SlideShare a Scribd company logo
1 of 22
SHRI RAMDEOBABA COLLEGE OF
ENGINEERING AND MANAGEMENT
Department of Industrial Engineering
Case Study
C.P.FOUNDRY WORKS
Presented by
Ajinkya Sawarkar & Deepak Pandey
IInd Semester Mtech 2019-20
Submitted to
Dr. V.S. Deshpande
About Company
 NAME OF THE ORGANIZATION: C.P.FOUNDRY WORKS
 PLANT ADDRESS: P.O.UPPALWADI INDUSTRIALESTATE , KAMPTEE
ROAD, NEAR PILI NADI, NAGPUR.
 E-MAILADDRESS: foundry_ngp@bsnl.in & foundry_ngp@yahoo.com
 CONTACT PERSON: MAQSOOD ALAM
 YEAR OF ESTABLISHMENT: 1942
 Major customers :
1. Mahindra & Mahindra Ltd.
2. Johnson Lifts
MAHINDRA &
MAHINDRA
JOHNSON LIFTS
Company Products
CI ROLLING MILL COUPLINGS CI ROLLING MILL STAND CI GRATE STEEL ROLLING MILL PARTS
CI SANITARY GRATE CI METRIC WEIGHT CI MANHOLE COVER CI TILES
CI FLYWHEEL
Main Processes
o MELTING
o MOULD MAKING
o CORE MAKING
o POURING
o FOUNDRY SAND SYSTEM
o CLEANING AND FINISHING
5 S Zone Wise Layout
ZONE 1 OFFICE
ZONE 2
PRODUCTION AND
PATTERN
ZONE 3 MELTING
ZONE 4 LAB
ZONE 5
STORE AND
OUTSIDE AREA
ZONE 6 INDUCTION
ZONE 7 DISPATCH
Kaizen
 From the Japanese words “kai-” which means “change”
and “-zen” which means “good.”
 Kaizen is defined as a continuous effort by each and
every employee (from the CEO to field staff) to ensure
improvement of all processes and systems of a particular
organization.
 Kaizen process aims at continuous improvement of
processes not only in manufacturing sector but all other
departments as well.
5S
 5S represents Japanese words that describe the steps of a
workplace organization process.
 Seiri - (Sort)
 Seiton - (Straighten, Set)
 Seiso - (Shine, Sweep)
 Seiketsu - (Standardize)
 Shitsuke - (Sustain)
 The five S methodology helps a workplace remove items that
are no longer needed (sort).
 Organize the items to optimize efficiency and flow
(straighten).
 Clean the area in order to more easily identify problems
(shine)
 Implement color coding and labels to stay consistent with
other areas (standardize) and
 Develop behaviors that keep the workplace organized over the
long term (sustain).
 It can also referred as 7S adding Safety and Spirit to it.
5S
Red Tag Summary
Zone No.
Zone
Name
1st 2nd
3rd
4th
Red Tagging Campaign Red Tagging Campaign Red Tagging Campaign Red Tagging Campaign
5/7/2018 22/10/2018
Red tag
Found
Red Tag
Clear
Pending
Red Tag
Red tag
Found
Red Tag
Clear
Pending
Red Tag
Red tag
Found
Red Tag
Clear
Pending
Red Tag
Total Red
tag Found
Total Red
Tag Clear
Total
Pending
Red Tag
1 OFFICE 3 2 1
2
PRODUCTIO
N
14 8 6 3 3
3 MELTING 2 0 2 2 2
4 LAB 1 1 0
5
STORE AND
GREEN
AREA
8 0 8
6
INDUCTION
PLANT
2 2 0
7
DELIVERY/D
ISPATCH
0
8
9
Total 30 13 17 5 0 5
Red Tag Summary
0
2
4
6
8
10
12
14
16 Total RED TAG Captured – 35
Total Red Tag Cleared – 13
% Clearance – 37.14
Worst Point Photograph Zone No.2
Improvement: - SPACE UTILIZED
Shop: PATTERN ROOM Item: PATTERN
23.02.2018 11.11.2018
Before:- UNEVEN PATTERNS PLACED After:- ARRANGE PATTERN
Worst Point Photograph Zone No.6
Improvement: - AREA SPECIFIED
Shop: INDUCTION FURNACE Item: AREA NAME BOARD DISPLAYED
03.11.2019 03.11.2019
Before:- AREA NOT SPECIFIED After:-AREA SPECIFIED
Worst Point Photograph Zone No.5
Improvement: - MATERIAL STACKING
Shop: OUTSIDE AREA Item: FOOTSTEP , SURFACE BOXES
16/06/19 24/07/19
Before:- CASTINGS NOT ARRANGE
PROPERLY
After:- PAINTING AND STACKING OF
CASTINGS
Worst Point Photograph Zone No.6
Improvement: - CLEAN AREA
Shop: INDUCTION FURNACE Item: RACKS
31/01/2019 21/07/2019
Before:- Unwanted & wanted material kept in
mixed condition
After:-Unwanted material disposed off &
wanted material kept properly. Spaced saved
10.61sq.m.
Sort & Set Activity done in Store
• Analysis of current situation
• Getting list of materials from Production Lines
• SDQ From Buyers (Concerned Person From Company)
• Physical verification of material (with store to production
line)
• Temporary location with coloured chalk or removable
stickers
• Labelling of Every Required items with Proper location
Old Store Photographs
New Store Photographs
New Rack Arrangement Sorting of Tools
CONTINUOUS
IMPROVEMENTS
Kaizen 1
Company: C.P. FOUNDRY
WORKS
Dept : LAB Result : FIRE EXTINGUSHER Month : 5 MAR 2019
Subject : SPACE UTILIZATION Process : SAFETY
Before Improvement
( Photo or Explanation drawing)
After Improvement
( Photo or Explanation drawing)
1. Manpower, Man hour
Saving
2. Physical Distribution
(Transporting distance)
3. Space Saving
4. Commanisation,
Unification
5. Weight Reduction
6. Energy Saving
7. Yield
8. Quality Improvement
9. 5s Yes
10. Cost Reduction.
11. Safety Yes
12. Horizontal Application
13. Productivity improved
Earlier : NO FIRE EXTINGUSHER Now : SPACE IS UTILIZED FOR FIRE
EXTINGUSHER
Cost Saving per year
Date of Implementation 26
TH
JULY 2018
Benefits :
 SPACE UTILIZED.
 SAFETY IMPROVED.
Suggested by MR. TAHIR
SIR
Approved by MR. TAHIR SIR
Kaizen 2
Company: C.P. FOUNDRY
WORKS
Dept : OFFICE Result : WORKPLACE 5S & SAFETY IMPROVED Month : 23
RD
FEB 2018
Subject : PROPER ARRANGEMENT OF WIRES ,
CABLES & COMPUTER EQUIPMENTS
Process : SYSTEMATIC ARRANGEMENTS OF WIRES ,
CABLES & COMPUTER EQUIPMENTS
Before Improvement
( Photo or Explanation drawing)
After Improvement
( Photo or Explanation drawing)
1. Manpower, Man hour
Saving
2. Physical Distribution
(Transporting distance)
3. Space Saving
4. Commanisation,
Unification
5. Weight Reduction
6. Energy Saving
7. Yield
8. Quality Improvement
9. 5s Yes
10. Cost Reduction.
11. Safety Yes
12. Horizontal Application
13. Productivity improved
Earlier : WIRES , CABLES & COMPUTER
EQUIPMENTS ARE TANGLLED &
UNSAFE FOR USE
Now : WIRES , CABLES & COMPUTER
EQUIPMENTS ARE ARRANGED
SYSTEMATICALLY
Cost Saving per year
Date of Implementation 26
TH
JULY 2018
Benefits :
 SAFETY IMPROVED.
 HOUSEKEEPING & 5S IMPROVED.
Suggested by MR. JOSHI SIR
Approved by MR. TAHER SIR
Kaizen 3
Company: C.P. FOUNDRY
WORKS
Dept : moulding
area
Result : 5S IMPROVED Month : 24 FEB 2019
Subject : SPACE SAVED Process : DISPOSED OF UNWANTED MATERIAL
Before Improvement
( Photo or Explanation drawing)
After Improvement
( Photo or Explanation drawing)
1. Manpower, Man hour
Saving
2. Physical Distribution
(Transporting distance)
3. Space Saving YES
4. Commanisation,
Unification
5. Weight Reduction
6. Energy Saving
7. Yield
8. Quality Improvement
9. 5s Yes
10. Cost Reduction.
11. Safety
12. Horizontal Application
13. Productivity improved
Earlier : MOLDING BOXES AND WOODEN
MATERIAL LYING ON AREA
Now : DISPOSED OFF MATERIAL AND CLAEA
N AREA
5.54 SQ.M. SPACE SAVED
Cost Saving per year
Date of Implementation 24
TH
FEB 2019
Benefits :
 SPACE SAVED. (5.54 SQ.M.)
 HOUSEKEEPING IMPROVED.
Suggested by MR.
MAQSOOD SIR
Approved by MR. TAHER SIR
Thank You

More Related Content

What's hot

5 s in office environment
5 s in office environment5 s in office environment
5 s in office environment
chaqcs
 

What's hot (20)

VT20152215-Report
VT20152215-ReportVT20152215-Report
VT20152215-Report
 
Six sigma case study (bjs)
Six sigma case study (bjs)Six sigma case study (bjs)
Six sigma case study (bjs)
 
Chapter 4 Mechanical Engineering Materials 22343
Chapter 4 Mechanical Engineering Materials 22343 Chapter 4 Mechanical Engineering Materials 22343
Chapter 4 Mechanical Engineering Materials 22343
 
Billet defects - transverse cracking formation prevention and evolution
Billet defects -  transverse cracking formation prevention and evolutionBillet defects -  transverse cracking formation prevention and evolution
Billet defects - transverse cracking formation prevention and evolution
 
Study of breakouts in thin slab caster
Study of breakouts in thin slab casterStudy of breakouts in thin slab caster
Study of breakouts in thin slab caster
 
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
 
Oxide dispersion strengthened stainless steel seminar
Oxide dispersion strengthened stainless steel seminarOxide dispersion strengthened stainless steel seminar
Oxide dispersion strengthened stainless steel seminar
 
kaizen
kaizenkaizen
kaizen
 
16 big losses for manufacturing and services
16 big losses for manufacturing and services16 big losses for manufacturing and services
16 big losses for manufacturing and services
 
Control of Cooling in Continuous Casting of Thin Steel Slabs
Control of Cooling in Continuous Casting of Thin Steel SlabsControl of Cooling in Continuous Casting of Thin Steel Slabs
Control of Cooling in Continuous Casting of Thin Steel Slabs
 
Kaizen presentation for garments
Kaizen presentation for garmentsKaizen presentation for garments
Kaizen presentation for garments
 
5 s in office environment
5 s in office environment5 s in office environment
5 s in office environment
 
Mura muri muda
Mura muri mudaMura muri muda
Mura muri muda
 
5S Implementation - Case Study
5S Implementation - Case Study5S Implementation - Case Study
5S Implementation - Case Study
 
Cast Iron
Cast IronCast Iron
Cast Iron
 
Lean Six Sigma 101
Lean Six Sigma 101Lean Six Sigma 101
Lean Six Sigma 101
 
Erw pipe
Erw pipeErw pipe
Erw pipe
 
Kaizen
KaizenKaizen
Kaizen
 
Lean principles
Lean principlesLean principles
Lean principles
 
Billet defects
Billet defectsBillet defects
Billet defects
 

Similar to Case study _cp foundry

Problem solving thru qc circle (1)
Problem solving thru qc circle (1)Problem solving thru qc circle (1)
Problem solving thru qc circle (1)
Jitesh Gaurav
 
Presentation Reduce Safety Stock of packaging BE
Presentation Reduce Safety Stock of packaging BEPresentation Reduce Safety Stock of packaging BE
Presentation Reduce Safety Stock of packaging BE
CATHERINE NGUYEN
 
project report - COMPLETE
project report - COMPLETEproject report - COMPLETE
project report - COMPLETE
Amit Verma
 
05. Process Mapping tools for 6 sigma.ppt
05. Process Mapping tools for 6 sigma.ppt05. Process Mapping tools for 6 sigma.ppt
05. Process Mapping tools for 6 sigma.ppt
hari534691
 
Danvil Dela Cruz CV
Danvil Dela Cruz CVDanvil Dela Cruz CV
Danvil Dela Cruz CV
Danvil Cruz
 

Similar to Case study _cp foundry (20)

Lci la chapter lean intro 071410 no pics
Lci la chapter lean intro 071410 no picsLci la chapter lean intro 071410 no pics
Lci la chapter lean intro 071410 no pics
 
Problem solving thru qc circle (1)
Problem solving thru qc circle (1)Problem solving thru qc circle (1)
Problem solving thru qc circle (1)
 
Sanmukh cv (2017)
Sanmukh cv (2017)Sanmukh cv (2017)
Sanmukh cv (2017)
 
Fixture design for heat treatment of nail gun
Fixture design for heat treatment of nail gunFixture design for heat treatment of nail gun
Fixture design for heat treatment of nail gun
 
PRODUCTIVITY IMPROVEMENT OF PRE-TREATMENTS & POWDER COATING PROCESS.
PRODUCTIVITY IMPROVEMENT OF PRE-TREATMENTS & POWDER COATING PROCESS.PRODUCTIVITY IMPROVEMENT OF PRE-TREATMENTS & POWDER COATING PROCESS.
PRODUCTIVITY IMPROVEMENT OF PRE-TREATMENTS & POWDER COATING PROCESS.
 
Applications of lean manufacturing tools
Applications of lean manufacturing toolsApplications of lean manufacturing tools
Applications of lean manufacturing tools
 
PW Final Jun7 2012
PW Final Jun7 2012PW Final Jun7 2012
PW Final Jun7 2012
 
Ceat qip report template
Ceat qip report templateCeat qip report template
Ceat qip report template
 
SCORE implimentation (Blue Nile PP bag).pptx
SCORE implimentation (Blue Nile PP bag).pptxSCORE implimentation (Blue Nile PP bag).pptx
SCORE implimentation (Blue Nile PP bag).pptx
 
Presentation Reduce Safety Stock of packaging BE
Presentation Reduce Safety Stock of packaging BEPresentation Reduce Safety Stock of packaging BE
Presentation Reduce Safety Stock of packaging BE
 
Work place improvement [read only]
Work place improvement [read only]Work place improvement [read only]
Work place improvement [read only]
 
project report - COMPLETE
project report - COMPLETEproject report - COMPLETE
project report - COMPLETE
 
IRJET- Design and Development of Gear Shift Boot Die
IRJET- Design and Development of Gear Shift Boot DieIRJET- Design and Development of Gear Shift Boot Die
IRJET- Design and Development of Gear Shift Boot Die
 
Human Performance AI Enhanced
Human Performance AI EnhancedHuman Performance AI Enhanced
Human Performance AI Enhanced
 
Amit_Barjibhe - cv
Amit_Barjibhe - cvAmit_Barjibhe - cv
Amit_Barjibhe - cv
 
05. Process Mapping tools for 6 sigma.ppt
05. Process Mapping tools for 6 sigma.ppt05. Process Mapping tools for 6 sigma.ppt
05. Process Mapping tools for 6 sigma.ppt
 
MBA project
MBA projectMBA project
MBA project
 
5 s 07.09.2015
5 s 07.09.20155 s 07.09.2015
5 s 07.09.2015
 
Danvil Dela Cruz CV
Danvil Dela Cruz CVDanvil Dela Cruz CV
Danvil Dela Cruz CV
 
IRJET- Productivity Improvement Kaizen of XC-60 Housing
IRJET- Productivity Improvement Kaizen of XC-60 HousingIRJET- Productivity Improvement Kaizen of XC-60 Housing
IRJET- Productivity Improvement Kaizen of XC-60 Housing
 

Recently uploaded

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 

Case study _cp foundry

  • 1. SHRI RAMDEOBABA COLLEGE OF ENGINEERING AND MANAGEMENT Department of Industrial Engineering Case Study C.P.FOUNDRY WORKS Presented by Ajinkya Sawarkar & Deepak Pandey IInd Semester Mtech 2019-20 Submitted to Dr. V.S. Deshpande
  • 2. About Company  NAME OF THE ORGANIZATION: C.P.FOUNDRY WORKS  PLANT ADDRESS: P.O.UPPALWADI INDUSTRIALESTATE , KAMPTEE ROAD, NEAR PILI NADI, NAGPUR.  E-MAILADDRESS: foundry_ngp@bsnl.in & foundry_ngp@yahoo.com  CONTACT PERSON: MAQSOOD ALAM  YEAR OF ESTABLISHMENT: 1942  Major customers : 1. Mahindra & Mahindra Ltd. 2. Johnson Lifts MAHINDRA & MAHINDRA JOHNSON LIFTS
  • 3. Company Products CI ROLLING MILL COUPLINGS CI ROLLING MILL STAND CI GRATE STEEL ROLLING MILL PARTS CI SANITARY GRATE CI METRIC WEIGHT CI MANHOLE COVER CI TILES CI FLYWHEEL
  • 4. Main Processes o MELTING o MOULD MAKING o CORE MAKING o POURING o FOUNDRY SAND SYSTEM o CLEANING AND FINISHING
  • 5. 5 S Zone Wise Layout ZONE 1 OFFICE ZONE 2 PRODUCTION AND PATTERN ZONE 3 MELTING ZONE 4 LAB ZONE 5 STORE AND OUTSIDE AREA ZONE 6 INDUCTION ZONE 7 DISPATCH
  • 6. Kaizen  From the Japanese words “kai-” which means “change” and “-zen” which means “good.”  Kaizen is defined as a continuous effort by each and every employee (from the CEO to field staff) to ensure improvement of all processes and systems of a particular organization.  Kaizen process aims at continuous improvement of processes not only in manufacturing sector but all other departments as well.
  • 7. 5S  5S represents Japanese words that describe the steps of a workplace organization process.  Seiri - (Sort)  Seiton - (Straighten, Set)  Seiso - (Shine, Sweep)  Seiketsu - (Standardize)  Shitsuke - (Sustain)
  • 8.  The five S methodology helps a workplace remove items that are no longer needed (sort).  Organize the items to optimize efficiency and flow (straighten).  Clean the area in order to more easily identify problems (shine)  Implement color coding and labels to stay consistent with other areas (standardize) and  Develop behaviors that keep the workplace organized over the long term (sustain).  It can also referred as 7S adding Safety and Spirit to it. 5S
  • 9. Red Tag Summary Zone No. Zone Name 1st 2nd 3rd 4th Red Tagging Campaign Red Tagging Campaign Red Tagging Campaign Red Tagging Campaign 5/7/2018 22/10/2018 Red tag Found Red Tag Clear Pending Red Tag Red tag Found Red Tag Clear Pending Red Tag Red tag Found Red Tag Clear Pending Red Tag Total Red tag Found Total Red Tag Clear Total Pending Red Tag 1 OFFICE 3 2 1 2 PRODUCTIO N 14 8 6 3 3 3 MELTING 2 0 2 2 2 4 LAB 1 1 0 5 STORE AND GREEN AREA 8 0 8 6 INDUCTION PLANT 2 2 0 7 DELIVERY/D ISPATCH 0 8 9 Total 30 13 17 5 0 5
  • 10. Red Tag Summary 0 2 4 6 8 10 12 14 16 Total RED TAG Captured – 35 Total Red Tag Cleared – 13 % Clearance – 37.14
  • 11. Worst Point Photograph Zone No.2 Improvement: - SPACE UTILIZED Shop: PATTERN ROOM Item: PATTERN 23.02.2018 11.11.2018 Before:- UNEVEN PATTERNS PLACED After:- ARRANGE PATTERN
  • 12. Worst Point Photograph Zone No.6 Improvement: - AREA SPECIFIED Shop: INDUCTION FURNACE Item: AREA NAME BOARD DISPLAYED 03.11.2019 03.11.2019 Before:- AREA NOT SPECIFIED After:-AREA SPECIFIED
  • 13. Worst Point Photograph Zone No.5 Improvement: - MATERIAL STACKING Shop: OUTSIDE AREA Item: FOOTSTEP , SURFACE BOXES 16/06/19 24/07/19 Before:- CASTINGS NOT ARRANGE PROPERLY After:- PAINTING AND STACKING OF CASTINGS
  • 14. Worst Point Photograph Zone No.6 Improvement: - CLEAN AREA Shop: INDUCTION FURNACE Item: RACKS 31/01/2019 21/07/2019 Before:- Unwanted & wanted material kept in mixed condition After:-Unwanted material disposed off & wanted material kept properly. Spaced saved 10.61sq.m.
  • 15. Sort & Set Activity done in Store • Analysis of current situation • Getting list of materials from Production Lines • SDQ From Buyers (Concerned Person From Company) • Physical verification of material (with store to production line) • Temporary location with coloured chalk or removable stickers • Labelling of Every Required items with Proper location
  • 17. New Store Photographs New Rack Arrangement Sorting of Tools
  • 19. Kaizen 1 Company: C.P. FOUNDRY WORKS Dept : LAB Result : FIRE EXTINGUSHER Month : 5 MAR 2019 Subject : SPACE UTILIZATION Process : SAFETY Before Improvement ( Photo or Explanation drawing) After Improvement ( Photo or Explanation drawing) 1. Manpower, Man hour Saving 2. Physical Distribution (Transporting distance) 3. Space Saving 4. Commanisation, Unification 5. Weight Reduction 6. Energy Saving 7. Yield 8. Quality Improvement 9. 5s Yes 10. Cost Reduction. 11. Safety Yes 12. Horizontal Application 13. Productivity improved Earlier : NO FIRE EXTINGUSHER Now : SPACE IS UTILIZED FOR FIRE EXTINGUSHER Cost Saving per year Date of Implementation 26 TH JULY 2018 Benefits :  SPACE UTILIZED.  SAFETY IMPROVED. Suggested by MR. TAHIR SIR Approved by MR. TAHIR SIR
  • 20. Kaizen 2 Company: C.P. FOUNDRY WORKS Dept : OFFICE Result : WORKPLACE 5S & SAFETY IMPROVED Month : 23 RD FEB 2018 Subject : PROPER ARRANGEMENT OF WIRES , CABLES & COMPUTER EQUIPMENTS Process : SYSTEMATIC ARRANGEMENTS OF WIRES , CABLES & COMPUTER EQUIPMENTS Before Improvement ( Photo or Explanation drawing) After Improvement ( Photo or Explanation drawing) 1. Manpower, Man hour Saving 2. Physical Distribution (Transporting distance) 3. Space Saving 4. Commanisation, Unification 5. Weight Reduction 6. Energy Saving 7. Yield 8. Quality Improvement 9. 5s Yes 10. Cost Reduction. 11. Safety Yes 12. Horizontal Application 13. Productivity improved Earlier : WIRES , CABLES & COMPUTER EQUIPMENTS ARE TANGLLED & UNSAFE FOR USE Now : WIRES , CABLES & COMPUTER EQUIPMENTS ARE ARRANGED SYSTEMATICALLY Cost Saving per year Date of Implementation 26 TH JULY 2018 Benefits :  SAFETY IMPROVED.  HOUSEKEEPING & 5S IMPROVED. Suggested by MR. JOSHI SIR Approved by MR. TAHER SIR
  • 21. Kaizen 3 Company: C.P. FOUNDRY WORKS Dept : moulding area Result : 5S IMPROVED Month : 24 FEB 2019 Subject : SPACE SAVED Process : DISPOSED OF UNWANTED MATERIAL Before Improvement ( Photo or Explanation drawing) After Improvement ( Photo or Explanation drawing) 1. Manpower, Man hour Saving 2. Physical Distribution (Transporting distance) 3. Space Saving YES 4. Commanisation, Unification 5. Weight Reduction 6. Energy Saving 7. Yield 8. Quality Improvement 9. 5s Yes 10. Cost Reduction. 11. Safety 12. Horizontal Application 13. Productivity improved Earlier : MOLDING BOXES AND WOODEN MATERIAL LYING ON AREA Now : DISPOSED OFF MATERIAL AND CLAEA N AREA 5.54 SQ.M. SPACE SAVED Cost Saving per year Date of Implementation 24 TH FEB 2019 Benefits :  SPACE SAVED. (5.54 SQ.M.)  HOUSEKEEPING IMPROVED. Suggested by MR. MAQSOOD SIR Approved by MR. TAHER SIR