SlideShare a Scribd company logo
1 of 38
mhaviTüal½ysMNg;sIuvil                                                   viTüasßanCatiBhubec©keTskm<úCa


                                  @> karviPaKrcnasm<½n§kMNt;edaysþaTic
                           Analysis of Statically Determinate Structures
          enAkñúgCMBUkenH eyIgnwgBiPakSaBITMrg;Fmμtarbs;eRKOgbgÁú<MEdlvisVkrRtUveFVIkarsikSaviPaK
ehIyvak¾CaTMrg;EdlsßitenAkñúgbøg; ehIymüa:geTotRbB½n§kMlaMgGnuvtþn_k¾sßitenAelIbøg;eRKOgbgÁúMEdr.
eyIgcab;epþImBiPakSaCamYynwgPaBcaM)ac;kñúgkareRCIserIsm:UEDlrbs;eRKOgbgÁúMd¾smRsbedIm,IeyIgGac
kMNt;kMlaMgenAkñúgeRKOgbgÁúMeGaymantMélsuRkitEdlGacTTYlyk)an. bnÞab;mkeTot eyIgnwg
BiPakSaBIlkçxNÐcaM)ac;sMrab;sßirPaBrbs;eRKOgbgÁúM. ehIycugeRkay mankarbgðajBIkarviPaKeRKOg
bgÁúMsßitkñúgbøg;kMNt;edaysþaTicEdltP¢ab;edaytMN pin.

@>!> m:UEDleRKOgbgÁúM (Idealized structure)
         Cak;Esþg eKminGacviPaKeRKOgbgÁúM)ansuRkiteT edaysareKRtUveFVIkar)a:n;RbmaNbnÞúk
nigPaBFn;rbs;sMPar³. elIsBIenH eKRtUveFVIkarsnμt;BITItaMgEdlbnÞúkRtUveFVIGMeBIr. dUcenH va
CakarsMxan;Nas;EdlvisVkrRtUvGPivDÆsmtßPaBkñúgkarbegáItm:UEDleRKOgbgÁúM. enAkñúgkfaxNÐ
enHeyIgnwgENnaMBIbec©keTsCamUldæanEdlcaM)ac;sMrab;kargarenH.
tMNTMr (Support Connection): Ggát;eRKOgbgÁúMRtUv)antamP¢ab;KñatamviFIeRcIn edayGaRs½yeTA
elIectnarbs;visVkr. tMNsamBaØbIRbePTEdleKsÁal;PaKeRcInKW tMNsnøak; (pin connection)/ TMr
rGil (roller support) nigtMNbgáb; (fixed joint). Pin-connection joint nig roller support GnuBaØat
eGayGgát;vil)an Et fixed joint minGnuBaØateGayGgát;vileT ehIyCaTUeTAkareFVI fixed joint TamTar
tMélx<s;. ]TahrN_éntMNTaMgenH ¬sMrab;Edk nigsMrab;ebtug¦RtUv)anbgðajenAkñúgrUbTI2-1 nig2-2
erogKña. tMNenAkñúgeRKOgbgÁúMeFVIGMeBIeQIPaKeRcInRtUv)aneKsnμt;faCa pin connection edaysarkar
P¢ab;edayb‘ULúg nigedayEdkeKalminGacpþl;nUvkarTb;karvil (restraint) )anRKb;RKan;eT.




Analysis of Statically Determinate Structures                                       T.Chhay -24
Department of Civil Engineering                                                                 NPIC




         m:UEDleRKOgbgÁúMEdleRbIenAkñúgkarviPaKeRKOgbgÁúMEdltMNageGayTMrsnøak; (pinned support)
nigTMrbgáb; (fixed support); nigtMNsnøak; (pin-connected joint) nigtMNbgáb; (fixed-connected
joist) RtUv)anbgðajenAkñúgrUbTI 2-3 a nigrUbTI 2-3 b erogKña. EtkarBit RKb;tMNTaMgGs;manPaB

rwgRkajxøHkñúgkarTb;Tl;nwgkarvil. sMrab;krNIEbbenH m:UEDlEdlsaksmCagsMrab;TMr b¤tMNRtUv
)anbgðajenAkñúgrUbTI 2-3 c. RbsinebIefrkMrajTb;karrmYl (torsional spring constant) k = 0
eKKitfatMNCasnøak; ehIyRbsinebI k → ∞ eKKitfatMNCatMNbgáb;.




        enAeBleRCIserIsm:UEDlsMrab;TMr b¤tMNnImYy²rYcehIy visVkrRtUvdwgfakarsnμt;nwgCHT§iBl
dl;kareFVIkarCak;Esþgrbs;Ggát; ehIyRtUvdwgfakarsnμt;enaHsmrmüsMrab;karsikSaKNnaeRKOgbgÁúM
b¤Gt;. ]TarhN_ eKmanFñwmdUcbgðajenAkñúgrUbTI 2-4 a edayeKeRbIvaeGayRTbnÞúkcMcMnuc P . tMN
EkgenARtg;cMnuc A dUckarbgðajenAkñúgrUbTI 2-1 a dUcenHeKGaceFVIm:UEDlTMrenHCaRbePTTMrsnøak; (pin
support). elIsBIenH TMrRtg;cMnuc B RKan;EtTl;Ggát;kMueGayFøak; dUcenHeKeFVIm:UEDlvaCaTMrkl; (roller).

kMras;rbs;FñwmRtUv)anecaledaysarvamanTMhMtUceFobnwgRbEvgrbs;Fñwm dUcenHm:UEDlrbs;FñwmRtUv)an
karviPaKrcnasm<½n§kMNt;edaysþaTic                                                     T.Chhay   -25
mhaviTüal½ysMNg;sIuvil                                                viTüasßanCatiBhubec©keTskm<úCa

bgðajenAkñúgrUbTI 2-4 b. kardak;bnÞúkenAelIm:UEDlFñwmmanlkçN³RsedogKñanwgkardak;bnÞúkenAelI
FñwmCak;Esþg. edIm,Ibgðajfam:UEDlenHmanlkçN³smRsb eyIgnwgBicarNakrNICak;lak;rbs;FñwmEdl
eFVIBIEdkEdlmanRbEvg 6.1m nigrgbnÞúk P = 35.6m ehIysnμt;TMrenARtg;cMnuc A Ca TMrsnøak;. kar
sikSaKNnaFñwmedayeRbI standard code procedures bgðajfa W 11× 22 mansmtßPaBRKb;RKan;kñúg
karRTbnÞúkenH. edayeRbIviFIkMNt;PaBdabmYyenAkñúgCMBUk8 mMurgVil (rotation) enARtg;TMrsnøak;KW
θ = 0.007rad = 0.40 o . BIrUbTI 2-4 c mMurgVilEbbenHeFVIeGaysøabxagelI nigsøabxageRkam pøas;TI
)ancMgay Δ = θr = (0.0070rad )(127mm) = 0.889mm . tMNEdlmanbgðajenAkñúgrUbTI 2-1 a BitCa
nwgpþl;nUvbrimaNd¾tUcEbbenHEmn dUcenHTMrsnøak;BitCasaksmsMrab;m:UEDlenH.




        RbePTtMNepSgeTotEdlEtgEtCYbRbTHenAelIeRKOgbgÁúMkñúgbøg;RtUv)anbgðajenAkñúgtarag 2-
1. vaBitCamansarsMxan;Nas;kñúgkarsÁal;nimitþsBaØa nigRbePTRbtikmμrbs;tMN b¤TMr. TMrGacbegáIt
kMlaMgenAelIGgát;RbsinebIvaTb;Tl;nwgkarcl½trbs;Ggát; ehIyvanwgbegáItm:Um:g;RbsinebIvaTb;Tl;kar
vilrbs;Ggát;. Ca]TahrN_ sMrab;Ggát;Edlb:HnwgépÞrelag (3) RtUv)ankarBarnwgkarcl½tEtmYyTis
EdlEkgnwgépÞ. dUcenH épÞGnuvtþEdlkMlaMgEkg F eTAelIGgát;enAkñúgTisenaH. TMhMrbs;kMlaMgenH
tMNageGaymYyGBaØat (unknown). ]TahrN_epSgeTot TMrbgáb; (fixed support) (7) karBarTaMgkar
cl½t TaMgkarvilrbs;Ggát;enARtg;tMN. dUcenH TMrRbePTenHGnuvtþbgÁúMkMlaMgBIr nigm:Um:g;mYyeTAelI
Ggát;. dUcenH sMrab;TMrbgáb;manGBaØatTaMgGs;cMnYnbI.

Analysis of Statically Determinate Structures                                    T.Chhay -26
Department of Civil Engineering               NPIC




karviPaKrcnasm<½n§kMNt;edaysþaTic   T.Chhay   -27
mhaviTüal½ysMNg;sIuvil                                                  viTüasßanCatiBhubec©keTskm<úCa

        enAkñúglkçN³Cak;Esþg TMrTaMgGs;GnuvtþkMlaMgBRgayelIépÞ (distributed surface load) eTAelI
Ggát;Edlb:HnwgTMr. kMlaMgcMcMnuc (concentrated load) nigm:Um:g; (moment) EdlbgðajenAkñúgtarag
2-1 tMNageGaykMlaMgpÁÜbénkarBRgaybnÞúkTaMgenH.
m:UEDleRKOgbgÁúM (Idealized structure): eday)anerobrab;BIviFIkñúgkarKitm:UEDléntMNenAelI
eRKOgbgÁúM eyIgGacBiPakSaBIbec©keTskñúgkarbegáItm:UEDleRKOgbgÁúMsMrab;RbB½n§eRKOgbgÁúMepSg².
        dUc]TahrN_TImYy BicarNadgsÞÚc jib crane nig trolley enAkñúgrUbTI 2-5 a. sMrab;karviPaK
eRKOgbgÁúMeyIgGacecalkMras;rbs;Ggát;emTaMgBIr ehIyeyIgsnμt;fatMNenARtg;cMnuc B CatMNrwg
(rigid). elIsBIenH eKGaceFIVm:UEDltMNTMrenARtg;cMnuc A CaTMrbgáb; ehIykarlMGitBI trolley minRtUv

)anKit. dUcenH Ggát;rbs;m:UEDleRKOgbgÁúMRtUv)ansMEdgedaybnÞat;BIrtP¢ab;Kña ehIybnÞúkenAelI hook
RtUv)ansMEdgedaybnÞúkcMcMnuceTal F ¬rUbTI 2-5 b¦.




         CaerOy² eKeRbIFñwm nigr:tedIm,IRTkMralrbs;GKar. r:t (girder) CaGgát;emEdlRTbnÞúkrbs;kM-
ral ÉGgát;muxkat;tUcCagEdlmanRbEvgElVgxøICag nigRtUv)antP¢ab;eTAnwgr:tRtUv)aneKeGayeQμaHfa
Fñwm (beam). bnÞúkEdlmanGMeBImkelIFñwm b¤r:tCabnÞúkEdl)anBIkMralEdlFñwm b¤r:tRT. Ca]TahrN_
eKmaneRKagEdleRbIedIm,IRTkMralkMral ¬rUbTI 2-6 a¦. kMralenHRtUv)anRTeday floor joist ehIy
Edl floor joist enHRtUv)anRTedayr:tBIr AB nig BC EdlenAsgxag. sMrab;karviPaKeKsnμt;fatMN
CatMNsnøak; b¤tMNrGilEdltP¢ab;eTAnwgr:t ehIyr:tRtUv)anRTedayssrEdleKsnμt;faCaTMrsnøak;
nig / b¤ TMrkl;. KMehIjBIxagelIrbs;RbB½n§eRKOgbgÁúMenHRtUv)anbgðajenAkñúgrUbTI 2-6 b. enAkñúgrUb
enHbnÞat; EdltageGay joist minb:Hnwgr:t ehIybnÞat;EdltMNageGayr:tminb:Hnwgssr. karminb:H
Analysis of Statically Determinate Structures                                      T.Chhay -28
Department of Civil Engineering                                                              NPIC



enHtMNageGaytMNTMrsnøak; nig / b¤tMNTMrkl;. müa:gvijeTot RbsinebIeKcg;bgðajbøg;eRKagenHCa
tMNbgáb; ¬eRbItMNpSarCMnYseGaytMNsamBaØedayb‘ULúg¦ enaHbnÞat;sMrab;Fñwm b¤r:tRtUvb:HnwgssrdUc
enAkñúgrUbTI 2-7. dUcKña eKRtUvbgðaj Fixed-connected overhanging beam kñúgKMehIjBIelIdUcbgðaj
enAkñúgrUbTI 2-8. RbsinebIkarsagsg;eRbIebtugGarem: Fñwm nigr:tRtUvtMNagedaybnÞat;Dub. CaTUeTA
RbB½n§enH Ggát;TaMgGs;RtUvP¢ab;edaytMNbgáb; dUcenHeKKUrP¢ab;Ggát;eTAnwgTMr. ]TahrN_ rUbTI 2-9 a
bgðajBIRkaPiceRKOgbgÁúMsMrab;RbB½n§ebtugGarem:Edlcak;enAnwgkEnøg (cast-in-place) ehIyrUbTI 2-9 b
bgðajBIbøg;emIlBIelI. bnÞat;sMrab;FñwmCabnÞat;dac;edaysarvasßitenAeRkamkMral.




karviPaKrcnasm<½n§kMNt;edaysþaTic                                                  T.Chhay   -29
mhaviTüal½ysMNg;sIuvil                                                  viTüasßanCatiBhubec©keTskm<úCa

       RkaPiceRKOgbgÁúM nigm:UEDleRKOgbgÁúMsMrab;rcnasm<½n§GMBIeQImanlkçN³RsedogKñanwgrcnasm<½n§
GMBIEdk. RbB½n§eRKOgbgÁúMEdlbgðajenAkñúgrUbTI 2-10 a bgðajBIsMNg; beam-wall ÉkMraldMbUl (roof
deck) RtUv)anRTedayrnUteQI (wood joist) EdlbBa¢ÚnbnÞúkeTACBa¢aMgdæ. eKGacsnμt;farnUtRtUv)an

RTedayTMrsamBaØenAelICBa¢aMg dUcenHeKGaceFVIm:UEDleRKOgbgÁúMdUcbgðajenAkñúgrUbTI 2-10 b.




karepÞrbnÞúkBIépÞrgsMBaF (tributary loadings): enAeBlEdlépÞerobesμIdUcCaCBa¢aMg kMral b¤
dMbUlRtUv)anRTedayeRKag eKcaM)ac;RtUvkMNt;BIrebobénkarepÞrbnÞúkEdlmanGMeBIelIépÞenaHeTAGgát;
eRKOgbgÁúMEdlRTva. CaTUeTA eKmanviFIBIrkñúgkarkMNt;va. kareRCIserIsviFIGaRs½ynwgragFrNImaRt
rbs;RbB½n§eRKOgbgÁúM sMPar³EdlvaeFVI nigviFIkñúgkarsagsg;va.
RbB½n§mYyTis (One-way system): karRTkMralEdlbBa¢ÚnbnÞúkeTAGgát;TMrtamskmμPaBmYyTis
RtUv)aneKeGayeQμaHfa kMralxNÐmYyTis (one-way slab). edIm,IbgðajBIviFIénkarbBa¢ÚnbnÞúk cUrBi-
carNaRbB½n§eRKagdUcbgðajenAkñúgrUbTI 2-11 a EdlFñwm AB / CD nig EF sßitenABIelIr:t AE nig
 BF . RbsinebIeKdak;bnÞúkrayesμI 4.8kN / m 2 enAelIkMral enaHeKsnμt;faFñwm CD RTbnÞúkEdlmanGMeBI

enAelIépÞrgsMBaF (tributary area) AB EdlbgðajedayBN’ditenAelIbøg;eRKagbgÁúMenAkñúgrUbTI 2-11b.
dUcenH Ggát; CD rgnUvkarBRgaybnÞúkefr (4.8kN / m 2 )(1.5m) = 7.2kN / m dUcbgðajenAelIm:UEDlFñwm
enAkñúgrUbTI 2-11c. bnÞab;RbtikmμenAelIFñwmenH (10.8kN ) GnuvtþeTAelIr:t AE ¬nig BF ¦ cMkNþal
dUcbgðajenAkñúgrUbTI 2-11d. edayeRbIviFIKMnitkñúgkarbBa¢ÚnbnÞúkEbbenH etIGñkmaneXIjcMENkrbs;
kMralEdlenAsl;RtUv)anepÞreTAcugrbs;r:tKW 5.4kN b¤eT?

Analysis of Statically Determinate Structures                                      T.Chhay -30
Department of Civil Engineering                                                                  NPIC




         sMrab;RbB½n§kMralxøH eKtP¢ab;Fñwm nigr:teTAnwgssrenARtg;nIv:UdUcKña dUcbgðajenAkñúgrUbTI 2-12
a. RbsinebIeKCYbkrNIEbbenH eBlxøHeKk¾GacKitfakMralCakMralxNÐmYyTisEdr. ]TahrN_ Rbsin

ebIkMralxNÐebtugGarem:EdlmanEdkBRgwgEtkñúgTismYy b¤eKcak;ebtugenAelIkMragEdlpñt; (corrugated
metal deck) enaHeKsnμt;fabnÞúkRtUv)anbBa¢ÚntamskmμPaBmYyTis. müa:gvijeTot RbsinebIkMralCa

kMralerobesμITaMgEpñkxagelI nigEpñkxageRkam ehIyRtUv)anBRgwgedayEdkkñúgTisTaMgBIr enaHeKKitfa
bnÞúkRtUv)anbBa¢ÚneTAGgát;TMrtammYy Tis b¤tamBIrTis. ]TahrN_ eKmankMral nigbøg;eRKagdUcenAkñúg
rUbTI 2-12b tamlkçxNÐTUeTA RbsinebI L2 ≥ L1 ehIyRbsinebIpleFobElVg (L2 / L1 ) ≥ 2 kMralxNÐ
nwgeFVIkarCakMralxNÐmYyTis. edaysarEt L1 kan;EttUc Fñwm AB / CD nig EF pþl;nUvPaBrwgRkaj
kan;EtFMkñúgkarRTbnÞúk.




karviPaKrcnasm<½n§kMNt;edaysþaTic                                                      T.Chhay   -31
mhaviTüal½ysMNg;sIuvil                                                   viTüasßanCatiBhubec©keTskm<úCa

RbB½n§BIrTis (Two-way system): RbsinebIpleFobElVgenAkñúgrUbTI 2-12 b KW (L                2   / L1 ) < 2

eKsnμt;fabnÞúkRtUv)anbBa¢ÚneTAFñwm nigr:ttamskmμPaBBIrTis. sMrab;kMralEdlCYbkrNIEbbenH RtUv
)aneKeGayeQμaHfa kMralxNÐBIrTis (two-way slab). edIm,IbgðajBIviFIkñúgkaredaHRsaykrNIenH cUr
BicarNakMralebtugGarem:ragkaerenAkñúgrUbTI 2-13 a EdlRTedayFñwmxagcMnUnbYn AB / BD / DC
nig DC EdlmanRbEvg 3m . enATIenH L2 / L1 = 1 . edaysarkMralxNÐrgskmμPaBBIrTis épÞrgsMBaF
sMrab;Fñwm AB RtUv)anbgðajedayBN’ditenAkñúgrUbTI 2-13b. épÞenHRtUv)ankMNt;edaybnÞat;Ggát;
RTUg 45o dUcbgðaj. dUcenH RbsinebIbnÞúkrayesμI 4.8kN / m 2 GnuvtþenAelIkMral GaMgtg;sIuetrbs;bnÞúk
EdlGnuvtþenARtg;cMnuckNþalFñwmKW (4.8kN / m 2 )(1.5m) = 7.2kN / m ehIybnÞúkEdlBRgayenAelIFñwm
enHmanragRtIekaNdUcbgðajenAkñúgrUbTI 2-13c. sMrab;]ThrN_enAkñúgkrNI L2 / L1 = 1.5 eKcaM)ac;
sg;bnÞat; 45o dUcbgðajenAkñúgrUbTI 2-14a. bnÞúk 4.8kN / m 2 EdlGnuvtþenAelIkMralnwgbegáItbnÞúk
BRgayragctuekaNBñay nigragRtIekaNenAelIGgát; AB nig AC dUcbgðajenAkñúgrUbTI 2-14b nig2-
14c erogKña.




Analysis of Statically Determinate Structures                                       T.Chhay -32
Department of Civil Engineering                                                                NPIC



]TahrN_2-1³ kMralrbs;fñak;eronmYyRtUv)anRTedayrnUtr)ar (bar joist) dUcbgðajenAkñúgrUbTI 2-
15 a. rnUtnImYy²manRbEvg 4.5m ehIyvamanKMlatBIKña 0.75m KitBIG½kS. kMralenHRtUv)ansagsg;BI
ebtugTMgn;RsalEdlmankMras;100mm . edayminKitTMgn;pÞal;rbs;rnUt nigkMralEdkpñt; (corrugated
metal deck) cUrkMNt;bnÞúkEdlmanGMeBIenAelIrnUtnImYy².




dMeNaHRsay³
bnÞúkefrenAelIkMralKWbNþalBITMgn;rbs;kMralebtug. BItarag 1-3 TMgn;ebtugTMgn;RsalkMras; 100mm
KW (100)(0.015kN / m 2 ) = 1.50kN / m 2 . BItarag1-4 bnÞúkGefrsMrab;fñak;eronKW1.92kN / m 2 . dUcenH
bnÞúkkMralsMrubKW1.50klN / m 2 + 1.92kN / m 2 = 3.42kN / m 2 . sMrab;RbB½n§kMral L1 = 0.75m nig
 L2 = 4.5 . edaysar L2 / L1 > 2 eKKitkMralxNÐCakMralxNÐmYyTis. épÞrgsMBaFsMrab;rnUtnImYy²

RtUv)anbgðajenAkñúgrUbTI 2-15 b. dUcenH bnÞúkrayesμIenArnUtKW
                     w = 3.42kN / m 2 (0.75m ) = 2.57 kN / m
bnÞúk nigRbtikmμenAelIGgát;rnUtnImYy²RtUv)anbgðajenAkñúgrUbTI 2-15c.

]TahrN_2-2³ kMraldMbUlrabesμIénGKareRKagEdkenAkñúgrUbTI 2-16a RtUv)aneKeRbIedIm,IRTbnÞúk
srub 2kN / m 2 EdlmanGMeBIelIépÞkMral. RbsinebIFñwm AD nig BC manRbEvg 5m ehIymanKMlat
3m ¬Fñwm AB nig DC ¦. cUrkMNt;bnÞúkdMbUl (roof load) enAkñúgtMbn; ABCD EdlRtUv)anbBa¢ÚneTAFñwm

BC .

karviPaKrcnasm<½n§kMNt;edaysþaTic                                                    T.Chhay   -33
mhaviTüal½ysMNg;sIuvil                                                     viTüasßanCatiBhubec©keTskm<úCa




dMeNaHRsay³
enAkñúgkrNIenH L1 = 5m ehIy L2 = 3m . edaysar L2 / L1 < 2 enaHkMralxNÐeFVIkartamBIrTis.
bnÞúkenAelIépÞrgsMBaFRtUv)anbgðajenAkñúgrUbTI 2-16b EdlépÞctuekaNBñayénbnÞúkEdlmanBN’dit
RtUv)anbBa¢ÚneTAGgát; BC . GaMgtg;sIuetrbs;bnÞúkenARtg;kMBUlKW (2kN / m 2 )(1.5m) = 3kN / m . Ca
lT§pl karBRgaybnÞúkenAelIGgát; BC RtUv)anbgðajenAkñúgrUbTI 2-16b. eKk¾KYreFVIkarKNnakar
bBa¢únbnÞúkenAelIépÞrgsMBaFsMrab;tMbn;kaerBIrEdlenAxagsþaMrbs;Ggát; BC enAkñúgrUbTI 2-16a ehIy
bnÞúkEdl)anKNnabEnßmenHk¾RtUv)andak;enAelIGgát; BC Edr.

@>@> eKalkarN_tMrYtpl (Principle of superposition)
         eKalkarN_tMrYtplbegáItnUvmUldæansMrab;RTwsþIviPaKeRKOgbgÁúM (theory of structural) CaeRcIn.
eKalkarN_BN’nafa³ eKGackMNt;bMlas;TIsrub b¤kMlaMgxagkñúg (internal loading or force) srubenA
Rtg;cMnucNamYyenAelIeRKOgbgÁúMEdlrgbnÞúkxageRkACaeRcInedaykarbUkbMlas;TI b¤kMlaMgxagkñúgEdl
bNþalBIbnÞúkxageRkAnImYy²bBa©ÚlKña. edIm,IGnuvtþeKalkarN_tMrYtplenH)an bnÞúk kugRtaMg nigbM-
las;TIRtUvEtCalIenEGr (linear).
         edIm,IGnuvtþeKalkarN_pl eKRtUvbMeBjtMrUvkarcMnYnBIrxaeRkam³
               sMPar³RtUvEteFVIkarenAkñúgTMrg;lIenEGreGLasÞic (linear-elastic) dUcenHmann½yfaeKGac
               eRbIc,ab;h‘Uk (Hook’s law) )an ehIybnÞúksmamaRteTAnwgbMlas;TI.

Analysis of Statically Determinate Structures                                         T.Chhay -34
Department of Civil Engineering                                                                   NPIC



               ragFrNImaRtrbs;eRKOgbgÁúMminRtUvrgkarERbRbYlFMeRkamGMeBIrbs;bnÞúkeT mann½yfaeK
               GnuvtþRTwsþIbMlas;TItUc (small displacement theory). bMlas;TIFMnwgpøas;bþÚrTItaMg nig
               Tisrbs;bnÞúky:agxøaMg. ]TahrN_ r)arEdkkugs‘ulesþIgEdlrgkMlaMgenAxagcugrbs;va.
        enAkñúgesovePAenH BN’naEtBIsMPar³lIenEGreGLasÞic ehIybMlas;TIEdlekItedaysabnÞúk
minpøas;bþÚrTisedArbs;bnÞúkGnuvtþn_FM ehIyk¾minpøas;bþÚrTMhMEdleRbIsMrab;KNnam:Um:g;énkMlaMgFMEdr
dUcenHtMrUvkarTaMgxagelIRtUv)anbMeBj.

@>#> smIkarlMnwg (Equation of equilibrium)
        enAkñúgsþaTic)anEcgfa eRKOgbgÁúM b¤Ggát;mYyéneRKOgbgÁúMmanlMnwg enAeBlNaEdlvaGacrkSa
lMnwgénkMlaMg niglMnwgénm:Um:g;. CaTUeTA eKRtUvbMeBjnUvlMnwgénsmIkarkMlaMg nigsmIkarm:Um:g;tam
G½kSTaMgbI mann½yfa³
                     ∑ Fx = 0       ∑ Fy = 0    ∑ Fz = 0
                     ∑Mx = 0        ∑M y = 0    ∑Mz = 0                                 (2-1)

b:uEnþ PaKeRcIneRKOgbgÁúMeRcInRTcMENkbnÞúkEdlsßitenAkñúgbøg;eTal ehIyedaysarEtbnÞúkk¾sßitenAkñúg
bøg;enaH smIkartMrUvkarxagelIkat;bnßymkRtwm
                     ∑ Fx = 0       ∑ Fy = 0    ∑ MO = 0                                (2-2)

enATIenH ∑ Fx nig ∑ Fy CaplbUkBiCKNiténbgÁúMkMlaMgtamG½kS x nigtamG½kS y erogKña EdlmanGMeBI
mkelIeRKOgbgÁúM b¤Ggát;mYyrbs;eRKOgbgÁúM ehIy ∑ M O CaplbUkBiCKNiténm:Um:g;énkMlaMgCMuvijG½kS
EdlEkgnwgbøg; x − y ¬G½kS z ¦ ehIykat;tamcMnuc O .
         enARKb;eBlEdleKGnuvtþsmIkarTaMgenH dMbUgeKcaM)ac;RtUvKUrdüaRkamGgÁesrI (free body
diagram) rbs;eRKOgbgÁúM b¤rbs;Ggát;. edIm,IKUrdüaRkamGgÁesrI eKRtUvpþac;Ggát;ecjBIKña nigecjBITMr.

kMlaMgxageRkA kMlaMgkñúg b¤kMlaMgRbtikmμRtUvbgðajenAelIGgát;Edl)anpþac;ecj. tamry³enH eKGac
kMNt;kMlaMgRbtikmμenARtg;TMredayeRbItarag 2-1. ehIyeyIgRtUvcaMpgEdrfa enAelIdüaRkamGgÁesrI
kMlaMgkñúgénGgát;BIrEdlP¢ab;KñamanTMhMdUcKña EtmanTispÞúyKña.
         RbsinebIeKcg;kMNt;kMlaMgkñúgenARtg;cMnucCak;lak;enAkñúgGgát; eKRtUveRbIviFImuxkat; (method
of section). viFIenHtMrUveGaykat;Ggát;tamTisEkgeTAnwgG½kSrbs;Ggát;Rtg;cMnucEdleKRtUvkarkMNt;

kMlaMgkñúg. eKRtUvKUrdüaRkamGgÁesrIénkMNat;Ggát;nImYy²Edl)ankat; rYckMNt;kMlaMgkñúgedayGnuvtþ
smIkarlMnwgeTAelIkMNat;Ggát;enaH. CaTUeTA kMlaMgkñúgEdlmanGMeBIenAelImuxkat;rbs;Ggát;Edlkat;
rYmmankMlaMgEkg (normal force) N / kMlaMgkat; (shear force) V nigm:Um:g;Bt; (bending moment)
karviPaKrcnasm<½n§kMNt;edaysþaTic                                                       T.Chhay   -35
mhaviTüal½ysMNg;sIuvil                                                               viTüasßanCatiBhubec©keTskm<úCa

M  dUcbgðajenAkñúgrUbTI 2-17.
      eyIgnwgBiBN’naeKalkarN_sþaTicEdleRbIedIm,IkMNt;RbtikmμxageRkAenAelIeRKOgbgÁúMenAkñúg
kfaxNÐ 2.5. eyIgnwgBiPakSaBIkMlaMgkñúgenAkñgGgát;eRKOgbgÁúMenAkñúgCMBUkTI 4.
                                           ú




@>$> PaBkMNt; nigsßirPaB (Determinacy and stability)
       muxnwgcab;epþImviPaKkMlaMgrbs;eRKOgbgÁúM eKcaM)ac;kMNt;nUvPaBkMNt; nigsßirPaBrbs;eRKOgbgÁúM.
PaBkMNt; (determinacy): smIkarlMnwgpþl;nUvlkçxNÐcaM)ac; nigRKb;RKan;sMrab;lMnwg. enAeBl
EdlRKb;kMlaMgTaMgGs;enAkñúgeRKOgbgÁúMGackMNt;edayeRbIsmIkarlMnwgxagelI enaHeKehAeRKOgbgÁúM
enaHCa eRKOgbgÁúMkMNt;edaysþaTic (statically determinate structure). sMrab;eRKOgbgÁúMEdlmancMnYn
kMlaMgCaGBaØateRcInCagcMnYnsmIkarEdlGacman eKeGayeQμaHvafa eRKOgbgÁúMminkMNt;edaysþaTic
(statically indeterminate structure). tamc,ab;TUeTA eKGackMNt;faeRKOgbgÁúMmYyCaeRKOgbgÁúMkMNt;

edaysþaTic b¤k¾eRKOgbgÁúMminkMNt;edaysþaTicedayKUrdüaRkamGgÁesrIénGgát;TaMgGs;rbs;va b¤épñkén
Ggát;EdleRCIserIs ehIybnÞab;mkeRbobeFobcMnYnGBaØatsrubEdlCakMlaMg nigm:Um:g;CamYynwgcMnYn
srubénsmIkarlMnwgEdlGacman*. sMrab;eRKOgbgÁúMkñúgbøg; eKmansmIkarlMnwgbIsMrab;Ggát;nImYy²
dUcenHRb sinebIeKmanGgát;srubcMnYn n ehIykMlaMgRbtikmμ nigm:Um:g;RbtikmμcMnYn r enaHeyIg)an
                 r = 3n / kMNt;edaysþaTic

                 r > 3n / minkMNt;edaysþaTic                                            (2-3)

        CaebIvaCaeRKOgbgÁúMminkMNt;edaysþaTic
enaHeKRtUvkarsmIkarbEnßmedIm,IedaHRsayrkRbtikmμEdlCaGBaØatedayP¢ab;TMnak;TMngrvagbnÞúkGnuvtþ
n_ nigRbtikmμeTAnwgbMlas;TI b¤mMurgVilenARtg;cMnucepSgKñaenAelIRKOgbgÁúM. smIkarTaMgenHCasmIkarRtUv
Kña (compatibility equation) ehIyvaRtUvmancMnYnesμInwgdWeRkénPaBminkMNt;rbs;eRKOgbgÁúM. smIkar
compatibility Tak;TgnwglkçN³FrNImaRt niglkçN³rUbrbs;eRKOgbgÁúM ehIyeyIgnwgelIkykvamk


*
 karKUrdüaRkamGgÁesrImincaM)ac;CaTUeTAeT edaysareKGacrab;cMnUnGBaØat ehIyeFVIkareRbobeFobCamYynwgcMnUnsmIkar
lMnwg)an.
Analysis of Statically Determinate Structures                                                   T.Chhay -36
Department of Civil Engineering                                                              NPIC



BN’naenAkñúgCMBUkTI 10.
]TahrN_ 2>3³ cat;cMNat;fñak;rbs;FñwmnImYy²EdlbgðajenAkñúgrUbTI 2-18 a rhUtdl; 2-18 d Ca
eRKOgbgÁúMkMNt;edaysþaTic b¤eRKOgbgÁúMminkMNt;edaysþaTic. eKsnμt;faeKsÁal;kMlaMgEdlGnuvtþmin
elIFñwm ehIyvaGacmanGMeBIenARKb;TItaMgTaMgGs;rbs;Fñwm.
dMeNaHRsay³
eKRtUvpþac;FñwmpSM (compound beam) enAkñúgrUbTI 2-18c nig 2-18d EdlpSMeLIgGgát;EdltP¢ab;Kña
edaytMNsnøak;ecjBIKña. cMNaMfa enAkñúgkrNITaMgenH kMlaMgRbtikmμEdlCaGBaØatEdlmanGMeBIenA
cenøaH Ggát;nImYy²RtUv)anbgðajCaKU EtmanTispÞúyKña. düRkamGgÁesrIRtUv)anbgðaj. edayGnuvtþ
r = 3n b¤ r > 3n lT§plénkarcat;cMNat;fñak;RtUv)anbgðaj.




]TahrN_ 2>4³ cat;cMNat;fñak;rbs;eRKOgbgÁúMEdltP¢ab;edaytMNsnøak;EdlbgðajenAkñúgrUbTI 2-19
a rhUtdl; 2-19 d CaeRKOgbgÁúMkMNt;edaysþaTic b¤CaeRKOgbgÁúMminkMNt;edaysþaTic. RbsinebIvaCa
eRKOgbgÁúMminkMNt;edaysþaTic cUrR)ab;BIcMnYnéndWeRkénPaBminkMNt;. eRKOgbgÁúMrgnUvbnÞúkxageRkAEdl
karviPaKrcnasm<½n§kMNt;edaysþaTic                                                  T.Chhay   -37
mhaviTüal½ysMNg;sIuvil                                                  viTüasßanCatiBhubec©keTskm<úCa

eKsnμt;sÁal; ehIyvamanGMeBIenARKb;TItaMgTaMgGs;rbs;eRKOgbgÁúM.
dMeNaHRsay³
karcat;cMNat;fñak;én;eRKOgbgÁúMEdltP¢ab;edaytMNsnøak;manlkçN³RsedogKñanwgFñwmEdr. düRkamGgÁ
esrIRtUv)anbgðaj. edayGnuvtþ r = 3n b¤ r > 3n lT§plénkarcat;cMNat;fñak;RtUv)anbgðaj.




]TahrN_ 2>5³ cat;cMNat;fñak;rbs;eRKagEdlbgðajenAkñúgrUbTI 2-20a nig2-20d CaeRKOgbgÁúM
kMNt;edaysþaTic b¤CaeRKOgbgÁúMminkMNt;edaysþaTic. RbsinebIvaCa eRKOgbgÁúMminkMNt;edaysþaTic
cUrR)ab;BIcMnYnéndWeRkénPaBminkMNt;. eRKOgbgÁúMrgnUvbnÞúkxageRkAEdl eKsnμt;sÁal; ehIyvaman
GMeBIenARKb;TItaMgTaMgGs;rbs;eRKOgbgÁúM.
dMeNaHRsay³
karkMNt;sßirPaB nigPaBkMNt;rbs;eRKOgbgÁúMeRKagmindUcKñanwgkarkMNt;sMrab;Fñwm nigeRKOgbgÁúMEdlt
Analysis of Statically Determinate Structures                                      T.Chhay -38
Department of Civil Engineering                                                                 NPIC



P¢ab;edaytMNsnøak;eT eRBaHeRKagpSMeLIgedayGgát;EdltP¢ab;Kñaedaysnøak;rwg. eBlxøHGgát;begáIt
tMbn;biTCitxagkñúg dUcenAkñúgrUbTI 2-20a. enATIenH ABCD begáIttMbn;biTCit. edIm,Icat;cMNat;fñak;
rbs;eRKOgbgÁúMTaMgenH eKcaM)ac;RtUveRbIviFImuxkat; ehIykat;EpñkEdlbiTCit. eRkayeBleKKUrdüaRkam
GgÁesrIrbs;EpñkEdlkat;rYcehIy enaHeKGaccat;cMNat;fñak;rbs;eRKag)an. cMNaMfa eKRtUvkarEtEpñk
mYyrbs;muxkat;Edlkat;tamtMbn;biTCit. enAeBlEdleKkMNt;GBaØatenARtg;muxkat;rYcehIy eKGac
kMNt;kMlaMgkñúgenARKb;cMnucTaMgGs;enAkñúgGgát;edayeRbIviFImuxkat; nigsmIkarlMnwg. eRKagenAkñúgrUbTI
2-20b manmintMbn;biTCit dUcenHedIm,IrkPaBkMBt;vaminRtUvkarkarkat;cenøaHTMreT. lT§plénkarcat;
cMNat;fñak;RtUv)anbgðajenAkñúgrUbTI 2-20a nig 2-20b.




sßirPaB (stability): edIm,IFananUvsßanPaBlMnwgrbs;eRKOgbgÁúM nigGgát;rbs;va eKminRtwmEtbMeBj
smIkarlMnwgb:uENÑaHeT b:uEnþGgát;RtUvEtTb; (constraint) y:agl¥ nigRtwmRtUvedayTMrrbs;va. sßanPaB
BIrnwgekItmaneLIgenAeBlNaEdlTMrmin)anTb;RtwmRtUv.
karTb;mineBjelj (partial constraints): enAkñúgkrNIxøH eRKOgbgÁúM b¤Ggát;rbs;vaGacman
kMlaMgRbtikmμticCagsmIkarlMnwgEdlRtUvbMeBj eBlenaHeRKOgbgÁúMnwgkøayCaeRKOgbgÁúMEdlTb;mineBj
elj (partially constrained structure). ]TahrN_ eKmanGgát;EdlbgðajenAkñúgrUbTI 2-21 CamYy
nwgdüaRkamGgÁesrIrbs;va. enATIenHsmIkar ∑ Fx = 0 minRtUv)anbMeBjsMrab;lkçxNÐdak;bnÞúk dUcenH
Ggát;KμansßirPaB.
karviPaKrcnasm<½n§kMNt;edaysþaTic                                                     T.Chhay   -39
mhaviTüal½ysMNg;sIuvil                                                  viTüasßanCatiBhubec©keTskm<úCa




karTb;minRtwmRtUv (improper constraints): enAkñúgkrNIxøHEdlcMnYnénkMlaMgEdlCaGBaØat nig
cMnYnénsmIkarlMnwgesμIKña b:uEnþvaenAEtGaceFIVeGayeRKOgbgÁúMcl½t)an b¤KμansßirPaB edaysarEtkarTb;
minRtwmRtUvrbs;TMr. krNIEbbenHekItmanenAeBlEdlExSskmμénkMlaMgRbtikmμrbs;TMrkat;KñaRtg;cMnuc
mYy. ]TahrN_sMrab;krNIRtUv)anbgðajenAkñúgrUbTI 2-22. BIdüaRkamGgÁesrIrbs;Fñwm eyIgeXIjfa
plbUkm:Um:g;Rtg;cMnuc O nwgminesμIsUnüeT ¬ Pd ≠ 0 ¦ dUcenHvanwgekItmankarvilCuMvijcMnuc O .




Analysis of Statically Determinate Structures                                      T.Chhay -40
Department of Civil Engineering                                                              NPIC



        viFImü:ageTotEdlkarTb;minRtwmRtUvrbs;TMrnaMeGaymaneRKOgbgÁúMKμansßirPaBekItmanenAeBl
EdlkMlaMgRbtikmμTaMgGs;manTisRsbKña. ]TahrN_sMrab;krNIRtUv)anbgðajenAkñúgrUbTI 2-23. enA
eBlEdleKGnuvtþkMlaMgeRTt P plbUkkMlaMgtamTisedknwgminesμIsUnüeT.
        CaTUeTA eRKOgbgÁúMnwgKμansßirPaBedaylkçN³FrNImaRt ¬rMkiltictYc b¤dYlrlM¦ RbsinebIva
mankMlaMgRbtikmμticCagsmIkarlMnwg b¤RsinebIvamankMlaMgRbtikmμRKb;RKan; EtGsßirPaBrbs;nwgekIt
manRbsinebIExSskmμénkMlaMgRbtikmμkat;KñaRtg;cMnucmYy b¤k¾RsbKña. RbsinebIeRKOgbgÁúMpSMeLIgeday
Ggát;eRcIn eKGackMNt;GsßirPaBrbs;Ggát;mYy b¤rbs;Ggát;eRcInedaykarGegát. RbsinebIGgát;begáIt
collapsible mechanism )an eRKOgbgÁúMnwgminmansßirPaB. eyIgGackMNt;sßirPaBtamrUbmnþ)ansMrab;

eRKOgbgÁúMkñúgbøg;Edlman n nigGBaØatEdlCakMlaMgRbtikmμ r ehIyedaysarGgát;nImYy²RtUvman
smIkarlMnwgcMnYnbI enaH
                   r < 3n        KμansßirPaB
                   r ≥ 3n        KμansßirPaBenAeBlEdlkMlaMgRbtikmμrbs;Ggát;
                                 kat;KñaRtg;cMnucmYy b¤RsbKña b¤Ggát;xøHbegáIt
                                    collapse mechanism                             (2-4)
         eKRtUveCosvaRbePTeRKOgbgÁúMEdlKμansßirPaBeTaHbICavaCaeRKOgbgÁúMkMNt;edaysþaTic b¤eRKOg
bgÁúMminkMNt;edaysþaTick¾eday.

]TahrN_ 2>6³ cUrcat;cMNat;fñak;rbs;eRKOgbgÁúMnImYy²enAkñúgrUbTI 2-24a rhUtdl;2-24e CaeRKOg
bgÁúMmansßirPaB b¤KμansßirPaB. eRKOgbgÁúMrgnUvbnÞúkxageRkANamYyEdleyIgsnμt;vasÁal;.
dMeNaHRsay³ eRKOgbgÁúMRtUv)ancat;cMNat;fñak;dUcbgðajkñúgrUb.




karviPaKrcnasm<½n§kMNt;edaysþaTic                                                  T.Chhay   -41
mhaviTüal½ysMNg;sIuvil                          viTüasßanCatiBhubec©keTskm<úCa




Analysis of Statically Determinate Structures              T.Chhay -42
Department of Civil Engineering                                                                NPIC



@>%> karGnuvtþénsmIkarlMnwg (Application of the equation of equilibrium)
        eBlxøH Ggát;rbs;eRKOgbgÁúMRtUv)antP¢ab;KñaedaytMNEdleKsnμt;faCatMNsnøak;. eRKagGKar
nig truss CaRbePTeRKOgbgÁúMEdlCaerOy²sagsg;edayeRbItMNEbbenH. kñúgkrNIeRKOgbgÁúMkñúgbøg;
EdltP¢ab;edaysnøak;mankarTb;RtwmRtUv nigminmanTMrelIs b¤Ggát;elIsedIm,IkarBarkardYlrlM enaHeK
GackMlaMgEdlmanGMeBIenARtg;tMN nigenARtg;TMredayGnuvtþsmIkarlMnwgTaMgbI ¬ ∑ Fx = 0 / ∑ Fy = 0
∑ M O = 0 ¦ eTAelIGgát;nImYy². enAeBlEdleKTTYl)ankMlaMgenARtg;tMN eKGacsikSaKNaTMhM

rbs;Ggát; kartP¢ab; nigTMredayEp¥kelI design code specification.




        edIm,IbgðajBIviFIénkarviPaKkMlaMg BicarNaeRKagEdlmanGgát;bIdUcbgðajenAkñúgrUbTI 2-25a
EdlrgnUvbnÞúk P1 nig P2 . düaRkamGgÁesrIrbs;Ggát;nImYy²RtUv)anbgðajenAkñúgrUbTI 2-25b. Ca
srub eKmanGBaØatTaMgGs; 9 ehIyeKmansmIkarlMnwgTaMgGs; 9 EdlGgát;nImYy²mansmIkarlMnwg 3
dUcenHeRKOgbgÁúMenHCaeRKOgbgÁúMkMNt;edaysþaTic. sMrab;dMeNaHRsayCak;Esþg ¬eBlxøHmanlkçN³
gayRsYl¦ eKGacBicarNaeRKagCaEpñk b¤k¾eRKagTaMgmUl enAeBlEdlGnuvtþsmIkarxøHénsmIkarTaMg
9 enH. Ca]TahrN_ düaRkamGgÁesrIéneRKagTaMgmUlRtUv)anbgðajenAkñúgrUbTI 2-25c. eKGackMNt;

kMlaMgRbtikmμTaMgbI Ax / Ay nig C x enAelIRbB½n§eRKOgbgÁúMEdltP¢ab;edaytMNsnøak;rwgraMenH bnÞab;mk
viPaKGgát;BIrkñúgcMeNamGgát;TaMgGs;enAkñúgrUbTI 2-25b edIm,ITTYl)anGBaØat 6 epSgeTot. elIsBI
enH eKGacRtYtBinitücMeLIyCaEpñkedayGnuvtþsmIkarlMnwgTaMgbIeTAelIGgát;TIbIEdlenAsl;. Casegçb
eKGacedaHRsaybBaðaenHedaysresrsmIkarlMnwgy:ageRcInNas;cMnYn 9 edayeRbIdüaRkamGgÁesrIén
Ggát;nImYy² nig / b¤bnSMénGgát;EdltP¢ab;. smIkareRkABIsmIkarTaMg 9 xagelIRtUv)aneRbIedIm,IRtYt
BinitülT§pl.
karviPaKrcnasm<½n§kMNt;edaysþaTic                                                    T.Chhay   -43
mhaviTüal½ysMNg;sIuvil                                                   viTüasßanCatiBhubec©keTskm<úCa

         LÚvBicarNaeRKagEdlmanGgát;BIrdUcbgðajenAkñúgrUbTI 2-26a . enATIenHdüaRkamGgÁesrI
rbs;Ggát;bgðajGBaØatcMnYn 6 ¬rUbTI 2-26b¦ ehIyeyIgGacsresrsmIkarlMnwgcMnYn 6 EdlGgát;
nImYy²mansmIkarlMnwgcMnYn 3 dUcenHvaCaeRKOgbgÁúMkMNt;edaysþaTic. dUckñúgkrNIelIkmun eKk¾Gac
eRbIdüaRkamGgÁesrIrbs;eRKOgbgÁúMTaMgmUl ¬rUbTI 2-26c¦ edIm,IviPaKpgEdr. dUcbgðajenAkñúgrUb
eRKagnwgdYlrlMRbsinebIKμanTMr edayvanwgvilCMuvijsnøak; B EtkrNIenHnwgminekItmaneT edaysar
RbB½n§kMlaMgEdlmanGMeBIenAelIeRKagTaMgGs;eFVIeGayeRKagmanlMnwg. dUcenH
eKGacKNnaGBaØatTaMg 6 enHedayGnuvtþsmIkarlMnwgTaMgbIeTAelIeRKagTaMgmUl ¬rUbTI 2-26c¦
ehIydUcKñaGnuvtþsmIkarTaMg bIeTAelIGgát;mYykñúgcMeNamGgát;TaMgBIr.
         ]TahrN_TaMgBIrxagelIbgðajfa RbsinebIeRKagRtUv)anRTedayTMrd¾RtwmRtUv nigminmanTMr b¤
Ggát;caM)ac;eRcInCagenHedIm,IkarBarkardYlrlM enaHeRKagCaeRKagkMNt;edaysþaTic ehIyeKGackMNt;
GBaØatEdlCakMlaMgenARtg;TMr nigtMNBIsmIkarlMnwgedayGnuvtþeTAelIGgát;nImYy². ehIyRbsinebI
eRKOgbgÁúMenAEtrwgmaM ¬minGacdYlrlM¦ enAeBleKdkTMrecj ¬rUbTI 2-25c¦ enaHeKGackMNt;Rbtikmμ
TMrTaMgbIedayGnuvtþsmIkarlMnwgeTAelIeRKOgbgÁúMTaMgmUl. b:uEnþRbsinebIeRKOgbgÁúMbgðajPaBminrwgmaM
¬GacdYlrlM¦ bnÞab;BIeKdkTMrecj ¬rUbTI 2-26c¦ enaHeKRtUvpþac;Ggát;TaMgenaHecjBIKña ehIyeKRtUv
BicarNalMnwgrbs;Ggát;nImYy²edIm,ITTYl)ansmIkarRKb;RKan;edIm,IkMNt;RbtikmμTMrTaMgGs;.




Analysis of Statically Determinate Structures                                       T.Chhay -44
Department of Civil Engineering                                                                       NPIC



dMeNIrkarkñúgkarviPaK (Procedure for analysis)
      CMhanxageRkampþl;nUvviFIsMrab;kMNt;kMlaMgRbtikmμsMrab;eRKOgbgÁúMEdlpSMedayGgát;EdltP¢ab;
edaytMNsnøak;.
düaRkamGgÁesrI (Free-body diagrams)
                 pþac;rcnasm½<n§ nigKUrdüaRkamGgÁesrIénGgát;nImYy². ehIy vanwgkan;EtgayRsYl Rbsin
                 ebIeyIgKUrdüaRkamGgÁesrIrbs;eRKOgbgÁúMTaMgmUlbEnßmBIelIdüaRkamGgÁesrIrbs;Ggát;nI-
                 mYy². eKGackMNt;RbtikmμTMrxøH b¤TaMgGs;edayeRbIdüaRkamenH.
                 eyIgRtUvcgcaMfakMlaMgRbtikmμrbs;Ggát;BIreFVIGMeBICamYynwgTMhMesμIKña b:uEnþmanTisedApÞúy
                 KñaenAelIdüaRkamGgÁesrIrbs;Ggát;.
                 enAkñúgkrNIxøH eyIgGacdwgBITisedArbs;kMlaMgEdlCaGBaØat b:uEnþRbsinebIeyIgBi)akkñúg
                 karkMNt;TisedArbs;va eyIgGacsnμt;)an.
smIkarlMnwg (Equation of equilibrium)
                 rab;cMnYnGBaØatsrubedIm,IeGayc,as;faeKGacsresrcMnYnsmIkarlMnwgsmmUlsMrab;kar
                 edaHRsay. CaTUeTAeKGacsresrsmIkarlMnwgbIsMrab;Ggát;nImYy² elIkElgGgát;Edl
                 mankMlaMgBIr.
                 dMeNaHRsaysMrab;GBaØatnwgminsμúKsμaj RbsinebIeKGnuvtþsmIkarm:Um:g; ∑ M O = 0 kan;
                 EteRcIn.
                 enAeBlGnuvtþsmIkarkMlaMg ∑ Fx = 0 nig ∑ Fy = 0 eKRtUvbMEbkkMlaMgpÁÜbeGayeTACa
                 bgÁúMkMlaMgtamG½kS x nigG½kS y .
                 RbsinebIdMeNaHRsayénsmIkarlMnwgeGayCaTMhMGviC¢mansMrab;kMlaMg b¤m:Um:g;KUEdlCa
                 GBaØat vabgðajfaTisedArbs;k,alRBYjpÞúyBIGVIEdleyIg)ansnμt;enAelIdüaRkamGgÁesrI.
]TahrN_ 2>7³ kMNt;kMlaMgRbtikmμenAelIFñwmEdlbgðajenAkñúgrUbTI 2-27a.




karviPaKrcnasm<½n§kMNt;edaysþaTic                                                           T.Chhay   -45
mhaviTüal½ysMNg;sIuvil                                                            viTüasßanCatiBhubec©keTskm<úCa

dMeNaHRsay³
düaRkamGgÁesrI³ dUcbgðajenAkñúgrUbTI 2-27b kMlaMg 270kN RtUv)anbMEbkCabgÁúMkMlaMgtamG½kS x nig
y . elIsBIenH eKminRtUvkarrgVas;RbEvg 2.1m eT edaysarm:Um:g;KUKμanviucT½r (free vector) ehIyeKGac

GnuvtþvaenARKb;TItaMgTaMgGs;rbs;FñwmsMrab;KNnakMlaMgRbtikmμ.
smIkarlMnwg³ edayGnuvtþsmIkar 2-2 CabnþbnÞab; edayeRbIlT§plEdlKNnaBIxagelI eyIg)an³
 +
→ ∑ Fx = 0               Ax − 270 cos 60 o = 0                                         Ax = 135kN

                     /
     + ∑ M A = 0 − 270 sin 60 o (3) + 270 cos 60 o (0.3) + B y (4.2) − 67.5 = 0        B y = 173.4kN

+ ↑ ∑ Fy = 0 − 270 sin 60o + 173.4 + Ay = 0                                            Ay = 60.4kN


]TahrN_ 2>8³ kMNt;kMlaMgRbtikmμenAelIFñwmenAkñúgrUbTI 2-28 a.




dMeNaHRsay³
düaRkamGgÁesrI³ dUcbgðajenAkñúgrUbTI 2-28b kMlaMgBRgayragctuekaNBñayRtUv)anbMElgCakMlaMg
BRgayragRtIekaN nigBRgayesμI. kMlaMgBRgayragRtIekaN nigBRgayesμIRtUv)ansMEdgCakMlaMgpÁÜb.
kMlaMgpÁÜbTaMgenHmanGMeBIkat;tamTIRbCMuTMgn;rbs;RkLaépÞkMlaMgEdlRtUvKña.
smIkarlMnwg³ edayGnuvtþsmIkar 2-2 CabnþbnÞab; edayeRbIlT§plEdlKNnaBIxagelI eyIg)an³
 +
→ ∑ Fx = 0               Ax = 0
+ ↑ ∑ Fy = 0 Ay − 60 − 60 = 0                       Ay = 120kN

                     /
     + ∑ M A = 0 − 60(4 ) − 60(6 ) + M A = 0        M A = 600kN .m



c]TahrN_ 2>9³ kMNt;kMlaMgRbtikmμenAelIFñwmenAkñúgrUbTI 2-29 a. snμt;fa A CaTMrsnøak; ehIy
B    CaTMrkl; ¬épÞrelag¦.

Analysis of Statically Determinate Structures                                                T.Chhay -46
Department of Civil Engineering                                                                   NPIC




dMeNaHRsay³
düaRkamGgÁesrI³ dUcbgðajenAkñúgrUbTI 2-29b TMrkl;enARtg;cMnuc B GnuvtþkMlaMgEkgeTAelIFñwmenA
Rtg;cMnucEdlvab:H. ExSskmμénkMlaMgTaMgenHRtUv)ankMNt;edayRtIekaN 3-4-5.
smIkarlMnwg³ bMEbkkMlaMg N B eGayeTACabgÁúMkMlaMgtamTis x nigtamTis y ehIyedayeFVIpl
bUkm:Um:g;Rtg;cMnuc A eyIgnwgTTYl)ankMlaMg N B edaypÞal;. edayeRbIlT§plenH eyIgGacTTYl)an
 Ax nig Ay .

                                                      ⎛3⎞          ⎛4⎞
     +∑MA = 0                     − 15.75(10.5) + N B ⎜ ⎟(3) + N B ⎜ ⎟(1.2) = 0   N B = 6kN
                                                      ⎝5⎠          ⎝5⎠
 +
                                  Ax − (6) = 0
                                       4
→ ∑ Fx = 0                                                                        Ax = 4.8kN
                                       5
                                  Ay − 15.75 + (6 ) = 0
                                               3
+ ↑ ∑ Fy = 0                                                                      Ay = 12.15kN
                                               5

]TahrN_ 2>10³ FñwmpSMenAkñúgrUbTI 2-30 a RtUv)anbgáb;enARtg;cMnuc A . kMNt;kMlaMgRbtikmμenA
Rtg; A / B nig C . snμt;fa B CatMNsnøak; ehIy C CaTMrkl;.




karviPaKrcnasm<½n§kMNt;edaysþaTic                                                       T.Chhay   -47
mhaviTüal½ysMNg;sIuvil                                                         viTüasßanCatiBhubec©keTskm<úCa

dMeNaHRsay³
düaRkamGgÁesrI³ düaRkamGgÁesrIénkMNat;Ggát;nImYy²RtUv)anbgðajenAkñúgrUbTI 2-30b. ehtuGVIk¾
lMhat;enHCaeRKOgbgÁúMkMNt;edaysþaTic?
smIkarlMnwg³ eKmanGBaØatTaMgGs;6. edayGnuvtþsmIkarlMnwgTaMg6 eyIg)an
sMrab;kMNat; BC ³
     + ∑MC = 0                   − 8 + B y (4.5) = 0          B y = 1.78kN
 +
→ ∑ Fx = 0                       Bx = 0
+ ↑ ∑ Fy = 0                     − 1.78 + C y = 0             C y = 1.78kN

sMrab;kMNat; AB ³
     +∑MA = 0                    M A − 36(3) + 1.78(6 ) = 0          M A = 97.3kN .m
 +
→ ∑ Fx = 0                       Ax − 0 = 0
+ ↑ ∑ Fy = 0                     Ay − 36 + 1.78 = 0                  Ay = 34.2kN


]TahrN_ 2>11³ eRKOgbgÁúMEdlbgðajenAkñúgrUb
RTkMral nigBüÜrTUk. m:UEDleRKOgbgÁúMEdlbgðaj
enAkñúgrUbenHRtUv)anbgðajenAkñúgrUbTI 2-31a
EdleyIgsnμt;fa A CaTMrkl; ehIy B CaTMrsnøak;.
edayeRbIkUdkñúgtMbn; (local code) bnÞúkkMralEdl
snμt;RtUv)aneTAelIr:tKW 6kN / m . xül;Gnuvtþ
kMlaMgpÁÜbtamTisedk 4kN dUcbgðaj ehIym:as;rbs;TUkEdlBüÜreTAnwgr:tKW 23Mg . TIRbCMuTMgn;rbs;
m:as;TUksßitenARtg; G . kMNt;kMlaMgRbtikmμenARtg;TMr.




Analysis of Statically Determinate Structures                                             T.Chhay -48
Department of Civil Engineering                                                                              NPIC



dMeNaHRsay³
düaRkamGgÁesrI³ enATIenH eyIgnwgBicarNaTUk nigr:tCaRbB½n§EtmYy ¬rUbTI 2-31b¦. dUcbgðaj eK
RtUvdak;bnÞúkpÁÜbCMnYseGaybnÞúkBRgay.
smIkarlMnwg³ edayGnuvtþsmIkar 2-2 CabnþbnÞab;. eyIg)an
 +
→ ∑ Fx = 0                        4 − Bx = 0

     + ∑MB = 0                    22.8(1.90 ) − Ay (2) + 225.6(5.40) − 4(0.30) = 0     Ay = 630.2kN = 630kN

+ ↑ ∑ Fy = 0                      630.2 − B y − 22.8 − 225.6 = 0                     B y = 382kN

cMMNaMfa³ RbsinebIeKBicarNar:tEtmYysMrab;karviPaK enaHkMlaMgEkgenARtg;cMnuc C nig D RtUv)anKit
dMbUgedayeRbIdüaRkamGgÁesrIénTUk. kMlaMgTaMgenHnwgmanRbsinebIkabTajTUkeGayb:Hp¥wbnwgcMnuc
TaMgBIr. kMlaMgEkgEdlmanTMhMesμIKña EtTisenApÞúyKñaenARtg;cMnuc C nwgeFVIGMeBIeTAelIr:t enAeBleK
EdleKBicarNadüaRkamGgÁesrIrbs;va. eKnwgTTYl)anlT§pldUcKña. b:uEnþ edayBicarNaRbB½n§TUk
nigr:t kMlaMgEkg nigkMlaMgkabkøayeTACakMlaMgkñúg ehIyminRtUv)aneKykmkKiteT.
]TahrN_ 2>12³ kMNt;bgÁúMkMlaMgRbtikmμedk nigQrenARtg;snøak; A / B nig C rbs;eRKagEdlman
GgÁt;BIrdUcbgðajenAkñúgrUbTI 2-32a.




karviPaKrcnasm<½n§kMNt;edaysþaTic                                                                  T.Chhay   -49
mhaviTüal½ysMNg;sIuvil                                                           viTüasßanCatiBhubec©keTskm<úCa

dMeNaHRsay³
düaRkamGgÁesrI³ düaRkamGgÁesrIénGgát;nImYy²RtUv)anbgðajenAkñúgrUbTI 2-32b.
smIkarlMnwg³ edayGnuvtþnUvsmIkarlMnwgcMnYn6 enAkñúgCMhanbnþbnÞab;GnuBaØateGayeyIgTTYl)an
dMeNaHRsaysMrab;GBaØatTaMg6edaypÞal;.
sMrab;Ggát; BC ³
     + ∑MC = 0                   − B y (2) + 6(1) = 0             B y = 3kN

sMrab;Ggát; AB ³
     +∑MA = 0                    − 8(2 ) − 3(2 ) + Bx (1.5) = 0   Bx = 14.7kN
 +
→ ∑ Fx = 0                       Ax +
                                     3
                                       (8) − 14.7 = 0             Ax = 9.87kN
                                     5
                                 Ay − (8) − 3 = 0
                                     4
+ ↑ ∑ Fy = 0                                                      Ay = 9.40kN
                                     5
sMrab;Ggát; BC ³
 +
→ ∑ Fx = 0                      14.7 − C x = 0                    C x = 14.7kN
+ ↑ ∑ Fy = 0                     3 − 6 + Cy = 0                   C y = 3kN



]TahrN_ 2>13³ RCugrbs;GKarenAkñúgrUbTI 2-33a rgnUvbnÞúkxül;EdlbegáItCasMBaFEkgBRgay
esμI 15kPa enAelICBa¢aMgEdlRbQmnwgTisxül;bk; (windward side) nigrgsMBaFbWt (suction
pressure) 5kPa enAelICBa¢aMgEdlminRbQmnwgTisxül;bk; (leeward side). kMNt;bgÁúMkMlaMgRbtikmμ

edk nigQrenARtg;snøak; A / B nig C énTMrrbs; gable arch.




Analysis of Statically Determinate Structures                                               T.Chhay -50
Department of Civil Engineering                                                                               NPIC



dMeNaHRsay³
edaysarbnÞúkCabnÞúkBRgayelIépÞ enaHeKRtUvbMElgbnÞúkenHeGayeTACabnÞúkBRgayelIbnÞat; mann½y
fa gable arch kNþalRTnUvbnÞúkEdleFVIGMeBIenAelICBa¢aMg nigdMbUlrbs;épÞrgsMBaFEdlmanBN’dit.
bnÞúkBRgayelIenAelIRCugEdlRtUvnwgTisxül;bk;KW (15kN / m 2 )(4m) = 60kN / m ehIyenAelIRCug
mYyeTotKW (5kN / m 2 )(4m) = 20kN / m ¬rUbTI 2-33b¦.




düaRkamGgÁesrI³ edaysMrYlKitbnÞúkBRgayCabnÞúkpÁÜbcMcMnuc düaRkamGgÁesrIrbs;eRKagTaMgmUl
nigrbs;Ggát;nImYy²RtUv)anbgðajenAkñúgrUbTI 2-33c.
smIkarlMnwg³ eKRtUveCosvagdMeNaHRsaykñúgeBlEtmYy
edayGnuvtþsmIkarlMnwgenAkñúgCMhanbnþbnÞab;dUcbgðajenAkñúg]TahrN_xagelI .                *


eRKagTaMgmUl³
   +∑MA = 0            − (180 + 60 )(1.5) − (254.6 + 84.9 )cos 45o (4.5) − (254.6 sin 45o )(1.5)
                       + (84.9 sin 45o )(4.5) + C y (6) = 0                       C y = 240.0kN

+ ↑ ∑ Fy = 0                      − Ay − 254.6 sin 45o + 84.9 sin 45o + 240.0 = 0           Ay = 120.0kN

sMrab;Ggát; AB ³
        + ∑MB = 0                 − Ax (6) + 120.0(3) + 180(4.5) + 254.6(2.12) = 0          Ax = 285.0kN
    +
→ ∑ Fx = 0                        − 285.0 + 180 + 254.6 cos 45o − Bx = 0                    Bx = 75.0kN
+ ↑ ∑ Fy = 0                      − 120.0 − 254.6 sin 45o + B y = 0                         B y = 300.0kN

sMrab;Ggát; BC ³
    +
→ ∑ Fx = 0                        − C x + 60 + 84.9 cos 45o + 75.0 = 0                      C x = 195.0kN

*
  eKk¾GacedaHRsay]TahrN_enHedayGnuvtþsmIkarlMnwgEtcMnYn6eTAelIGgát;TaMgBI. RbsinvaGaceTArYc vaCakarRbesIrEdl
dMbUleyIgRtUv eFVIplbUkm:Um:gRtg;cMnuc A enAelIGgát; AB bnÞab;mkRtg;cMnuc C enAelIGgát; CB. edayeFVIEbbenH eyIgnwg
TTYl)anBIrsmIkarsMrab;edaHRsayrk B nig B kñúgeBlCamYyKña.
                                         x     y


karviPaKrcnasm<½n§kMNt;edaysþaTic                                                                   T.Chhay   -51
mhaviTüal½ysMNg;sIuvil                                                  viTüasßanCatiBhubec©keTskm<úCa

                                             cMeNaT
2>1> eKeRbIeRKagmYyeGayRTkMraleQI ¬min           BE  nig FD . yk b = 3m / a = 2.4m . CMnYy³
bgðaj¦ EdlvargbnÞúkBRgayesμI 6.5kN / m 2 .       emIltarag 1-3.
KUrbgðajBIbnÞúkEdlmanGMeBIenAelIGgát; BG nig
ABCD . yk b = 3m / a = 1.5m .




                                                 2>4> edaHRsaycMeNaT 2-3/ CamYynwg b =
                                                 3 .6 m / a = 1 .2 m .

2>2> kMraldMbUlénGKarEdlmankMBs;mYyCan;          2>5> eKeRbIeRKageQIedIm,IRTkMraleQI. bgðaj
rgnUvbnÞúkefr nigbnÞúkGefr 6kN / m 2 . Rbsin     bnÞúkEdlmanGMeBIelIGgát; BG nig ABCD . yk
                                                 b = 3m / a = 1.5m . CMnYy³ emIltarag 1-4.
ebIrnUtmanKMlatBIKña1.2m ehIyr:tmanKMlat
7.5m BIKña cUrkMNt;bnÞúkBRgayEdleFVIGMeBIelI

rnUt DF nigbnÞúkEdleFVIGMeBIelIr:tenARtg;cMnuc
 A / B / C / D nig E .




                                                 2>6> edaHRsaycMeNaT 2-5/ CamYynwg b =
                                                 2 .4 m / a = 2 .4 m .

                                                 2>7> edaHRsaycMeNaT 2-5/ CamYynwg b =
                                                 4.5m / a = 3m .

                                                 2>8> cat;cMNat;fñak;éneRKOgbgÁúMnImYy²CaeRKOg
                                                 bgÁúMkMNt;edaysþaTic eRKOgbgÁúMminkMNt;edaysþa
2>3> eKeRbIeRKagEdkedIm,IRTkMralebtugGarem:      Tic eRKOgbgÁúMmansßirPaB b¤eRKOgbgÁúMKμanesßr PaB.
TMgn;RsalkMras; 100mm EdlRTbnÞúkBRgayesμI        RbsinebICaeRKOgbgÁúMminkMNt;edaysþaTic
25kN / m 2 . bgðajbnÞúkEdlmanGMeBIelIGgát;       cUrkMNt;BIdWeRkénPaBminkMNt;.
Problems                                                                           T.Chhay -52
Department of Civil Engineering                                                              NPIC



                                                 2>10> cat;cMNat;fñak;éneRKOgbgÁúMnImYy²Ca
                                                 eRKOgbgÁúMkMNt;edaysþaTic eRKOgbgÁúMminkMNt;
                                                 edaysþaTic b¤eRKOgbgÁúMKμansßirPaB. RbsinebICa
                                                 eRKOg bgÁúMminkMNt;edaysþaTic cUrkMNt;BIdWeRkén
                                                 PaBminkMNt;.




2>9> cat;cMNat;fñak;éneRKOgbgÁúMnImYy²CaeRKOg
bgÁúMkMNt;edaysþaTic eRKOgbgÁúMminkMNt;edaysþa
Tic b¤eRKOgbgÁúMKμansßirPaB. RbsinebICaeRKOg
bgÁúMminkMNt;edaysþaTic cUrkMNt;BIdWeRkénPaB
minkMNt;.


                                                 2>11> cat;cMNat;fñak;éneRKOgbgÁúMnImYy²Ca
                                                 eRKOgbgÁúMkMNt;edaysþaTic eRKOgbgÁúMminkMNt;
                                                 edaysþaTic b¤eRKOgbgÁúMKμansßirPaB. RbsinebICa
                                                 eRKOgbgÁúMminkMNt;edaysþaTic cUrkMNt;BIdWeRkén
                                                 PaBminkMNt;.




cMeNaT                                                                             T.Chhay   -53
mhaviTüal½ysMNg;sIuvil                                                 viTüasßanCatiBhubec©keTskm<úCa

                                                 edaysþaTic b¤eRKOgbgÁúMKμansßirPaB. RbsinebICa
                                                 eRKOgbgÁúMminkMNt;edaysþaTic cUrkMNt;BIdWeRkén
                                                 PaBminkMNt;. TMr nigtMNTaMgGs;RtUv)ansnμt;
                                                 dUcbgðaj.




2>12> cat;cMNat;fñak;éneRKOgbgÁúMnImYy²Ca
eRKOgbgÁúMkMNt;edaysþaTic eRKOgbgÁúMminkMNt;
edaysþaTic b¤eRKOgbgÁúMKμansßirPaB. RbsinebICa
eRKOgbgÁúMminkMNt;edaysþaTic cUrkMNt;BIdWeRkén
PaBminkMNt;. TMr nigsnøak;RtUv)ansnμt;dUc
bgðaj.


                                                 2>14> cat;cMNat;fñak;éneRKOgbgÁúMnImYy²Ca
                                                 eRKOgbgÁúMkMNt;edaysþaTic eRKOgbgÁúMminkMNt;
                                                 edaysþaTic b¤eRKOgbgÁúMKμansßirPaB. RbsinebICa
                                                 eRKOgbgÁúMminkMNt;edaysþaTic cUrkMNt;BIdWeRkén
                                                 PaBminkMNt;. tMNTaMgGs;CatMNrwg b¤tMNbgáb;.




2>13> cat;cMNat;fñak;éneRKOgbgÁúMnImYy²Ca
eRKOgbgÁúMkMNt;edaysþaTic eRKOgbgÁúMminkMNt;
Problems                                                                          T.Chhay -54
Department of Civil Engineering                                                       NPIC




                                           2>16> cat;cMNat;fñak;éneRKOgbgÁúMnImYy²Ca
                                           eRKOgbgÁúMkMNt;edaysþaTic eRKOgbgÁúMminkMNt;
                                           edaysþaTic b¤eRKOgbgÁúMKμansßirPaB. RbsinebICa
                                           eRKOgbgÁúMminkMNt;edaysþaTic cUrkMNt;BIdWeRkén
                                           PaBminkMNt;. TMr nigtMNTaMgGs;RtUv)ansnμt;
2>15> cUrkMNt;BIdWeRkénPaBminkMNt;rbs;     dUcbgðaj.
eRKOgbgÁúMminkMNt;edaysþaTic. tMNTaMgGs;
CatMNrwg b¤tMNbgáb;.

cMeNaT                                                                      T.Chhay   -55
mhaviTüal½ysMNg;sIuvil                                               viTüasßanCatiBhubec©keTskm<úCa

                                                2>20> kMNt;kMlaMgRbtikmμenAelIFñwm.




                                                2>21> kMNt;kMlaMgRbtikmμenAelIFñwm.




2>17> kMNt;kMlaMgRbtikmμenAelIFñwm. eKsnμt;
TMrenARtg; B CaTMrkl; nigminKitBIkMras;rbs;Fñwm. 2>22> kMNt;kMlaMgRbtikmμenARtg;TMr A nig B .
                                                 kMral CD / DE / EF nig FG bBa¢ÚnbnÞúkrbs;va
                                                 eTAelIr:ttamTMrkl;. snμt; A CaTMrkl; nig B
                                                 CaTMrsnøak;.

2>18> kMNt;kMlaMgRbtikmμenARtg;TMr A nig B .
snμt; A CaTMrkl; nig B CaTMrsnøak;.


                                                2>23> KNnakMlaMgRbtikmμenARtg;TMr A nig B
                                                énFñwmpSM. enARtg; C CatMNsnøak;.
2>19> kMNt;kMlaMgRbtikmμenAelIFñwm.




Problems                                                                        T.Chhay -56
Department of Civil Engineering                                                            NPIC



2>24> eKeRbIRKwHeCIgtagedIm,IRTbnÞú 50kN . kM-
Nt;GaMgtg;sIuet w1 nig w2 énbnÞúkBRgayEdl
manGMeBIenAelI)atrbs;RKWHedIm,IeGaymanlMnwg.




                                                 2>28> eKeRbIeCIgtagkugs‘ul (cantilever
                                                 footing) edIm,IRTCBa¢aMgenAEk,rcugEKmrbs;RKwH

                                                  A dUcenH vaeFVIeGaymansMBaFdIrayesμIenABI

                                                 eRkamRKwH. kMNt;bnÞúkBRgayesμIcaM)ac; wA nig
                                                 wB EdlKitCa kN / m enARtg;RKwH A nig B edIm,I
2>25> kMNt;kMlaMgRbtikmμenAelIFñwm.              RTbnÞúkCBa¢aMg 40kN nig100kN .




2>26> KNnakMlaMgRbtikmμenARtg;TMrrelag C
nigenARtg;TMrsnøak; A . snμt; B CatMNbgáb; . 2>29> kMNt;kMlaMgRbtikmμenARtg;TMr A nig B
                                             rbs; truss. bnÞúkBRgayRtUv)anbgáeLIgeday
                                             sarxül;.



2>27> KNnakMlaMgRbtikmμenARtg;TMrrelag A
nigenARtg;TMrsnøak; B . tMN C CatMNbgáb; .

cMeNaT                                                                           T.Chhay   -57
mhaviTüal½ysMNg;sIuvil                                                viTüasßanCatiBhubec©keTskm<úCa

2>30> dgsÞÚc jib crane mantMNsnøak;enARtg;
A nigmanTMr smooth collar enARtg; B . kMNt;

bMlas;TI x énbnÞúk 22.5kN dUcenHvaeFVIeGayman
kMlaMgRbtikmμGtibrma nigGb,brma. KNnakM-
laMgRbtikmμenAkñúgkrNInImYy². snμt;eKecal
TMgn;rbs;dgsÞúc. eKtMrUveGay1.2m ≤ x ≤ 3m .
                                                2>33> kMNt;bgÁúMkMlaMgRbtikmμedk nigQrenA
                                                Rtg;TMr A nig B . tMNenARtg; C nig D CatMN
                                                bgáb; .




2>31> kMNt;kMlaMgRbtikmμenARtg;TMr A nig B      2>34> kMNt;kMlaMgRbtikmμenARtg;TMr A / B nig
éneRKag. snμt;fa A CaTMrkl;.                    E . snμt; B CaTMrkl;.




                                                2>35> kMNt;kMlaMgRbtikmμenARtg;TMr A / B /
                                                C nig D .


2>32> kMNt;kMlaMgRbtikmμenARtg;TMr A nig B
rbs; truss. bnÞúkBRgayRtUv)anbgáeLIgeday
sarxül;.
Problems                                                                         T.Chhay -58
Department of Civil Engineering                                                               NPIC



2>36> kMNt;kMlaMgRbtikmμenRtg;TMrsMrab;FñwmpSM.
eKmansnøak;enARtg; A / E nig F .




2>37> sMNg;s<anRtUv)anbgðajenAkñúgrUb. enATI
enHeyIgeXIjfa truss kNþal CD RtUv)anRT       2>40> kMNt;kMlaMgRbtikmμenARtg; A / B . snμt;
eday truss ly ABC nig DEF . C nig D          B CaTMrkl; ¬TMrrGil¦ C CatMNrwg.

CatMNsnøak;. kMNt;RbtikmμbBaÄrenARtg;TMr A /
 B / E nig F RbsinebIbnÞúk 60kN manGMeBIenA

elI truss kNþal.




2>38> kMNt;kMlaMgRbtikmμenARtg;TMr A / C nig
D.                                                2>41> kMNt;kMlaMgRbtikmμenARtg;TMr A nig B .




                                                  2>42> eRKags<anmYypSMeLIgedaybIkMNat; Edl
2>39> kMNt;kMlaMgRbtikmμenARtg; A nig C .         eKKitfa A / D nig E Casnøak; ehIy C nig F
snμt;fa A CaTMrkl; B CatMNbgáb; nig C Ca          CaTMr rocker É B CaTMrkl;. kMNt;bgÁúMkMlaMgRbti
tMNsnøak;.                                        kmμtamTisedk nigTisQrenARKb;TMrTaMgGs;
                                                  EdlbNþalBIbnÞúkEdl)anbgðaj.
cMeNaT                                                                              T.Chhay   -59
mhaviTüal½ysMNg;sIuvil                                              viTüasßanCatiBhubec©keTskm<úCa




2>43> kMNt;bgÁúMkMlaMgRbtikmμedk nigQrenA
Rtg; A / B nig C . snμt;eKP¢ab;eRKagedaytMN
snøak;enARtg;cMnucTaMgenH ehIy D nig E CatMN   2>46> kMNt;kMlaMgRbtikmμenARtg;TMr A nig D .
rwg.                                           snμt;fa A CaTMrbgáb; ehIy B / C nig D Casnøak;.




2>44> kMNt;kMlaMgRbtikmμenARtg;TMr A nig B .
tMN C nig D CatMNrwg.
                                               2>47> kMNt;kMlaMgRbtikmμenARtg;TMr A nig C .
                                               eRKagRtUv)antP¢ab;edaytMNsnøak;enARtg; A / B
                                               nig C ehIytMNTaMgBIrCaTMrrwg.




2>45> kMNt;bgÁúMkMlaMgRbtikmμedk nigQrenA
Rtg;TMr A nig B .

Problems                                                                       T.Chhay -60
Department of Civil Engineering                                                           NPIC



2>48> kMNt;kMlaMgRbtikmμenARtg;tMN A / B
nig C . snμt;tMNnImYy²CatMNsnøak; ehIytMN
B CatMNrwg.




                                              KMerag³ pøÚvrfePøIgRtUv)anRTedayeRKagebtug
                                              Garem:. snμt;r:tTMrsmBaØBIrRTEdk rail nigkMral
                                              pøÚvrfePøIgEdlmanTMgn; 7.5kN / m nigRTbnÞúk
                                              rbs;rfePøIg 100kN / m ¬rUbxageRkam¦. r:t
                                              nImYy²manRbEvg 100kN / m . GnuvtþbnÞúkTaMg
2>49> kMNt;bgÁúMkMlaMgRbtikmμenARtg;tMN A nig enHeTAelIeRKags<anTaMgmUl ehIykMNt;kMlaMg
C én gable frame. snμt;fa A / B nig C Ca
                                              sgát;enAkñúgssrrbs;va. sMrab;karviPaKsnμt;fa
tMNsnøak;. eKdak;bnÞúkenARtg;cMnuc D / E / F tMNTaMgGs;CatMNsnøak; ehIyecalTMrg;rbs;
nig G EkgeTAnwgG½kSrbs;r:tnImYy².             eRKag. etIkarsnμt;tMNTaMgGs;CatMNsnøak;Gac
                                              TTYlyk)aneTsMrab;PaBCak;Esþg?




2>50> kMNt;bgÁúMkMlaMgRbtikmμedk nigQrenA
Rtg;TMr A / B nig C . snμt;faeRKagRtUv)antP¢ab;
edaytMNsnøak;enARtg; A / B / D / E nig F
É C CaTMrbgáb;.



cMeNaT                                                                          T.Chhay   -61

More Related Content

What's hot

ព្រះពុទ្ឌសុភាសិត អធិប្បាយខ្លីៗ
ព្រះពុទ្ឌសុភាសិត អធិប្បាយខ្លីៗព្រះពុទ្ឌសុភាសិត អធិប្បាយខ្លីៗ
ព្រះពុទ្ឌសុភាសិត អធិប្បាយខ្លីៗVantha Kago
 
13.combined stresses
13.combined stresses13.combined stresses
13.combined stressesChhay Teng
 
Estimation and Confidence Intervals
Estimation and Confidence IntervalsEstimation and Confidence Intervals
Estimation and Confidence IntervalsTung Nget
 
15. beam analysis using the stiffness method
15. beam analysis using the stiffness method15. beam analysis using the stiffness method
15. beam analysis using the stiffness methodChhay Teng
 
ព្រះពោធិសត្វភាគ១
ព្រះពោធិសត្វភាគ១ព្រះពោធិសត្វភាគ១
ព្រះពោធិសត្វភាគ១Vantha Kago
 
Roof preparation
Roof preparationRoof preparation
Roof preparationChhay Teng
 
12. displacement method of analysis moment distribution
12. displacement method of analysis moment distribution12. displacement method of analysis moment distribution
12. displacement method of analysis moment distributionChhay Teng
 
ប្រវត្តិសាស្ត្រ​កម្ពុជាប្រជាធិបតេយ្យ (1975 1979) និពន្ធ​ដោយ​លោក ឌី ខាំបូលី
ប្រវត្តិសាស្ត្រ​កម្ពុជាប្រជាធិបតេយ្យ (1975 1979) និពន្ធ​ដោយ​លោក ឌី ខាំបូលីប្រវត្តិសាស្ត្រ​កម្ពុជាប្រជាធិបតេយ្យ (1975 1979) និពន្ធ​ដោយ​លោក ឌី ខាំបូលី
ប្រវត្តិសាស្ត្រ​កម្ពុជាប្រជាធិបតេយ្យ (1975 1979) និពន្ធ​ដោយ​លោក ឌី ខាំបូលីខ្មែរមហានគរ
 
11. displacement method of analysis slope deflection equations
11. displacement method of analysis  slope deflection equations11. displacement method of analysis  slope deflection equations
11. displacement method of analysis slope deflection equationsChhay Teng
 
Cement knowledge revised 160110
Cement knowledge revised 160110Cement knowledge revised 160110
Cement knowledge revised 160110Chhay Teng
 
Carpentering work
Carpentering work Carpentering work
Carpentering work Chhay Teng
 
ជំនួយសតិ១៦
ជំនួយសតិ១៦ជំនួយសតិ១៦
ជំនួយសតិ១៦Vantha Kago
 
suemonaethគោលសំខាន់ក្នុងសិង្គាលិកសូត្រ
suemonaethគោលសំខាន់ក្នុងសិង្គាលិកសូត្រsuemonaethគោលសំខាន់ក្នុងសិង្គាលិកសូត្រ
suemonaethគោលសំខាន់ក្នុងសិង្គាលិកសូត្រsue moneath
 

What's hot (16)

ព្រះពុទ្ឌសុភាសិត អធិប្បាយខ្លីៗ
ព្រះពុទ្ឌសុភាសិត អធិប្បាយខ្លីៗព្រះពុទ្ឌសុភាសិត អធិប្បាយខ្លីៗ
ព្រះពុទ្ឌសុភាសិត អធិប្បាយខ្លីៗ
 
13.combined stresses
13.combined stresses13.combined stresses
13.combined stresses
 
Estimation and Confidence Intervals
Estimation and Confidence IntervalsEstimation and Confidence Intervals
Estimation and Confidence Intervals
 
15. beam analysis using the stiffness method
15. beam analysis using the stiffness method15. beam analysis using the stiffness method
15. beam analysis using the stiffness method
 
ព្រះពោធិសត្វភាគ១
ព្រះពោធិសត្វភាគ១ព្រះពោធិសត្វភាគ១
ព្រះពោធិសត្វភាគ១
 
Roof preparation
Roof preparationRoof preparation
Roof preparation
 
12. displacement method of analysis moment distribution
12. displacement method of analysis moment distribution12. displacement method of analysis moment distribution
12. displacement method of analysis moment distribution
 
History of-cambodia
History of-cambodiaHistory of-cambodia
History of-cambodia
 
ប្រវត្តិសាស្ត្រ​កម្ពុជាប្រជាធិបតេយ្យ (1975 1979) និពន្ធ​ដោយ​លោក ឌី ខាំបូលី
ប្រវត្តិសាស្ត្រ​កម្ពុជាប្រជាធិបតេយ្យ (1975 1979) និពន្ធ​ដោយ​លោក ឌី ខាំបូលីប្រវត្តិសាស្ត្រ​កម្ពុជាប្រជាធិបតេយ្យ (1975 1979) និពន្ធ​ដោយ​លោក ឌី ខាំបូលី
ប្រវត្តិសាស្ត្រ​កម្ពុជាប្រជាធិបតេយ្យ (1975 1979) និពន្ធ​ដោយ​លោក ឌី ខាំបូលី
 
11. displacement method of analysis slope deflection equations
11. displacement method of analysis  slope deflection equations11. displacement method of analysis  slope deflection equations
11. displacement method of analysis slope deflection equations
 
Cement knowledge revised 160110
Cement knowledge revised 160110Cement knowledge revised 160110
Cement knowledge revised 160110
 
Carpentering work
Carpentering work Carpentering work
Carpentering work
 
ជំនួយសតិ១៦
ជំនួយសតិ១៦ជំនួយសតិ១៦
ជំនួយសតិ១៦
 
Desing slab by robot
Desing slab by robotDesing slab by robot
Desing slab by robot
 
ច្បាប់ស្តីពីព្រៃឈើ 2002
ច្បាប់ស្តីពីព្រៃឈើ 2002ច្បាប់ស្តីពីព្រៃឈើ 2002
ច្បាប់ស្តីពីព្រៃឈើ 2002
 
suemonaethគោលសំខាន់ក្នុងសិង្គាលិកសូត្រ
suemonaethគោលសំខាន់ក្នុងសិង្គាលិកសូត្រsuemonaethគោលសំខាន់ក្នុងសិង្គាលិកសូត្រ
suemonaethគោលសំខាន់ក្នុងសិង្គាលិកសូត្រ
 

Viewers also liked (7)

British ub
British ubBritish ub
British ub
 
The fatal nature of nadab & abihu's sin
The fatal nature of nadab & abihu's sinThe fatal nature of nadab & abihu's sin
The fatal nature of nadab & abihu's sin
 
Aisc c
Aisc cAisc c
Aisc c
 
Worship & Life
Worship & LifeWorship & Life
Worship & Life
 
Cleverly devised tales
Cleverly devised talesCleverly devised tales
Cleverly devised tales
 
A Matter of Faith
A Matter of FaithA Matter of Faith
A Matter of Faith
 
Where Has All The Decency Gone?
Where Has All The Decency Gone?Where Has All The Decency Gone?
Where Has All The Decency Gone?
 

Similar to Analysis of Statically Determinate Structures

Xvi continuous beams and frames
Xvi continuous beams and framesXvi continuous beams and frames
Xvi continuous beams and framesChhay Teng
 
Ix one way slab
Ix one way slabIx one way slab
Ix one way slabChhay Teng
 
Viii shear and diagonal tension
Viii shear and diagonal tensionViii shear and diagonal tension
Viii shear and diagonal tensionChhay Teng
 
7. approximate analysis of statically indeterminate structures
7. approximate analysis of statically indeterminate structures7. approximate analysis of statically indeterminate structures
7. approximate analysis of statically indeterminate structuresChhay Teng
 
Appendix a plastic analysis and design
Appendix a plastic analysis and designAppendix a plastic analysis and design
Appendix a plastic analysis and designChhay Teng
 
Iii flexural analysis of reinforced concrete
Iii flexural analysis of reinforced concreteIii flexural analysis of reinforced concrete
Iii flexural analysis of reinforced concreteChhay Teng
 
9. deflection using energy method
9. deflection using energy method9. deflection using energy method
9. deflection using energy methodChhay Teng
 
Vi deflection and control of cracking
Vi deflection and control of cracking Vi deflection and control of cracking
Vi deflection and control of cracking Chhay Teng
 
Vii. camber, deflection, and crack control
Vii. camber, deflection, and crack controlVii. camber, deflection, and crack control
Vii. camber, deflection, and crack controlChhay Teng
 
X axial loaded column
X axial loaded columnX axial loaded column
X axial loaded columnChhay Teng
 
3. analysis of statically determinate trusses
3. analysis of statically determinate trusses3. analysis of statically determinate trusses
3. analysis of statically determinate trussesChhay Teng
 
Xii slender column
Xii slender columnXii slender column
Xii slender columnChhay Teng
 
Construction design drawing practice
Construction design drawing practiceConstruction design drawing practice
Construction design drawing practiceChhay Teng
 
Xi members in compression and bending
Xi members in compression and bendingXi members in compression and bending
Xi members in compression and bendingChhay Teng
 
Ix. two way prestressed concrete floor systems
Ix. two way prestressed concrete floor systemsIx. two way prestressed concrete floor systems
Ix. two way prestressed concrete floor systemsChhay Teng
 
Estimation and Confidence Intervals
Estimation and Confidence IntervalsEstimation and Confidence Intervals
Estimation and Confidence IntervalsTung Nget
 
6. influence lines for statically determinate structures
6. influence lines for statically determinate structures6. influence lines for statically determinate structures
6. influence lines for statically determinate structuresChhay Teng
 
14. truss analysis using the stiffness method
14. truss analysis using the stiffness method14. truss analysis using the stiffness method
14. truss analysis using the stiffness methodChhay Teng
 
4.compression members
4.compression members4.compression members
4.compression membersChhay Teng
 

Similar to Analysis of Statically Determinate Structures (20)

Xvi continuous beams and frames
Xvi continuous beams and framesXvi continuous beams and frames
Xvi continuous beams and frames
 
Ix one way slab
Ix one way slabIx one way slab
Ix one way slab
 
Viii shear and diagonal tension
Viii shear and diagonal tensionViii shear and diagonal tension
Viii shear and diagonal tension
 
7. approximate analysis of statically indeterminate structures
7. approximate analysis of statically indeterminate structures7. approximate analysis of statically indeterminate structures
7. approximate analysis of statically indeterminate structures
 
Appendix a plastic analysis and design
Appendix a plastic analysis and designAppendix a plastic analysis and design
Appendix a plastic analysis and design
 
Iii flexural analysis of reinforced concrete
Iii flexural analysis of reinforced concreteIii flexural analysis of reinforced concrete
Iii flexural analysis of reinforced concrete
 
9. deflection using energy method
9. deflection using energy method9. deflection using energy method
9. deflection using energy method
 
Vi deflection and control of cracking
Vi deflection and control of cracking Vi deflection and control of cracking
Vi deflection and control of cracking
 
Vii. camber, deflection, and crack control
Vii. camber, deflection, and crack controlVii. camber, deflection, and crack control
Vii. camber, deflection, and crack control
 
X axial loaded column
X axial loaded columnX axial loaded column
X axial loaded column
 
3. analysis of statically determinate trusses
3. analysis of statically determinate trusses3. analysis of statically determinate trusses
3. analysis of statically determinate trusses
 
Xii slender column
Xii slender columnXii slender column
Xii slender column
 
Construction design drawing practice
Construction design drawing practiceConstruction design drawing practice
Construction design drawing practice
 
Xi members in compression and bending
Xi members in compression and bendingXi members in compression and bending
Xi members in compression and bending
 
Ix. two way prestressed concrete floor systems
Ix. two way prestressed concrete floor systemsIx. two way prestressed concrete floor systems
Ix. two way prestressed concrete floor systems
 
Xiii footings
Xiii footingsXiii footings
Xiii footings
 
Estimation and Confidence Intervals
Estimation and Confidence IntervalsEstimation and Confidence Intervals
Estimation and Confidence Intervals
 
6. influence lines for statically determinate structures
6. influence lines for statically determinate structures6. influence lines for statically determinate structures
6. influence lines for statically determinate structures
 
14. truss analysis using the stiffness method
14. truss analysis using the stiffness method14. truss analysis using the stiffness method
14. truss analysis using the stiffness method
 
4.compression members
4.compression members4.compression members
4.compression members
 

More from Chhay Teng

Advance section properties_for_students
Advance section properties_for_studentsAdvance section properties_for_students
Advance section properties_for_studentsChhay Teng
 
Representative flower of asian countries
Representative flower of asian countriesRepresentative flower of asian countries
Representative flower of asian countriesChhay Teng
 
Composition of mix design
Composition of mix designComposition of mix design
Composition of mix designChhay Teng
 
2009 ncdd-csf-technical-manual-vol-i-study-design-guidelines
2009 ncdd-csf-technical-manual-vol-i-study-design-guidelines2009 ncdd-csf-technical-manual-vol-i-study-design-guidelines
2009 ncdd-csf-technical-manual-vol-i-study-design-guidelinesChhay Teng
 
Technical standard specification auto content
Technical standard specification auto contentTechnical standard specification auto content
Technical standard specification auto contentChhay Teng
 
Available steel-section-list-in-cam
Available steel-section-list-in-camAvailable steel-section-list-in-cam
Available steel-section-list-in-camChhay Teng
 
Concrete basics
Concrete basicsConcrete basics
Concrete basicsChhay Teng
 
Rebar arrangement and construction carryout
Rebar arrangement and construction carryoutRebar arrangement and construction carryout
Rebar arrangement and construction carryoutChhay Teng
 
1 dimension and properties table of w shapes
1 dimension and properties table of w shapes1 dimension and properties table of w shapes
1 dimension and properties table of w shapesChhay Teng
 
2 dimension and properties table of s shape
2 dimension and properties table of s shape2 dimension and properties table of s shape
2 dimension and properties table of s shapeChhay Teng
 
3 dimension and properties table of hp shape
3 dimension and properties table of hp shape3 dimension and properties table of hp shape
3 dimension and properties table of hp shapeChhay Teng
 
4 dimension and properties table c shape
4 dimension and properties table c shape4 dimension and properties table c shape
4 dimension and properties table c shapeChhay Teng
 
5 dimension and properties table l shape
5 dimension and properties table l shape5 dimension and properties table l shape
5 dimension and properties table l shapeChhay Teng
 
6 dimension and properties table of ipe shape
6 dimension and properties table of ipe shape6 dimension and properties table of ipe shape
6 dimension and properties table of ipe shapeChhay Teng
 
7 dimension and properties table ipn
7 dimension and properties table ipn7 dimension and properties table ipn
7 dimension and properties table ipnChhay Teng
 
8 dimension and properties table of equal leg angle
8 dimension and properties table of equal leg angle8 dimension and properties table of equal leg angle
8 dimension and properties table of equal leg angleChhay Teng
 
9 dimension and properties table of upe
9 dimension and properties table of upe9 dimension and properties table of upe
9 dimension and properties table of upeChhay Teng
 
10 dimension and properties table upn
10 dimension and properties table upn10 dimension and properties table upn
10 dimension and properties table upnChhay Teng
 

More from Chhay Teng (20)

Advance section properties_for_students
Advance section properties_for_studentsAdvance section properties_for_students
Advance section properties_for_students
 
Representative flower of asian countries
Representative flower of asian countriesRepresentative flower of asian countries
Representative flower of asian countries
 
Composition of mix design
Composition of mix designComposition of mix design
Composition of mix design
 
2009 ncdd-csf-technical-manual-vol-i-study-design-guidelines
2009 ncdd-csf-technical-manual-vol-i-study-design-guidelines2009 ncdd-csf-technical-manual-vol-i-study-design-guidelines
2009 ncdd-csf-technical-manual-vol-i-study-design-guidelines
 
Type of road
Type of roadType of road
Type of road
 
Technical standard specification auto content
Technical standard specification auto contentTechnical standard specification auto content
Technical standard specification auto content
 
Available steel-section-list-in-cam
Available steel-section-list-in-camAvailable steel-section-list-in-cam
Available steel-section-list-in-cam
 
Concrete basics
Concrete basicsConcrete basics
Concrete basics
 
Rebar arrangement and construction carryout
Rebar arrangement and construction carryoutRebar arrangement and construction carryout
Rebar arrangement and construction carryout
 
Mix design
Mix designMix design
Mix design
 
1 dimension and properties table of w shapes
1 dimension and properties table of w shapes1 dimension and properties table of w shapes
1 dimension and properties table of w shapes
 
2 dimension and properties table of s shape
2 dimension and properties table of s shape2 dimension and properties table of s shape
2 dimension and properties table of s shape
 
3 dimension and properties table of hp shape
3 dimension and properties table of hp shape3 dimension and properties table of hp shape
3 dimension and properties table of hp shape
 
4 dimension and properties table c shape
4 dimension and properties table c shape4 dimension and properties table c shape
4 dimension and properties table c shape
 
5 dimension and properties table l shape
5 dimension and properties table l shape5 dimension and properties table l shape
5 dimension and properties table l shape
 
6 dimension and properties table of ipe shape
6 dimension and properties table of ipe shape6 dimension and properties table of ipe shape
6 dimension and properties table of ipe shape
 
7 dimension and properties table ipn
7 dimension and properties table ipn7 dimension and properties table ipn
7 dimension and properties table ipn
 
8 dimension and properties table of equal leg angle
8 dimension and properties table of equal leg angle8 dimension and properties table of equal leg angle
8 dimension and properties table of equal leg angle
 
9 dimension and properties table of upe
9 dimension and properties table of upe9 dimension and properties table of upe
9 dimension and properties table of upe
 
10 dimension and properties table upn
10 dimension and properties table upn10 dimension and properties table upn
10 dimension and properties table upn
 

Recently uploaded

GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSJoshuaGantuangco2
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptxiammrhaywood
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfSpandanaRallapalli
 
Culture Uniformity or Diversity IN SOCIOLOGY.pptx
Culture Uniformity or Diversity IN SOCIOLOGY.pptxCulture Uniformity or Diversity IN SOCIOLOGY.pptx
Culture Uniformity or Diversity IN SOCIOLOGY.pptxPoojaSen20
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Jisc
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)cama23
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 

Recently uploaded (20)

GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdf
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
Culture Uniformity or Diversity IN SOCIOLOGY.pptx
Culture Uniformity or Diversity IN SOCIOLOGY.pptxCulture Uniformity or Diversity IN SOCIOLOGY.pptx
Culture Uniformity or Diversity IN SOCIOLOGY.pptx
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 

Analysis of Statically Determinate Structures

  • 1. mhaviTüal½ysMNg;sIuvil viTüasßanCatiBhubec©keTskm<úCa @> karviPaKrcnasm<½n§kMNt;edaysþaTic Analysis of Statically Determinate Structures enAkñúgCMBUkenH eyIgnwgBiPakSaBITMrg;Fmμtarbs;eRKOgbgÁú<MEdlvisVkrRtUveFVIkarsikSaviPaK ehIyvak¾CaTMrg;EdlsßitenAkñúgbøg; ehIymüa:geTotRbB½n§kMlaMgGnuvtþn_k¾sßitenAelIbøg;eRKOgbgÁúMEdr. eyIgcab;epþImBiPakSaCamYynwgPaBcaM)ac;kñúgkareRCIserIsm:UEDlrbs;eRKOgbgÁúMd¾smRsbedIm,IeyIgGac kMNt;kMlaMgenAkñúgeRKOgbgÁúMeGaymantMélsuRkitEdlGacTTYlyk)an. bnÞab;mkeTot eyIgnwg BiPakSaBIlkçxNÐcaM)ac;sMrab;sßirPaBrbs;eRKOgbgÁúM. ehIycugeRkay mankarbgðajBIkarviPaKeRKOg bgÁúMsßitkñúgbøg;kMNt;edaysþaTicEdltP¢ab;edaytMN pin. @>!> m:UEDleRKOgbgÁúM (Idealized structure) Cak;Esþg eKminGacviPaKeRKOgbgÁúM)ansuRkiteT edaysareKRtUveFVIkar)a:n;RbmaNbnÞúk nigPaBFn;rbs;sMPar³. elIsBIenH eKRtUveFVIkarsnμt;BITItaMgEdlbnÞúkRtUveFVIGMeBIr. dUcenH va CakarsMxan;Nas;EdlvisVkrRtUvGPivDÆsmtßPaBkñúgkarbegáItm:UEDleRKOgbgÁúM. enAkñúgkfaxNÐ enHeyIgnwgENnaMBIbec©keTsCamUldæanEdlcaM)ac;sMrab;kargarenH. tMNTMr (Support Connection): Ggát;eRKOgbgÁúMRtUv)antamP¢ab;KñatamviFIeRcIn edayGaRs½yeTA elIectnarbs;visVkr. tMNsamBaØbIRbePTEdleKsÁal;PaKeRcInKW tMNsnøak; (pin connection)/ TMr rGil (roller support) nigtMNbgáb; (fixed joint). Pin-connection joint nig roller support GnuBaØat eGayGgát;vil)an Et fixed joint minGnuBaØateGayGgát;vileT ehIyCaTUeTAkareFVI fixed joint TamTar tMélx<s;. ]TahrN_éntMNTaMgenH ¬sMrab;Edk nigsMrab;ebtug¦RtUv)anbgðajenAkñúgrUbTI2-1 nig2-2 erogKña. tMNenAkñúgeRKOgbgÁúMeFVIGMeBIeQIPaKeRcInRtUv)aneKsnμt;faCa pin connection edaysarkar P¢ab;edayb‘ULúg nigedayEdkeKalminGacpþl;nUvkarTb;karvil (restraint) )anRKb;RKan;eT. Analysis of Statically Determinate Structures T.Chhay -24
  • 2. Department of Civil Engineering NPIC m:UEDleRKOgbgÁúMEdleRbIenAkñúgkarviPaKeRKOgbgÁúMEdltMNageGayTMrsnøak; (pinned support) nigTMrbgáb; (fixed support); nigtMNsnøak; (pin-connected joint) nigtMNbgáb; (fixed-connected joist) RtUv)anbgðajenAkñúgrUbTI 2-3 a nigrUbTI 2-3 b erogKña. EtkarBit RKb;tMNTaMgGs;manPaB rwgRkajxøHkñúgkarTb;Tl;nwgkarvil. sMrab;krNIEbbenH m:UEDlEdlsaksmCagsMrab;TMr b¤tMNRtUv )anbgðajenAkñúgrUbTI 2-3 c. RbsinebIefrkMrajTb;karrmYl (torsional spring constant) k = 0 eKKitfatMNCasnøak; ehIyRbsinebI k → ∞ eKKitfatMNCatMNbgáb;. enAeBleRCIserIsm:UEDlsMrab;TMr b¤tMNnImYy²rYcehIy visVkrRtUvdwgfakarsnμt;nwgCHT§iBl dl;kareFVIkarCak;Esþgrbs;Ggát; ehIyRtUvdwgfakarsnμt;enaHsmrmüsMrab;karsikSaKNnaeRKOgbgÁúM b¤Gt;. ]TarhN_ eKmanFñwmdUcbgðajenAkñúgrUbTI 2-4 a edayeKeRbIvaeGayRTbnÞúkcMcMnuc P . tMN EkgenARtg;cMnuc A dUckarbgðajenAkñúgrUbTI 2-1 a dUcenHeKGaceFVIm:UEDlTMrenHCaRbePTTMrsnøak; (pin support). elIsBIenH TMrRtg;cMnuc B RKan;EtTl;Ggát;kMueGayFøak; dUcenHeKeFVIm:UEDlvaCaTMrkl; (roller). kMras;rbs;FñwmRtUv)anecaledaysarvamanTMhMtUceFobnwgRbEvgrbs;Fñwm dUcenHm:UEDlrbs;FñwmRtUv)an karviPaKrcnasm<½n§kMNt;edaysþaTic T.Chhay -25
  • 3. mhaviTüal½ysMNg;sIuvil viTüasßanCatiBhubec©keTskm<úCa bgðajenAkñúgrUbTI 2-4 b. kardak;bnÞúkenAelIm:UEDlFñwmmanlkçN³RsedogKñanwgkardak;bnÞúkenAelI FñwmCak;Esþg. edIm,Ibgðajfam:UEDlenHmanlkçN³smRsb eyIgnwgBicarNakrNICak;lak;rbs;FñwmEdl eFVIBIEdkEdlmanRbEvg 6.1m nigrgbnÞúk P = 35.6m ehIysnμt;TMrenARtg;cMnuc A Ca TMrsnøak;. kar sikSaKNnaFñwmedayeRbI standard code procedures bgðajfa W 11× 22 mansmtßPaBRKb;RKan;kñúg karRTbnÞúkenH. edayeRbIviFIkMNt;PaBdabmYyenAkñúgCMBUk8 mMurgVil (rotation) enARtg;TMrsnøak;KW θ = 0.007rad = 0.40 o . BIrUbTI 2-4 c mMurgVilEbbenHeFVIeGaysøabxagelI nigsøabxageRkam pøas;TI )ancMgay Δ = θr = (0.0070rad )(127mm) = 0.889mm . tMNEdlmanbgðajenAkñúgrUbTI 2-1 a BitCa nwgpþl;nUvbrimaNd¾tUcEbbenHEmn dUcenHTMrsnøak;BitCasaksmsMrab;m:UEDlenH. RbePTtMNepSgeTotEdlEtgEtCYbRbTHenAelIeRKOgbgÁúMkñúgbøg;RtUv)anbgðajenAkñúgtarag 2- 1. vaBitCamansarsMxan;Nas;kñúgkarsÁal;nimitþsBaØa nigRbePTRbtikmμrbs;tMN b¤TMr. TMrGacbegáIt kMlaMgenAelIGgát;RbsinebIvaTb;Tl;nwgkarcl½trbs;Ggát; ehIyvanwgbegáItm:Um:g;RbsinebIvaTb;Tl;kar vilrbs;Ggát;. Ca]TahrN_ sMrab;Ggát;Edlb:HnwgépÞrelag (3) RtUv)ankarBarnwgkarcl½tEtmYyTis EdlEkgnwgépÞ. dUcenH épÞGnuvtþEdlkMlaMgEkg F eTAelIGgát;enAkñúgTisenaH. TMhMrbs;kMlaMgenH tMNageGaymYyGBaØat (unknown). ]TahrN_epSgeTot TMrbgáb; (fixed support) (7) karBarTaMgkar cl½t TaMgkarvilrbs;Ggát;enARtg;tMN. dUcenH TMrRbePTenHGnuvtþbgÁúMkMlaMgBIr nigm:Um:g;mYyeTAelI Ggát;. dUcenH sMrab;TMrbgáb;manGBaØatTaMgGs;cMnYnbI. Analysis of Statically Determinate Structures T.Chhay -26
  • 4. Department of Civil Engineering NPIC karviPaKrcnasm<½n§kMNt;edaysþaTic T.Chhay -27
  • 5. mhaviTüal½ysMNg;sIuvil viTüasßanCatiBhubec©keTskm<úCa enAkñúglkçN³Cak;Esþg TMrTaMgGs;GnuvtþkMlaMgBRgayelIépÞ (distributed surface load) eTAelI Ggát;Edlb:HnwgTMr. kMlaMgcMcMnuc (concentrated load) nigm:Um:g; (moment) EdlbgðajenAkñúgtarag 2-1 tMNageGaykMlaMgpÁÜbénkarBRgaybnÞúkTaMgenH. m:UEDleRKOgbgÁúM (Idealized structure): eday)anerobrab;BIviFIkñúgkarKitm:UEDléntMNenAelI eRKOgbgÁúM eyIgGacBiPakSaBIbec©keTskñúgkarbegáItm:UEDleRKOgbgÁúMsMrab;RbB½n§eRKOgbgÁúMepSg². dUc]TahrN_TImYy BicarNadgsÞÚc jib crane nig trolley enAkñúgrUbTI 2-5 a. sMrab;karviPaK eRKOgbgÁúMeyIgGacecalkMras;rbs;Ggát;emTaMgBIr ehIyeyIgsnμt;fatMNenARtg;cMnuc B CatMNrwg (rigid). elIsBIenH eKGaceFIVm:UEDltMNTMrenARtg;cMnuc A CaTMrbgáb; ehIykarlMGitBI trolley minRtUv )anKit. dUcenH Ggát;rbs;m:UEDleRKOgbgÁúMRtUv)ansMEdgedaybnÞat;BIrtP¢ab;Kña ehIybnÞúkenAelI hook RtUv)ansMEdgedaybnÞúkcMcMnuceTal F ¬rUbTI 2-5 b¦. CaerOy² eKeRbIFñwm nigr:tedIm,IRTkMralrbs;GKar. r:t (girder) CaGgát;emEdlRTbnÞúkrbs;kM- ral ÉGgát;muxkat;tUcCagEdlmanRbEvgElVgxøICag nigRtUv)antP¢ab;eTAnwgr:tRtUv)aneKeGayeQμaHfa Fñwm (beam). bnÞúkEdlmanGMeBImkelIFñwm b¤r:tCabnÞúkEdl)anBIkMralEdlFñwm b¤r:tRT. Ca]TahrN_ eKmaneRKagEdleRbIedIm,IRTkMralkMral ¬rUbTI 2-6 a¦. kMralenHRtUv)anRTeday floor joist ehIy Edl floor joist enHRtUv)anRTedayr:tBIr AB nig BC EdlenAsgxag. sMrab;karviPaKeKsnμt;fatMN CatMNsnøak; b¤tMNrGilEdltP¢ab;eTAnwgr:t ehIyr:tRtUv)anRTedayssrEdleKsnμt;faCaTMrsnøak; nig / b¤ TMrkl;. KMehIjBIxagelIrbs;RbB½n§eRKOgbgÁúMenHRtUv)anbgðajenAkñúgrUbTI 2-6 b. enAkñúgrUb enHbnÞat; EdltageGay joist minb:Hnwgr:t ehIybnÞat;EdltMNageGayr:tminb:Hnwgssr. karminb:H Analysis of Statically Determinate Structures T.Chhay -28
  • 6. Department of Civil Engineering NPIC enHtMNageGaytMNTMrsnøak; nig / b¤tMNTMrkl;. müa:gvijeTot RbsinebIeKcg;bgðajbøg;eRKagenHCa tMNbgáb; ¬eRbItMNpSarCMnYseGaytMNsamBaØedayb‘ULúg¦ enaHbnÞat;sMrab;Fñwm b¤r:tRtUvb:HnwgssrdUc enAkñúgrUbTI 2-7. dUcKña eKRtUvbgðaj Fixed-connected overhanging beam kñúgKMehIjBIelIdUcbgðaj enAkñúgrUbTI 2-8. RbsinebIkarsagsg;eRbIebtugGarem: Fñwm nigr:tRtUvtMNagedaybnÞat;Dub. CaTUeTA RbB½n§enH Ggát;TaMgGs;RtUvP¢ab;edaytMNbgáb; dUcenHeKKUrP¢ab;Ggát;eTAnwgTMr. ]TahrN_ rUbTI 2-9 a bgðajBIRkaPiceRKOgbgÁúMsMrab;RbB½n§ebtugGarem:Edlcak;enAnwgkEnøg (cast-in-place) ehIyrUbTI 2-9 b bgðajBIbøg;emIlBIelI. bnÞat;sMrab;FñwmCabnÞat;dac;edaysarvasßitenAeRkamkMral. karviPaKrcnasm<½n§kMNt;edaysþaTic T.Chhay -29
  • 7. mhaviTüal½ysMNg;sIuvil viTüasßanCatiBhubec©keTskm<úCa RkaPiceRKOgbgÁúM nigm:UEDleRKOgbgÁúMsMrab;rcnasm<½n§GMBIeQImanlkçN³RsedogKñanwgrcnasm<½n§ GMBIEdk. RbB½n§eRKOgbgÁúMEdlbgðajenAkñúgrUbTI 2-10 a bgðajBIsMNg; beam-wall ÉkMraldMbUl (roof deck) RtUv)anRTedayrnUteQI (wood joist) EdlbBa¢ÚnbnÞúkeTACBa¢aMgdæ. eKGacsnμt;farnUtRtUv)an RTedayTMrsamBaØenAelICBa¢aMg dUcenHeKGaceFVIm:UEDleRKOgbgÁúMdUcbgðajenAkñúgrUbTI 2-10 b. karepÞrbnÞúkBIépÞrgsMBaF (tributary loadings): enAeBlEdlépÞerobesμIdUcCaCBa¢aMg kMral b¤ dMbUlRtUv)anRTedayeRKag eKcaM)ac;RtUvkMNt;BIrebobénkarepÞrbnÞúkEdlmanGMeBIelIépÞenaHeTAGgát; eRKOgbgÁúMEdlRTva. CaTUeTA eKmanviFIBIrkñúgkarkMNt;va. kareRCIserIsviFIGaRs½ynwgragFrNImaRt rbs;RbB½n§eRKOgbgÁúM sMPar³EdlvaeFVI nigviFIkñúgkarsagsg;va. RbB½n§mYyTis (One-way system): karRTkMralEdlbBa¢ÚnbnÞúkeTAGgát;TMrtamskmμPaBmYyTis RtUv)aneKeGayeQμaHfa kMralxNÐmYyTis (one-way slab). edIm,IbgðajBIviFIénkarbBa¢ÚnbnÞúk cUrBi- carNaRbB½n§eRKagdUcbgðajenAkñúgrUbTI 2-11 a EdlFñwm AB / CD nig EF sßitenABIelIr:t AE nig BF . RbsinebIeKdak;bnÞúkrayesμI 4.8kN / m 2 enAelIkMral enaHeKsnμt;faFñwm CD RTbnÞúkEdlmanGMeBI enAelIépÞrgsMBaF (tributary area) AB EdlbgðajedayBN’ditenAelIbøg;eRKagbgÁúMenAkñúgrUbTI 2-11b. dUcenH Ggát; CD rgnUvkarBRgaybnÞúkefr (4.8kN / m 2 )(1.5m) = 7.2kN / m dUcbgðajenAelIm:UEDlFñwm enAkñúgrUbTI 2-11c. bnÞab;RbtikmμenAelIFñwmenH (10.8kN ) GnuvtþeTAelIr:t AE ¬nig BF ¦ cMkNþal dUcbgðajenAkñúgrUbTI 2-11d. edayeRbIviFIKMnitkñúgkarbBa¢ÚnbnÞúkEbbenH etIGñkmaneXIjcMENkrbs; kMralEdlenAsl;RtUv)anepÞreTAcugrbs;r:tKW 5.4kN b¤eT? Analysis of Statically Determinate Structures T.Chhay -30
  • 8. Department of Civil Engineering NPIC sMrab;RbB½n§kMralxøH eKtP¢ab;Fñwm nigr:teTAnwgssrenARtg;nIv:UdUcKña dUcbgðajenAkñúgrUbTI 2-12 a. RbsinebIeKCYbkrNIEbbenH eBlxøHeKk¾GacKitfakMralCakMralxNÐmYyTisEdr. ]TahrN_ Rbsin ebIkMralxNÐebtugGarem:EdlmanEdkBRgwgEtkñúgTismYy b¤eKcak;ebtugenAelIkMragEdlpñt; (corrugated metal deck) enaHeKsnμt;fabnÞúkRtUv)anbBa¢ÚntamskmμPaBmYyTis. müa:gvijeTot RbsinebIkMralCa kMralerobesμITaMgEpñkxagelI nigEpñkxageRkam ehIyRtUv)anBRgwgedayEdkkñúgTisTaMgBIr enaHeKKitfa bnÞúkRtUv)anbBa¢ÚneTAGgát;TMrtammYy Tis b¤tamBIrTis. ]TahrN_ eKmankMral nigbøg;eRKagdUcenAkñúg rUbTI 2-12b tamlkçxNÐTUeTA RbsinebI L2 ≥ L1 ehIyRbsinebIpleFobElVg (L2 / L1 ) ≥ 2 kMralxNÐ nwgeFVIkarCakMralxNÐmYyTis. edaysarEt L1 kan;EttUc Fñwm AB / CD nig EF pþl;nUvPaBrwgRkaj kan;EtFMkñúgkarRTbnÞúk. karviPaKrcnasm<½n§kMNt;edaysþaTic T.Chhay -31
  • 9. mhaviTüal½ysMNg;sIuvil viTüasßanCatiBhubec©keTskm<úCa RbB½n§BIrTis (Two-way system): RbsinebIpleFobElVgenAkñúgrUbTI 2-12 b KW (L 2 / L1 ) < 2 eKsnμt;fabnÞúkRtUv)anbBa¢ÚneTAFñwm nigr:ttamskmμPaBBIrTis. sMrab;kMralEdlCYbkrNIEbbenH RtUv )aneKeGayeQμaHfa kMralxNÐBIrTis (two-way slab). edIm,IbgðajBIviFIkñúgkaredaHRsaykrNIenH cUr BicarNakMralebtugGarem:ragkaerenAkñúgrUbTI 2-13 a EdlRTedayFñwmxagcMnUnbYn AB / BD / DC nig DC EdlmanRbEvg 3m . enATIenH L2 / L1 = 1 . edaysarkMralxNÐrgskmμPaBBIrTis épÞrgsMBaF sMrab;Fñwm AB RtUv)anbgðajedayBN’ditenAkñúgrUbTI 2-13b. épÞenHRtUv)ankMNt;edaybnÞat;Ggát; RTUg 45o dUcbgðaj. dUcenH RbsinebIbnÞúkrayesμI 4.8kN / m 2 GnuvtþenAelIkMral GaMgtg;sIuetrbs;bnÞúk EdlGnuvtþenARtg;cMnuckNþalFñwmKW (4.8kN / m 2 )(1.5m) = 7.2kN / m ehIybnÞúkEdlBRgayenAelIFñwm enHmanragRtIekaNdUcbgðajenAkñúgrUbTI 2-13c. sMrab;]ThrN_enAkñúgkrNI L2 / L1 = 1.5 eKcaM)ac; sg;bnÞat; 45o dUcbgðajenAkñúgrUbTI 2-14a. bnÞúk 4.8kN / m 2 EdlGnuvtþenAelIkMralnwgbegáItbnÞúk BRgayragctuekaNBñay nigragRtIekaNenAelIGgát; AB nig AC dUcbgðajenAkñúgrUbTI 2-14b nig2- 14c erogKña. Analysis of Statically Determinate Structures T.Chhay -32
  • 10. Department of Civil Engineering NPIC ]TahrN_2-1³ kMralrbs;fñak;eronmYyRtUv)anRTedayrnUtr)ar (bar joist) dUcbgðajenAkñúgrUbTI 2- 15 a. rnUtnImYy²manRbEvg 4.5m ehIyvamanKMlatBIKña 0.75m KitBIG½kS. kMralenHRtUv)ansagsg;BI ebtugTMgn;RsalEdlmankMras;100mm . edayminKitTMgn;pÞal;rbs;rnUt nigkMralEdkpñt; (corrugated metal deck) cUrkMNt;bnÞúkEdlmanGMeBIenAelIrnUtnImYy². dMeNaHRsay³ bnÞúkefrenAelIkMralKWbNþalBITMgn;rbs;kMralebtug. BItarag 1-3 TMgn;ebtugTMgn;RsalkMras; 100mm KW (100)(0.015kN / m 2 ) = 1.50kN / m 2 . BItarag1-4 bnÞúkGefrsMrab;fñak;eronKW1.92kN / m 2 . dUcenH bnÞúkkMralsMrubKW1.50klN / m 2 + 1.92kN / m 2 = 3.42kN / m 2 . sMrab;RbB½n§kMral L1 = 0.75m nig L2 = 4.5 . edaysar L2 / L1 > 2 eKKitkMralxNÐCakMralxNÐmYyTis. épÞrgsMBaFsMrab;rnUtnImYy² RtUv)anbgðajenAkñúgrUbTI 2-15 b. dUcenH bnÞúkrayesμIenArnUtKW w = 3.42kN / m 2 (0.75m ) = 2.57 kN / m bnÞúk nigRbtikmμenAelIGgát;rnUtnImYy²RtUv)anbgðajenAkñúgrUbTI 2-15c. ]TahrN_2-2³ kMraldMbUlrabesμIénGKareRKagEdkenAkñúgrUbTI 2-16a RtUv)aneKeRbIedIm,IRTbnÞúk srub 2kN / m 2 EdlmanGMeBIelIépÞkMral. RbsinebIFñwm AD nig BC manRbEvg 5m ehIymanKMlat 3m ¬Fñwm AB nig DC ¦. cUrkMNt;bnÞúkdMbUl (roof load) enAkñúgtMbn; ABCD EdlRtUv)anbBa¢ÚneTAFñwm BC . karviPaKrcnasm<½n§kMNt;edaysþaTic T.Chhay -33
  • 11. mhaviTüal½ysMNg;sIuvil viTüasßanCatiBhubec©keTskm<úCa dMeNaHRsay³ enAkñúgkrNIenH L1 = 5m ehIy L2 = 3m . edaysar L2 / L1 < 2 enaHkMralxNÐeFVIkartamBIrTis. bnÞúkenAelIépÞrgsMBaFRtUv)anbgðajenAkñúgrUbTI 2-16b EdlépÞctuekaNBñayénbnÞúkEdlmanBN’dit RtUv)anbBa¢ÚneTAGgát; BC . GaMgtg;sIuetrbs;bnÞúkenARtg;kMBUlKW (2kN / m 2 )(1.5m) = 3kN / m . Ca lT§pl karBRgaybnÞúkenAelIGgát; BC RtUv)anbgðajenAkñúgrUbTI 2-16b. eKk¾KYreFVIkarKNnakar bBa¢únbnÞúkenAelIépÞrgsMBaFsMrab;tMbn;kaerBIrEdlenAxagsþaMrbs;Ggát; BC enAkñúgrUbTI 2-16a ehIy bnÞúkEdl)anKNnabEnßmenHk¾RtUv)andak;enAelIGgát; BC Edr. @>@> eKalkarN_tMrYtpl (Principle of superposition) eKalkarN_tMrYtplbegáItnUvmUldæansMrab;RTwsþIviPaKeRKOgbgÁúM (theory of structural) CaeRcIn. eKalkarN_BN’nafa³ eKGackMNt;bMlas;TIsrub b¤kMlaMgxagkñúg (internal loading or force) srubenA Rtg;cMnucNamYyenAelIeRKOgbgÁúMEdlrgbnÞúkxageRkACaeRcInedaykarbUkbMlas;TI b¤kMlaMgxagkñúgEdl bNþalBIbnÞúkxageRkAnImYy²bBa©ÚlKña. edIm,IGnuvtþeKalkarN_tMrYtplenH)an bnÞúk kugRtaMg nigbM- las;TIRtUvEtCalIenEGr (linear). edIm,IGnuvtþeKalkarN_pl eKRtUvbMeBjtMrUvkarcMnYnBIrxaeRkam³ sMPar³RtUvEteFVIkarenAkñúgTMrg;lIenEGreGLasÞic (linear-elastic) dUcenHmann½yfaeKGac eRbIc,ab;h‘Uk (Hook’s law) )an ehIybnÞúksmamaRteTAnwgbMlas;TI. Analysis of Statically Determinate Structures T.Chhay -34
  • 12. Department of Civil Engineering NPIC ragFrNImaRtrbs;eRKOgbgÁúMminRtUvrgkarERbRbYlFMeRkamGMeBIrbs;bnÞúkeT mann½yfaeK GnuvtþRTwsþIbMlas;TItUc (small displacement theory). bMlas;TIFMnwgpøas;bþÚrTItaMg nig Tisrbs;bnÞúky:agxøaMg. ]TahrN_ r)arEdkkugs‘ulesþIgEdlrgkMlaMgenAxagcugrbs;va. enAkñúgesovePAenH BN’naEtBIsMPar³lIenEGreGLasÞic ehIybMlas;TIEdlekItedaysabnÞúk minpøas;bþÚrTisedArbs;bnÞúkGnuvtþn_FM ehIyk¾minpøas;bþÚrTMhMEdleRbIsMrab;KNnam:Um:g;énkMlaMgFMEdr dUcenHtMrUvkarTaMgxagelIRtUv)anbMeBj. @>#> smIkarlMnwg (Equation of equilibrium) enAkñúgsþaTic)anEcgfa eRKOgbgÁúM b¤Ggát;mYyéneRKOgbgÁúMmanlMnwg enAeBlNaEdlvaGacrkSa lMnwgénkMlaMg niglMnwgénm:Um:g;. CaTUeTA eKRtUvbMeBjnUvlMnwgénsmIkarkMlaMg nigsmIkarm:Um:g;tam G½kSTaMgbI mann½yfa³ ∑ Fx = 0 ∑ Fy = 0 ∑ Fz = 0 ∑Mx = 0 ∑M y = 0 ∑Mz = 0 (2-1) b:uEnþ PaKeRcIneRKOgbgÁúMeRcInRTcMENkbnÞúkEdlsßitenAkñúgbøg;eTal ehIyedaysarEtbnÞúkk¾sßitenAkñúg bøg;enaH smIkartMrUvkarxagelIkat;bnßymkRtwm ∑ Fx = 0 ∑ Fy = 0 ∑ MO = 0 (2-2) enATIenH ∑ Fx nig ∑ Fy CaplbUkBiCKNiténbgÁúMkMlaMgtamG½kS x nigtamG½kS y erogKña EdlmanGMeBI mkelIeRKOgbgÁúM b¤Ggát;mYyrbs;eRKOgbgÁúM ehIy ∑ M O CaplbUkBiCKNiténm:Um:g;énkMlaMgCMuvijG½kS EdlEkgnwgbøg; x − y ¬G½kS z ¦ ehIykat;tamcMnuc O . enARKb;eBlEdleKGnuvtþsmIkarTaMgenH dMbUgeKcaM)ac;RtUvKUrdüaRkamGgÁesrI (free body diagram) rbs;eRKOgbgÁúM b¤rbs;Ggát;. edIm,IKUrdüaRkamGgÁesrI eKRtUvpþac;Ggát;ecjBIKña nigecjBITMr. kMlaMgxageRkA kMlaMgkñúg b¤kMlaMgRbtikmμRtUvbgðajenAelIGgát;Edl)anpþac;ecj. tamry³enH eKGac kMNt;kMlaMgRbtikmμenARtg;TMredayeRbItarag 2-1. ehIyeyIgRtUvcaMpgEdrfa enAelIdüaRkamGgÁesrI kMlaMgkñúgénGgát;BIrEdlP¢ab;KñamanTMhMdUcKña EtmanTispÞúyKña. RbsinebIeKcg;kMNt;kMlaMgkñúgenARtg;cMnucCak;lak;enAkñúgGgát; eKRtUveRbIviFImuxkat; (method of section). viFIenHtMrUveGaykat;Ggát;tamTisEkgeTAnwgG½kSrbs;Ggát;Rtg;cMnucEdleKRtUvkarkMNt; kMlaMgkñúg. eKRtUvKUrdüaRkamGgÁesrIénkMNat;Ggát;nImYy²Edl)ankat; rYckMNt;kMlaMgkñúgedayGnuvtþ smIkarlMnwgeTAelIkMNat;Ggát;enaH. CaTUeTA kMlaMgkñúgEdlmanGMeBIenAelImuxkat;rbs;Ggát;Edlkat; rYmmankMlaMgEkg (normal force) N / kMlaMgkat; (shear force) V nigm:Um:g;Bt; (bending moment) karviPaKrcnasm<½n§kMNt;edaysþaTic T.Chhay -35
  • 13. mhaviTüal½ysMNg;sIuvil viTüasßanCatiBhubec©keTskm<úCa M dUcbgðajenAkñúgrUbTI 2-17. eyIgnwgBiBN’naeKalkarN_sþaTicEdleRbIedIm,IkMNt;RbtikmμxageRkAenAelIeRKOgbgÁúMenAkñúg kfaxNÐ 2.5. eyIgnwgBiPakSaBIkMlaMgkñúgenAkñgGgát;eRKOgbgÁúMenAkñúgCMBUkTI 4. ú @>$> PaBkMNt; nigsßirPaB (Determinacy and stability) muxnwgcab;epþImviPaKkMlaMgrbs;eRKOgbgÁúM eKcaM)ac;kMNt;nUvPaBkMNt; nigsßirPaBrbs;eRKOgbgÁúM. PaBkMNt; (determinacy): smIkarlMnwgpþl;nUvlkçxNÐcaM)ac; nigRKb;RKan;sMrab;lMnwg. enAeBl EdlRKb;kMlaMgTaMgGs;enAkñúgeRKOgbgÁúMGackMNt;edayeRbIsmIkarlMnwgxagelI enaHeKehAeRKOgbgÁúM enaHCa eRKOgbgÁúMkMNt;edaysþaTic (statically determinate structure). sMrab;eRKOgbgÁúMEdlmancMnYn kMlaMgCaGBaØateRcInCagcMnYnsmIkarEdlGacman eKeGayeQμaHvafa eRKOgbgÁúMminkMNt;edaysþaTic (statically indeterminate structure). tamc,ab;TUeTA eKGackMNt;faeRKOgbgÁúMmYyCaeRKOgbgÁúMkMNt; edaysþaTic b¤k¾eRKOgbgÁúMminkMNt;edaysþaTicedayKUrdüaRkamGgÁesrIénGgát;TaMgGs;rbs;va b¤épñkén Ggát;EdleRCIserIs ehIybnÞab;mkeRbobeFobcMnYnGBaØatsrubEdlCakMlaMg nigm:Um:g;CamYynwgcMnYn srubénsmIkarlMnwgEdlGacman*. sMrab;eRKOgbgÁúMkñúgbøg; eKmansmIkarlMnwgbIsMrab;Ggát;nImYy² dUcenHRb sinebIeKmanGgát;srubcMnYn n ehIykMlaMgRbtikmμ nigm:Um:g;RbtikmμcMnYn r enaHeyIg)an r = 3n / kMNt;edaysþaTic r > 3n / minkMNt;edaysþaTic (2-3) CaebIvaCaeRKOgbgÁúMminkMNt;edaysþaTic enaHeKRtUvkarsmIkarbEnßmedIm,IedaHRsayrkRbtikmμEdlCaGBaØatedayP¢ab;TMnak;TMngrvagbnÞúkGnuvtþ n_ nigRbtikmμeTAnwgbMlas;TI b¤mMurgVilenARtg;cMnucepSgKñaenAelIRKOgbgÁúM. smIkarTaMgenHCasmIkarRtUv Kña (compatibility equation) ehIyvaRtUvmancMnYnesμInwgdWeRkénPaBminkMNt;rbs;eRKOgbgÁúM. smIkar compatibility Tak;TgnwglkçN³FrNImaRt niglkçN³rUbrbs;eRKOgbgÁúM ehIyeyIgnwgelIkykvamk * karKUrdüaRkamGgÁesrImincaM)ac;CaTUeTAeT edaysareKGacrab;cMnUnGBaØat ehIyeFVIkareRbobeFobCamYynwgcMnUnsmIkar lMnwg)an. Analysis of Statically Determinate Structures T.Chhay -36
  • 14. Department of Civil Engineering NPIC BN’naenAkñúgCMBUkTI 10. ]TahrN_ 2>3³ cat;cMNat;fñak;rbs;FñwmnImYy²EdlbgðajenAkñúgrUbTI 2-18 a rhUtdl; 2-18 d Ca eRKOgbgÁúMkMNt;edaysþaTic b¤eRKOgbgÁúMminkMNt;edaysþaTic. eKsnμt;faeKsÁal;kMlaMgEdlGnuvtþmin elIFñwm ehIyvaGacmanGMeBIenARKb;TItaMgTaMgGs;rbs;Fñwm. dMeNaHRsay³ eKRtUvpþac;FñwmpSM (compound beam) enAkñúgrUbTI 2-18c nig 2-18d EdlpSMeLIgGgát;EdltP¢ab;Kña edaytMNsnøak;ecjBIKña. cMNaMfa enAkñúgkrNITaMgenH kMlaMgRbtikmμEdlCaGBaØatEdlmanGMeBIenA cenøaH Ggát;nImYy²RtUv)anbgðajCaKU EtmanTispÞúyKña. düRkamGgÁesrIRtUv)anbgðaj. edayGnuvtþ r = 3n b¤ r > 3n lT§plénkarcat;cMNat;fñak;RtUv)anbgðaj. ]TahrN_ 2>4³ cat;cMNat;fñak;rbs;eRKOgbgÁúMEdltP¢ab;edaytMNsnøak;EdlbgðajenAkñúgrUbTI 2-19 a rhUtdl; 2-19 d CaeRKOgbgÁúMkMNt;edaysþaTic b¤CaeRKOgbgÁúMminkMNt;edaysþaTic. RbsinebIvaCa eRKOgbgÁúMminkMNt;edaysþaTic cUrR)ab;BIcMnYnéndWeRkénPaBminkMNt;. eRKOgbgÁúMrgnUvbnÞúkxageRkAEdl karviPaKrcnasm<½n§kMNt;edaysþaTic T.Chhay -37
  • 15. mhaviTüal½ysMNg;sIuvil viTüasßanCatiBhubec©keTskm<úCa eKsnμt;sÁal; ehIyvamanGMeBIenARKb;TItaMgTaMgGs;rbs;eRKOgbgÁúM. dMeNaHRsay³ karcat;cMNat;fñak;én;eRKOgbgÁúMEdltP¢ab;edaytMNsnøak;manlkçN³RsedogKñanwgFñwmEdr. düRkamGgÁ esrIRtUv)anbgðaj. edayGnuvtþ r = 3n b¤ r > 3n lT§plénkarcat;cMNat;fñak;RtUv)anbgðaj. ]TahrN_ 2>5³ cat;cMNat;fñak;rbs;eRKagEdlbgðajenAkñúgrUbTI 2-20a nig2-20d CaeRKOgbgÁúM kMNt;edaysþaTic b¤CaeRKOgbgÁúMminkMNt;edaysþaTic. RbsinebIvaCa eRKOgbgÁúMminkMNt;edaysþaTic cUrR)ab;BIcMnYnéndWeRkénPaBminkMNt;. eRKOgbgÁúMrgnUvbnÞúkxageRkAEdl eKsnμt;sÁal; ehIyvaman GMeBIenARKb;TItaMgTaMgGs;rbs;eRKOgbgÁúM. dMeNaHRsay³ karkMNt;sßirPaB nigPaBkMNt;rbs;eRKOgbgÁúMeRKagmindUcKñanwgkarkMNt;sMrab;Fñwm nigeRKOgbgÁúMEdlt Analysis of Statically Determinate Structures T.Chhay -38
  • 16. Department of Civil Engineering NPIC P¢ab;edaytMNsnøak;eT eRBaHeRKagpSMeLIgedayGgát;EdltP¢ab;Kñaedaysnøak;rwg. eBlxøHGgát;begáIt tMbn;biTCitxagkñúg dUcenAkñúgrUbTI 2-20a. enATIenH ABCD begáIttMbn;biTCit. edIm,Icat;cMNat;fñak; rbs;eRKOgbgÁúMTaMgenH eKcaM)ac;RtUveRbIviFImuxkat; ehIykat;EpñkEdlbiTCit. eRkayeBleKKUrdüaRkam GgÁesrIrbs;EpñkEdlkat;rYcehIy enaHeKGaccat;cMNat;fñak;rbs;eRKag)an. cMNaMfa eKRtUvkarEtEpñk mYyrbs;muxkat;Edlkat;tamtMbn;biTCit. enAeBlEdleKkMNt;GBaØatenARtg;muxkat;rYcehIy eKGac kMNt;kMlaMgkñúgenARKb;cMnucTaMgGs;enAkñúgGgát;edayeRbIviFImuxkat; nigsmIkarlMnwg. eRKagenAkñúgrUbTI 2-20b manmintMbn;biTCit dUcenHedIm,IrkPaBkMBt;vaminRtUvkarkarkat;cenøaHTMreT. lT§plénkarcat; cMNat;fñak;RtUv)anbgðajenAkñúgrUbTI 2-20a nig 2-20b. sßirPaB (stability): edIm,IFananUvsßanPaBlMnwgrbs;eRKOgbgÁúM nigGgát;rbs;va eKminRtwmEtbMeBj smIkarlMnwgb:uENÑaHeT b:uEnþGgát;RtUvEtTb; (constraint) y:agl¥ nigRtwmRtUvedayTMrrbs;va. sßanPaB BIrnwgekItmaneLIgenAeBlNaEdlTMrmin)anTb;RtwmRtUv. karTb;mineBjelj (partial constraints): enAkñúgkrNIxøH eRKOgbgÁúM b¤Ggát;rbs;vaGacman kMlaMgRbtikmμticCagsmIkarlMnwgEdlRtUvbMeBj eBlenaHeRKOgbgÁúMnwgkøayCaeRKOgbgÁúMEdlTb;mineBj elj (partially constrained structure). ]TahrN_ eKmanGgát;EdlbgðajenAkñúgrUbTI 2-21 CamYy nwgdüaRkamGgÁesrIrbs;va. enATIenHsmIkar ∑ Fx = 0 minRtUv)anbMeBjsMrab;lkçxNÐdak;bnÞúk dUcenH Ggát;KμansßirPaB. karviPaKrcnasm<½n§kMNt;edaysþaTic T.Chhay -39
  • 17. mhaviTüal½ysMNg;sIuvil viTüasßanCatiBhubec©keTskm<úCa karTb;minRtwmRtUv (improper constraints): enAkñúgkrNIxøHEdlcMnYnénkMlaMgEdlCaGBaØat nig cMnYnénsmIkarlMnwgesμIKña b:uEnþvaenAEtGaceFIVeGayeRKOgbgÁúMcl½t)an b¤KμansßirPaB edaysarEtkarTb; minRtwmRtUvrbs;TMr. krNIEbbenHekItmanenAeBlEdlExSskmμénkMlaMgRbtikmμrbs;TMrkat;KñaRtg;cMnuc mYy. ]TahrN_sMrab;krNIRtUv)anbgðajenAkñúgrUbTI 2-22. BIdüaRkamGgÁesrIrbs;Fñwm eyIgeXIjfa plbUkm:Um:g;Rtg;cMnuc O nwgminesμIsUnüeT ¬ Pd ≠ 0 ¦ dUcenHvanwgekItmankarvilCuMvijcMnuc O . Analysis of Statically Determinate Structures T.Chhay -40
  • 18. Department of Civil Engineering NPIC viFImü:ageTotEdlkarTb;minRtwmRtUvrbs;TMrnaMeGaymaneRKOgbgÁúMKμansßirPaBekItmanenAeBl EdlkMlaMgRbtikmμTaMgGs;manTisRsbKña. ]TahrN_sMrab;krNIRtUv)anbgðajenAkñúgrUbTI 2-23. enA eBlEdleKGnuvtþkMlaMgeRTt P plbUkkMlaMgtamTisedknwgminesμIsUnüeT. CaTUeTA eRKOgbgÁúMnwgKμansßirPaBedaylkçN³FrNImaRt ¬rMkiltictYc b¤dYlrlM¦ RbsinebIva mankMlaMgRbtikmμticCagsmIkarlMnwg b¤RsinebIvamankMlaMgRbtikmμRKb;RKan; EtGsßirPaBrbs;nwgekIt manRbsinebIExSskmμénkMlaMgRbtikmμkat;KñaRtg;cMnucmYy b¤k¾RsbKña. RbsinebIeRKOgbgÁúMpSMeLIgeday Ggát;eRcIn eKGackMNt;GsßirPaBrbs;Ggát;mYy b¤rbs;Ggát;eRcInedaykarGegát. RbsinebIGgát;begáIt collapsible mechanism )an eRKOgbgÁúMnwgminmansßirPaB. eyIgGackMNt;sßirPaBtamrUbmnþ)ansMrab; eRKOgbgÁúMkñúgbøg;Edlman n nigGBaØatEdlCakMlaMgRbtikmμ r ehIyedaysarGgát;nImYy²RtUvman smIkarlMnwgcMnYnbI enaH r < 3n KμansßirPaB r ≥ 3n KμansßirPaBenAeBlEdlkMlaMgRbtikmμrbs;Ggát; kat;KñaRtg;cMnucmYy b¤RsbKña b¤Ggát;xøHbegáIt collapse mechanism (2-4) eKRtUveCosvaRbePTeRKOgbgÁúMEdlKμansßirPaBeTaHbICavaCaeRKOgbgÁúMkMNt;edaysþaTic b¤eRKOg bgÁúMminkMNt;edaysþaTick¾eday. ]TahrN_ 2>6³ cUrcat;cMNat;fñak;rbs;eRKOgbgÁúMnImYy²enAkñúgrUbTI 2-24a rhUtdl;2-24e CaeRKOg bgÁúMmansßirPaB b¤KμansßirPaB. eRKOgbgÁúMrgnUvbnÞúkxageRkANamYyEdleyIgsnμt;vasÁal;. dMeNaHRsay³ eRKOgbgÁúMRtUv)ancat;cMNat;fñak;dUcbgðajkñúgrUb. karviPaKrcnasm<½n§kMNt;edaysþaTic T.Chhay -41
  • 19. mhaviTüal½ysMNg;sIuvil viTüasßanCatiBhubec©keTskm<úCa Analysis of Statically Determinate Structures T.Chhay -42
  • 20. Department of Civil Engineering NPIC @>%> karGnuvtþénsmIkarlMnwg (Application of the equation of equilibrium) eBlxøH Ggát;rbs;eRKOgbgÁúMRtUv)antP¢ab;KñaedaytMNEdleKsnμt;faCatMNsnøak;. eRKagGKar nig truss CaRbePTeRKOgbgÁúMEdlCaerOy²sagsg;edayeRbItMNEbbenH. kñúgkrNIeRKOgbgÁúMkñúgbøg; EdltP¢ab;edaysnøak;mankarTb;RtwmRtUv nigminmanTMrelIs b¤Ggát;elIsedIm,IkarBarkardYlrlM enaHeK GackMlaMgEdlmanGMeBIenARtg;tMN nigenARtg;TMredayGnuvtþsmIkarlMnwgTaMgbI ¬ ∑ Fx = 0 / ∑ Fy = 0 ∑ M O = 0 ¦ eTAelIGgát;nImYy². enAeBlEdleKTTYl)ankMlaMgenARtg;tMN eKGacsikSaKNaTMhM rbs;Ggát; kartP¢ab; nigTMredayEp¥kelI design code specification. edIm,IbgðajBIviFIénkarviPaKkMlaMg BicarNaeRKagEdlmanGgát;bIdUcbgðajenAkñúgrUbTI 2-25a EdlrgnUvbnÞúk P1 nig P2 . düaRkamGgÁesrIrbs;Ggát;nImYy²RtUv)anbgðajenAkñúgrUbTI 2-25b. Ca srub eKmanGBaØatTaMgGs; 9 ehIyeKmansmIkarlMnwgTaMgGs; 9 EdlGgát;nImYy²mansmIkarlMnwg 3 dUcenHeRKOgbgÁúMenHCaeRKOgbgÁúMkMNt;edaysþaTic. sMrab;dMeNaHRsayCak;Esþg ¬eBlxøHmanlkçN³ gayRsYl¦ eKGacBicarNaeRKagCaEpñk b¤k¾eRKagTaMgmUl enAeBlEdlGnuvtþsmIkarxøHénsmIkarTaMg 9 enH. Ca]TahrN_ düaRkamGgÁesrIéneRKagTaMgmUlRtUv)anbgðajenAkñúgrUbTI 2-25c. eKGackMNt; kMlaMgRbtikmμTaMgbI Ax / Ay nig C x enAelIRbB½n§eRKOgbgÁúMEdltP¢ab;edaytMNsnøak;rwgraMenH bnÞab;mk viPaKGgát;BIrkñúgcMeNamGgát;TaMgGs;enAkñúgrUbTI 2-25b edIm,ITTYl)anGBaØat 6 epSgeTot. elIsBI enH eKGacRtYtBinitücMeLIyCaEpñkedayGnuvtþsmIkarlMnwgTaMgbIeTAelIGgát;TIbIEdlenAsl;. Casegçb eKGacedaHRsaybBaðaenHedaysresrsmIkarlMnwgy:ageRcInNas;cMnYn 9 edayeRbIdüaRkamGgÁesrIén Ggát;nImYy² nig / b¤bnSMénGgát;EdltP¢ab;. smIkareRkABIsmIkarTaMg 9 xagelIRtUv)aneRbIedIm,IRtYt BinitülT§pl. karviPaKrcnasm<½n§kMNt;edaysþaTic T.Chhay -43
  • 21. mhaviTüal½ysMNg;sIuvil viTüasßanCatiBhubec©keTskm<úCa LÚvBicarNaeRKagEdlmanGgát;BIrdUcbgðajenAkñúgrUbTI 2-26a . enATIenHdüaRkamGgÁesrI rbs;Ggát;bgðajGBaØatcMnYn 6 ¬rUbTI 2-26b¦ ehIyeyIgGacsresrsmIkarlMnwgcMnYn 6 EdlGgát; nImYy²mansmIkarlMnwgcMnYn 3 dUcenHvaCaeRKOgbgÁúMkMNt;edaysþaTic. dUckñúgkrNIelIkmun eKk¾Gac eRbIdüaRkamGgÁesrIrbs;eRKOgbgÁúMTaMgmUl ¬rUbTI 2-26c¦ edIm,IviPaKpgEdr. dUcbgðajenAkñúgrUb eRKagnwgdYlrlMRbsinebIKμanTMr edayvanwgvilCMuvijsnøak; B EtkrNIenHnwgminekItmaneT edaysar RbB½n§kMlaMgEdlmanGMeBIenAelIeRKagTaMgGs;eFVIeGayeRKagmanlMnwg. dUcenH eKGacKNnaGBaØatTaMg 6 enHedayGnuvtþsmIkarlMnwgTaMgbIeTAelIeRKagTaMgmUl ¬rUbTI 2-26c¦ ehIydUcKñaGnuvtþsmIkarTaMg bIeTAelIGgát;mYykñúgcMeNamGgát;TaMgBIr. ]TahrN_TaMgBIrxagelIbgðajfa RbsinebIeRKagRtUv)anRTedayTMrd¾RtwmRtUv nigminmanTMr b¤ Ggát;caM)ac;eRcInCagenHedIm,IkarBarkardYlrlM enaHeRKagCaeRKagkMNt;edaysþaTic ehIyeKGackMNt; GBaØatEdlCakMlaMgenARtg;TMr nigtMNBIsmIkarlMnwgedayGnuvtþeTAelIGgát;nImYy². ehIyRbsinebI eRKOgbgÁúMenAEtrwgmaM ¬minGacdYlrlM¦ enAeBleKdkTMrecj ¬rUbTI 2-25c¦ enaHeKGackMNt;Rbtikmμ TMrTaMgbIedayGnuvtþsmIkarlMnwgeTAelIeRKOgbgÁúMTaMgmUl. b:uEnþRbsinebIeRKOgbgÁúMbgðajPaBminrwgmaM ¬GacdYlrlM¦ bnÞab;BIeKdkTMrecj ¬rUbTI 2-26c¦ enaHeKRtUvpþac;Ggát;TaMgenaHecjBIKña ehIyeKRtUv BicarNalMnwgrbs;Ggát;nImYy²edIm,ITTYl)ansmIkarRKb;RKan;edIm,IkMNt;RbtikmμTMrTaMgGs;. Analysis of Statically Determinate Structures T.Chhay -44
  • 22. Department of Civil Engineering NPIC dMeNIrkarkñúgkarviPaK (Procedure for analysis) CMhanxageRkampþl;nUvviFIsMrab;kMNt;kMlaMgRbtikmμsMrab;eRKOgbgÁúMEdlpSMedayGgát;EdltP¢ab; edaytMNsnøak;. düaRkamGgÁesrI (Free-body diagrams) pþac;rcnasm½<n§ nigKUrdüaRkamGgÁesrIénGgát;nImYy². ehIy vanwgkan;EtgayRsYl Rbsin ebIeyIgKUrdüaRkamGgÁesrIrbs;eRKOgbgÁúMTaMgmUlbEnßmBIelIdüaRkamGgÁesrIrbs;Ggát;nI- mYy². eKGackMNt;RbtikmμTMrxøH b¤TaMgGs;edayeRbIdüaRkamenH. eyIgRtUvcgcaMfakMlaMgRbtikmμrbs;Ggát;BIreFVIGMeBICamYynwgTMhMesμIKña b:uEnþmanTisedApÞúy KñaenAelIdüaRkamGgÁesrIrbs;Ggát;. enAkñúgkrNIxøH eyIgGacdwgBITisedArbs;kMlaMgEdlCaGBaØat b:uEnþRbsinebIeyIgBi)akkñúg karkMNt;TisedArbs;va eyIgGacsnμt;)an. smIkarlMnwg (Equation of equilibrium) rab;cMnYnGBaØatsrubedIm,IeGayc,as;faeKGacsresrcMnYnsmIkarlMnwgsmmUlsMrab;kar edaHRsay. CaTUeTAeKGacsresrsmIkarlMnwgbIsMrab;Ggát;nImYy² elIkElgGgát;Edl mankMlaMgBIr. dMeNaHRsaysMrab;GBaØatnwgminsμúKsμaj RbsinebIeKGnuvtþsmIkarm:Um:g; ∑ M O = 0 kan; EteRcIn. enAeBlGnuvtþsmIkarkMlaMg ∑ Fx = 0 nig ∑ Fy = 0 eKRtUvbMEbkkMlaMgpÁÜbeGayeTACa bgÁúMkMlaMgtamG½kS x nigG½kS y . RbsinebIdMeNaHRsayénsmIkarlMnwgeGayCaTMhMGviC¢mansMrab;kMlaMg b¤m:Um:g;KUEdlCa GBaØat vabgðajfaTisedArbs;k,alRBYjpÞúyBIGVIEdleyIg)ansnμt;enAelIdüaRkamGgÁesrI. ]TahrN_ 2>7³ kMNt;kMlaMgRbtikmμenAelIFñwmEdlbgðajenAkñúgrUbTI 2-27a. karviPaKrcnasm<½n§kMNt;edaysþaTic T.Chhay -45
  • 23. mhaviTüal½ysMNg;sIuvil viTüasßanCatiBhubec©keTskm<úCa dMeNaHRsay³ düaRkamGgÁesrI³ dUcbgðajenAkñúgrUbTI 2-27b kMlaMg 270kN RtUv)anbMEbkCabgÁúMkMlaMgtamG½kS x nig y . elIsBIenH eKminRtUvkarrgVas;RbEvg 2.1m eT edaysarm:Um:g;KUKμanviucT½r (free vector) ehIyeKGac GnuvtþvaenARKb;TItaMgTaMgGs;rbs;FñwmsMrab;KNnakMlaMgRbtikmμ. smIkarlMnwg³ edayGnuvtþsmIkar 2-2 CabnþbnÞab; edayeRbIlT§plEdlKNnaBIxagelI eyIg)an³ + → ∑ Fx = 0 Ax − 270 cos 60 o = 0 Ax = 135kN / + ∑ M A = 0 − 270 sin 60 o (3) + 270 cos 60 o (0.3) + B y (4.2) − 67.5 = 0 B y = 173.4kN + ↑ ∑ Fy = 0 − 270 sin 60o + 173.4 + Ay = 0 Ay = 60.4kN ]TahrN_ 2>8³ kMNt;kMlaMgRbtikmμenAelIFñwmenAkñúgrUbTI 2-28 a. dMeNaHRsay³ düaRkamGgÁesrI³ dUcbgðajenAkñúgrUbTI 2-28b kMlaMgBRgayragctuekaNBñayRtUv)anbMElgCakMlaMg BRgayragRtIekaN nigBRgayesμI. kMlaMgBRgayragRtIekaN nigBRgayesμIRtUv)ansMEdgCakMlaMgpÁÜb. kMlaMgpÁÜbTaMgenHmanGMeBIkat;tamTIRbCMuTMgn;rbs;RkLaépÞkMlaMgEdlRtUvKña. smIkarlMnwg³ edayGnuvtþsmIkar 2-2 CabnþbnÞab; edayeRbIlT§plEdlKNnaBIxagelI eyIg)an³ + → ∑ Fx = 0 Ax = 0 + ↑ ∑ Fy = 0 Ay − 60 − 60 = 0 Ay = 120kN / + ∑ M A = 0 − 60(4 ) − 60(6 ) + M A = 0 M A = 600kN .m c]TahrN_ 2>9³ kMNt;kMlaMgRbtikmμenAelIFñwmenAkñúgrUbTI 2-29 a. snμt;fa A CaTMrsnøak; ehIy B CaTMrkl; ¬épÞrelag¦. Analysis of Statically Determinate Structures T.Chhay -46
  • 24. Department of Civil Engineering NPIC dMeNaHRsay³ düaRkamGgÁesrI³ dUcbgðajenAkñúgrUbTI 2-29b TMrkl;enARtg;cMnuc B GnuvtþkMlaMgEkgeTAelIFñwmenA Rtg;cMnucEdlvab:H. ExSskmμénkMlaMgTaMgenHRtUv)ankMNt;edayRtIekaN 3-4-5. smIkarlMnwg³ bMEbkkMlaMg N B eGayeTACabgÁúMkMlaMgtamTis x nigtamTis y ehIyedayeFVIpl bUkm:Um:g;Rtg;cMnuc A eyIgnwgTTYl)ankMlaMg N B edaypÞal;. edayeRbIlT§plenH eyIgGacTTYl)an Ax nig Ay . ⎛3⎞ ⎛4⎞ +∑MA = 0 − 15.75(10.5) + N B ⎜ ⎟(3) + N B ⎜ ⎟(1.2) = 0 N B = 6kN ⎝5⎠ ⎝5⎠ + Ax − (6) = 0 4 → ∑ Fx = 0 Ax = 4.8kN 5 Ay − 15.75 + (6 ) = 0 3 + ↑ ∑ Fy = 0 Ay = 12.15kN 5 ]TahrN_ 2>10³ FñwmpSMenAkñúgrUbTI 2-30 a RtUv)anbgáb;enARtg;cMnuc A . kMNt;kMlaMgRbtikmμenA Rtg; A / B nig C . snμt;fa B CatMNsnøak; ehIy C CaTMrkl;. karviPaKrcnasm<½n§kMNt;edaysþaTic T.Chhay -47
  • 25. mhaviTüal½ysMNg;sIuvil viTüasßanCatiBhubec©keTskm<úCa dMeNaHRsay³ düaRkamGgÁesrI³ düaRkamGgÁesrIénkMNat;Ggát;nImYy²RtUv)anbgðajenAkñúgrUbTI 2-30b. ehtuGVIk¾ lMhat;enHCaeRKOgbgÁúMkMNt;edaysþaTic? smIkarlMnwg³ eKmanGBaØatTaMgGs;6. edayGnuvtþsmIkarlMnwgTaMg6 eyIg)an sMrab;kMNat; BC ³ + ∑MC = 0 − 8 + B y (4.5) = 0 B y = 1.78kN + → ∑ Fx = 0 Bx = 0 + ↑ ∑ Fy = 0 − 1.78 + C y = 0 C y = 1.78kN sMrab;kMNat; AB ³ +∑MA = 0 M A − 36(3) + 1.78(6 ) = 0 M A = 97.3kN .m + → ∑ Fx = 0 Ax − 0 = 0 + ↑ ∑ Fy = 0 Ay − 36 + 1.78 = 0 Ay = 34.2kN ]TahrN_ 2>11³ eRKOgbgÁúMEdlbgðajenAkñúgrUb RTkMral nigBüÜrTUk. m:UEDleRKOgbgÁúMEdlbgðaj enAkñúgrUbenHRtUv)anbgðajenAkñúgrUbTI 2-31a EdleyIgsnμt;fa A CaTMrkl; ehIy B CaTMrsnøak;. edayeRbIkUdkñúgtMbn; (local code) bnÞúkkMralEdl snμt;RtUv)aneTAelIr:tKW 6kN / m . xül;Gnuvtþ kMlaMgpÁÜbtamTisedk 4kN dUcbgðaj ehIym:as;rbs;TUkEdlBüÜreTAnwgr:tKW 23Mg . TIRbCMuTMgn;rbs; m:as;TUksßitenARtg; G . kMNt;kMlaMgRbtikmμenARtg;TMr. Analysis of Statically Determinate Structures T.Chhay -48
  • 26. Department of Civil Engineering NPIC dMeNaHRsay³ düaRkamGgÁesrI³ enATIenH eyIgnwgBicarNaTUk nigr:tCaRbB½n§EtmYy ¬rUbTI 2-31b¦. dUcbgðaj eK RtUvdak;bnÞúkpÁÜbCMnYseGaybnÞúkBRgay. smIkarlMnwg³ edayGnuvtþsmIkar 2-2 CabnþbnÞab;. eyIg)an + → ∑ Fx = 0 4 − Bx = 0 + ∑MB = 0 22.8(1.90 ) − Ay (2) + 225.6(5.40) − 4(0.30) = 0 Ay = 630.2kN = 630kN + ↑ ∑ Fy = 0 630.2 − B y − 22.8 − 225.6 = 0 B y = 382kN cMMNaMfa³ RbsinebIeKBicarNar:tEtmYysMrab;karviPaK enaHkMlaMgEkgenARtg;cMnuc C nig D RtUv)anKit dMbUgedayeRbIdüaRkamGgÁesrIénTUk. kMlaMgTaMgenHnwgmanRbsinebIkabTajTUkeGayb:Hp¥wbnwgcMnuc TaMgBIr. kMlaMgEkgEdlmanTMhMesμIKña EtTisenApÞúyKñaenARtg;cMnuc C nwgeFVIGMeBIeTAelIr:t enAeBleK EdleKBicarNadüaRkamGgÁesrIrbs;va. eKnwgTTYl)anlT§pldUcKña. b:uEnþ edayBicarNaRbB½n§TUk nigr:t kMlaMgEkg nigkMlaMgkabkøayeTACakMlaMgkñúg ehIyminRtUv)aneKykmkKiteT. ]TahrN_ 2>12³ kMNt;bgÁúMkMlaMgRbtikmμedk nigQrenARtg;snøak; A / B nig C rbs;eRKagEdlman GgÁt;BIrdUcbgðajenAkñúgrUbTI 2-32a. karviPaKrcnasm<½n§kMNt;edaysþaTic T.Chhay -49
  • 27. mhaviTüal½ysMNg;sIuvil viTüasßanCatiBhubec©keTskm<úCa dMeNaHRsay³ düaRkamGgÁesrI³ düaRkamGgÁesrIénGgát;nImYy²RtUv)anbgðajenAkñúgrUbTI 2-32b. smIkarlMnwg³ edayGnuvtþnUvsmIkarlMnwgcMnYn6 enAkñúgCMhanbnþbnÞab;GnuBaØateGayeyIgTTYl)an dMeNaHRsaysMrab;GBaØatTaMg6edaypÞal;. sMrab;Ggát; BC ³ + ∑MC = 0 − B y (2) + 6(1) = 0 B y = 3kN sMrab;Ggát; AB ³ +∑MA = 0 − 8(2 ) − 3(2 ) + Bx (1.5) = 0 Bx = 14.7kN + → ∑ Fx = 0 Ax + 3 (8) − 14.7 = 0 Ax = 9.87kN 5 Ay − (8) − 3 = 0 4 + ↑ ∑ Fy = 0 Ay = 9.40kN 5 sMrab;Ggát; BC ³ + → ∑ Fx = 0 14.7 − C x = 0 C x = 14.7kN + ↑ ∑ Fy = 0 3 − 6 + Cy = 0 C y = 3kN ]TahrN_ 2>13³ RCugrbs;GKarenAkñúgrUbTI 2-33a rgnUvbnÞúkxül;EdlbegáItCasMBaFEkgBRgay esμI 15kPa enAelICBa¢aMgEdlRbQmnwgTisxül;bk; (windward side) nigrgsMBaFbWt (suction pressure) 5kPa enAelICBa¢aMgEdlminRbQmnwgTisxül;bk; (leeward side). kMNt;bgÁúMkMlaMgRbtikmμ edk nigQrenARtg;snøak; A / B nig C énTMrrbs; gable arch. Analysis of Statically Determinate Structures T.Chhay -50
  • 28. Department of Civil Engineering NPIC dMeNaHRsay³ edaysarbnÞúkCabnÞúkBRgayelIépÞ enaHeKRtUvbMElgbnÞúkenHeGayeTACabnÞúkBRgayelIbnÞat; mann½y fa gable arch kNþalRTnUvbnÞúkEdleFVIGMeBIenAelICBa¢aMg nigdMbUlrbs;épÞrgsMBaFEdlmanBN’dit. bnÞúkBRgayelIenAelIRCugEdlRtUvnwgTisxül;bk;KW (15kN / m 2 )(4m) = 60kN / m ehIyenAelIRCug mYyeTotKW (5kN / m 2 )(4m) = 20kN / m ¬rUbTI 2-33b¦. düaRkamGgÁesrI³ edaysMrYlKitbnÞúkBRgayCabnÞúkpÁÜbcMcMnuc düaRkamGgÁesrIrbs;eRKagTaMgmUl nigrbs;Ggát;nImYy²RtUv)anbgðajenAkñúgrUbTI 2-33c. smIkarlMnwg³ eKRtUveCosvagdMeNaHRsaykñúgeBlEtmYy edayGnuvtþsmIkarlMnwgenAkñúgCMhanbnþbnÞab;dUcbgðajenAkñúg]TahrN_xagelI . * eRKagTaMgmUl³ +∑MA = 0 − (180 + 60 )(1.5) − (254.6 + 84.9 )cos 45o (4.5) − (254.6 sin 45o )(1.5) + (84.9 sin 45o )(4.5) + C y (6) = 0 C y = 240.0kN + ↑ ∑ Fy = 0 − Ay − 254.6 sin 45o + 84.9 sin 45o + 240.0 = 0 Ay = 120.0kN sMrab;Ggát; AB ³ + ∑MB = 0 − Ax (6) + 120.0(3) + 180(4.5) + 254.6(2.12) = 0 Ax = 285.0kN + → ∑ Fx = 0 − 285.0 + 180 + 254.6 cos 45o − Bx = 0 Bx = 75.0kN + ↑ ∑ Fy = 0 − 120.0 − 254.6 sin 45o + B y = 0 B y = 300.0kN sMrab;Ggát; BC ³ + → ∑ Fx = 0 − C x + 60 + 84.9 cos 45o + 75.0 = 0 C x = 195.0kN * eKk¾GacedaHRsay]TahrN_enHedayGnuvtþsmIkarlMnwgEtcMnYn6eTAelIGgát;TaMgBI. RbsinvaGaceTArYc vaCakarRbesIrEdl dMbUleyIgRtUv eFVIplbUkm:Um:gRtg;cMnuc A enAelIGgát; AB bnÞab;mkRtg;cMnuc C enAelIGgát; CB. edayeFVIEbbenH eyIgnwg TTYl)anBIrsmIkarsMrab;edaHRsayrk B nig B kñúgeBlCamYyKña. x y karviPaKrcnasm<½n§kMNt;edaysþaTic T.Chhay -51
  • 29. mhaviTüal½ysMNg;sIuvil viTüasßanCatiBhubec©keTskm<úCa cMeNaT 2>1> eKeRbIeRKagmYyeGayRTkMraleQI ¬min BE nig FD . yk b = 3m / a = 2.4m . CMnYy³ bgðaj¦ EdlvargbnÞúkBRgayesμI 6.5kN / m 2 . emIltarag 1-3. KUrbgðajBIbnÞúkEdlmanGMeBIenAelIGgát; BG nig ABCD . yk b = 3m / a = 1.5m . 2>4> edaHRsaycMeNaT 2-3/ CamYynwg b = 3 .6 m / a = 1 .2 m . 2>2> kMraldMbUlénGKarEdlmankMBs;mYyCan; 2>5> eKeRbIeRKageQIedIm,IRTkMraleQI. bgðaj rgnUvbnÞúkefr nigbnÞúkGefr 6kN / m 2 . Rbsin bnÞúkEdlmanGMeBIelIGgát; BG nig ABCD . yk b = 3m / a = 1.5m . CMnYy³ emIltarag 1-4. ebIrnUtmanKMlatBIKña1.2m ehIyr:tmanKMlat 7.5m BIKña cUrkMNt;bnÞúkBRgayEdleFVIGMeBIelI rnUt DF nigbnÞúkEdleFVIGMeBIelIr:tenARtg;cMnuc A / B / C / D nig E . 2>6> edaHRsaycMeNaT 2-5/ CamYynwg b = 2 .4 m / a = 2 .4 m . 2>7> edaHRsaycMeNaT 2-5/ CamYynwg b = 4.5m / a = 3m . 2>8> cat;cMNat;fñak;éneRKOgbgÁúMnImYy²CaeRKOg bgÁúMkMNt;edaysþaTic eRKOgbgÁúMminkMNt;edaysþa 2>3> eKeRbIeRKagEdkedIm,IRTkMralebtugGarem: Tic eRKOgbgÁúMmansßirPaB b¤eRKOgbgÁúMKμanesßr PaB. TMgn;RsalkMras; 100mm EdlRTbnÞúkBRgayesμI RbsinebICaeRKOgbgÁúMminkMNt;edaysþaTic 25kN / m 2 . bgðajbnÞúkEdlmanGMeBIelIGgát; cUrkMNt;BIdWeRkénPaBminkMNt;. Problems T.Chhay -52
  • 30. Department of Civil Engineering NPIC 2>10> cat;cMNat;fñak;éneRKOgbgÁúMnImYy²Ca eRKOgbgÁúMkMNt;edaysþaTic eRKOgbgÁúMminkMNt; edaysþaTic b¤eRKOgbgÁúMKμansßirPaB. RbsinebICa eRKOg bgÁúMminkMNt;edaysþaTic cUrkMNt;BIdWeRkén PaBminkMNt;. 2>9> cat;cMNat;fñak;éneRKOgbgÁúMnImYy²CaeRKOg bgÁúMkMNt;edaysþaTic eRKOgbgÁúMminkMNt;edaysþa Tic b¤eRKOgbgÁúMKμansßirPaB. RbsinebICaeRKOg bgÁúMminkMNt;edaysþaTic cUrkMNt;BIdWeRkénPaB minkMNt;. 2>11> cat;cMNat;fñak;éneRKOgbgÁúMnImYy²Ca eRKOgbgÁúMkMNt;edaysþaTic eRKOgbgÁúMminkMNt; edaysþaTic b¤eRKOgbgÁúMKμansßirPaB. RbsinebICa eRKOgbgÁúMminkMNt;edaysþaTic cUrkMNt;BIdWeRkén PaBminkMNt;. cMeNaT T.Chhay -53
  • 31. mhaviTüal½ysMNg;sIuvil viTüasßanCatiBhubec©keTskm<úCa edaysþaTic b¤eRKOgbgÁúMKμansßirPaB. RbsinebICa eRKOgbgÁúMminkMNt;edaysþaTic cUrkMNt;BIdWeRkén PaBminkMNt;. TMr nigtMNTaMgGs;RtUv)ansnμt; dUcbgðaj. 2>12> cat;cMNat;fñak;éneRKOgbgÁúMnImYy²Ca eRKOgbgÁúMkMNt;edaysþaTic eRKOgbgÁúMminkMNt; edaysþaTic b¤eRKOgbgÁúMKμansßirPaB. RbsinebICa eRKOgbgÁúMminkMNt;edaysþaTic cUrkMNt;BIdWeRkén PaBminkMNt;. TMr nigsnøak;RtUv)ansnμt;dUc bgðaj. 2>14> cat;cMNat;fñak;éneRKOgbgÁúMnImYy²Ca eRKOgbgÁúMkMNt;edaysþaTic eRKOgbgÁúMminkMNt; edaysþaTic b¤eRKOgbgÁúMKμansßirPaB. RbsinebICa eRKOgbgÁúMminkMNt;edaysþaTic cUrkMNt;BIdWeRkén PaBminkMNt;. tMNTaMgGs;CatMNrwg b¤tMNbgáb;. 2>13> cat;cMNat;fñak;éneRKOgbgÁúMnImYy²Ca eRKOgbgÁúMkMNt;edaysþaTic eRKOgbgÁúMminkMNt; Problems T.Chhay -54
  • 32. Department of Civil Engineering NPIC 2>16> cat;cMNat;fñak;éneRKOgbgÁúMnImYy²Ca eRKOgbgÁúMkMNt;edaysþaTic eRKOgbgÁúMminkMNt; edaysþaTic b¤eRKOgbgÁúMKμansßirPaB. RbsinebICa eRKOgbgÁúMminkMNt;edaysþaTic cUrkMNt;BIdWeRkén PaBminkMNt;. TMr nigtMNTaMgGs;RtUv)ansnμt; 2>15> cUrkMNt;BIdWeRkénPaBminkMNt;rbs; dUcbgðaj. eRKOgbgÁúMminkMNt;edaysþaTic. tMNTaMgGs; CatMNrwg b¤tMNbgáb;. cMeNaT T.Chhay -55
  • 33. mhaviTüal½ysMNg;sIuvil viTüasßanCatiBhubec©keTskm<úCa 2>20> kMNt;kMlaMgRbtikmμenAelIFñwm. 2>21> kMNt;kMlaMgRbtikmμenAelIFñwm. 2>17> kMNt;kMlaMgRbtikmμenAelIFñwm. eKsnμt; TMrenARtg; B CaTMrkl; nigminKitBIkMras;rbs;Fñwm. 2>22> kMNt;kMlaMgRbtikmμenARtg;TMr A nig B . kMral CD / DE / EF nig FG bBa¢ÚnbnÞúkrbs;va eTAelIr:ttamTMrkl;. snμt; A CaTMrkl; nig B CaTMrsnøak;. 2>18> kMNt;kMlaMgRbtikmμenARtg;TMr A nig B . snμt; A CaTMrkl; nig B CaTMrsnøak;. 2>23> KNnakMlaMgRbtikmμenARtg;TMr A nig B énFñwmpSM. enARtg; C CatMNsnøak;. 2>19> kMNt;kMlaMgRbtikmμenAelIFñwm. Problems T.Chhay -56
  • 34. Department of Civil Engineering NPIC 2>24> eKeRbIRKwHeCIgtagedIm,IRTbnÞú 50kN . kM- Nt;GaMgtg;sIuet w1 nig w2 énbnÞúkBRgayEdl manGMeBIenAelI)atrbs;RKWHedIm,IeGaymanlMnwg. 2>28> eKeRbIeCIgtagkugs‘ul (cantilever footing) edIm,IRTCBa¢aMgenAEk,rcugEKmrbs;RKwH A dUcenH vaeFVIeGaymansMBaFdIrayesμIenABI eRkamRKwH. kMNt;bnÞúkBRgayesμIcaM)ac; wA nig wB EdlKitCa kN / m enARtg;RKwH A nig B edIm,I 2>25> kMNt;kMlaMgRbtikmμenAelIFñwm. RTbnÞúkCBa¢aMg 40kN nig100kN . 2>26> KNnakMlaMgRbtikmμenARtg;TMrrelag C nigenARtg;TMrsnøak; A . snμt; B CatMNbgáb; . 2>29> kMNt;kMlaMgRbtikmμenARtg;TMr A nig B rbs; truss. bnÞúkBRgayRtUv)anbgáeLIgeday sarxül;. 2>27> KNnakMlaMgRbtikmμenARtg;TMrrelag A nigenARtg;TMrsnøak; B . tMN C CatMNbgáb; . cMeNaT T.Chhay -57
  • 35. mhaviTüal½ysMNg;sIuvil viTüasßanCatiBhubec©keTskm<úCa 2>30> dgsÞÚc jib crane mantMNsnøak;enARtg; A nigmanTMr smooth collar enARtg; B . kMNt; bMlas;TI x énbnÞúk 22.5kN dUcenHvaeFVIeGayman kMlaMgRbtikmμGtibrma nigGb,brma. KNnakM- laMgRbtikmμenAkñúgkrNInImYy². snμt;eKecal TMgn;rbs;dgsÞúc. eKtMrUveGay1.2m ≤ x ≤ 3m . 2>33> kMNt;bgÁúMkMlaMgRbtikmμedk nigQrenA Rtg;TMr A nig B . tMNenARtg; C nig D CatMN bgáb; . 2>31> kMNt;kMlaMgRbtikmμenARtg;TMr A nig B 2>34> kMNt;kMlaMgRbtikmμenARtg;TMr A / B nig éneRKag. snμt;fa A CaTMrkl;. E . snμt; B CaTMrkl;. 2>35> kMNt;kMlaMgRbtikmμenARtg;TMr A / B / C nig D . 2>32> kMNt;kMlaMgRbtikmμenARtg;TMr A nig B rbs; truss. bnÞúkBRgayRtUv)anbgáeLIgeday sarxül;. Problems T.Chhay -58
  • 36. Department of Civil Engineering NPIC 2>36> kMNt;kMlaMgRbtikmμenRtg;TMrsMrab;FñwmpSM. eKmansnøak;enARtg; A / E nig F . 2>37> sMNg;s<anRtUv)anbgðajenAkñúgrUb. enATI enHeyIgeXIjfa truss kNþal CD RtUv)anRT 2>40> kMNt;kMlaMgRbtikmμenARtg; A / B . snμt; eday truss ly ABC nig DEF . C nig D B CaTMrkl; ¬TMrrGil¦ C CatMNrwg. CatMNsnøak;. kMNt;RbtikmμbBaÄrenARtg;TMr A / B / E nig F RbsinebIbnÞúk 60kN manGMeBIenA elI truss kNþal. 2>38> kMNt;kMlaMgRbtikmμenARtg;TMr A / C nig D. 2>41> kMNt;kMlaMgRbtikmμenARtg;TMr A nig B . 2>42> eRKags<anmYypSMeLIgedaybIkMNat; Edl 2>39> kMNt;kMlaMgRbtikmμenARtg; A nig C . eKKitfa A / D nig E Casnøak; ehIy C nig F snμt;fa A CaTMrkl; B CatMNbgáb; nig C Ca CaTMr rocker É B CaTMrkl;. kMNt;bgÁúMkMlaMgRbti tMNsnøak;. kmμtamTisedk nigTisQrenARKb;TMrTaMgGs; EdlbNþalBIbnÞúkEdl)anbgðaj. cMeNaT T.Chhay -59
  • 37. mhaviTüal½ysMNg;sIuvil viTüasßanCatiBhubec©keTskm<úCa 2>43> kMNt;bgÁúMkMlaMgRbtikmμedk nigQrenA Rtg; A / B nig C . snμt;eKP¢ab;eRKagedaytMN snøak;enARtg;cMnucTaMgenH ehIy D nig E CatMN 2>46> kMNt;kMlaMgRbtikmμenARtg;TMr A nig D . rwg. snμt;fa A CaTMrbgáb; ehIy B / C nig D Casnøak;. 2>44> kMNt;kMlaMgRbtikmμenARtg;TMr A nig B . tMN C nig D CatMNrwg. 2>47> kMNt;kMlaMgRbtikmμenARtg;TMr A nig C . eRKagRtUv)antP¢ab;edaytMNsnøak;enARtg; A / B nig C ehIytMNTaMgBIrCaTMrrwg. 2>45> kMNt;bgÁúMkMlaMgRbtikmμedk nigQrenA Rtg;TMr A nig B . Problems T.Chhay -60
  • 38. Department of Civil Engineering NPIC 2>48> kMNt;kMlaMgRbtikmμenARtg;tMN A / B nig C . snμt;tMNnImYy²CatMNsnøak; ehIytMN B CatMNrwg. KMerag³ pøÚvrfePøIgRtUv)anRTedayeRKagebtug Garem:. snμt;r:tTMrsmBaØBIrRTEdk rail nigkMral pøÚvrfePøIgEdlmanTMgn; 7.5kN / m nigRTbnÞúk rbs;rfePøIg 100kN / m ¬rUbxageRkam¦. r:t nImYy²manRbEvg 100kN / m . GnuvtþbnÞúkTaMg 2>49> kMNt;bgÁúMkMlaMgRbtikmμenARtg;tMN A nig enHeTAelIeRKags<anTaMgmUl ehIykMNt;kMlaMg C én gable frame. snμt;fa A / B nig C Ca sgát;enAkñúgssrrbs;va. sMrab;karviPaKsnμt;fa tMNsnøak;. eKdak;bnÞúkenARtg;cMnuc D / E / F tMNTaMgGs;CatMNsnøak; ehIyecalTMrg;rbs; nig G EkgeTAnwgG½kSrbs;r:tnImYy². eRKag. etIkarsnμt;tMNTaMgGs;CatMNsnøak;Gac TTYlyk)aneTsMrab;PaBCak;Esþg? 2>50> kMNt;bgÁúMkMlaMgRbtikmμedk nigQrenA Rtg;TMr A / B nig C . snμt;faeRKagRtUv)antP¢ab; edaytMNsnøak;enARtg; A / B / D / E nig F É C CaTMrbgáb;. cMeNaT T.Chhay -61