SlideShare a Scribd company logo
1 of 3
ROBERT LANGELL
112 Shadyside Ave. Concord, MA 01742 978-505-0861 Boblangell1@gmail.com
VP of Operations
Experienced, hands-on leader with proven success developing and executing strategic plans,
driving Lean/Sigma culture, while continually improving operating efficiencies, cost &
margin.
Areas of Expertise:
Certified Lean/Sigma instructor – Driving corporate
World Class Production culture change thru continuous improvement while
developing worldwide Manufacturing operations
New Business Development Develop growth strategies for Manuf/Sales/Marketing to
gain market share and compete in new markets
New Product Introduction (NPI) Cost effective transition of new product designs
seamlessly thru production using DFSS/Lean principles
Supply Chain Development Manage technical challenges at critical suppliers driving
continuous improvements in COPQ
SCHLEIFRING NORTH AMERICA - CHELMSFORD, MA Dec 2015 - Present
Executive Vice President Operations
Schleifring is a global leader in slip ring development and technology
Developed a start-up manufacturing plant producing electro-mechanical components for the
defense industry. Managed all aspects from building design, hiring and training to qualifying
production. Managed all customer and regulatory audits enabling product shipment.
Developed plans to transfer technology and manufacturing lines from UK and Chicago plants to
a new Massachusetts facility.
• Successfully transferred product lines from UK facility to be produced in new MA plant to
support global initiatives
• Managed all International Traffic in Arms regulations (ITAR) with export compliance
responsibility enabling the transfer of products and technologies between countries
• Managed International Standards Organization (ISO) and customer audits to achieve
regulatory compliance and ability to manufacture and ship product from MA plant
• Developed and delivered the plan for hiring and training of all staff from engineering through
production to support year two customer delivery objectives
• Hired and managed Supply Chain staff to develop local and overseas procurement to support
production targets
• Managed all building facilities and contractors thru turn-key operation within $11M budget
and time schedule
• Developed quarterly Operation plan that grew sales from zero to $8.5M in first year
• Managed and implemented SAP operating system to integrate with corporate headquarters
• Developed and implemented a state of the art copper/gold plating operation, managed design,
contractors and procurement of all equipment and materials to reduce international plating
costs while maintaining intellectual property
Robert Langell Page 2
• Successfully transferred all product lines to new Massachusetts facility and closed Chicago
operation
• Developed operations strategy to hire 200 employees, supporting existing and new business
while reducing global manufacturing footprint
APRIORI TECHNOLOGIES - CONCORD, MA Oct 2013 – Dec 2015
Client Executive
aPriori is a venture funded firm using software and services to generate product cost savings in
design, manufacturing and sourcing for manufacturing organizations.
Customer facing executive developing and implementing manufacturing strategies to realize
savings, launch products on time at cost targets, and maximize savings in re-work and
outsourced parts.
BAE SYSTEMS - NASHUA, NH 2008- 2013
Plant Manager - Lean Six Sigma MasterBlack Belt
BAE Systems is a global company engaged in the development, delivery and support of
advanced defense, security and aerospace systems - $4B Annual Sales
Managed staff of 80 engineers and production across multiple sites & diverse product lines to
drive continuous cost improvements while delivering $60M operations strategy.
Spearheaded strategy that improved processes and delivery performance, reduced rework
rescuing a $20M program in jeopardy.
 Delivered Lean/Sigma training to entire staff developing COPQ portfolio of $10M
 Resolved production shutdown issues at mission-critical suppliers by developing and
managing Kaizen teams through risk mitigation strategies enabling $300M program success
 Increased sales $20M/year resolving production bottlenecks, improving operating costs,
leading root cause analysis teams to improve yields, and correcting supplier quality issues
 Implemented Statistical Process Control & automated data analysis in critical areas
 Managed/prepared staff for ISO, DCMA, government & customer audits – directed teams thru
corrective action resolution by working closely with customers & government agencies
 Developed corporate NPI strategy to reduce transition to manufacturing costs 25%
 Developed business strategy and marketing campaign to compete in $20B commercial market
 Managed delinquent suppliers by identifying risks, capability and capacity constraints and
developing ‘return to green’ strategies guaranteeing program success
W.R. GRACE - CAMBRIDGE, MA 2004- 2008
Global Productivity Manager – Lean/Six Sigma
W.R. Grace is a premier international, high volume specialty chemicals and materials company –
Chapter 11 in 2008.
Transformed international business by instituting LeanSigma operations worldwide.
Developed operating plans for Manufacturing, Sales, Marketing, Supply Chain and
R&D. Personal cost reduction & revenue enhancement program in excess of $15M per
year. Trained and managed international teams reducing COGS by 10% from $1B in sales.
Robert Langell Page 3
 Developed $15M Strategic & Operational Plan consisting of 30 international projects
 Reduced operating costs 15% transitioning United Kingdom production facility into a
Lean/Sigma operation
HELIX TECHNOLOGY CORP, CTI – MANSFIELD, MA 1999 - 2004
Director – Global Business Development
Helix/CTI Cryogenics designed high-vacuum systems used to manufacture semi-conductor, data
storage, flat panel, and optical devices – company sold & moved to Brooks Automation in 2005.
 Planned, designed and directed the development of five international, world class facilities in
Taiwan, Japan, Korea, China & France growing international business by 150%
 Setup each operation by developing unique manufacturing, sales and marketing strategies,
hired & trained staff, developed local supply base and operating systems to improve and grow
regional market share
FORD MOTOR COMPANY – BASSILDEN, ESSEX - UNITED KINGDOM 1998 - 1999
Cost Reduction Manager, – Dagenham Automotive Plant
 Managed European supply base to reduce material costs by 2% per year, generated corrective
action database reducing warranty claims by 25%
TELECTRONICS PACING SYSTEMS – SYDNEY, AUSTRALIA 1994 - 1998
QA/Production Manager
Telectronics manufactured implant pace makers & defibrillators – office closed 1998.
 Managed Production department along with ISO, FDA & British Standards accreditation
programs by preparing facilities for audits thru training, documentation control and resolving
corrective actions
PNEUMATIC SCALE – N. QUINCY, MA 1992 - 1994
Mechanical DesignEngineer / Pneumatic Scale manufactured packaging equipment for the
food & beverage industry – office closed 1994
 Managed designs to meet customer specifications for high-speed packaging equipment
EDUCATION
B.S. Mechanical Engineering University of Lowell - Massachusetts 1988 – 1992
B.S. Business Marketing University of Maine - Orono 1981 – 1985
Travel: Receptive to 75% foreign/domestic
Security Clearance: Previous Clearance expired 2014

More Related Content

What's hot

Austin C Mattson_II_resume_May 2013
Austin C  Mattson_II_resume_May 2013Austin C  Mattson_II_resume_May 2013
Austin C Mattson_II_resume_May 2013Austin C. Mattson II
 
Resume Edgardo Rivera-Sueiro 2015-v1
Resume Edgardo Rivera-Sueiro 2015-v1Resume Edgardo Rivera-Sueiro 2015-v1
Resume Edgardo Rivera-Sueiro 2015-v1Edgardo Rivera-Sueiro
 
bufford, peter resume 160608
bufford, peter resume 160608bufford, peter resume 160608
bufford, peter resume 160608Peter Bufford
 
zCharlieResume091416
zCharlieResume091416zCharlieResume091416
zCharlieResume091416Charlie White
 
Eric VanAuken detailed resume
Eric VanAuken detailed resumeEric VanAuken detailed resume
Eric VanAuken detailed resumeEric VanAuken
 
g c fell resume President General Manager
 g c fell resume President General Manager g c fell resume President General Manager
g c fell resume President General ManagerGary C. Fell
 
John Tobin Resume
John Tobin ResumeJohn Tobin Resume
John Tobin ResumeJohn Tobin
 
William Bryant - Resume PMP 2016
William Bryant - Resume PMP 2016William Bryant - Resume PMP 2016
William Bryant - Resume PMP 2016William Bryant, PMP
 
resume_Sid Persaud_Dec 9 2015
resume_Sid Persaud_Dec 9 2015resume_Sid Persaud_Dec 9 2015
resume_Sid Persaud_Dec 9 2015Sid Persaud
 
Resume112414
Resume112414Resume112414
Resume112414Jim Cuatt
 
Tom steele resume
Tom steele resumeTom steele resume
Tom steele resumeTom Steele
 
Tom Steele Resume_PM 0326
Tom Steele Resume_PM 0326Tom Steele Resume_PM 0326
Tom Steele Resume_PM 0326Tom Steele
 

What's hot (19)

Marco resume.(3)
Marco resume.(3)Marco resume.(3)
Marco resume.(3)
 
Austin C Mattson_II_resume_May 2013
Austin C  Mattson_II_resume_May 2013Austin C  Mattson_II_resume_May 2013
Austin C Mattson_II_resume_May 2013
 
MTF Resume 101215
MTF Resume 101215MTF Resume 101215
MTF Resume 101215
 
Resume Edgardo Rivera-Sueiro 2015-v1
Resume Edgardo Rivera-Sueiro 2015-v1Resume Edgardo Rivera-Sueiro 2015-v1
Resume Edgardo Rivera-Sueiro 2015-v1
 
Hvrsume Hv Word Format
Hvrsume Hv Word FormatHvrsume Hv Word Format
Hvrsume Hv Word Format
 
bufford, peter resume 160608
bufford, peter resume 160608bufford, peter resume 160608
bufford, peter resume 160608
 
Resume Giridhar
Resume GiridharResume Giridhar
Resume Giridhar
 
zCharlieResume091416
zCharlieResume091416zCharlieResume091416
zCharlieResume091416
 
Eric VanAuken detailed resume
Eric VanAuken detailed resumeEric VanAuken detailed resume
Eric VanAuken detailed resume
 
g c fell resume President General Manager
 g c fell resume President General Manager g c fell resume President General Manager
g c fell resume President General Manager
 
John Tobin Resume
John Tobin ResumeJohn Tobin Resume
John Tobin Resume
 
William Bryant - Resume PMP 2016
William Bryant - Resume PMP 2016William Bryant - Resume PMP 2016
William Bryant - Resume PMP 2016
 
resume_Sid Persaud_Dec 9 2015
resume_Sid Persaud_Dec 9 2015resume_Sid Persaud_Dec 9 2015
resume_Sid Persaud_Dec 9 2015
 
Kathy R Brown Resume Nov2016
Kathy R Brown Resume Nov2016Kathy R Brown Resume Nov2016
Kathy R Brown Resume Nov2016
 
resume A Castrejon Dec16 1
resume A Castrejon Dec16 1resume A Castrejon Dec16 1
resume A Castrejon Dec16 1
 
Resume112414
Resume112414Resume112414
Resume112414
 
Tom steele resume
Tom steele resumeTom steele resume
Tom steele resume
 
Tom Steele Resume_PM 0326
Tom Steele Resume_PM 0326Tom Steele Resume_PM 0326
Tom Steele Resume_PM 0326
 
CV S Larner 2016
CV S Larner 2016CV S Larner 2016
CV S Larner 2016
 

Viewers also liked

HENRY VU-RESUME
HENRY VU-RESUMEHENRY VU-RESUME
HENRY VU-RESUMEHenry Vu
 
pdf Conant Resume 2015 Rev 1
 pdf Conant Resume 2015 Rev 1 pdf Conant Resume 2015 Rev 1
pdf Conant Resume 2015 Rev 1David Conant
 
MJonesMFG Production Resume
MJonesMFG Production ResumeMJonesMFG Production Resume
MJonesMFG Production ResumeMark R. Jones
 
Bob McDonald Resume
Bob McDonald ResumeBob McDonald Resume
Bob McDonald ResumeBob McDonald
 
Kevin Resume 3-12-2016
Kevin Resume 3-12-2016Kevin Resume 3-12-2016
Kevin Resume 3-12-2016Kevin Logeais
 
2016 Fermenick Resume doc
2016 Fermenick Resume doc2016 Fermenick Resume doc
2016 Fermenick Resume docMark Fermenick
 
Resume - Suncor
Resume - SuncorResume - Suncor
Resume - SuncorSyed Rizvi
 
0 b a levine mfg qc eng resume
0 b a levine mfg   qc eng resume0 b a levine mfg   qc eng resume
0 b a levine mfg qc eng resumeAndy Levine
 
Value Proposition Design
Value Proposition DesignValue Proposition Design
Value Proposition DesignYves Pigneur
 

Viewers also liked (9)

HENRY VU-RESUME
HENRY VU-RESUMEHENRY VU-RESUME
HENRY VU-RESUME
 
pdf Conant Resume 2015 Rev 1
 pdf Conant Resume 2015 Rev 1 pdf Conant Resume 2015 Rev 1
pdf Conant Resume 2015 Rev 1
 
MJonesMFG Production Resume
MJonesMFG Production ResumeMJonesMFG Production Resume
MJonesMFG Production Resume
 
Bob McDonald Resume
Bob McDonald ResumeBob McDonald Resume
Bob McDonald Resume
 
Kevin Resume 3-12-2016
Kevin Resume 3-12-2016Kevin Resume 3-12-2016
Kevin Resume 3-12-2016
 
2016 Fermenick Resume doc
2016 Fermenick Resume doc2016 Fermenick Resume doc
2016 Fermenick Resume doc
 
Resume - Suncor
Resume - SuncorResume - Suncor
Resume - Suncor
 
0 b a levine mfg qc eng resume
0 b a levine mfg   qc eng resume0 b a levine mfg   qc eng resume
0 b a levine mfg qc eng resume
 
Value Proposition Design
Value Proposition DesignValue Proposition Design
Value Proposition Design
 

Similar to Robert Langell's Resume Jan 2017

Corneliu ioan gligor - cv - rev 2
Corneliu ioan gligor - cv - rev 2Corneliu ioan gligor - cv - rev 2
Corneliu ioan gligor - cv - rev 2Cornell J. Gligor
 
2015.08 John Kidd cv.2
2015.08 John Kidd cv.22015.08 John Kidd cv.2
2015.08 John Kidd cv.2John Kidd
 
Philip Fulmer Resume
Philip Fulmer ResumePhilip Fulmer Resume
Philip Fulmer ResumePhilip Fulmer
 
MJonesMFG Operation Resume
MJonesMFG Operation ResumeMJonesMFG Operation Resume
MJonesMFG Operation ResumeMark R. Jones
 
Wieland Charles Resume 11.05.16
Wieland Charles Resume  11.05.16Wieland Charles Resume  11.05.16
Wieland Charles Resume 11.05.16Charles Wieland
 
Resume of Louis Wang
Resume of Louis WangResume of Louis Wang
Resume of Louis WangLouis Wang
 
Bruce Shaver Operations 2011
Bruce Shaver   Operations 2011Bruce Shaver   Operations 2011
Bruce Shaver Operations 2011tbshaver
 
Scott a. bean resume july 2016
Scott a. bean resume july 2016Scott a. bean resume july 2016
Scott a. bean resume july 2016Scott Bean
 
Resume M Pitcher 2010 08 27
Resume   M Pitcher 2010 08 27Resume   M Pitcher 2010 08 27
Resume M Pitcher 2010 08 27Michael Pitcher
 
Seanresume3-15.docx-2
Seanresume3-15.docx-2Seanresume3-15.docx-2
Seanresume3-15.docx-2Sean Hedden
 
NPI operations eng
NPI operations eng NPI operations eng
NPI operations eng Craig Oeser
 
MJonesMFG Management Resume
MJonesMFG Management ResumeMJonesMFG Management Resume
MJonesMFG Management ResumeMark R. Jones
 
Austin_C _Mattson_II_resume_Sep_2015
Austin_C _Mattson_II_resume_Sep_2015Austin_C _Mattson_II_resume_Sep_2015
Austin_C _Mattson_II_resume_Sep_2015Austin C. Mattson II
 
John F Petak Resume July 2011
John F Petak   Resume July  2011John F Petak   Resume July  2011
John F Petak Resume July 2011ExerciseLeanLLC
 

Similar to Robert Langell's Resume Jan 2017 (20)

DWADAMS RESUME2
DWADAMS RESUME2DWADAMS RESUME2
DWADAMS RESUME2
 
Corneliu ioan gligor - cv - rev 2
Corneliu ioan gligor - cv - rev 2Corneliu ioan gligor - cv - rev 2
Corneliu ioan gligor - cv - rev 2
 
2015.08 John Kidd cv.2
2015.08 John Kidd cv.22015.08 John Kidd cv.2
2015.08 John Kidd cv.2
 
Smiley Stephen Resume
Smiley Stephen ResumeSmiley Stephen Resume
Smiley Stephen Resume
 
TS 7.27 PDF
TS 7.27 PDFTS 7.27 PDF
TS 7.27 PDF
 
Philip Fulmer Resume
Philip Fulmer ResumePhilip Fulmer Resume
Philip Fulmer Resume
 
MJonesMFG Operation Resume
MJonesMFG Operation ResumeMJonesMFG Operation Resume
MJonesMFG Operation Resume
 
Wieland Charles Resume 11.05.16
Wieland Charles Resume  11.05.16Wieland Charles Resume  11.05.16
Wieland Charles Resume 11.05.16
 
Resume of Louis Wang
Resume of Louis WangResume of Louis Wang
Resume of Louis Wang
 
Bruce Shaver Operations 2011
Bruce Shaver   Operations 2011Bruce Shaver   Operations 2011
Bruce Shaver Operations 2011
 
Resume
ResumeResume
Resume
 
Scott a. bean resume july 2016
Scott a. bean resume july 2016Scott a. bean resume july 2016
Scott a. bean resume july 2016
 
M Pitcher Resume
M Pitcher ResumeM Pitcher Resume
M Pitcher Resume
 
Resume M Pitcher 2010 08 27
Resume   M Pitcher 2010 08 27Resume   M Pitcher 2010 08 27
Resume M Pitcher 2010 08 27
 
Seanresume3-15.docx-2
Seanresume3-15.docx-2Seanresume3-15.docx-2
Seanresume3-15.docx-2
 
NPI operations eng
NPI operations eng NPI operations eng
NPI operations eng
 
RPOMALESCV 2015
RPOMALESCV 2015RPOMALESCV 2015
RPOMALESCV 2015
 
MJonesMFG Management Resume
MJonesMFG Management ResumeMJonesMFG Management Resume
MJonesMFG Management Resume
 
Austin_C _Mattson_II_resume_Sep_2015
Austin_C _Mattson_II_resume_Sep_2015Austin_C _Mattson_II_resume_Sep_2015
Austin_C _Mattson_II_resume_Sep_2015
 
John F Petak Resume July 2011
John F Petak   Resume July  2011John F Petak   Resume July  2011
John F Petak Resume July 2011
 

Robert Langell's Resume Jan 2017

  • 1. ROBERT LANGELL 112 Shadyside Ave. Concord, MA 01742 978-505-0861 Boblangell1@gmail.com VP of Operations Experienced, hands-on leader with proven success developing and executing strategic plans, driving Lean/Sigma culture, while continually improving operating efficiencies, cost & margin. Areas of Expertise: Certified Lean/Sigma instructor – Driving corporate World Class Production culture change thru continuous improvement while developing worldwide Manufacturing operations New Business Development Develop growth strategies for Manuf/Sales/Marketing to gain market share and compete in new markets New Product Introduction (NPI) Cost effective transition of new product designs seamlessly thru production using DFSS/Lean principles Supply Chain Development Manage technical challenges at critical suppliers driving continuous improvements in COPQ SCHLEIFRING NORTH AMERICA - CHELMSFORD, MA Dec 2015 - Present Executive Vice President Operations Schleifring is a global leader in slip ring development and technology Developed a start-up manufacturing plant producing electro-mechanical components for the defense industry. Managed all aspects from building design, hiring and training to qualifying production. Managed all customer and regulatory audits enabling product shipment. Developed plans to transfer technology and manufacturing lines from UK and Chicago plants to a new Massachusetts facility. • Successfully transferred product lines from UK facility to be produced in new MA plant to support global initiatives • Managed all International Traffic in Arms regulations (ITAR) with export compliance responsibility enabling the transfer of products and technologies between countries • Managed International Standards Organization (ISO) and customer audits to achieve regulatory compliance and ability to manufacture and ship product from MA plant • Developed and delivered the plan for hiring and training of all staff from engineering through production to support year two customer delivery objectives • Hired and managed Supply Chain staff to develop local and overseas procurement to support production targets • Managed all building facilities and contractors thru turn-key operation within $11M budget and time schedule • Developed quarterly Operation plan that grew sales from zero to $8.5M in first year • Managed and implemented SAP operating system to integrate with corporate headquarters • Developed and implemented a state of the art copper/gold plating operation, managed design, contractors and procurement of all equipment and materials to reduce international plating costs while maintaining intellectual property
  • 2. Robert Langell Page 2 • Successfully transferred all product lines to new Massachusetts facility and closed Chicago operation • Developed operations strategy to hire 200 employees, supporting existing and new business while reducing global manufacturing footprint APRIORI TECHNOLOGIES - CONCORD, MA Oct 2013 – Dec 2015 Client Executive aPriori is a venture funded firm using software and services to generate product cost savings in design, manufacturing and sourcing for manufacturing organizations. Customer facing executive developing and implementing manufacturing strategies to realize savings, launch products on time at cost targets, and maximize savings in re-work and outsourced parts. BAE SYSTEMS - NASHUA, NH 2008- 2013 Plant Manager - Lean Six Sigma MasterBlack Belt BAE Systems is a global company engaged in the development, delivery and support of advanced defense, security and aerospace systems - $4B Annual Sales Managed staff of 80 engineers and production across multiple sites & diverse product lines to drive continuous cost improvements while delivering $60M operations strategy. Spearheaded strategy that improved processes and delivery performance, reduced rework rescuing a $20M program in jeopardy.  Delivered Lean/Sigma training to entire staff developing COPQ portfolio of $10M  Resolved production shutdown issues at mission-critical suppliers by developing and managing Kaizen teams through risk mitigation strategies enabling $300M program success  Increased sales $20M/year resolving production bottlenecks, improving operating costs, leading root cause analysis teams to improve yields, and correcting supplier quality issues  Implemented Statistical Process Control & automated data analysis in critical areas  Managed/prepared staff for ISO, DCMA, government & customer audits – directed teams thru corrective action resolution by working closely with customers & government agencies  Developed corporate NPI strategy to reduce transition to manufacturing costs 25%  Developed business strategy and marketing campaign to compete in $20B commercial market  Managed delinquent suppliers by identifying risks, capability and capacity constraints and developing ‘return to green’ strategies guaranteeing program success W.R. GRACE - CAMBRIDGE, MA 2004- 2008 Global Productivity Manager – Lean/Six Sigma W.R. Grace is a premier international, high volume specialty chemicals and materials company – Chapter 11 in 2008. Transformed international business by instituting LeanSigma operations worldwide. Developed operating plans for Manufacturing, Sales, Marketing, Supply Chain and R&D. Personal cost reduction & revenue enhancement program in excess of $15M per year. Trained and managed international teams reducing COGS by 10% from $1B in sales.
  • 3. Robert Langell Page 3  Developed $15M Strategic & Operational Plan consisting of 30 international projects  Reduced operating costs 15% transitioning United Kingdom production facility into a Lean/Sigma operation HELIX TECHNOLOGY CORP, CTI – MANSFIELD, MA 1999 - 2004 Director – Global Business Development Helix/CTI Cryogenics designed high-vacuum systems used to manufacture semi-conductor, data storage, flat panel, and optical devices – company sold & moved to Brooks Automation in 2005.  Planned, designed and directed the development of five international, world class facilities in Taiwan, Japan, Korea, China & France growing international business by 150%  Setup each operation by developing unique manufacturing, sales and marketing strategies, hired & trained staff, developed local supply base and operating systems to improve and grow regional market share FORD MOTOR COMPANY – BASSILDEN, ESSEX - UNITED KINGDOM 1998 - 1999 Cost Reduction Manager, – Dagenham Automotive Plant  Managed European supply base to reduce material costs by 2% per year, generated corrective action database reducing warranty claims by 25% TELECTRONICS PACING SYSTEMS – SYDNEY, AUSTRALIA 1994 - 1998 QA/Production Manager Telectronics manufactured implant pace makers & defibrillators – office closed 1998.  Managed Production department along with ISO, FDA & British Standards accreditation programs by preparing facilities for audits thru training, documentation control and resolving corrective actions PNEUMATIC SCALE – N. QUINCY, MA 1992 - 1994 Mechanical DesignEngineer / Pneumatic Scale manufactured packaging equipment for the food & beverage industry – office closed 1994  Managed designs to meet customer specifications for high-speed packaging equipment EDUCATION B.S. Mechanical Engineering University of Lowell - Massachusetts 1988 – 1992 B.S. Business Marketing University of Maine - Orono 1981 – 1985 Travel: Receptive to 75% foreign/domestic Security Clearance: Previous Clearance expired 2014