INTERNSHIP PRESENTATION ON
QUANTITY ESTIMATION OF BUILDING
Under the Guidance of Presented by
Shaik Vaheed M.Tech B.Aravind B151144
Assistant Professor
Dept. of Civil Engineerin P.Thirumalesh B151435
RGUKT Basar
B.Naresh B151372
RAJIV GANDHI UNIVERSITY OF KNOWLEDGE TECHNOLOGIES
R
1. What is Estimation?
2. Essential Qualities of Good Estimator.
3. Types of Estimates.
4. Methods of Detailed Estimates.
5. Description of Measurements for Common Items.
6. Estimation of Building, Plan , Foundation , Tabular forms..
7. Results.
8. Conclusion.
9. References.
CONTENT
R
Estimation
Estimation is the scientific way of working out the approximate cost of an engineering
project before execution of the work.
It is totally different from calculation of the exact cost after completion of the project.
Estimation requires a thorough Knowledge of the construction procedures and cost of
materials & labour in addition to the skill ,experience, foresight and good judgment
For a good estimate the, actual cost of the proposed work after completion should not
differ by more then 5 to 10 % from its approximate cost estimate, provided there are no
unusual, unforeseen circumstances.
R
1. It help to work out the approximate cost of the project in order to decide its
feasibility with respect to the cost and to ensure the financial resources, it the
proposal is approved.
2. Requirements of controlled materials, such as cement and steel can be estimated
for making applications to the controlling authorities.
3. It is used for framing the tenders for the work sand to check contractor’s work
during and after the its execution for the purpose of making payments to the
contractor.
4. From quantities of different items of work calculated in detailed estimation,
resources are allocated to different activities of the project and ultimately their
durations and whole planning and scheduling of the project is carried out.
NEED FOR ESTIMATE
R
ESSENTIAL QUALITIES OF A GOOD ESTIMATOR
Note the location of the proposed building.
Get all data available regarding the soil.
Make a sketch of the site showing all important details.
Obtain information concerning light, power, and water.
Secure information concerning banking facilities.
Note conditions of streets leading to railway yards and to material dealers, and
Investigate general efficiency of local workman.
R
1.To Explain the process of estimating the building cost for a Building.
2.To prepare a preliminary estimate of the cost of a residential Structure.
3.Generate a final estimate for a simple Structure.
4.To Estimate the quantities of a residential building by using long wall and short
wall method.
5. To know the approximate quantities of various material.
OBJECTIVIES
R
Purpose of Estimation
R
TYPES OF ESTIMATES
There are two main types of estimates:-
1 = Rough cost estimate.
2 = Detailed estimate.
Depending upon the purpose of estimate,
some types of detailed estimate are as
follows:-
a) Contractor's estimate
b) Engineer's estimate
c) Progress estimate
R
• Detailed estimates are prepared by carefully and separately calculating in detail
the costs of various items of the work.
• The mistakes, if any, in the rough cost estimate are eliminated in the detailed
estimate.
• Detailed estimates are submitted to the competent authorities for obtaining
technical sanction.
DETAILED ESTIMATE
R
The dimensions, length, breadth and height or depth are to
be taken out from the working drawings (plan, elevation
and section).
Junctions of walls, corners and the meeting points of walls
require special attention.
For symmetrical footings, which is the usual case, earthwork
in excavation in foundations, foundation concrete, brickwork
in foundation and plinth, and brickwork in superstructure
may be estimated by either of the two methods:
(1) SEPARATE OR INDIVIDUAL WALL METHOD
(2) CENTER LINE METHOD
METHODS OF DETAILED ESTIMATE
R
• The walls running in one direction are termed as "long walls” and the
walls running in the transverse direction, as "Short walls", without
keeping in mind which wall is lesser in length and which wall is greater
in length.
• Lengths of long walls are measured or found "Out-to out" and those of
short walls as "Into- in".
• Different quantities are calculated by multiplying the length by the
breadth and the height of the wall.
SEPARATE OR INDIVIDUAL WALLS METHOD
R
1.Site Clearance Works.
2.Excavation for Foundation Trenches.
3.Foundation Concrete.
4.Brick Work in Foundation up to Plinth.
5.Damp Proof Course.
6.Brick Work in Super Structure.
7. Roofing & R.C.C work.
8. Floor.
9.Plastering.
DESCRIPTION AND UNITS OF MEASUREMENT FOR COMMON ITEMS
R
Selected Building for Estimation
R
ESTIMATION OF A BUILDING : PLAN
R
FOUNDATIONS
R
SPECIFICATIONS
1.Clear Height of the Walls(Long & Short) = 3.96 m.
2.Plinth Level = 0.4 m.
3.Thickness of Roof Slab = 0.15 m.
4.Parapet wall Height = 1 m.
5.Parapet Wall Width = 0.1 m.
6.Lintels width & Height = 1.10 &0.15m
7.Damp proof Course = 2.5cm thickness of bitumen & polythene Sheet
8.Internal Finish = Three Coats of White Wash
9.External Finish= Three Coats of Weather Shield Paint
10.Door Dimensions = 1.98 m*1.1 m
11. Window Dimensions = 1.28m *1.22m
R
CENTRE TO CENTRE LENGTHS
S1 & S2 & S3 = (4.3+3.5)+(0.3)+(0.3/2)+(0.3/2) = 8.4 m
L1 & L2 & L3= (5.21)+(4.725)+(0.3)+(0.3/2)+(0.3/2) = 10.545 m
K = (4.3)+(0.3/2)+(0.3/2) = 4.6 m
R
Details of Measurement and Calculations of Building
Item
No. Particulars of Items No. Length Breadth Height or Depth Quantity
1 Earthwork in Excavation in
Foundation
Long Walls……
Short Walls…..
Kitchen Wall…..
3
3
1
10.535+0.6
8.4+0.6
4.6+0.6
0.6
0.6
0.6
0.7
0.7
0.7
14.03
11.34
2.184
Total = 27.6 m^3
2 Lime Concrete in
foundation
Long Walls….
Short Walls…
Kitchen Wall…
3
3
1
11.135
9.0
5.20
0.6
0.6
0.6
0.3
0.3
0.3
6.01
4.86
0.936
Total = 11.806 m^3
R
Item
No. Particular of Item No. Length Breadth Height or Depth Quantity
3 1st Class Brick Work in 1:6
cement mortar in
foundation and plinth
(i) Long Walls…
a) 1st Footing
b) Plinth
(ii) Short Walls….
a) 1st Footing
b) Plinth
Kitchen Wall…
a) 1st Footing
b) Plinth
3
3
3
3
1
1
10.935
10.835
8.8
8.7
5
4.9
0.4
0.3
0.4
0.3
0.4
0.3
0.3
0.60
0.20
0.60
0.4
0.3
2.62
1.95
2.112
4.691
0.4
0.882
Total = 12.662 m^3
4 Damp Proof Course
2.5 cm thick c.c
Long Walls….
Short Walls….
Kitchen Wall…
3
3
1
10.835
8.4
4.3
0.3
0.3
0.3
-
-
-
9.75
7.56
1.29
Total= 18.6 m^2
R
Item
No. Particulars of Item No. Length Breadth Height or Depth Quantity
5 1st Class Brick Work in
Lime Mortar in
Superstructure
Long Walls…
Short Walls…
Kitchen Wall….
Deduct
Door openings
Windows Opening
Lintels over Doors
Lintels over Windows
3
3
1
5
6
2
6
10.835
8.7
4.9
1.10
1.22
1.10
1.22
0.3
0.3
0.3
0.3
0.3
0.3
0.3
3.96
3.96
3.96
1.98
1.28
0.15
0.15
38.61
31.006
5.82
Total = 75.43 m^3
3.261
2.81
0.099
0.3294
Total = 6.49 m^3
Total = 75.43-6.49=68.92 m^3
6 Concrete in Slab 1 10.835 8.7 0.15 14.139 m^3
R
Item
No.
Particulars of Item No. Length Breadth Height or Depth Quantity
7 Plastering Of Super
Structure
Long Walls…
Short Walls..
Kitchen Wall…
Deduct
Door openings
Windows
3
3
1
5
6
10.835
8.7
4.3
1.10
1.22
-
-
-
-
-
3.96
3.96
3.96
1.98
1.28
128.71
103.356
17.025
TOTAL = 249.094 m^2
For both side of walls
249.094*2= 498.18 m^2
17.424
9.36
Total = 26.79 m^2
For both Sides
26.79*2=53.58 m^2
Plastering for Super
structure is
498.18-53.58=444.59 m^2
R
Details of Measurement and Calculations of Quantities of Compound Wall
Item
No. Particulars of Items No. Length Breadth Height or Depth Quantity
1 Earthwork in Excavation of
Compound Wall
Long Walls……
Short Walls…..
2
2
21.35+0.40
10.85+0.40
0.4
0.4
0.6
0.6
10.44
5.4
Total = 15.84 m^3
2 Lime Concrete in
foundation of Compound
Wall
Long Walls….
Short Walls…
2
2
21.35+0.40
10.85+0.40
0.4
0.4
0.2
0.2
3.48
1.8
Total = 5.28 m^3
R
Item
No. Particulars of Item No. Length Breadth Height or Depth Quantity
3 1st Class Brick Work
Compound Wall
Long Walls…
Short Walls…
Deduct
Gate openings
2
2
1
21.35+0.15
10.85+0.40
- 1.6
0.15
0.15
0.15
1.85
1.85
1.85
11.93
6.11
Total = 18.035 m^3
0.444 m^3
Total = 18.035-0.444=17.591 m^3
4 Plastering of Compound Wall
(Sides)
Long Walls….
Short Walls….
(Top)
Long Walls…..
Short Walls…..
Deduct
Gate Opening
2
2
2
2
1
21.5
11
21.5
11
1.6
-
-
0.15
0.15
1.55
1.55
-
-
1.85
66.65
34.1
6.45
3.3
Total= 110.5 m^2 *2= 221 m^2
2.96 m^2
Total = 221-2.96=218.2 m^2
R
Item
No. Particulars of Item No. Length Breadth Height or Depth Quantity
1 1st Class Brick Work in
Parapet Wall
Long Walls…
Short Walls…
Deduct
Parapet Wall opening
2
2
1
10.835
8.1
0.8
0.1
0.1
0.1
1
1
1
2.167
1.62
Total = 3.787 m^3
0.08 m^3
Total = 3.787-0.08=3.707 m^3
4 Plastering for Parapet Wall
(Sides)
Long Walls….
Short Walls….
(Top)
Long Walls…..
Short Walls…..
Deduct
Parapet Wall Opening(Side
Parapet Wall opening (top)
2
2
2
2
1
1
10.835
8.7
10.835
8.7
0.8
0.8
-
-
0.1
0.1
-
0.1
1
1
-
-
1
-
21.67
17.4
2.167
1.67
Total= 42.907 m^2 *2= 85.814 m^2
0.8*2=1.6 m^2
0.08*2=0.16 m^2 => 1.76 m^2
Total = 85.814-1.76= 84.054 m^2
R
Calculations For Staircase
R
Observations from Staircase
1. Height of Slab = 3.96 m.
2. Height to be acquired for on flight = 1.98 m.
3. Tread & Rise Lengths = 0.28 m & 0.16 m
4. Number of Risers = 12
5. Number of Treads = 11
6. Thickness of Waist Slab = 0.1524 m.
7. Length of Step = 0.9 m.
R
Calculations
1. Volume of Concrete for Steps
Volume of One Step = ½* Riser*Tread*Length of Step
= 0.21 m^3.
Volume for 12 steps = 12*0.21
= 2.42 m^3.
2. Volume of Concrete for Waist Slab
Volume of waist Slab = Inclined Length * Length of Slab * Width of Slab
= 3.9*0.9*0.15 = 0.54 m^3.
3. Volume of Concrete for First Flight
Total volume = Volume of waist Slab + Volume of Steps
= 0.54 + 2.42 = 2.96 m^3.
R
4. Volume of concrete for Landing of Staircase
Concrete volume for landing = Length * Width * Thickness of Landing
= 1.9 * 1 * 0.15
= 0.29 m^3.
5. Total Volume for Staircase
Volume = Volume of First Flight + Volume of Second Flight + Volume of Landing
= 2.96 + 2.96 + 0.29
= 6.21 m^3
R
Total Estimation of a Building
No. Particular of an Item Quantity( in m^3)
1 Earthwork in Excavation for Building and Compound Wall 27.6 + 15.84 = 43.33 m^3
2 Lime concrete in foundation of Building and Compound Wall 11.806 + 5.28 =
3 1st Class Brick Work in 1:6 cement mortar in foundation and plinth of
Building
12.67 m^3
4 Damp Proof Course 2.5 cm thick c.c of Building 18.6 m^3
5 1st Class Brick Work in Lime Mortar in Superstructure of Building ,
Compound Wall and Parapet Wall.
68.92 + 17.59 + 3.71 = 90.22 m^3
6 Plastering Of Super Structure of Building , Compound Wall and Parapet
Wall.
444.59 +218.2 + 84.05 = 746.84 m^2
7 Concrete in Slab 14.14 m^3
8 Total Volume of concrete of Staircase 6.21 m^3
R
Cost and time project estimate is a critical preparation in project management
process. Both of top-down and bottom-up approach is useful and applicable in
specific situations. Estimation as well as preparation for project, especially mission
critical ones, should be done so that it can reduce risks in implementing project,
control and assess this implementation process.
In this project we have estimated all the major items of works (Earth work
excavation, sand filling footings and columns, beams, slab total RCC Quantities and
brick work Quantities, plastering, painting, etc.) according to the drawings
CONCLUSION
R
• Akshay chaudhary and Payal Sachedeva and Maninderpal Singh; Design and
Estimation of a reinforced building: A Case study ISR journal of civil
Engineering.
• Estimation And Costing In Civil Engineering Theory And Practice Including
Specifications And Valuations B.N Dutta.
• Estimating, Costing, Specifications & Valuations in Civil Engineering By
Monojit Chakraborti (Book).
• Estimating in building construction By steven J.Peterson and Frank R.Dagostino.
REFERENCES
R
R

More Related Content

What's hot

BUILDING ESTIMATION (Details Estimate For G+2 Storied Building presentation ...
BUILDING ESTIMATION (Details Estimate For G+2  Storied Building presentation ...BUILDING ESTIMATION (Details Estimate For G+2  Storied Building presentation ...
BUILDING ESTIMATION (Details Estimate For G+2 Storied Building presentation ...Manoranjan Roy
 
Construction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project ManagementConstruction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project Managementsrinivas2036
 
Summer Internship Report of Civil Engineering in Construction Site
Summer Internship Report of Civil Engineering in Construction SiteSummer Internship Report of Civil Engineering in Construction Site
Summer Internship Report of Civil Engineering in Construction SiteRAVI KUMAR
 
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTIONSUMMER TRAINING REPORT ON BUILDING CONSTRUCTION
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTIONVed Jangid
 
District schedule rates (DSR), specification of items of work as per PWD
District schedule rates (DSR), specification of items of work as per PWDDistrict schedule rates (DSR), specification of items of work as per PWD
District schedule rates (DSR), specification of items of work as per PWDAshwiniChaudhari13
 
civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-ContractsNikhil Kumar
 
Specifications, reports and tenders - Estimation, Costing and Valuation Engin...
Specifications, reports and tenders - Estimation, Costing and Valuation Engin...Specifications, reports and tenders - Estimation, Costing and Valuation Engin...
Specifications, reports and tenders - Estimation, Costing and Valuation Engin...Shanmugasundaram N
 
Specifications, reports and tenders
Specifications, reports and tendersSpecifications, reports and tenders
Specifications, reports and tendersgayu pandian
 
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORTROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORTssuser5fea8f
 
Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works ALI HYDER GADHI
 
Schedule of Rates
Schedule of RatesSchedule of Rates
Schedule of RatesRaj Shah
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction ManagementShahin MB
 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYINGlizwi nyandu
 
50451783 taking-off-quantity
50451783 taking-off-quantity50451783 taking-off-quantity
50451783 taking-off-quantityhlksd
 
REPORT ON SUMMER TRAINING AT PWD(FLEXIBLE PAVEMENTS CONSTRUCTION)
REPORT ON SUMMER TRAINING AT PWD(FLEXIBLE PAVEMENTS CONSTRUCTION)REPORT ON SUMMER TRAINING AT PWD(FLEXIBLE PAVEMENTS CONSTRUCTION)
REPORT ON SUMMER TRAINING AT PWD(FLEXIBLE PAVEMENTS CONSTRUCTION)Ratnesh Kushwaha
 
Project report on self compacting concrete
Project report on self compacting concreteProject report on self compacting concrete
Project report on self compacting concreterajhoney
 
Preparation of bill sandeep
Preparation of bill sandeepPreparation of bill sandeep
Preparation of bill sandeepSandeep Yadav
 

What's hot (20)

BUILDING ESTIMATION (Details Estimate For G+2 Storied Building presentation ...
BUILDING ESTIMATION (Details Estimate For G+2  Storied Building presentation ...BUILDING ESTIMATION (Details Estimate For G+2  Storied Building presentation ...
BUILDING ESTIMATION (Details Estimate For G+2 Storied Building presentation ...
 
Construction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project ManagementConstruction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project Management
 
Summer Internship Report of Civil Engineering in Construction Site
Summer Internship Report of Civil Engineering in Construction SiteSummer Internship Report of Civil Engineering in Construction Site
Summer Internship Report of Civil Engineering in Construction Site
 
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTIONSUMMER TRAINING REPORT ON BUILDING CONSTRUCTION
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION
 
District schedule rates (DSR), specification of items of work as per PWD
District schedule rates (DSR), specification of items of work as per PWDDistrict schedule rates (DSR), specification of items of work as per PWD
District schedule rates (DSR), specification of items of work as per PWD
 
civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-Contracts
 
ESTIMATING AND COSTING
ESTIMATING AND COSTINGESTIMATING AND COSTING
ESTIMATING AND COSTING
 
Specifications, reports and tenders - Estimation, Costing and Valuation Engin...
Specifications, reports and tenders - Estimation, Costing and Valuation Engin...Specifications, reports and tenders - Estimation, Costing and Valuation Engin...
Specifications, reports and tenders - Estimation, Costing and Valuation Engin...
 
Specifications, reports and tenders
Specifications, reports and tendersSpecifications, reports and tenders
Specifications, reports and tenders
 
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORTROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
 
Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works
 
Item rate contract
Item rate contractItem rate contract
Item rate contract
 
Schedule of Rates
Schedule of RatesSchedule of Rates
Schedule of Rates
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction Management
 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYING
 
50451783 taking-off-quantity
50451783 taking-off-quantity50451783 taking-off-quantity
50451783 taking-off-quantity
 
REPORT ON SUMMER TRAINING AT PWD(FLEXIBLE PAVEMENTS CONSTRUCTION)
REPORT ON SUMMER TRAINING AT PWD(FLEXIBLE PAVEMENTS CONSTRUCTION)REPORT ON SUMMER TRAINING AT PWD(FLEXIBLE PAVEMENTS CONSTRUCTION)
REPORT ON SUMMER TRAINING AT PWD(FLEXIBLE PAVEMENTS CONSTRUCTION)
 
Project report on self compacting concrete
Project report on self compacting concreteProject report on self compacting concrete
Project report on self compacting concrete
 
Preparation of bill sandeep
Preparation of bill sandeepPreparation of bill sandeep
Preparation of bill sandeep
 
Estimation
EstimationEstimation
Estimation
 

Similar to Cost estimation of a Building

Estimation & costing guide
Estimation & costing guideEstimation & costing guide
Estimation & costing guideHiren Thakkar
 
B.arch Estimation and Costing
B.arch  Estimation and CostingB.arch  Estimation and Costing
B.arch Estimation and CostingSamreenFatima29
 
Lec 9 center line method
Lec 9 center line methodLec 9 center line method
Lec 9 center line methodmalang1214
 
Ce1402 estimationandquantitysurveying (1)
Ce1402 estimationandquantitysurveying (1)Ce1402 estimationandquantitysurveying (1)
Ce1402 estimationandquantitysurveying (1)hlksd
 
estimation of a g+5 structure
estimation of a g+5 structureestimation of a g+5 structure
estimation of a g+5 structureSharan_63
 
estimation,costingandvaluation.pdf
estimation,costingandvaluation.pdfestimation,costingandvaluation.pdf
estimation,costingandvaluation.pdfIctsol
 
A Course Material On Estimation And Quantity Surveying
A Course Material On Estimation And Quantity SurveyingA Course Material On Estimation And Quantity Surveying
A Course Material On Estimation And Quantity SurveyingClaire Webber
 
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...DougDos
 
estimation and quantity surveying
estimation and quantity surveyingestimation and quantity surveying
estimation and quantity surveyingsooricivil
 
Estimating-Costing-civil.pdf
Estimating-Costing-civil.pdfEstimating-Costing-civil.pdf
Estimating-Costing-civil.pdfDivyaTadepalli1
 
Construction practices aphb
Construction practices aphbConstruction practices aphb
Construction practices aphbhlksd
 
Lec.3 General rules in quantitative survey. Quantity measuring. Rate analysis
Lec.3  General rules in quantitative survey. Quantity measuring. Rate analysisLec.3  General rules in quantitative survey. Quantity measuring. Rate analysis
Lec.3 General rules in quantitative survey. Quantity measuring. Rate analysisMuthanna Abbu
 
Design of 16 storied apartment using TEKLA STRUCTURAL DESIGNER
Design of 16 storied apartment using TEKLA STRUCTURAL DESIGNERDesign of 16 storied apartment using TEKLA STRUCTURAL DESIGNER
Design of 16 storied apartment using TEKLA STRUCTURAL DESIGNERzafrin mohamed
 
Whatisworkofcivilengineeronconstructionsite 190827025839 (9 files merged)
Whatisworkofcivilengineeronconstructionsite 190827025839 (9 files merged)Whatisworkofcivilengineeronconstructionsite 190827025839 (9 files merged)
Whatisworkofcivilengineeronconstructionsite 190827025839 (9 files merged)AMIT PAYAL
 
INTERNSHIP (5).pptx
 INTERNSHIP (5).pptx INTERNSHIP (5).pptx
INTERNSHIP (5).pptxkartik395517
 

Similar to Cost estimation of a Building (20)

Estimation & costing guide
Estimation & costing guideEstimation & costing guide
Estimation & costing guide
 
B.arch Estimation and Costing
B.arch  Estimation and CostingB.arch  Estimation and Costing
B.arch Estimation and Costing
 
Lec 9 center line method
Lec 9 center line methodLec 9 center line method
Lec 9 center line method
 
Cost estimation
Cost estimationCost estimation
Cost estimation
 
Seminar
SeminarSeminar
Seminar
 
Ce1402 estimationandquantitysurveying (1)
Ce1402 estimationandquantitysurveying (1)Ce1402 estimationandquantitysurveying (1)
Ce1402 estimationandquantitysurveying (1)
 
estimation of a g+5 structure
estimation of a g+5 structureestimation of a g+5 structure
estimation of a g+5 structure
 
estimation,costingandvaluation.pdf
estimation,costingandvaluation.pdfestimation,costingandvaluation.pdf
estimation,costingandvaluation.pdf
 
A Course Material On Estimation And Quantity Surveying
A Course Material On Estimation And Quantity SurveyingA Course Material On Estimation And Quantity Surveying
A Course Material On Estimation And Quantity Surveying
 
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
 
final praveen.pptx
final praveen.pptxfinal praveen.pptx
final praveen.pptx
 
estimation and quantity surveying
estimation and quantity surveyingestimation and quantity surveying
estimation and quantity surveying
 
Estimating-Costing-civil.pdf
Estimating-Costing-civil.pdfEstimating-Costing-civil.pdf
Estimating-Costing-civil.pdf
 
Construction practices aphb
Construction practices aphbConstruction practices aphb
Construction practices aphb
 
Lec.3 General rules in quantitative survey. Quantity measuring. Rate analysis
Lec.3  General rules in quantitative survey. Quantity measuring. Rate analysisLec.3  General rules in quantitative survey. Quantity measuring. Rate analysis
Lec.3 General rules in quantitative survey. Quantity measuring. Rate analysis
 
Design of 16 storied apartment using TEKLA STRUCTURAL DESIGNER
Design of 16 storied apartment using TEKLA STRUCTURAL DESIGNERDesign of 16 storied apartment using TEKLA STRUCTURAL DESIGNER
Design of 16 storied apartment using TEKLA STRUCTURAL DESIGNER
 
188.pptx
188.pptx188.pptx
188.pptx
 
EC Unit 002 new (1).pdf
EC  Unit 002 new (1).pdfEC  Unit 002 new (1).pdf
EC Unit 002 new (1).pdf
 
Whatisworkofcivilengineeronconstructionsite 190827025839 (9 files merged)
Whatisworkofcivilengineeronconstructionsite 190827025839 (9 files merged)Whatisworkofcivilengineeronconstructionsite 190827025839 (9 files merged)
Whatisworkofcivilengineeronconstructionsite 190827025839 (9 files merged)
 
INTERNSHIP (5).pptx
 INTERNSHIP (5).pptx INTERNSHIP (5).pptx
INTERNSHIP (5).pptx
 

Recently uploaded

(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 

Recently uploaded (20)

(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 

Cost estimation of a Building

  • 1. R INTERNSHIP PRESENTATION ON QUANTITY ESTIMATION OF BUILDING Under the Guidance of Presented by Shaik Vaheed M.Tech B.Aravind B151144 Assistant Professor Dept. of Civil Engineerin P.Thirumalesh B151435 RGUKT Basar B.Naresh B151372 RAJIV GANDHI UNIVERSITY OF KNOWLEDGE TECHNOLOGIES
  • 2. R 1. What is Estimation? 2. Essential Qualities of Good Estimator. 3. Types of Estimates. 4. Methods of Detailed Estimates. 5. Description of Measurements for Common Items. 6. Estimation of Building, Plan , Foundation , Tabular forms.. 7. Results. 8. Conclusion. 9. References. CONTENT
  • 3. R Estimation Estimation is the scientific way of working out the approximate cost of an engineering project before execution of the work. It is totally different from calculation of the exact cost after completion of the project. Estimation requires a thorough Knowledge of the construction procedures and cost of materials & labour in addition to the skill ,experience, foresight and good judgment For a good estimate the, actual cost of the proposed work after completion should not differ by more then 5 to 10 % from its approximate cost estimate, provided there are no unusual, unforeseen circumstances.
  • 4. R 1. It help to work out the approximate cost of the project in order to decide its feasibility with respect to the cost and to ensure the financial resources, it the proposal is approved. 2. Requirements of controlled materials, such as cement and steel can be estimated for making applications to the controlling authorities. 3. It is used for framing the tenders for the work sand to check contractor’s work during and after the its execution for the purpose of making payments to the contractor. 4. From quantities of different items of work calculated in detailed estimation, resources are allocated to different activities of the project and ultimately their durations and whole planning and scheduling of the project is carried out. NEED FOR ESTIMATE
  • 5. R ESSENTIAL QUALITIES OF A GOOD ESTIMATOR Note the location of the proposed building. Get all data available regarding the soil. Make a sketch of the site showing all important details. Obtain information concerning light, power, and water. Secure information concerning banking facilities. Note conditions of streets leading to railway yards and to material dealers, and Investigate general efficiency of local workman.
  • 6. R 1.To Explain the process of estimating the building cost for a Building. 2.To prepare a preliminary estimate of the cost of a residential Structure. 3.Generate a final estimate for a simple Structure. 4.To Estimate the quantities of a residential building by using long wall and short wall method. 5. To know the approximate quantities of various material. OBJECTIVIES
  • 8. R TYPES OF ESTIMATES There are two main types of estimates:- 1 = Rough cost estimate. 2 = Detailed estimate. Depending upon the purpose of estimate, some types of detailed estimate are as follows:- a) Contractor's estimate b) Engineer's estimate c) Progress estimate
  • 9. R • Detailed estimates are prepared by carefully and separately calculating in detail the costs of various items of the work. • The mistakes, if any, in the rough cost estimate are eliminated in the detailed estimate. • Detailed estimates are submitted to the competent authorities for obtaining technical sanction. DETAILED ESTIMATE
  • 10. R The dimensions, length, breadth and height or depth are to be taken out from the working drawings (plan, elevation and section). Junctions of walls, corners and the meeting points of walls require special attention. For symmetrical footings, which is the usual case, earthwork in excavation in foundations, foundation concrete, brickwork in foundation and plinth, and brickwork in superstructure may be estimated by either of the two methods: (1) SEPARATE OR INDIVIDUAL WALL METHOD (2) CENTER LINE METHOD METHODS OF DETAILED ESTIMATE
  • 11. R • The walls running in one direction are termed as "long walls” and the walls running in the transverse direction, as "Short walls", without keeping in mind which wall is lesser in length and which wall is greater in length. • Lengths of long walls are measured or found "Out-to out" and those of short walls as "Into- in". • Different quantities are calculated by multiplying the length by the breadth and the height of the wall. SEPARATE OR INDIVIDUAL WALLS METHOD
  • 12. R 1.Site Clearance Works. 2.Excavation for Foundation Trenches. 3.Foundation Concrete. 4.Brick Work in Foundation up to Plinth. 5.Damp Proof Course. 6.Brick Work in Super Structure. 7. Roofing & R.C.C work. 8. Floor. 9.Plastering. DESCRIPTION AND UNITS OF MEASUREMENT FOR COMMON ITEMS
  • 14. R ESTIMATION OF A BUILDING : PLAN
  • 16. R SPECIFICATIONS 1.Clear Height of the Walls(Long & Short) = 3.96 m. 2.Plinth Level = 0.4 m. 3.Thickness of Roof Slab = 0.15 m. 4.Parapet wall Height = 1 m. 5.Parapet Wall Width = 0.1 m. 6.Lintels width & Height = 1.10 &0.15m 7.Damp proof Course = 2.5cm thickness of bitumen & polythene Sheet 8.Internal Finish = Three Coats of White Wash 9.External Finish= Three Coats of Weather Shield Paint 10.Door Dimensions = 1.98 m*1.1 m 11. Window Dimensions = 1.28m *1.22m
  • 17. R CENTRE TO CENTRE LENGTHS S1 & S2 & S3 = (4.3+3.5)+(0.3)+(0.3/2)+(0.3/2) = 8.4 m L1 & L2 & L3= (5.21)+(4.725)+(0.3)+(0.3/2)+(0.3/2) = 10.545 m K = (4.3)+(0.3/2)+(0.3/2) = 4.6 m
  • 18. R Details of Measurement and Calculations of Building Item No. Particulars of Items No. Length Breadth Height or Depth Quantity 1 Earthwork in Excavation in Foundation Long Walls…… Short Walls….. Kitchen Wall….. 3 3 1 10.535+0.6 8.4+0.6 4.6+0.6 0.6 0.6 0.6 0.7 0.7 0.7 14.03 11.34 2.184 Total = 27.6 m^3 2 Lime Concrete in foundation Long Walls…. Short Walls… Kitchen Wall… 3 3 1 11.135 9.0 5.20 0.6 0.6 0.6 0.3 0.3 0.3 6.01 4.86 0.936 Total = 11.806 m^3
  • 19. R Item No. Particular of Item No. Length Breadth Height or Depth Quantity 3 1st Class Brick Work in 1:6 cement mortar in foundation and plinth (i) Long Walls… a) 1st Footing b) Plinth (ii) Short Walls…. a) 1st Footing b) Plinth Kitchen Wall… a) 1st Footing b) Plinth 3 3 3 3 1 1 10.935 10.835 8.8 8.7 5 4.9 0.4 0.3 0.4 0.3 0.4 0.3 0.3 0.60 0.20 0.60 0.4 0.3 2.62 1.95 2.112 4.691 0.4 0.882 Total = 12.662 m^3 4 Damp Proof Course 2.5 cm thick c.c Long Walls…. Short Walls…. Kitchen Wall… 3 3 1 10.835 8.4 4.3 0.3 0.3 0.3 - - - 9.75 7.56 1.29 Total= 18.6 m^2
  • 20. R Item No. Particulars of Item No. Length Breadth Height or Depth Quantity 5 1st Class Brick Work in Lime Mortar in Superstructure Long Walls… Short Walls… Kitchen Wall…. Deduct Door openings Windows Opening Lintels over Doors Lintels over Windows 3 3 1 5 6 2 6 10.835 8.7 4.9 1.10 1.22 1.10 1.22 0.3 0.3 0.3 0.3 0.3 0.3 0.3 3.96 3.96 3.96 1.98 1.28 0.15 0.15 38.61 31.006 5.82 Total = 75.43 m^3 3.261 2.81 0.099 0.3294 Total = 6.49 m^3 Total = 75.43-6.49=68.92 m^3 6 Concrete in Slab 1 10.835 8.7 0.15 14.139 m^3
  • 21. R Item No. Particulars of Item No. Length Breadth Height or Depth Quantity 7 Plastering Of Super Structure Long Walls… Short Walls.. Kitchen Wall… Deduct Door openings Windows 3 3 1 5 6 10.835 8.7 4.3 1.10 1.22 - - - - - 3.96 3.96 3.96 1.98 1.28 128.71 103.356 17.025 TOTAL = 249.094 m^2 For both side of walls 249.094*2= 498.18 m^2 17.424 9.36 Total = 26.79 m^2 For both Sides 26.79*2=53.58 m^2 Plastering for Super structure is 498.18-53.58=444.59 m^2
  • 22. R Details of Measurement and Calculations of Quantities of Compound Wall Item No. Particulars of Items No. Length Breadth Height or Depth Quantity 1 Earthwork in Excavation of Compound Wall Long Walls…… Short Walls….. 2 2 21.35+0.40 10.85+0.40 0.4 0.4 0.6 0.6 10.44 5.4 Total = 15.84 m^3 2 Lime Concrete in foundation of Compound Wall Long Walls…. Short Walls… 2 2 21.35+0.40 10.85+0.40 0.4 0.4 0.2 0.2 3.48 1.8 Total = 5.28 m^3
  • 23. R Item No. Particulars of Item No. Length Breadth Height or Depth Quantity 3 1st Class Brick Work Compound Wall Long Walls… Short Walls… Deduct Gate openings 2 2 1 21.35+0.15 10.85+0.40 - 1.6 0.15 0.15 0.15 1.85 1.85 1.85 11.93 6.11 Total = 18.035 m^3 0.444 m^3 Total = 18.035-0.444=17.591 m^3 4 Plastering of Compound Wall (Sides) Long Walls…. Short Walls…. (Top) Long Walls….. Short Walls….. Deduct Gate Opening 2 2 2 2 1 21.5 11 21.5 11 1.6 - - 0.15 0.15 1.55 1.55 - - 1.85 66.65 34.1 6.45 3.3 Total= 110.5 m^2 *2= 221 m^2 2.96 m^2 Total = 221-2.96=218.2 m^2
  • 24. R Item No. Particulars of Item No. Length Breadth Height or Depth Quantity 1 1st Class Brick Work in Parapet Wall Long Walls… Short Walls… Deduct Parapet Wall opening 2 2 1 10.835 8.1 0.8 0.1 0.1 0.1 1 1 1 2.167 1.62 Total = 3.787 m^3 0.08 m^3 Total = 3.787-0.08=3.707 m^3 4 Plastering for Parapet Wall (Sides) Long Walls…. Short Walls…. (Top) Long Walls….. Short Walls….. Deduct Parapet Wall Opening(Side Parapet Wall opening (top) 2 2 2 2 1 1 10.835 8.7 10.835 8.7 0.8 0.8 - - 0.1 0.1 - 0.1 1 1 - - 1 - 21.67 17.4 2.167 1.67 Total= 42.907 m^2 *2= 85.814 m^2 0.8*2=1.6 m^2 0.08*2=0.16 m^2 => 1.76 m^2 Total = 85.814-1.76= 84.054 m^2
  • 26. R Observations from Staircase 1. Height of Slab = 3.96 m. 2. Height to be acquired for on flight = 1.98 m. 3. Tread & Rise Lengths = 0.28 m & 0.16 m 4. Number of Risers = 12 5. Number of Treads = 11 6. Thickness of Waist Slab = 0.1524 m. 7. Length of Step = 0.9 m.
  • 27. R Calculations 1. Volume of Concrete for Steps Volume of One Step = ½* Riser*Tread*Length of Step = 0.21 m^3. Volume for 12 steps = 12*0.21 = 2.42 m^3. 2. Volume of Concrete for Waist Slab Volume of waist Slab = Inclined Length * Length of Slab * Width of Slab = 3.9*0.9*0.15 = 0.54 m^3. 3. Volume of Concrete for First Flight Total volume = Volume of waist Slab + Volume of Steps = 0.54 + 2.42 = 2.96 m^3.
  • 28. R 4. Volume of concrete for Landing of Staircase Concrete volume for landing = Length * Width * Thickness of Landing = 1.9 * 1 * 0.15 = 0.29 m^3. 5. Total Volume for Staircase Volume = Volume of First Flight + Volume of Second Flight + Volume of Landing = 2.96 + 2.96 + 0.29 = 6.21 m^3
  • 29. R Total Estimation of a Building No. Particular of an Item Quantity( in m^3) 1 Earthwork in Excavation for Building and Compound Wall 27.6 + 15.84 = 43.33 m^3 2 Lime concrete in foundation of Building and Compound Wall 11.806 + 5.28 = 3 1st Class Brick Work in 1:6 cement mortar in foundation and plinth of Building 12.67 m^3 4 Damp Proof Course 2.5 cm thick c.c of Building 18.6 m^3 5 1st Class Brick Work in Lime Mortar in Superstructure of Building , Compound Wall and Parapet Wall. 68.92 + 17.59 + 3.71 = 90.22 m^3 6 Plastering Of Super Structure of Building , Compound Wall and Parapet Wall. 444.59 +218.2 + 84.05 = 746.84 m^2 7 Concrete in Slab 14.14 m^3 8 Total Volume of concrete of Staircase 6.21 m^3
  • 30. R Cost and time project estimate is a critical preparation in project management process. Both of top-down and bottom-up approach is useful and applicable in specific situations. Estimation as well as preparation for project, especially mission critical ones, should be done so that it can reduce risks in implementing project, control and assess this implementation process. In this project we have estimated all the major items of works (Earth work excavation, sand filling footings and columns, beams, slab total RCC Quantities and brick work Quantities, plastering, painting, etc.) according to the drawings CONCLUSION
  • 31. R • Akshay chaudhary and Payal Sachedeva and Maninderpal Singh; Design and Estimation of a reinforced building: A Case study ISR journal of civil Engineering. • Estimation And Costing In Civil Engineering Theory And Practice Including Specifications And Valuations B.N Dutta. • Estimating, Costing, Specifications & Valuations in Civil Engineering By Monojit Chakraborti (Book). • Estimating in building construction By steven J.Peterson and Frank R.Dagostino. REFERENCES