CENTRALIZED AIR CONDITIONING
CASE STUDY – KUALA LUMPUR PERFORMING ARTS CENTRE,MALASIYA
SUBMITTED BY :-
ABHISHEK S. KUMAR 01
ABHISHEK V. KUMAR 02
ANKIT SHARMA 04
SUBMITTED TO :-
AR. ADITI MAHAJAN
AR. PRIYANKA PUROHIT
CENTRALIZED AIR CONDITIONING SYSTEM
• Central air conditioning circulate cool air through a
system of supply and return ducts. Supply ducts and
register (i. e., openings in the walls, floors, or ceiling
covered by grills) carry cooled air from the air
conditioner to the home. This cooled air becomes
warmer as it circulates through the home.
• Central air conditioning is a system in which air is
cooled at a central location and distributed to and
form rooms by one or more fans and ductwork. The
works of the air conditioning compressor is what
marks the whole process of air conditioning
possible.
Components of air conditioning system
• Compressor :-
• The compressor is responsible for moving the
refrigerant between the evaporator and condenser
coils, ensuring that the refrigerant changes to gas
or liquid as needed.
• The compressor pumps the refrigerant through the
system to keep it alive and running properly.
• Evaporator coil :-
• The evaporator coil is the component in your AC
system that absorbs the heat from the air inside
your home. It is often either attached to your
furnace or located on the inside of your air handler.
It works with a condenser coil to complete the heat
exchange process that produces cool air.
Components of air conditioning system
• Condenser coil :-
An AC condenser coil is made up of different tubes
that are filled up with refrigerant liquid. In order for it
to fully function, a chiller inside the coil cools the fluid
and moves through the condenser tubing.
• Thermal expansion valve :-
A thermal expansion valve or thermostatic expansion
valve is a component in vapor – compression
refrigeration and air conditioning systems that
controls the amount of refrigerant released into the
evaporator and is intended to regulate the superheat
of the refrigerant that flows out of the evaporator to
a steady value.
KUALA LUMPUR PERFORMING ARTS CENTRE
 INTRODUCTION :-
Kuala lumpur performing arts centre (KLPAC)
is the choosen building for this mechanical
system research. KLPAC is ventilated by
mechanical ventilation and air- conditioning
system. These system comforts the space by
controlling the internal air temperature in
term to achieve thermal comfort. With the
support of these systems, the user in KLPAC
will have a comfortable and cooling space to
stay at. The air conditioning system that
used in KLPAC is unit air conditioning
system. GROUND FLOOR PLAN
AIR DIFFUSER ARE CONNECTED THROUGH DUCTWORK
 SUPPLY AIR DIFFUSER AND GRILLE :-
• At least 2-3 connected vertical supply at diffuser had been
found at the main lobby different type of diffuser can be
found in the range from cost efficient type to complex and
efficient air distribution regarding to the requirements.
• Windows and opening allowing uninterrupted air passage
is not necessary if the rooms are equipped with
mechanical.
 Exhaust air grille :-
• The function of the installation of exhaust air griller is to
expel the foul air which is inside the building. It helps to
carry the air back to the designated AHU rooms. The duct
behinds often being covered up by series of grillwork in
order to avoid obstacles entering or damaging the system.
In addition, filters are included into the installation to trap
pollutants and allow better airflow accessing the building.
It can require the maintenance cost by reduce the
frequent components break down.
SECTION OF SUPPLY AIR DIFUSSER
DETAIL PLAN OF
SUPPLY AIR GRILLE
TOILET PLAN WITH
SUPPLY AIR GRILLE
 Air handling unit (a.h.u.)-
• ANALYSIS :
Air – handling unit (A.H.U.) room in the building KLPAC
have reach the requirements of malasiyan standard code
of practice of energy efficiency and use of renewable
energy (MS 1525). It was located at the rear end of the
building that gives control panel to the person in charge.
This allows that person to shut or reduce the energy to any
space the not required in the building.
 Fan-coil unit :-
• ANALYSIS :
Control panels can be found around the space where FCU were
installed to reduced the energy during the time where the space
is not used. The air conditioning and mechanical ventilation
system in KLPAC was installed to reach requirement started by
Malaysian standard code of practice on energy efficiency and use
of renewable energy (MS 1525)
AIR HANDLING UNIT
FAN –COIL UNIT
Location of A.H.U. in Ground Floor Plan
Location of A.H.U. in Third Floor Plan
Location of A.H.U. in Second Floor Plan
Location of A.H.U. in First Floor Plan
Location of F.C.U. in Ground Floor Plan
Location of F.C.U. in Third Floor Plan
Location of F.C.U. in Second Floor Plan
Location of F.C.U. in First Floor Plan
 Ductwork :-
• ANALYSIS :
The ducting system in the building KLPAC were fully
insulated to prevent any loss of energy that means the
requirement of Malaysian standard code of practice on
energy efficiency and use of renewable energy (MS 1525).
 Air - cooled chilled water :-
• ANALYSIS :
The centralized chilled water at air conditioning system in
the buildings that the reach the requirements by Malaysian
standard code of practice of energy efficiency and use of
renewable energy (MS 1525) by installing two chillers at
the rear of KLPAC. One is used during the daytime
operating hours to reduce energy consumption while the
other one is installed to avoid any emergency like
breakdown or maintenance both of the chillers will be
function when there is a need for high cooling load.
DUCT
DUCTWORK
AIR – COOLED CHILLED
THANk
YOU

More Related Content

What's hot

Building Science 2
Building Science 2Building Science 2
Building Science 2Gertrude Lee
 
Architecture Museum Malacca Adaptive Reuse Design Proposal
Architecture Museum Malacca Adaptive Reuse Design ProposalArchitecture Museum Malacca Adaptive Reuse Design Proposal
Architecture Museum Malacca Adaptive Reuse Design ProposalNaqiuddin Johari
 
Acoustic Case Study on Calvery Conventional Centre
Acoustic Case Study on Calvery Conventional CentreAcoustic Case Study on Calvery Conventional Centre
Acoustic Case Study on Calvery Conventional CentreAndy Heng
 
Building Service Final Report
Building Service Final ReportBuilding Service Final Report
Building Service Final ReportIvy Yee
 
Building service project1
Building service project1Building service project1
Building service project1J.j. Hayashi
 
Asian architecture
Asian architectureAsian architecture
Asian architecturekimberlywjs
 
Building services (Project 1: Case Study)
Building services (Project 1: Case Study)Building services (Project 1: Case Study)
Building services (Project 1: Case Study)AlexSiv03
 
Building Services
Building Services Building Services
Building Services Joshua Lee
 
Final building science ii report
Final building science ii reportFinal building science ii report
Final building science ii reportlgkr
 
Building service
Building serviceBuilding service
Building serviceOng Shi Hui
 
Bscience project 1 (report)
Bscience project 1 (report)Bscience project 1 (report)
Bscience project 1 (report)Afiq Knick
 
B.services case-study
B.services case-studyB.services case-study
B.services case-studyClement Seong
 
A Case Study On Room Acoustic
A Case Study On Room AcousticA Case Study On Room Acoustic
A Case Study On Room AcousticKalvin Bong
 
Building services final report
Building services final reportBuilding services final report
Building services final reportAfiq Knick
 
Building Science II : Project 1
Building Science II : Project 1Building Science II : Project 1
Building Science II : Project 1Patricia Kong
 
Report of National Mosque, KL
Report of National Mosque, KLReport of National Mosque, KL
Report of National Mosque, KLLek Yuen
 
Project 2
Project 2Project 2
Project 2wzhen77
 
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2Darshiini Vig
 
building services project 1
building services project 1building services project 1
building services project 1Baddy Peigun
 

What's hot (20)

Building Science 2
Building Science 2Building Science 2
Building Science 2
 
Architecture Museum Malacca Adaptive Reuse Design Proposal
Architecture Museum Malacca Adaptive Reuse Design ProposalArchitecture Museum Malacca Adaptive Reuse Design Proposal
Architecture Museum Malacca Adaptive Reuse Design Proposal
 
Acoustic Case Study on Calvery Conventional Centre
Acoustic Case Study on Calvery Conventional CentreAcoustic Case Study on Calvery Conventional Centre
Acoustic Case Study on Calvery Conventional Centre
 
Building Service Final Report
Building Service Final ReportBuilding Service Final Report
Building Service Final Report
 
Building service project1
Building service project1Building service project1
Building service project1
 
Asian architecture
Asian architectureAsian architecture
Asian architecture
 
Building services (Project 1: Case Study)
Building services (Project 1: Case Study)Building services (Project 1: Case Study)
Building services (Project 1: Case Study)
 
Building Services
Building Services Building Services
Building Services
 
Final building science ii report
Final building science ii reportFinal building science ii report
Final building science ii report
 
Building service
Building serviceBuilding service
Building service
 
Bscience project 1 (report)
Bscience project 1 (report)Bscience project 1 (report)
Bscience project 1 (report)
 
B.services case-study
B.services case-studyB.services case-study
B.services case-study
 
A Case Study On Room Acoustic
A Case Study On Room AcousticA Case Study On Room Acoustic
A Case Study On Room Acoustic
 
Building services final report
Building services final reportBuilding services final report
Building services final report
 
Building Science II : Project 1
Building Science II : Project 1Building Science II : Project 1
Building Science II : Project 1
 
Report of National Mosque, KL
Report of National Mosque, KLReport of National Mosque, KL
Report of National Mosque, KL
 
Project 2
Project 2Project 2
Project 2
 
Bservice
BserviceBservice
Bservice
 
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2
 
building services project 1
building services project 1building services project 1
building services project 1
 

Similar to CASE STUDY OF KLPAC.pptx

Building services systems in sri lanka ac
Building services systems in sri lanka acBuilding services systems in sri lanka ac
Building services systems in sri lanka acArunali Dhelika
 
HVAC presentation for masters in architecture
HVAC presentation for masters in architectureHVAC presentation for masters in architecture
HVAC presentation for masters in architecturegamertagore1999
 
Centralized AC System- S Menon & S Dayakar
Centralized AC System-  S Menon & S DayakarCentralized AC System-  S Menon & S Dayakar
Centralized AC System- S Menon & S DayakarSrinath Menon
 
Overview and Maintenanaces of HVAC system
Overview and Maintenanaces of HVAC system Overview and Maintenanaces of HVAC system
Overview and Maintenanaces of HVAC system Srinath Menon
 
Overview and Maintenanaces of HVAC system
Overview and Maintenanaces of HVAC system Overview and Maintenanaces of HVAC system
Overview and Maintenanaces of HVAC system Srinath Menon
 
Design options for hvac distribution systems
Design options for hvac distribution systemsDesign options for hvac distribution systems
Design options for hvac distribution systemsJASON KEMBOI
 
HEATING VENTILATION AND AIR CONDITIONING SYSTEMS
HEATING VENTILATION AND AIR CONDITIONING SYSTEMSHEATING VENTILATION AND AIR CONDITIONING SYSTEMS
HEATING VENTILATION AND AIR CONDITIONING SYSTEMSLakshmi Ravi Chandu Kolusu
 
AHU HVAC.ppt Air Distribution Systems, HVAC
AHU HVAC.ppt Air Distribution Systems, HVACAHU HVAC.ppt Air Distribution Systems, HVAC
AHU HVAC.ppt Air Distribution Systems, HVACPurushottam Ingle
 
AIR CONDITIONING SYSTEMS.ppt
AIR CONDITIONING SYSTEMS.pptAIR CONDITIONING SYSTEMS.ppt
AIR CONDITIONING SYSTEMS.pptPurushottam Ingle
 
BS 2 Hvac air conditioning 4
BS 2 Hvac air conditioning 4BS 2 Hvac air conditioning 4
BS 2 Hvac air conditioning 4Est
 
AIR CONDITIONER for Engineering Project.pptx
AIR CONDITIONER for Engineering Project.pptxAIR CONDITIONER for Engineering Project.pptx
AIR CONDITIONER for Engineering Project.pptxARYANGOYAL72
 
Packaged air conditioners
Packaged air conditioners Packaged air conditioners
Packaged air conditioners Ar.ADITYA GOEL
 

Similar to CASE STUDY OF KLPAC.pptx (20)

Building services systems in sri lanka ac
Building services systems in sri lanka acBuilding services systems in sri lanka ac
Building services systems in sri lanka ac
 
HVAC presentation for masters in architecture
HVAC presentation for masters in architectureHVAC presentation for masters in architecture
HVAC presentation for masters in architecture
 
Centralized AC System- S Menon & S Dayakar
Centralized AC System-  S Menon & S DayakarCentralized AC System-  S Menon & S Dayakar
Centralized AC System- S Menon & S Dayakar
 
Overview and Maintenanaces of HVAC system
Overview and Maintenanaces of HVAC system Overview and Maintenanaces of HVAC system
Overview and Maintenanaces of HVAC system
 
Central ac system
Central ac system Central ac system
Central ac system
 
Overview and Maintenanaces of HVAC system
Overview and Maintenanaces of HVAC system Overview and Maintenanaces of HVAC system
Overview and Maintenanaces of HVAC system
 
Design options for hvac distribution systems
Design options for hvac distribution systemsDesign options for hvac distribution systems
Design options for hvac distribution systems
 
HEATING VENTILATION AND AIR CONDITIONING SYSTEMS
HEATING VENTILATION AND AIR CONDITIONING SYSTEMSHEATING VENTILATION AND AIR CONDITIONING SYSTEMS
HEATING VENTILATION AND AIR CONDITIONING SYSTEMS
 
AHU HVAC.ppt Air Distribution Systems, HVAC
AHU HVAC.ppt Air Distribution Systems, HVACAHU HVAC.ppt Air Distribution Systems, HVAC
AHU HVAC.ppt Air Distribution Systems, HVAC
 
Final presentation
Final presentationFinal presentation
Final presentation
 
Airconditioning ppt
Airconditioning pptAirconditioning ppt
Airconditioning ppt
 
AIR CONDITIONING SYSTEMS.ppt
AIR CONDITIONING SYSTEMS.pptAIR CONDITIONING SYSTEMS.ppt
AIR CONDITIONING SYSTEMS.ppt
 
The Role of HVAC in Achieving High Performance Goals
The Role of HVAC in Achieving High Performance GoalsThe Role of HVAC in Achieving High Performance Goals
The Role of HVAC in Achieving High Performance Goals
 
BS 2 Hvac air conditioning 4
BS 2 Hvac air conditioning 4BS 2 Hvac air conditioning 4
BS 2 Hvac air conditioning 4
 
AIR CONDITIONER for Engineering Project.pptx
AIR CONDITIONER for Engineering Project.pptxAIR CONDITIONER for Engineering Project.pptx
AIR CONDITIONER for Engineering Project.pptx
 
Packaged air conditioners
Packaged air conditioners Packaged air conditioners
Packaged air conditioners
 
Pharmaceutical hvac system by adnan et.al
Pharmaceutical hvac system by adnan et.alPharmaceutical hvac system by adnan et.al
Pharmaceutical hvac system by adnan et.al
 
HVAC AUDIT.pdf
HVAC AUDIT.pdfHVAC AUDIT.pdf
HVAC AUDIT.pdf
 
HVAC AUDIT.pdf
HVAC AUDIT.pdfHVAC AUDIT.pdf
HVAC AUDIT.pdf
 
CHAP 4 HVAC.pdf
CHAP 4 HVAC.pdfCHAP 4 HVAC.pdf
CHAP 4 HVAC.pdf
 

Recently uploaded

Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 

Recently uploaded (20)

Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 

CASE STUDY OF KLPAC.pptx

  • 1. CENTRALIZED AIR CONDITIONING CASE STUDY – KUALA LUMPUR PERFORMING ARTS CENTRE,MALASIYA SUBMITTED BY :- ABHISHEK S. KUMAR 01 ABHISHEK V. KUMAR 02 ANKIT SHARMA 04 SUBMITTED TO :- AR. ADITI MAHAJAN AR. PRIYANKA PUROHIT
  • 2. CENTRALIZED AIR CONDITIONING SYSTEM • Central air conditioning circulate cool air through a system of supply and return ducts. Supply ducts and register (i. e., openings in the walls, floors, or ceiling covered by grills) carry cooled air from the air conditioner to the home. This cooled air becomes warmer as it circulates through the home. • Central air conditioning is a system in which air is cooled at a central location and distributed to and form rooms by one or more fans and ductwork. The works of the air conditioning compressor is what marks the whole process of air conditioning possible.
  • 3. Components of air conditioning system • Compressor :- • The compressor is responsible for moving the refrigerant between the evaporator and condenser coils, ensuring that the refrigerant changes to gas or liquid as needed. • The compressor pumps the refrigerant through the system to keep it alive and running properly. • Evaporator coil :- • The evaporator coil is the component in your AC system that absorbs the heat from the air inside your home. It is often either attached to your furnace or located on the inside of your air handler. It works with a condenser coil to complete the heat exchange process that produces cool air.
  • 4. Components of air conditioning system • Condenser coil :- An AC condenser coil is made up of different tubes that are filled up with refrigerant liquid. In order for it to fully function, a chiller inside the coil cools the fluid and moves through the condenser tubing. • Thermal expansion valve :- A thermal expansion valve or thermostatic expansion valve is a component in vapor – compression refrigeration and air conditioning systems that controls the amount of refrigerant released into the evaporator and is intended to regulate the superheat of the refrigerant that flows out of the evaporator to a steady value.
  • 5. KUALA LUMPUR PERFORMING ARTS CENTRE  INTRODUCTION :- Kuala lumpur performing arts centre (KLPAC) is the choosen building for this mechanical system research. KLPAC is ventilated by mechanical ventilation and air- conditioning system. These system comforts the space by controlling the internal air temperature in term to achieve thermal comfort. With the support of these systems, the user in KLPAC will have a comfortable and cooling space to stay at. The air conditioning system that used in KLPAC is unit air conditioning system. GROUND FLOOR PLAN AIR DIFFUSER ARE CONNECTED THROUGH DUCTWORK
  • 6.  SUPPLY AIR DIFFUSER AND GRILLE :- • At least 2-3 connected vertical supply at diffuser had been found at the main lobby different type of diffuser can be found in the range from cost efficient type to complex and efficient air distribution regarding to the requirements. • Windows and opening allowing uninterrupted air passage is not necessary if the rooms are equipped with mechanical.  Exhaust air grille :- • The function of the installation of exhaust air griller is to expel the foul air which is inside the building. It helps to carry the air back to the designated AHU rooms. The duct behinds often being covered up by series of grillwork in order to avoid obstacles entering or damaging the system. In addition, filters are included into the installation to trap pollutants and allow better airflow accessing the building. It can require the maintenance cost by reduce the frequent components break down. SECTION OF SUPPLY AIR DIFUSSER DETAIL PLAN OF SUPPLY AIR GRILLE TOILET PLAN WITH SUPPLY AIR GRILLE
  • 7.  Air handling unit (a.h.u.)- • ANALYSIS : Air – handling unit (A.H.U.) room in the building KLPAC have reach the requirements of malasiyan standard code of practice of energy efficiency and use of renewable energy (MS 1525). It was located at the rear end of the building that gives control panel to the person in charge. This allows that person to shut or reduce the energy to any space the not required in the building.  Fan-coil unit :- • ANALYSIS : Control panels can be found around the space where FCU were installed to reduced the energy during the time where the space is not used. The air conditioning and mechanical ventilation system in KLPAC was installed to reach requirement started by Malaysian standard code of practice on energy efficiency and use of renewable energy (MS 1525) AIR HANDLING UNIT FAN –COIL UNIT
  • 8. Location of A.H.U. in Ground Floor Plan Location of A.H.U. in Third Floor Plan Location of A.H.U. in Second Floor Plan Location of A.H.U. in First Floor Plan
  • 9. Location of F.C.U. in Ground Floor Plan Location of F.C.U. in Third Floor Plan Location of F.C.U. in Second Floor Plan Location of F.C.U. in First Floor Plan
  • 10.  Ductwork :- • ANALYSIS : The ducting system in the building KLPAC were fully insulated to prevent any loss of energy that means the requirement of Malaysian standard code of practice on energy efficiency and use of renewable energy (MS 1525).  Air - cooled chilled water :- • ANALYSIS : The centralized chilled water at air conditioning system in the buildings that the reach the requirements by Malaysian standard code of practice of energy efficiency and use of renewable energy (MS 1525) by installing two chillers at the rear of KLPAC. One is used during the daytime operating hours to reduce energy consumption while the other one is installed to avoid any emergency like breakdown or maintenance both of the chillers will be function when there is a need for high cooling load. DUCT DUCTWORK AIR – COOLED CHILLED