1.5.4 Basic protection (protection against direct contact)
1.5.4.1 General
Protection shall be provided against dangers that may arise
from
contact with parts of the electrical installation that are live in
normal
service.
1.5.4.2 Methods of protection
Basic protection shall be provided by one or any combination of
the
following methods:
(a) Insulation, in accordance with Clause 1.5.4.3.
(b) Barriers or enclosures, in accordance with Clause 1.5.4.4.
(c) Obstacles, in accordance with Clause 1.5.4.5.
(d) Placing out of reach, in accordance with Clause 1.5.4.6.
RCDs are not recognized as a sole means of basic protection
against
contact with live parts but may be used to augment one of the
above
methods.
1.5.4.3 Protection by insulation
Live parts shall be completely covered with insulation capable of
withstanding the mechanical, chemical, electrical and thermal
influences to
which they may be subjected in service, and that can only be
removed by
destruction
.NOTE: Paints, varnishes, enamels or similar products alone are
not generally
considered as providing adequate insulation for basic protection.
For commercially manufactured electrical equipment, the
insulation shall
comply with the relevant Standard for the electrical equipment.
1.5.4.4 Protection by barriers or enclosures
(a) Degree of protection Live parts shall be inside enclosures or behind
barriers that provide a degree of protection of at least—
(i) IPXXB or IP2X; and
(ii) IP4X for horizontal top surfaces that are readily accessible.
NOTE: This applies in particular to parts of enclosures that might serve as
a—
(A) floor; or
(B) surface where objects on surrounding surfaces may be displaced
into openings.
Larger openings are allowable in electrical equipment where they may
be necessary for the proper operation and functioning of electrical
equipment, or where they are required for the replacement of parts,
such as lamps or fuses. In such cases—
(1) suitable precautions shall be taken to prevent unintentional
contact with live parts; and
(2) as far as practicable, persons shall be advised that live parts can
be touched through the opening and should not be touched
intentionally.
(b) Constructional requirements Barriers and enclosures shall be firmly
secured in place and shall have adequate stability and strength to
withstand any appreciable distortion that might be caused by the
stresses likely to occur in normal operation, including external
influences, so that the required degrees of protection and separation
from live parts are maintained.
The removal of barriers, opening of enclosures, or withdrawal of parts
of enclosures (doors, casings, lids, covers and the like) shall not be
possible.
Exception: The removal of barriers is permitted where one of the
following conditions apply:
(i) The use of a key or tool is required.
NOTE: Electrical equipment complying with an appropriate Standard
that allows the removal of barriers or enclosures by an alternative
COPYRIGHT
(ii) An interlocking device is fitted that requires—
(A) switching off, or automatic disconnection, of the supply to all
live parts protected by the barrier or enclosure that might be
touched accidentally during or after the removal, opening or
withdrawal process; and
(B) the barrier or enclosure to be replaced or closed before the
supply can normally be switched on.
NOTE: Account should be taken of danger that may exist from the
stored energy of power capacitors in electrical equipment or the
capacitive effect of electrical equipment, such as busways that have
been isolated from the supply.
(iii) An intermediate barrier is provided that—
(A) prevents contact with all live parts when the barrier or
enclosure is removed; and
(B) is permanently in position, or arranged so that it is
automatically put in position when the barrier or enclosure is
removed; and
(C) requires the use of a key or tool to remove. is not prohibited.
1.5.4.5 Protection by obstacles
The method of protection ‘use of obstacles’ shall only be used
in installations where access is restricted to:
(a) competent persons; or
(b) persons under the supervision of competent persons.
Obstacles shall prevent either—
(i) unintentional bodily approach to live parts; or
(ii) unintentional contact with live parts during the operation of
live electrical equipment in normal service. Obstacles may be
removed without the use of a key or tool but shall be secured to
prevent unintentional removal.
NOTE: Obstacles are intended to prevent unintentional contact
with live parts but not intentional contact by deliberate
circumvention of the obstacle.


1.5.4.6 Protection by placing out of reach
The method of protection ‘placing out of reach’ shall only be
used in
installations where access is restricted to—
(a) competent persons; or
(b) persons under the supervision of competent persons.
Simultaneously accessible parts at different voltages shall not
be within
arm’s reach.
NOTES:
1 Two parts are deemed to be simultaneously accessible if they
are not more
than 2.5 m apart.
2 Placing out of arm’s reach is intended only to prevent
unintentional contact
with live parts.
3 The term ‘arm’s reach’ is defined in Clause 1.4.12 and
illustrated in
Figure 1.1
6protectiondirectcontact

More Related Content

What's hot

MU Electrical safety
MU Electrical safetyMU Electrical safety
MU Electrical safetytblackley
 
Manual de usuario estacion total topcon serie gpt 3000 lw (1)
Manual de usuario estacion total topcon serie gpt 3000 lw (1)Manual de usuario estacion total topcon serie gpt 3000 lw (1)
Manual de usuario estacion total topcon serie gpt 3000 lw (1)Elkin Del Castillo delcastillo
 
Mitsubishi inverter fr-a700-instruction-manualbasic dienhathe.vn
Mitsubishi inverter fr-a700-instruction-manualbasic dienhathe.vnMitsubishi inverter fr-a700-instruction-manualbasic dienhathe.vn
Mitsubishi inverter fr-a700-instruction-manualbasic dienhathe.vnDien Ha The
 
Samsung ps43d450a2wxzg chassis_f82a_sm
Samsung ps43d450a2wxzg chassis_f82a_smSamsung ps43d450a2wxzg chassis_f82a_sm
Samsung ps43d450a2wxzg chassis_f82a_smMalik Arif
 
Si veichi solar pump inverter
Si veichi solar pump inverterSi veichi solar pump inverter
Si veichi solar pump inverterNav Ahmed
 
5.7 Insulation Test 1
5.7 Insulation Test 15.7 Insulation Test 1
5.7 Insulation Test 1Talia Carbis
 

What's hot (10)

MU Electrical safety
MU Electrical safetyMU Electrical safety
MU Electrical safety
 
Manual de usuario estacion total topcon serie gpt 3000 lw (1)
Manual de usuario estacion total topcon serie gpt 3000 lw (1)Manual de usuario estacion total topcon serie gpt 3000 lw (1)
Manual de usuario estacion total topcon serie gpt 3000 lw (1)
 
Mitsubishi inverter fr-a700-instruction-manualbasic dienhathe.vn
Mitsubishi inverter fr-a700-instruction-manualbasic dienhathe.vnMitsubishi inverter fr-a700-instruction-manualbasic dienhathe.vn
Mitsubishi inverter fr-a700-instruction-manualbasic dienhathe.vn
 
Electricity on site
Electricity on siteElectricity on site
Electricity on site
 
Samsung ps43d450a2wxzg chassis_f82a_sm
Samsung ps43d450a2wxzg chassis_f82a_smSamsung ps43d450a2wxzg chassis_f82a_sm
Samsung ps43d450a2wxzg chassis_f82a_sm
 
Exloc is hj
Exloc is hjExloc is hj
Exloc is hj
 
Intrinsic safety
Intrinsic safetyIntrinsic safety
Intrinsic safety
 
Si veichi solar pump inverter
Si veichi solar pump inverterSi veichi solar pump inverter
Si veichi solar pump inverter
 
Electrical Safety Training by ISRI
Electrical Safety Training by ISRIElectrical Safety Training by ISRI
Electrical Safety Training by ISRI
 
5.7 Insulation Test 1
5.7 Insulation Test 15.7 Insulation Test 1
5.7 Insulation Test 1
 

Viewers also liked

Viewers also liked (20)

7.4.1colour1
7.4.1colour17.4.1colour1
7.4.1colour1
 
13.3.1
13.3.113.3.1
13.3.1
 
10.3.3
10.3.310.3.3
10.3.3
 
6.1.1 Parallel Ac Circuits
6.1.1 Parallel Ac Circuits6.1.1 Parallel Ac Circuits
6.1.1 Parallel Ac Circuits
 
4current
4current4current
4current
 
8.2.3
8.2.38.2.3
8.2.3
 
3.1.1 Magnetising
3.1.1 Magnetising3.1.1 Magnetising
3.1.1 Magnetising
 
4.1.1 Principles
4.1.1 Principles4.1.1 Principles
4.1.1 Principles
 
8.2.6
8.2.68.2.6
8.2.6
 
6.5.2 Example
6.5.2 Example6.5.2 Example
6.5.2 Example
 
7.1.1introduction
7.1.1introduction7.1.1introduction
7.1.1introduction
 
5protection
5protection5protection
5protection
 
3circuitbreakers
3circuitbreakers3circuitbreakers
3circuitbreakers
 
6.2.1 Analyzing Parallel
6.2.1 Analyzing Parallel6.2.1 Analyzing Parallel
6.2.1 Analyzing Parallel
 
13.1.5
13.1.513.1.5
13.1.5
 
3.5.1 Circuits
3.5.1 Circuits3.5.1 Circuits
3.5.1 Circuits
 
12scientificnotation B
12scientificnotation B12scientificnotation B
12scientificnotation B
 
7.1.5potentiometer
7.1.5potentiometer7.1.5potentiometer
7.1.5potentiometer
 
Lighting
LightingLighting
Lighting
 
Microsoft TechDays 2012 France - BPOS301 La réversibilité des données dans le...
Microsoft TechDays 2012 France - BPOS301 La réversibilité des données dans le...Microsoft TechDays 2012 France - BPOS301 La réversibilité des données dans le...
Microsoft TechDays 2012 France - BPOS301 La réversibilité des données dans le...
 

Similar to 6protectiondirectcontact

2008 26 spring_wiring_matters_electric_shock
2008 26 spring_wiring_matters_electric_shock2008 26 spring_wiring_matters_electric_shock
2008 26 spring_wiring_matters_electric_shockBhagwati Prasad Jangir
 
International Journal of Computational Engineering Research (IJCER)
International Journal of Computational Engineering Research (IJCER) International Journal of Computational Engineering Research (IJCER)
International Journal of Computational Engineering Research (IJCER) ijceronline
 
Electrical wiring systems and safety devices.pptx
Electrical wiring systems and safety devices.pptxElectrical wiring systems and safety devices.pptx
Electrical wiring systems and safety devices.pptxsubhasmitain
 
Electrical Safety in healthcare.
Electrical Safety in healthcare.Electrical Safety in healthcare.
Electrical Safety in healthcare.Ahmad Thanin
 
MSOSH-Electrical Safety-Day 1-26.06.2023.pdf
MSOSH-Electrical Safety-Day 1-26.06.2023.pdfMSOSH-Electrical Safety-Day 1-26.06.2023.pdf
MSOSH-Electrical Safety-Day 1-26.06.2023.pdfNateJames12
 
17th Edition Parts 53 To 56
17th  Edition Parts 53 To 5617th  Edition Parts 53 To 56
17th Edition Parts 53 To 56Paul Holden
 
ELECTRICAL SAFETY Training module pembelajaran
ELECTRICAL SAFETY Training module pembelajaranELECTRICAL SAFETY Training module pembelajaran
ELECTRICAL SAFETY Training module pembelajaranDianYudhakurniawan
 
Platero_Electrical_Safety_Audit.PPT.pptx
Platero_Electrical_Safety_Audit.PPT.pptxPlatero_Electrical_Safety_Audit.PPT.pptx
Platero_Electrical_Safety_Audit.PPT.pptxJayCanobar
 
Pti safety brochure
Pti safety brochurePti safety brochure
Pti safety brochurenataniels80
 
PTI Safety Brochure
PTI Safety BrochurePTI Safety Brochure
PTI Safety BrochureSENA
 
Manual de serviço tv led samsung ua32 f5500 chassis u85a
Manual de serviço tv led samsung ua32 f5500 chassis u85aManual de serviço tv led samsung ua32 f5500 chassis u85a
Manual de serviço tv led samsung ua32 f5500 chassis u85aPortal Eletrônica
 

Similar to 6protectiondirectcontact (20)

2008 26 spring_wiring_matters_electric_shock
2008 26 spring_wiring_matters_electric_shock2008 26 spring_wiring_matters_electric_shock
2008 26 spring_wiring_matters_electric_shock
 
beeeppt.pptx
beeeppt.pptxbeeeppt.pptx
beeeppt.pptx
 
International Journal of Computational Engineering Research (IJCER)
International Journal of Computational Engineering Research (IJCER) International Journal of Computational Engineering Research (IJCER)
International Journal of Computational Engineering Research (IJCER)
 
Electrical wiring systems and safety devices.pptx
Electrical wiring systems and safety devices.pptxElectrical wiring systems and safety devices.pptx
Electrical wiring systems and safety devices.pptx
 
Electrical Safety in healthcare.
Electrical Safety in healthcare.Electrical Safety in healthcare.
Electrical Safety in healthcare.
 
Basic Electrical safety.ppt
Basic Electrical safety.pptBasic Electrical safety.ppt
Basic Electrical safety.ppt
 
MSOSH-Electrical Safety-Day 1-26.06.2023.pdf
MSOSH-Electrical Safety-Day 1-26.06.2023.pdfMSOSH-Electrical Safety-Day 1-26.06.2023.pdf
MSOSH-Electrical Safety-Day 1-26.06.2023.pdf
 
17th Edition Parts 53 To 56
17th  Edition Parts 53 To 5617th  Edition Parts 53 To 56
17th Edition Parts 53 To 56
 
130935887 areva-kvfg-r8559 c
130935887 areva-kvfg-r8559 c130935887 areva-kvfg-r8559 c
130935887 areva-kvfg-r8559 c
 
LG Le50 Service Manual
LG Le50 Service ManualLG Le50 Service Manual
LG Le50 Service Manual
 
Gs38
Gs38Gs38
Gs38
 
ELECTRICAL SAFETY Training module pembelajaran
ELECTRICAL SAFETY Training module pembelajaranELECTRICAL SAFETY Training module pembelajaran
ELECTRICAL SAFETY Training module pembelajaran
 
Platero_Electrical_Safety_Audit.PPT.pptx
Platero_Electrical_Safety_Audit.PPT.pptxPlatero_Electrical_Safety_Audit.PPT.pptx
Platero_Electrical_Safety_Audit.PPT.pptx
 
Pti safety brochure
Pti safety brochurePti safety brochure
Pti safety brochure
 
Power tool safety
Power tool safetyPower tool safety
Power tool safety
 
Pti safety brochure
Pti safety brochurePti safety brochure
Pti safety brochure
 
Pti safety brochure
Pti safety brochurePti safety brochure
Pti safety brochure
 
Power tool safety
Power tool safetyPower tool safety
Power tool safety
 
PTI Safety Brochure
PTI Safety BrochurePTI Safety Brochure
PTI Safety Brochure
 
Manual de serviço tv led samsung ua32 f5500 chassis u85a
Manual de serviço tv led samsung ua32 f5500 chassis u85aManual de serviço tv led samsung ua32 f5500 chassis u85a
Manual de serviço tv led samsung ua32 f5500 chassis u85a
 

More from Talia Carbis

4.1.13 Light Demand 3
4.1.13 Light Demand 34.1.13 Light Demand 3
4.1.13 Light Demand 3Talia Carbis
 
4.1.12 Light Demand 2 Table Part2
4.1.12 Light Demand 2 Table Part24.1.12 Light Demand 2 Table Part2
4.1.12 Light Demand 2 Table Part2Talia Carbis
 
4.1.11 Light Demand 2 Table
4.1.11 Light Demand 2 Table4.1.11 Light Demand 2 Table
4.1.11 Light Demand 2 TableTalia Carbis
 
4.1.10 Light Demand 2
4.1.10 Light Demand 24.1.10 Light Demand 2
4.1.10 Light Demand 2Talia Carbis
 
4.1.9 Light Demand 1
4.1.9 Light Demand 14.1.9 Light Demand 1
4.1.9 Light Demand 1Talia Carbis
 
4.1.8 Light Demand
4.1.8 Light Demand4.1.8 Light Demand
4.1.8 Light DemandTalia Carbis
 
4.1.7 Example Domestic 3
4.1.7 Example Domestic 34.1.7 Example Domestic 3
4.1.7 Example Domestic 3Talia Carbis
 
4.1.6 Example Domestic 2
4.1.6 Example Domestic 24.1.6 Example Domestic 2
4.1.6 Example Domestic 2Talia Carbis
 
4.1.5 Example Domestic 1
4.1.5 Example Domestic 14.1.5 Example Domestic 1
4.1.5 Example Domestic 1Talia Carbis
 
4.1.3 Example Solution Three
4.1.3 Example Solution Three4.1.3 Example Solution Three
4.1.3 Example Solution ThreeTalia Carbis
 
4.1.2 Example Three
4.1.2 Example Three4.1.2 Example Three
4.1.2 Example ThreeTalia Carbis
 
4.1.1 Example Single
4.1.1 Example Single4.1.1 Example Single
4.1.1 Example SingleTalia Carbis
 
14.5.4 Example 1 Part 1
14.5.4 Example 1 Part 114.5.4 Example 1 Part 1
14.5.4 Example 1 Part 1Talia Carbis
 
14.5.8 Example 1 Part 5
14.5.8 Example 1 Part 514.5.8 Example 1 Part 5
14.5.8 Example 1 Part 5Talia Carbis
 

More from Talia Carbis (20)

7.4.6 slip
7.4.6 slip7.4.6 slip
7.4.6 slip
 
4.2.1 Better Load
4.2.1 Better Load4.2.1 Better Load
4.2.1 Better Load
 
4.1.13 Light Demand 3
4.1.13 Light Demand 34.1.13 Light Demand 3
4.1.13 Light Demand 3
 
4.1.12 Light Demand 2 Table Part2
4.1.12 Light Demand 2 Table Part24.1.12 Light Demand 2 Table Part2
4.1.12 Light Demand 2 Table Part2
 
4.1.11 Light Demand 2 Table
4.1.11 Light Demand 2 Table4.1.11 Light Demand 2 Table
4.1.11 Light Demand 2 Table
 
4.1.10 Light Demand 2
4.1.10 Light Demand 24.1.10 Light Demand 2
4.1.10 Light Demand 2
 
4.1.9 Light Demand 1
4.1.9 Light Demand 14.1.9 Light Demand 1
4.1.9 Light Demand 1
 
4.1.8 Light Demand
4.1.8 Light Demand4.1.8 Light Demand
4.1.8 Light Demand
 
4.1.7 Example Domestic 3
4.1.7 Example Domestic 34.1.7 Example Domestic 3
4.1.7 Example Domestic 3
 
4.1.6 Example Domestic 2
4.1.6 Example Domestic 24.1.6 Example Domestic 2
4.1.6 Example Domestic 2
 
4.1.5 Example Domestic 1
4.1.5 Example Domestic 14.1.5 Example Domestic 1
4.1.5 Example Domestic 1
 
4.1.4 Step 2
4.1.4 Step 24.1.4 Step 2
4.1.4 Step 2
 
4.1.3 Example Solution Three
4.1.3 Example Solution Three4.1.3 Example Solution Three
4.1.3 Example Solution Three
 
4.1.2 Example Three
4.1.2 Example Three4.1.2 Example Three
4.1.2 Example Three
 
4.1.1 Example Single
4.1.1 Example Single4.1.1 Example Single
4.1.1 Example Single
 
5.4.4 LR Circuits
5.4.4 LR Circuits5.4.4 LR Circuits
5.4.4 LR Circuits
 
14.5.4 Example 1 Part 1
14.5.4 Example 1 Part 114.5.4 Example 1 Part 1
14.5.4 Example 1 Part 1
 
14.5.3 Improve
14.5.3 Improve14.5.3 Improve
14.5.3 Improve
 
14.1.2 TRA Power
14.1.2 TRA Power14.1.2 TRA Power
14.1.2 TRA Power
 
14.5.8 Example 1 Part 5
14.5.8 Example 1 Part 514.5.8 Example 1 Part 5
14.5.8 Example 1 Part 5
 

Recently uploaded

Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 

Recently uploaded (20)

Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 

6protectiondirectcontact

  • 1. 1.5.4 Basic protection (protection against direct contact) 1.5.4.1 General Protection shall be provided against dangers that may arise from contact with parts of the electrical installation that are live in normal service. 1.5.4.2 Methods of protection Basic protection shall be provided by one or any combination of the following methods: (a) Insulation, in accordance with Clause 1.5.4.3. (b) Barriers or enclosures, in accordance with Clause 1.5.4.4. (c) Obstacles, in accordance with Clause 1.5.4.5. (d) Placing out of reach, in accordance with Clause 1.5.4.6. RCDs are not recognized as a sole means of basic protection against contact with live parts but may be used to augment one of the above methods. 1.5.4.3 Protection by insulation Live parts shall be completely covered with insulation capable of withstanding the mechanical, chemical, electrical and thermal influences to which they may be subjected in service, and that can only be removed by destruction .NOTE: Paints, varnishes, enamels or similar products alone are not generally considered as providing adequate insulation for basic protection. For commercially manufactured electrical equipment, the insulation shall comply with the relevant Standard for the electrical equipment.
  • 2. 1.5.4.4 Protection by barriers or enclosures (a) Degree of protection Live parts shall be inside enclosures or behind barriers that provide a degree of protection of at least— (i) IPXXB or IP2X; and (ii) IP4X for horizontal top surfaces that are readily accessible. NOTE: This applies in particular to parts of enclosures that might serve as a— (A) floor; or (B) surface where objects on surrounding surfaces may be displaced into openings. Larger openings are allowable in electrical equipment where they may be necessary for the proper operation and functioning of electrical equipment, or where they are required for the replacement of parts, such as lamps or fuses. In such cases— (1) suitable precautions shall be taken to prevent unintentional contact with live parts; and (2) as far as practicable, persons shall be advised that live parts can be touched through the opening and should not be touched intentionally. (b) Constructional requirements Barriers and enclosures shall be firmly secured in place and shall have adequate stability and strength to withstand any appreciable distortion that might be caused by the stresses likely to occur in normal operation, including external influences, so that the required degrees of protection and separation from live parts are maintained. The removal of barriers, opening of enclosures, or withdrawal of parts of enclosures (doors, casings, lids, covers and the like) shall not be possible. Exception: The removal of barriers is permitted where one of the following conditions apply: (i) The use of a key or tool is required. NOTE: Electrical equipment complying with an appropriate Standard that allows the removal of barriers or enclosures by an alternative COPYRIGHT (ii) An interlocking device is fitted that requires— (A) switching off, or automatic disconnection, of the supply to all live parts protected by the barrier or enclosure that might be touched accidentally during or after the removal, opening or withdrawal process; and (B) the barrier or enclosure to be replaced or closed before the supply can normally be switched on. NOTE: Account should be taken of danger that may exist from the stored energy of power capacitors in electrical equipment or the capacitive effect of electrical equipment, such as busways that have been isolated from the supply. (iii) An intermediate barrier is provided that— (A) prevents contact with all live parts when the barrier or enclosure is removed; and (B) is permanently in position, or arranged so that it is automatically put in position when the barrier or enclosure is removed; and (C) requires the use of a key or tool to remove. is not prohibited.
  • 3. 1.5.4.5 Protection by obstacles The method of protection ‘use of obstacles’ shall only be used in installations where access is restricted to: (a) competent persons; or (b) persons under the supervision of competent persons. Obstacles shall prevent either— (i) unintentional bodily approach to live parts; or (ii) unintentional contact with live parts during the operation of live electrical equipment in normal service. Obstacles may be removed without the use of a key or tool but shall be secured to prevent unintentional removal. NOTE: Obstacles are intended to prevent unintentional contact with live parts but not intentional contact by deliberate circumvention of the obstacle. 1.5.4.6 Protection by placing out of reach The method of protection ‘placing out of reach’ shall only be used in installations where access is restricted to— (a) competent persons; or (b) persons under the supervision of competent persons. Simultaneously accessible parts at different voltages shall not be within arm’s reach. NOTES: 1 Two parts are deemed to be simultaneously accessible if they are not more than 2.5 m apart. 2 Placing out of arm’s reach is intended only to prevent unintentional contact with live parts. 3 The term ‘arm’s reach’ is defined in Clause 1.4.12 and illustrated in Figure 1.1