award of Contract Final Draft
Tendering Bidding & Award of Contract Final Draft
Muneesh Methwani
 

What's hot (20)

Site engineer duties
Site engineer dutiesSite engineer duties
Site engineer duties
 
Construction phases
Construction phasesConstruction phases
Construction phases
 
Tendering in Construction
Tendering in ConstructionTendering in Construction
Tendering in Construction
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
 
Tendering, Contract and Execution
Tendering, Contract and ExecutionTendering, Contract and Execution
Tendering, Contract and Execution
 
Rate analysis and costing - Estimation, Costing and Valuation Engineering
Rate analysis and costing - Estimation, Costing and Valuation EngineeringRate analysis and costing - Estimation, Costing and Valuation Engineering
Rate analysis and costing - Estimation, Costing and Valuation Engineering
 
Bridge construction methodology
Bridge construction methodologyBridge construction methodology
Bridge construction methodology
 
Construction contract
Construction contract Construction contract
Construction contract
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
 
Tendering Bidding & Award of Contract Final Draft
Tendering Bidding & Award of Contract Final DraftTendering Bidding & Award of Contract Final Draft
Tendering Bidding & Award of Contract Final Draft
 
Rate analysis
Rate analysisRate analysis
Rate analysis
 
Quantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Quantity Surveying/longwall shortwall method/Earthwork- Civil EngineeringQuantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Quantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
 
Preparation of boq
Preparation of boqPreparation of boq
Preparation of boq
 
ESTIMATING AND COSTING
ESTIMATING AND COSTINGESTIMATING AND COSTING
ESTIMATING AND COSTING
 
estimation and quantity surveying
estimation and quantity surveyingestimation and quantity surveying
estimation and quantity surveying
 
MEASUREMENT PDF
MEASUREMENT PDFMEASUREMENT PDF
MEASUREMENT PDF
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In Construction
 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYING
 
Construction Planning
Construction PlanningConstruction Planning
Construction Planning
 
Construction tender process
Construction tender processConstruction tender process
Construction tender process
 

Viewers also liked

Smm2 second edition
Smm2 second editionSmm2 second edition
Smm2 second edition
Bt Lee
 
50639312 roll-of-quantity-surveyor
50639312 roll-of-quantity-surveyor50639312 roll-of-quantity-surveyor
50639312 roll-of-quantity-surveyor
hlksd
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of Quantities
Natalie Reid
 
Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveying
Awanish Shukla
 
Excavation2014a-Lecture1
Excavation2014a-Lecture1Excavation2014a-Lecture1
Excavation2014a-Lecture1
Anne Allan
 
Excavation 2014a-Lecture2
Excavation 2014a-Lecture2Excavation 2014a-Lecture2
Excavation 2014a-Lecture2
Anne Allan
 
Excavation 2014a-Lecture3
Excavation 2014a-Lecture3Excavation 2014a-Lecture3
Excavation 2014a-Lecture3
Anne Allan
 
Standard bill of quantities
Standard bill of quantitiesStandard bill of quantities
Standard bill of quantities
Bt Lee
 
Estimating and-costing book
Estimating and-costing bookEstimating and-costing book
Estimating and-costing book
Thomas Britto
 
Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works
ALI HYDER GADHI
 
KA6564 Assignment 1
KA6564 Assignment 1KA6564 Assignment 1
KA6564 Assignment 1
armada7000
 
Aed 1313 ibe-wk 1
Aed 1313 ibe-wk 1Aed 1313 ibe-wk 1
Aed 1313 ibe-wk 1
nurun2010
 
Concrete 2014a-Lecture7
Concrete 2014a-Lecture7Concrete 2014a-Lecture7
Concrete 2014a-Lecture7
Anne Allan
 
Sgp4813 measurement of quantities
Sgp4813 measurement of quantitiesSgp4813 measurement of quantities
Sgp4813 measurement of quantities
alanchong88
 

Viewers also liked (20)

Smm2 second edition
Smm2 second editionSmm2 second edition
Smm2 second edition
 
50639312 roll-of-quantity-surveyor
50639312 roll-of-quantity-surveyor50639312 roll-of-quantity-surveyor
50639312 roll-of-quantity-surveyor
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of Quantities
 
Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveying
 
Excavation2014a-Lecture1
Excavation2014a-Lecture1Excavation2014a-Lecture1
Excavation2014a-Lecture1
 
Excavation 2014a-Lecture2
Excavation 2014a-Lecture2Excavation 2014a-Lecture2
Excavation 2014a-Lecture2
 
Excavation 2014a-Lecture3
Excavation 2014a-Lecture3Excavation 2014a-Lecture3
Excavation 2014a-Lecture3
 
50451783 taking-off-quantity
50451783 taking-off-quantity50451783 taking-off-quantity
50451783 taking-off-quantity
 
Standard bill of quantities
Standard bill of quantitiesStandard bill of quantities
Standard bill of quantities
 
Estimating and-costing book
Estimating and-costing bookEstimating and-costing book
Estimating and-costing book
 
Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works
 
How to pour concrete
How to pour concreteHow to pour concrete
How to pour concrete
 
KA6564 Assignment 1
KA6564 Assignment 1KA6564 Assignment 1
KA6564 Assignment 1
 
Aed 1313 ibe-wk 1
Aed 1313 ibe-wk 1Aed 1313 ibe-wk 1
Aed 1313 ibe-wk 1
 
Concrete 2014a-Lecture7
Concrete 2014a-Lecture7Concrete 2014a-Lecture7
Concrete 2014a-Lecture7
 
Formwork
FormworkFormwork
Formwork
 
Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )
 
Building construction ii report (1)
Building construction ii report  (1)Building construction ii report  (1)
Building construction ii report (1)
 
METHODS OF DOCUMENTATION AND MEASURED DRAWING (ISTANA BANDAR)
METHODS OF DOCUMENTATION AND MEASURED DRAWING (ISTANA BANDAR)METHODS OF DOCUMENTATION AND MEASURED DRAWING (ISTANA BANDAR)
METHODS OF DOCUMENTATION AND MEASURED DRAWING (ISTANA BANDAR)
 
Sgp4813 measurement of quantities
Sgp4813 measurement of quantitiesSgp4813 measurement of quantities
Sgp4813 measurement of quantities
 

Similar to Quantity surveyor (ici+itd)

Cjmconstructionconsultingpresentation 13086519950433-phpapp02-110621053129-ph...
Cjmconstructionconsultingpresentation 13086519950433-phpapp02-110621053129-ph...Cjmconstructionconsultingpresentation 13086519950433-phpapp02-110621053129-ph...
Cjmconstructionconsultingpresentation 13086519950433-phpapp02-110621053129-ph...
Neha V
 
ITD Presentation
ITD PresentationITD Presentation
ITD Presentation
masonsth
 
ICI ITD QS PROJECT 1 (1).pptx
ICI ITD QS PROJECT 1 (1).pptxICI ITD QS PROJECT 1 (1).pptx
ICI ITD QS PROJECT 1 (1).pptx
mkyong1996
 
CV Clive V2 180612 A
CV Clive V2 180612 ACV Clive V2 180612 A
CV Clive V2 180612 A
Clive Price
 

Similar to Quantity surveyor (ici+itd) (20)

Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
 
Quantity surveying drawing FNBE 2014
Quantity surveying drawing FNBE 2014Quantity surveying drawing FNBE 2014
Quantity surveying drawing FNBE 2014
 
Guc arct 702 legislations lecture 4 - project delivery process and business...
Guc arct 702 legislations   lecture 4 - project delivery process and business...Guc arct 702 legislations   lecture 4 - project delivery process and business...
Guc arct 702 legislations lecture 4 - project delivery process and business...
 
Cjmconstructionconsultingpresentation 13086519950433-phpapp02-110621053129-ph...
Cjmconstructionconsultingpresentation 13086519950433-phpapp02-110621053129-ph...Cjmconstructionconsultingpresentation 13086519950433-phpapp02-110621053129-ph...
Cjmconstructionconsultingpresentation 13086519950433-phpapp02-110621053129-ph...
 
QSS
QSSQSS
QSS
 
Qs(ici&itd) (1)
Qs(ici&itd) (1)Qs(ici&itd) (1)
Qs(ici&itd) (1)
 
Qs(ici&itd)
Qs(ici&itd)Qs(ici&itd)
Qs(ici&itd)
 
Duties and job roles of QS.pptx
Duties and job roles of QS.pptxDuties and job roles of QS.pptx
Duties and job roles of QS.pptx
 
CJM Construction Consulting PowerPoint Presentation
CJM Construction Consulting PowerPoint PresentationCJM Construction Consulting PowerPoint Presentation
CJM Construction Consulting PowerPoint Presentation
 
Qsx
QsxQsx
Qsx
 
Qs(ici&itd)
Qs(ici&itd)Qs(ici&itd)
Qs(ici&itd)
 
Pp1 seminar
Pp1 seminarPp1 seminar
Pp1 seminar
 
FMA - 2_CM651_Group.pptx
FMA - 2_CM651_Group.pptxFMA - 2_CM651_Group.pptx
FMA - 2_CM651_Group.pptx
 
ITD Presentation
ITD PresentationITD Presentation
ITD Presentation
 
The Architecture Profession
The Architecture ProfessionThe Architecture Profession
The Architecture Profession
 
Construction Stages and Construction Teams
Construction Stages and Construction TeamsConstruction Stages and Construction Teams
Construction Stages and Construction Teams
 
Ici itd qs project 1
Ici itd qs project 1Ici itd qs project 1
Ici itd qs project 1
 
ICI ITD QS PROJECT 1 (1).pptx
ICI ITD QS PROJECT 1 (1).pptxICI ITD QS PROJECT 1 (1).pptx
ICI ITD QS PROJECT 1 (1).pptx
 
CV Clive V2 180612 A
CV Clive V2 180612 ACV Clive V2 180612 A
CV Clive V2 180612 A
 

More from ALISON TANG

Project 2 board game project brief march 2015
Project 2 board game project brief march 2015Project 2 board game project brief march 2015
Project 2 board game project brief march 2015
ALISON TANG
 
Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015
ALISON TANG
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015
ALISON TANG
 
Project 2 design process research & analysis mac 2015
Project 2 design process research & analysis mac 2015Project 2 design process research & analysis mac 2015
Project 2 design process research & analysis mac 2015
ALISON TANG
 

More from ALISON TANG (20)

7d40cea99011b4eabbdae995202513f9
7d40cea99011b4eabbdae995202513f97d40cea99011b4eabbdae995202513f9
7d40cea99011b4eabbdae995202513f9
 
Enbe future city template
Enbe future city templateEnbe future city template
Enbe future city template
 
Project 2 board game project brief march 2015
Project 2 board game project brief march 2015Project 2 board game project brief march 2015
Project 2 board game project brief march 2015
 
ICI + ITD
ICI + ITDICI + ITD
ICI + ITD
 
Idj topics big hero 6
Idj topics   big hero 6Idj topics   big hero 6
Idj topics big hero 6
 
Cts project 1 brief mac 2015
Cts project 1 brief mac 2015Cts project 1 brief mac 2015
Cts project 1 brief mac 2015
 
Enbe The Journal
Enbe The JournalEnbe The Journal
Enbe The Journal
 
ENBE Final Project Brief
ENBE Final Project BriefENBE Final Project Brief
ENBE Final Project Brief
 
Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015
 
Project 2 itd
Project 2 itdProject 2 itd
Project 2 itd
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015
 
Project 2 design process research & analysis mac 2015
Project 2 design process research & analysis mac 2015Project 2 design process research & analysis mac 2015
Project 2 design process research & analysis mac 2015
 
Project 1 experiential landscape mac 2015
Project 1 experiential landscape mac 2015Project 1 experiential landscape mac 2015
Project 1 experiential landscape mac 2015
 
Module outline cl mac 2015
Module outline cl mac 2015Module outline cl mac 2015
Module outline cl mac 2015
 
Ici finale
Ici finaleIci finale
Ici finale
 
Final project march 2015
Final project march 2015Final project march 2015
Final project march 2015
 
ICIMagazine 2
ICIMagazine 2ICIMagazine 2
ICIMagazine 2
 
Assignment 1B
Assignment 1BAssignment 1B
Assignment 1B
 
Magazine 1
Magazine 1Magazine 1
Magazine 1
 
Enbe brief
Enbe briefEnbe brief
Enbe brief
 

Recently uploaded

Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
PECB
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
Chris Hunter
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
MateoGardella
 

Recently uploaded (20)

Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 

Quantity surveyor (ici+itd)

  • 1. Quantity Surveyor INTRODUCTION TO CONSTRUCTION INDUSTRY + INTRODUCTION TO DRAWING GROUP: • CH’NG PHEI WOON(LEADER) • CHRISTINA CHUA • BOON LI YING • ALISON TANG • CHONG YI HUI ASSIGNMENT 1
  • 3. Definition of Quantity Surveyor • Providing advices on procurement, contracts and project cost management. • Work as consultants or be employed by a contractor or sub- contractor.
  • 4. Quantity Surveyor Certified board • The Board of Quantity Surveyors Malaysia was set up by an Act of Parliament, i.e. Quantity Surveyors Act 1967 (revised 2002). The Board consists of a President, a Registrar and sixteen (16) members appointed by the Minister of Works, Malaysia. • to approve or reject applications for registration or approval to practise under this Act or to approve any such application subject to such conditions or restrictions as it may deem fit to impose • to order the issuance of a written warning or reprimand, the imposition of a fine, suspension, cancellation, removal or reinstatement in accordance with Part III and IV Quantity Surveyors Act
  • 5. Scope of Work Handled by 
 Quantity Surveyors • Cost Planning • To help the design team to keep within the budget from start to the end of the project • Preliminary Cost Advice •Give practical advice on comparative costs of alternative layouts, materials, components & methods of construction.
  • 6. •Contractual Methods • Advise on the best form of contract for a specific project. •Tendering •Calculating the cost and risk to tender for the project.
  • 7. • Choice of Contractor • Quantity surveyor makes recommendation of contractors base on past performances to the employers. •Valuation of Construction Work •Quantity surveyor evaluates work carried out before making certified payment.
  • 8. •Increase Efficiency •Making sure that fairness exists between employer and contractors to make work smoother and easier.
  • 9. Responsibilities & Tasks at Different Stages of Construction • Monitor cost at different stages of project. • Certify payment and invoices. • Negotiating disputes. • Advising on budgets and costs. • Giving advice for disputes on contracts.
  • 10. Daily Activities Construction starts… • Feasibility studies of a project • Roughly estimate what’s involve in the project (Measurement of Sketches) • Study architects’ and engineers’ plans • Identify cost and overall budget (Value Engineering) • Final detailed estimate is prepared by Quantity Surveyor and Architect
  • 11. •During Construction… • Provide flow of cash data • Can access cost effects when change of project occur •After Construction… •Quantity Surveyor prepare statement of final account (Records actual cost for all sections of job)
  • 12. Stages that involve in cost planning during design and construction Tender Reconciliation Comparing tender price with final cost Post-Contract Cost Control Controlling cost at different stages of construction Preliminary Estimate Using research market price to estimate Cost Plan Calculating project cost according to elemental analysis Cost Check Evaluating the work done according to cost
  • 14. Preliminary Drawing • A rough design with less detail • Estimate the budget of a project • Can be used to prepared cost plan
  • 15. Tender Drawing • A complete design with full details by Architects and Structural engineer • Comprise of architectural and structural drawings • Can be used to prepare Bills of Quantities
  • 16. STRUCTURAL DRAWING By Structural Engineer Column Beam • Between 2 column Slab (Floor)
  • 17. Structural Drawing by Structural Engineer
  • 20. Quantity Surveyors ‘Bible book’
 SMM2 • Latest edition : SMM2 • SMM 1 Slightly different from SMM2 • This book is guide for calculation and format of BILLS OF QUANTITIES
  • 21. Contract Drawing • Same drawing as tender drawings Contract Drawing = Construction Drawing Used to prepare contract document
  • 23. As-Built Drawing • A finalise drawing Any changes in example Type of tile ,paint Commonly by Clients or Architects