SlideShare a Scribd company logo
1 of 2
Alba M. Cruz Rubero
451 Batey St. |Toa Alta, PR 00953 | H: 787-251-4978 | C: 787-637-1209 | i-hdez@hotmail.com
MANUFACTURING MANAGEMENT
Results driven and dedicated with experience planningand leading operations involving Manufacturing
environment including Quality, Maintenance, Engineering and Production Planning.
Key Strengths
 Strategic Operations Management
 Quality Assurance
 Financial Management
 Cost Reduction & Budgeting
 Lean Manufacturing
 Process Improvement
 Strategic Planning
 ISO 9001:2008
EXPERIENCE
Thomas & Betts
Manufacturing Manager
2004 – Present
In charge of all Plant aspects on the Terminals Plant; Production, Quality, Engineering, Production Planning and
Maintenance. Managed five direct reports and 85 hourly employees.
Key projects:
 Increase Efficiency from 51% to 65%.
 Managed a $3M Capital Projects for the Terminals Plant.
 Identified products to manufacture in house, reducing manufacturing cost by 15%.
 Establish SMED in Press Area reducing set up times in 50%.
 Caribe TWI and Kaizen Leader.
 Establish a Preventive Maintenance Program in all Plant equipment.
 Replace labor-intense processes through Semi-Automatic technology helping labor absorption and
output.
 Maintain compliance with critical safety and quality standards.
 Develop production schedules for three shift operations with 85 employees.
 Project Management using A3 and 4Q tools.
 Decrease customer complaint in 9%.
 SWI, JHA & LOTO creation for all Terminals Plant process and equipment.
Air Master Windows & Doors
Manufacturing Manager
2003 – 2004
Oversaw floor operations and managed two direct reports and 65+ hourly employees for windows
manufacturer.
Key projects:
 Decrease absenteeism for 10%.
 Increase output in 20%.
Wyeth
Manufacturing Process Flow Assurer
2002 – 2003
In charge of Aseptic Equipment Preparation and Bulk Manufacturing areas. Coordinates and supervise both
departments activities to assure on-time delivery of equipment and formulations.
Key projects:
 Generated and Documented manufacturing investigations for non-conforming results.
Harvey Hubbell Caribe
Fabrication Superintendent (Components)
2000 – 2002
Oversaw floor operations and managed four direct reports and 30+ hourly employees for Fabrication plant.
Key projects:
 Establish PM program for all the 22 machines in the department and their tools.
 Decrease set up time in 60%.
 Color Code Program.
Quality Engineer 1998 – 2000
Provide engineering support to production for the evaluation of process and equipment problems affecting
quality and productivity.
Key projects:
 Recovery of $200Kin returns in one-year period through a process that promotes good customer-
supplier relationship.
 Establish a 24 hours disposition in all hold areas.
 Kaizen Leader by Everest Consulting Group, Boston Mass. And TBM Consulting Group.
 ISO 9000 Internal Auditor
 Poke-a-Yoke
Manufacturing Supervisor 1996 – 1998
Managed 65+ hourly employees for Kellems plant.
Key projects:
 In charge of all the training required for the Transfer of 40 Products from Connecticut.
 Increase efficiency 5%.
 Responsible for the production scheduling for the department.
 Implementation of One piece flow in all of our production lines.
Davis & Geck
Manufacturing Supervisor
1995 –1996
Managed 60 hourly employees for Surgical Sutures Department
Key projects:
 Production Scheduling of the department in order to meet orders request and maintain efficiency at
95%.
 Exposure to Good Manufacturing Processes (GMP’s)
 ISO 9000 Certification Program
EDUCATION & TRAINING
University of Phoenix, Guaynabo, PR
MBA, Master of Business Administration in Technology Management
2000-2002
Polytechnic University, Rio Piedras, PR
BSIE, Bachelor of Science in Industrial Engineering
1989-1994

More Related Content

What's hot

Kim Reynolds Resume LF 2P 6 20 2016
Kim Reynolds Resume LF 2P 6 20 2016Kim Reynolds Resume LF 2P 6 20 2016
Kim Reynolds Resume LF 2P 6 20 2016Kim Reynolds
 
Weil Eric Resume_2016
Weil Eric Resume_2016Weil Eric Resume_2016
Weil Eric Resume_2016Eric Weil
 
Ruben Renteria - Resume Nov. 11. 2015
Ruben Renteria - Resume Nov. 11. 2015Ruben Renteria - Resume Nov. 11. 2015
Ruben Renteria - Resume Nov. 11. 2015Ruben Renteria
 
Christopher irving parks_4.8. 2020 new
Christopher irving parks_4.8. 2020 newChristopher irving parks_4.8. 2020 new
Christopher irving parks_4.8. 2020 newChris Parks
 
White kent resume_2017
White kent resume_2017White kent resume_2017
White kent resume_2017Kent White
 
Resume - Chris Marlow
Resume - Chris MarlowResume - Chris Marlow
Resume - Chris MarlowChris Marlow
 
Paul Philips Praneshkumar Paul Devanbu - Resume Final
Paul Philips Praneshkumar Paul Devanbu  - Resume FinalPaul Philips Praneshkumar Paul Devanbu  - Resume Final
Paul Philips Praneshkumar Paul Devanbu - Resume FinalPhilips Pranesh
 
Resume marty hudson bloomington
Resume marty hudson bloomingtonResume marty hudson bloomington
Resume marty hudson bloomingtonMarty Hudson
 
Seanresume3-15.docx-2
Seanresume3-15.docx-2Seanresume3-15.docx-2
Seanresume3-15.docx-2Sean Hedden
 
Andrew taylor cv march 2016.doc
Andrew taylor cv march 2016.docAndrew taylor cv march 2016.doc
Andrew taylor cv march 2016.docAndy Taylor
 
Dennis Bertoni Resume Review (1)
Dennis Bertoni Resume Review (1)Dennis Bertoni Resume Review (1)
Dennis Bertoni Resume Review (1)Dennis Bertoni
 
resume_Sid Persaud_Dec 9 2015
resume_Sid Persaud_Dec 9 2015resume_Sid Persaud_Dec 9 2015
resume_Sid Persaud_Dec 9 2015Sid Persaud
 
MelKensingerResume 4-13-15
MelKensingerResume  4-13-15MelKensingerResume  4-13-15
MelKensingerResume 4-13-15Mel Kensinger
 
Michael phillips resume 04-10-2017
Michael phillips resume   04-10-2017Michael phillips resume   04-10-2017
Michael phillips resume 04-10-2017Michael Phillips
 
Lean manufacturing case study
  Lean manufacturing case study  Lean manufacturing case study
Lean manufacturing case studymallicknazrul
 

What's hot (19)

Kim Reynolds Resume LF 2P 6 20 2016
Kim Reynolds Resume LF 2P 6 20 2016Kim Reynolds Resume LF 2P 6 20 2016
Kim Reynolds Resume LF 2P 6 20 2016
 
Weil Eric Resume_2016
Weil Eric Resume_2016Weil Eric Resume_2016
Weil Eric Resume_2016
 
Ruben Renteria - Resume Nov. 11. 2015
Ruben Renteria - Resume Nov. 11. 2015Ruben Renteria - Resume Nov. 11. 2015
Ruben Renteria - Resume Nov. 11. 2015
 
Christopher irving parks_4.8. 2020 new
Christopher irving parks_4.8. 2020 newChristopher irving parks_4.8. 2020 new
Christopher irving parks_4.8. 2020 new
 
White kent resume_2017
White kent resume_2017White kent resume_2017
White kent resume_2017
 
Resume - Chris Marlow
Resume - Chris MarlowResume - Chris Marlow
Resume - Chris Marlow
 
Paul Philips Praneshkumar Paul Devanbu - Resume Final
Paul Philips Praneshkumar Paul Devanbu  - Resume FinalPaul Philips Praneshkumar Paul Devanbu  - Resume Final
Paul Philips Praneshkumar Paul Devanbu - Resume Final
 
Elizabeth Rubio - CV-2
Elizabeth Rubio - CV-2Elizabeth Rubio - CV-2
Elizabeth Rubio - CV-2
 
Resume marty hudson bloomington
Resume marty hudson bloomingtonResume marty hudson bloomington
Resume marty hudson bloomington
 
Seanresume3-15.docx-2
Seanresume3-15.docx-2Seanresume3-15.docx-2
Seanresume3-15.docx-2
 
Andrew taylor cv march 2016.doc
Andrew taylor cv march 2016.docAndrew taylor cv march 2016.doc
Andrew taylor cv march 2016.doc
 
Dennis Bertoni Resume Review (1)
Dennis Bertoni Resume Review (1)Dennis Bertoni Resume Review (1)
Dennis Bertoni Resume Review (1)
 
Diener Adrian Arellanes - Curriculum
Diener Adrian Arellanes - CurriculumDiener Adrian Arellanes - Curriculum
Diener Adrian Arellanes - Curriculum
 
resume_Sid Persaud_Dec 9 2015
resume_Sid Persaud_Dec 9 2015resume_Sid Persaud_Dec 9 2015
resume_Sid Persaud_Dec 9 2015
 
MelKensingerResume 4-13-15
MelKensingerResume  4-13-15MelKensingerResume  4-13-15
MelKensingerResume 4-13-15
 
Resume R.Coronado
Resume R.CoronadoResume R.Coronado
Resume R.Coronado
 
Michael phillips resume 04-10-2017
Michael phillips resume   04-10-2017Michael phillips resume   04-10-2017
Michael phillips resume 04-10-2017
 
DWADAMS RESUME2
DWADAMS RESUME2DWADAMS RESUME2
DWADAMS RESUME2
 
Lean manufacturing case study
  Lean manufacturing case study  Lean manufacturing case study
Lean manufacturing case study
 

Similar to Resume

Resume Edgardo Rivera-Sueiro 2015-v1
Resume Edgardo Rivera-Sueiro 2015-v1Resume Edgardo Rivera-Sueiro 2015-v1
Resume Edgardo Rivera-Sueiro 2015-v1Edgardo Rivera-Sueiro
 
VP Operations / General Manager
VP Operations / General ManagerVP Operations / General Manager
VP Operations / General Managerjiwri79
 
EDWARD HOCKWATER resume wo graphic
EDWARD HOCKWATER     resume wo graphicEDWARD HOCKWATER     resume wo graphic
EDWARD HOCKWATER resume wo graphicEd Hockwater
 
Gyasi Brown Resume 6-8-16
Gyasi Brown Resume 6-8-16Gyasi Brown Resume 6-8-16
Gyasi Brown Resume 6-8-16Gyasi Brown
 
Robert Langell's Resume Jan 2017
Robert Langell's Resume Jan 2017Robert Langell's Resume Jan 2017
Robert Langell's Resume Jan 2017Robert Langell
 
Carl Arens Resume 8_15 Revised
Carl Arens Resume 8_15 RevisedCarl Arens Resume 8_15 Revised
Carl Arens Resume 8_15 RevisedCarl Arens
 
Baldwin Dias resume
Baldwin Dias resumeBaldwin Dias resume
Baldwin Dias resumeBaldwin Dias
 
Roger Banks: My Professional Resume
Roger Banks: My Professional ResumeRoger Banks: My Professional Resume
Roger Banks: My Professional Resumerogerkbanks
 
John F Petak Resume July 2011
John F Petak   Resume July  2011John F Petak   Resume July  2011
John F Petak Resume July 2011ExerciseLeanLLC
 
Rakesh burman resume
Rakesh burman resume Rakesh burman resume
Rakesh burman resume Rakesh burman
 
Thomas randallresume2016
Thomas randallresume2016Thomas randallresume2016
Thomas randallresume2016Tom Randall
 
ThomasRandallResume2016
ThomasRandallResume2016ThomasRandallResume2016
ThomasRandallResume2016Tom Randall
 
Amy Freeman Resume June2009
Amy Freeman Resume June2009Amy Freeman Resume June2009
Amy Freeman Resume June2009guestc9e91c
 

Similar to Resume (20)

Resume Edgardo Rivera-Sueiro 2015-v1
Resume Edgardo Rivera-Sueiro 2015-v1Resume Edgardo Rivera-Sueiro 2015-v1
Resume Edgardo Rivera-Sueiro 2015-v1
 
KBM resume18102015
KBM resume18102015KBM resume18102015
KBM resume18102015
 
VP Operations / General Manager
VP Operations / General ManagerVP Operations / General Manager
VP Operations / General Manager
 
EDWARD HOCKWATER resume wo graphic
EDWARD HOCKWATER     resume wo graphicEDWARD HOCKWATER     resume wo graphic
EDWARD HOCKWATER resume wo graphic
 
Gyasi Brown Resume 6-8-16
Gyasi Brown Resume 6-8-16Gyasi Brown Resume 6-8-16
Gyasi Brown Resume 6-8-16
 
Robert Langell's Resume Jan 2017
Robert Langell's Resume Jan 2017Robert Langell's Resume Jan 2017
Robert Langell's Resume Jan 2017
 
Carl Arens Resume 8_15 Revised
Carl Arens Resume 8_15 RevisedCarl Arens Resume 8_15 Revised
Carl Arens Resume 8_15 Revised
 
Baldwin Dias resume
Baldwin Dias resumeBaldwin Dias resume
Baldwin Dias resume
 
RsmGV17usmx
RsmGV17usmxRsmGV17usmx
RsmGV17usmx
 
CV S Larner 2016
CV S Larner 2016CV S Larner 2016
CV S Larner 2016
 
Resume 2016_
Resume 2016_Resume 2016_
Resume 2016_
 
Roger Banks: My Professional Resume
Roger Banks: My Professional ResumeRoger Banks: My Professional Resume
Roger Banks: My Professional Resume
 
John F Petak Resume July 2011
John F Petak   Resume July  2011John F Petak   Resume July  2011
John F Petak Resume July 2011
 
Rakesh burman resume
Rakesh burman resume Rakesh burman resume
Rakesh burman resume
 
Conprofile.DOC
Conprofile.DOCConprofile.DOC
Conprofile.DOC
 
TS 7.27 PDF
TS 7.27 PDFTS 7.27 PDF
TS 7.27 PDF
 
Bhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.EngBhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.Eng
 
Thomas randallresume2016
Thomas randallresume2016Thomas randallresume2016
Thomas randallresume2016
 
ThomasRandallResume2016
ThomasRandallResume2016ThomasRandallResume2016
ThomasRandallResume2016
 
Amy Freeman Resume June2009
Amy Freeman Resume June2009Amy Freeman Resume June2009
Amy Freeman Resume June2009
 

Resume

  • 1. Alba M. Cruz Rubero 451 Batey St. |Toa Alta, PR 00953 | H: 787-251-4978 | C: 787-637-1209 | i-hdez@hotmail.com MANUFACTURING MANAGEMENT Results driven and dedicated with experience planningand leading operations involving Manufacturing environment including Quality, Maintenance, Engineering and Production Planning. Key Strengths  Strategic Operations Management  Quality Assurance  Financial Management  Cost Reduction & Budgeting  Lean Manufacturing  Process Improvement  Strategic Planning  ISO 9001:2008 EXPERIENCE Thomas & Betts Manufacturing Manager 2004 – Present In charge of all Plant aspects on the Terminals Plant; Production, Quality, Engineering, Production Planning and Maintenance. Managed five direct reports and 85 hourly employees. Key projects:  Increase Efficiency from 51% to 65%.  Managed a $3M Capital Projects for the Terminals Plant.  Identified products to manufacture in house, reducing manufacturing cost by 15%.  Establish SMED in Press Area reducing set up times in 50%.  Caribe TWI and Kaizen Leader.  Establish a Preventive Maintenance Program in all Plant equipment.  Replace labor-intense processes through Semi-Automatic technology helping labor absorption and output.  Maintain compliance with critical safety and quality standards.  Develop production schedules for three shift operations with 85 employees.  Project Management using A3 and 4Q tools.  Decrease customer complaint in 9%.  SWI, JHA & LOTO creation for all Terminals Plant process and equipment. Air Master Windows & Doors Manufacturing Manager 2003 – 2004 Oversaw floor operations and managed two direct reports and 65+ hourly employees for windows manufacturer. Key projects:  Decrease absenteeism for 10%.  Increase output in 20%. Wyeth Manufacturing Process Flow Assurer 2002 – 2003 In charge of Aseptic Equipment Preparation and Bulk Manufacturing areas. Coordinates and supervise both departments activities to assure on-time delivery of equipment and formulations. Key projects:  Generated and Documented manufacturing investigations for non-conforming results.
  • 2. Harvey Hubbell Caribe Fabrication Superintendent (Components) 2000 – 2002 Oversaw floor operations and managed four direct reports and 30+ hourly employees for Fabrication plant. Key projects:  Establish PM program for all the 22 machines in the department and their tools.  Decrease set up time in 60%.  Color Code Program. Quality Engineer 1998 – 2000 Provide engineering support to production for the evaluation of process and equipment problems affecting quality and productivity. Key projects:  Recovery of $200Kin returns in one-year period through a process that promotes good customer- supplier relationship.  Establish a 24 hours disposition in all hold areas.  Kaizen Leader by Everest Consulting Group, Boston Mass. And TBM Consulting Group.  ISO 9000 Internal Auditor  Poke-a-Yoke Manufacturing Supervisor 1996 – 1998 Managed 65+ hourly employees for Kellems plant. Key projects:  In charge of all the training required for the Transfer of 40 Products from Connecticut.  Increase efficiency 5%.  Responsible for the production scheduling for the department.  Implementation of One piece flow in all of our production lines. Davis & Geck Manufacturing Supervisor 1995 –1996 Managed 60 hourly employees for Surgical Sutures Department Key projects:  Production Scheduling of the department in order to meet orders request and maintain efficiency at 95%.  Exposure to Good Manufacturing Processes (GMP’s)  ISO 9000 Certification Program EDUCATION & TRAINING University of Phoenix, Guaynabo, PR MBA, Master of Business Administration in Technology Management 2000-2002 Polytechnic University, Rio Piedras, PR BSIE, Bachelor of Science in Industrial Engineering 1989-1994