1. 1
RESUME OF ENG. AMR SAADELDIN ABDELMONEIM OTHMAN
Name : Amr Saad Eldin Abdel-Moneim Othman
Nationality : Egyptian
Address : Al-AzyziaY- Meniah El kamh-Sharkiah- Egypt
Marital Status : Married
Phone Number : (+21064240864 , +21068212227 )
E-Mail Address : Amretman@yahoo.com
Drive License : Valid Drive License
Qualifications : B.S.C. CIVIL ENGINEERING
Academy : Faculty of Engineering, Zagazig University
Graduation Year : May 1991
Languages known : English, Arabic (Spoken/written)
Computer Skill : MS Word, Excle, AutoCAD, Earthwork, Civil 3d
Years of Experience :
Six years -Resident Engineer (in Egypt)
Tow years- Resident Engineer (in Saudi Arabia)
Three years- assistant Resident Engineer (in Saudi Arabia)
Five Years- Road construction manager (in Egypt)
Six years- Road site engineer (in Egypt)
Four Years- Building Construction manager (in Egypt)
Qualification:
More than 24 years' experience and well acquainted with Road Construction,
Airport,Bridges,Tunnels, Pipe Culverts, Box Culverts,
Well background of road design, quantity surveyor, surveying
* Approved at Ministry of Transport in Egypt and Saudi Arabia.
Countries Worked in : Five years in Saudi Arabia and eighteen years in Egypt
2. 2
Professional Experience:
Périod : From April 2014 till now
Project Name : Construction of two bridge on the railway and
tunnel in banha city
Company Name : ACE Arab Consulting Engineers (Moharram –Bakhoum)
Dokki, Cairo, Egypt. Tel +202 33 37 71 20
Position : Resident Engineer
Project Value : USD 40 million
Client : State of Qaliubiya-Egypt
Project Description : Construction of two bridge on the railway , a length of 750 m
each bridge14ms width and spans 30ms, make free intersection on
Banha Railway Starting with piles ,pile caps ,Columns ,Frames
,Bearings,30 M Concreet Box Sections ,40 m Steel section
surface road ,Asphalt, and thermal expansion joint
-The tunnel is 240 meters long in Banha city and consists of
420 secant piels 60 cm diameter,the bottom
slab and the walls a length of 240 meters and a length of the
upper slab 14 meters The tow bridge and tunnel solving the
problem of traffic jams in Banha city.
Job Description : The duties includes review, comment the work procedures,
shop drawings, time schedules, quantities, The duties also include
as well site Supervision of all Bridge and road activities.
Périod : From January 2011 till April 2014
Project Name : Construction of Ring Regional Road ( Badr-Al-sadat )
Company Name : ACE Arab Consulting Engineers (Moharram –Bakhoum)
Position : Resident Engineer
Project Value : USD 100 million
Client : Ministry of Transport
Project Description : Construction of Ring Regional Road Badr-Al-sadat
Sections NO. 1,2 with 43.0 kms length ,two direction
Each 20msWidth, Fill volume about 4,000,000.00 m3,
Sub base and base layers, Stone Pitching,
three layers of hot asphalt mix, Road marking,Cat eyes, Newjersy
walls, Sing boards, pipe culverts
Job Description :
Responsible as a Resident Engineer for Supervising and management of
the Road project, supervision, and coordination of all technical aspects
of a construction project. Maintains high quality assurance to confirm
that the installation of all work within his discipline is in accordance
with the plans, specifications, and industry standards, Ensures that tests
and inspections are performed, witnessed, and documented in
accordancewith approved Procedures, Establishes and maintains liaison
with the discipline design engineering staff. Reviews and interprets
discipline design drawings and specifications to ensure current revision
level and correcttechnical execution of the work.
3. 3
Ensure that contractor’s submissions and drawings are correct.
Ensure that work has been carried out correctly, materials are tested,
planning of traffic detours are implemented
Supervising and Executing the Project as per Contract Conditions,
Specifications, drawings and relevant codes. Responsible for Civil
works, quality control, payment certification, variation orders if any.
Reviewing and giving approvals for all submittals including shop
drawing, Contractors time schedule, materials are tested, planning of
traffic detours are implemented Monitor project progress and conduct
reports for client.
Périod : APRIL 2006 to May 2008
Company Name : Abdualrahman Alnaim consulting engineers
(Alkhober - Saudi Arabia) Tel +966035877278
Project Name : 1- Construction of Almahd – Afif Road (220km highway)
2- Construction of Begadyah – Dwadmy Road (70 km highway)
Project location : Saudi Arabia west of Riyadh
Position : Resident engineer
Project Value : USD 81.0 million
Client : Saudi Arabia Ministry of Transport
Project Description :
1- Construction of Almahd-Afif Road ( 220 km highway)
including five Bridges each 100 MS length,
Subgrade, Agg.base courseand two layers of hot asphalt mix
, 38 concrete box culverts, 19 pipe culverts, Road marking, Cat eyes.
2- Construction of Begadyah-Dwadmy Road ( 70 km highway)
, 18 concrete boxculverts, 42 pipe culverts
Périod : March 2003 to APRIL 2006
Company Name : Abdualrahman Alnaim consulting engineers
Project Name : Rehabilitation of (Arar-Turif) highway, 190 km length.
Project locatio : Saudi Arabia northern region
Position : Assistant Resident engineer
Project Value : USD 34.0 million
Client : Saudi Arabia Ministry of Transport
Project Description :
Rehabilitation of Arar-Turif Road ( highway) with 190.0 Km length ,
,Agg.base course and Two layers of hot asphalt mix, 13 concrete box
culverts, 27 pipe culverts, Road marking, Cat eyes.
4. 4
Périod : April 2010 - January 2011
Company Name : Nasr general contracting (Hassan .M. Allam)
Abassiya, Cairo, Egypt. Tel +20226858065
Project Name : Construction new Cairo airport 3rd runway
Position : Construction Manager
Project Value : USD 100 million
Client : Cairo Airport Company
Project Description : Constructing of runway ,taxiway and surface roads.
Job Description :
Responsible as a Construction Manager for the execution roads
,earth work, Agg.B.C, asphalt, Leading Site Construction Team,
, Estimates resources such as manpower, materials, equipment.
- Submits site daily reports, inspection requests
- Ensures that all the works done are in accordancewith the approved
construction drawings.
Périod : June 2008 – April 2010
Company Name : Talaat Mustafa group (Dokki,Cairo, Egypt Tel +20233312000)
Project Name : Construction a new city near Cairo (madinaty)
Position : Construction manager
Project Value : USD 120.0 million
Client : Talaat Mustafa group
Project Description : Construction a new city east Cairo (madinaty)
Job Description :
-Construction manager for 140 villas.
-Prepare project requirement from manpower, equipment and
Materials, provide direction and supportto project team, defining project
progress, problems and solutions,
-Supervises all manpower processingof construction documents
, check shop drawing of project items and prepare monthly invoices.
Périod : May2001 to March 2003
Company Name : Misr engineering development CO. (Medcom)
Heliopolis Cairo, Egypt Tel, +20226350094
Project Name : Construction of the Smart village roads in 6 October city
Position : Site engineer
Client : Egypt Government - Ministry of Telecom
Project Description : Constructing of the Smart village, consists of many large building
For many telecom company, infrastructure, 15.0 km internal roads
Job Description : Construction manager for earth work, roads and landscape
5. 5
Périod : from Feb 2000 to April 2001
Company Name : Misr engineering developmentco. (Medcom)
Project Name : Alazhar park -Cairo
Position : Construction manager
Project Value : USD 5.0 million
Client : Agha-khan for culture
Project Description :
A new entertainment park located in the center of Cairo has a total area
of 336000 m2. The park consists of green areas, roads with 9.0 km
length,7.0 m width, entertaining areas, artificial lake, café, restaurant and
many other facilities.
Job Description :
Construction manager for earth work, road and landscape.
Preparing the site and liaising with other construction professionals,
Evaluate project requirement from manpower, equipment, materials.
leading Site Construction Team, monitoring equipment Production ,
Prepare monthly invoice, provide direction and supportto project team.
Périod : from December 1997 to January 2000
Company Name : Misr engineering development CO. (Medcom)
Project Name : Construction of 165 Bulding in nasr city -Cairo
Position : Area manager for 20 Bulding
Project Value : USD 54.0 million
Client : Egypt Government - Ministry of Defence
Period : from June 1993 to Nov 1997
Company Name : Nasr general contracting (Hassan .M. Allam)
Abassiya, Cairo, Egypt. Tel +20226858065
Project Name : Construction of Taba –Rafah road ( 120 km length )
Position : Site engineer
Project Value : USD 50.0 million
Client : Egypt Government – Minister of Works.
Project Description:
Constructing of 120.0 km from the International east boarderline
( Taba- rafah ) Width of 14 MS , fill volume 14,000,000 m3, Cut volume
5,000,000 m3, height of fill in some area was 69.0 ms and cut height
about 40.0 MS , Drilling and blasting of hard rock about 1,000,000.0 m3
, Subgrade ,Agg.base courseand Two layers of hot asphalt mix (binder
and surface wearing course), 41concrete box culverts, 29pipe culverts,
Road marking, Cat eyes, and Sing boards
Job Description :
Leading Site Construction Team, Ensures that all site works are done
according to all applicable quality standards
, Assign targets for accomplishments and ensure targets are met on daily
basis for all civil groups at site, Submits site daily reports, prepare
horizontal, vertical alignment and coordinates data.