Where We Are NowWhere We Are NowWhere We Are NowWhere We Are Now
14–2
Major Tasks of Project ClosureMajor Tasks of Project ClosureMajor Tasks of Project ClosureMajor Tasks of Project Closure
1. Evaluate if the project delivered the
expected benefits to all stakeholders.
• Was the project managed well?
• Was the customer satisfied?
1. Assess what was done wrong and
what contributed to successes.
2. Identify changes to improve
the delivery of future projects.
14–3
Project Monitoring ActivitiesProject Monitoring ActivitiesProject Monitoring ActivitiesProject Monitoring Activities
• A review of why the project was selected.
• A reassessment of the project’s role
in the organization’s priorities.
• A check on the organizational culture to ensure it
facilitates the type of project being implemented.
• An assessment of how well the project team is
functioning well and if its is appropriately staffed.
• A check on external factors that might change
where the project is heading or its importance.
• A review of all factors relevant to the project
and to managing future projects.
14–4
Project Closure and Review DeliverablesProject Closure and Review DeliverablesProject Closure and Review DeliverablesProject Closure and Review Deliverables
FIGURE 14.1
14–5
Project ClosureProject ClosureProject ClosureProject Closure
• Types of Project Closure
– Normal
– Premature
– Perpetual
– Failed Project
– Changed Priority
• Close-out Plan:
Questions to be Asked
– What tasks are required
to close the project?
– Who will be responsible
for these tasks?
– When will closure begin
and end?
– How will the project be
delivered?
14–6
Wrap-up Closure ChecklistWrap-up Closure ChecklistWrap-up Closure ChecklistWrap-up Closure Checklist
TABLE 14.1
14–7
Implementing ClosedownImplementing ClosedownImplementing ClosedownImplementing Closedown
1. Getting delivery acceptance
from the customer.
2. Shutting down resources
and releasing to new uses.
3. Reassigning project team members.
4. Closing accounts and paying all bills.
5. Evaluating the project team, project team
members, and the project manager.
14–8
Creating the Final ReportCreating the Final ReportCreating the Final ReportCreating the Final Report
• Executive Summary
– Project goals met/unmet
– Stakeholder satisfaction
with project
– User reactions to quality
of deliverables
• Analysis
– Project mission and
objective
– Procedures and
systems used
– Organization resources
used
• Recommendations
– Technical improvements
– Corrective actions
• Lessons Learned
– Reminders
– Retrospectives
• Appendix
– Backup data
– Critical information
14–9
Project Performance EvaluationsProject Performance EvaluationsProject Performance EvaluationsProject Performance Evaluations
• Reasons for Poor-Quality Project
Performance Evaluations:
–Evaluations of individuals are left to
supervisors of the team member’s
home department.
–Typically measure team performance only
on time, cost, and specifications.
14–10
Pre-Implementation Conditions: TeamPre-Implementation Conditions: TeamPre-Implementation Conditions: TeamPre-Implementation Conditions: Team
• Are standards and goals for measuring performance clear,
challenging, and attainable? Lead to positive consequences?
• Are responsibilities and performance standards known
by all team members?
• Are team rewards adequate? Management believes teams
are important?
• Is there a career path for successful project managers
• Does the team have discretionary authority to manage
short-term difficulties?
• Is there a high level of trust within the organization culture?
• Are there criteria beyond time, cost, and specifications?
14–11
Sample Team Evaluation and Feedback SurveySample Team Evaluation and Feedback SurveySample Team Evaluation and Feedback SurveySample Team Evaluation and Feedback Survey
TABLE 14.2
14–12
Project Performance Evaluation: IndividualProject Performance Evaluation: IndividualProject Performance Evaluation: IndividualProject Performance Evaluation: Individual
• Performance Assessment Responsibilities:
–Functional organization or functional matrix: the
individual’s area manager.
• The area manager may solicit the project manager’s opinion
of the individual’s performance on a specific project.
–Balanced matrix: the project manager and the area
manager jointly evaluate an individual’s performance.
–Project matrix and project organizations: the project
manager is responsible for appraising individual
performance.
14–13
Conducting Performance ReviewsConducting Performance ReviewsConducting Performance ReviewsConducting Performance Reviews
• Begin by asking the individual to evaluate his or
her own performance.
• Avoid drawing comparisons with other team members;
rather, assess the individual in terms of established
standards and expectations.
• Focus criticism on specific behaviors rather than
on the individual personally.
• Be consistent and fair in treatment of all team members.
• Treat the review as one point in an ongoing process.
14–14
Individual Performance AssessmentIndividual Performance AssessmentIndividual Performance AssessmentIndividual Performance Assessment
• Multirater appraisal (“360-degree feedback)
–Involves soliciting feedback concerning team
members’ performance from all of the people
that their work affects.
• Project managers, area managers, peers,
subordinates, and customers.
14–15
RetrospectivesRetrospectivesRetrospectivesRetrospectives
• Lessons Learned
–An analysis carried out during and shortly after the
project life cycle to capture positive and negative
project learning—“what worked and what didn’t?”
• Goals of Retrospectives
–To reuse learned solutions
–To stop repetitive mistakes
14–16
Retrospectives (cont’d)Retrospectives (cont’d)Retrospectives (cont’d)Retrospectives (cont’d)
• Barriers to Organizational Learning
–Lack of post-project time for developing lessons
–No post-project direction or support for teams
–Lessons become blame sessions
–Lessons are not applied in other locations
–Organizational culture does not recognize
value of learning
14–17
The Value of Retrospective AnalysesThe Value of Retrospective AnalysesThe Value of Retrospective AnalysesThe Value of Retrospective Analyses
• Making Retrospectives Effective:
–Use an independent facilitator to guide the project
team through the analysis project activities.
–Include a minimum of three in-process learning gates
during the life project cycle.
–Designate a team member as owner for each point in
the retrospective.
–Develop an easy-to-use learning repository to ensure
future utilization of retrospective lessons.
–Mandate use of retrospectives as part of the normal
process for all projects.
14–18
Characteristics of a FacilitatorCharacteristics of a FacilitatorCharacteristics of a FacilitatorCharacteristics of a Facilitator
1. No direct involvement or direct interest in the project.
2. Perceived as impartial and fair
3. Respect of senior management and other project
stakeholders.
4. Willingness to listen.
5. Independence and authority to report results without
fear of recriminations from special interests.
6. Perceived as having the best interests of the
organization in making decisions.
7. Broad-based experience in the organization or
industry.
14–19
Initiating the Retrospective ReviewInitiating the Retrospective Review
• Have automatic times or points when reviews will
take place. Avoid surprises.
• Conduct reviews carefully and with sensitivity
• Review staff must independent from the project.
• Review reports need to be used and accessible.
• Reviews support organizational culture
• Project closures should be planned and orderly.
• Certain “core conditions” must be in place to support
team and individual evaluation.
• Conduct individual and team evaluations separate
from pay or merit reviews.
14–20
The Retrospectives ProcessThe Retrospectives ProcessThe Retrospectives ProcessThe Retrospectives Process
FIGURE 14.2
14–21
Conducting a Retrospective AnalysisConducting a Retrospective AnalysisConducting a Retrospective AnalysisConducting a Retrospective Analysis
• Initiation and Staffing
• Data Collection and Analysis
• Reporting
14–22
Project Process Review QuestionnaireProject Process Review QuestionnaireProject Process Review QuestionnaireProject Process Review Questionnaire
TABLE 14.3
1. Were the project objectives and strategic
intent of the project clearly and explicitly
communicated?
2. Were the objectives and strategy in
alignment?
3. Were the stakeholders identified and
included in the planning?
4. Were project resources adequate for this
project?
5. Were people with the right skill sets
assigned to this project?
6. Were time estimates reasonable and
achievable?
7. Were the risks for the project
appropriately identified and assessed
before the project started?
8. Were the processes and practices
appropriate for this type of project?
Should projects of similar size and type
use these systems? Why/why not?
9. Did outside contractors perform as
expected? Explain.
10. Were communication methods
appropriate and adequate among all
stakeholders? Explain.
11. Is the customer satisfied with the
project product?
12. Are the customers using the project
deliverables as intended? Are they
satisfied?
13. Were the project objectives met?
14. Are the stakeholders satisfied their
strategic intents have been met?
15. Has the customer or sponsor accepted
a formal statement that the terms of the
project charter and scope have been
met?
16. Were schedule, budget, and scope
standards met?
17. Is there any one important area that
needs to be reviewed and improved
upon? Can you identify the cause?
14–23
Organizational Culture Review QuestionnaireOrganizational Culture Review QuestionnaireOrganizational Culture Review QuestionnaireOrganizational Culture Review Questionnaire
TABLE 14.4
1. Was the organizational culture supportive for this type of project?
2. Was senior management support adequate?
3. Were people with the right skills assigned to this project?
4. Did the project office help or hinder management of the project?
Explain.
5. Did the team have access to organizational resources (people,
funds, equipment)?
6. Was training for this project adequate? Explain.
7. Were lessons learned from earlier projects useful? Why? Where?
8. Did the project have a clear link to organizational objectives?
Explain.
9. Was project staff properly reassigned?
10. Was the Human Resources Office helpful in finding new
assignments? Comment.
14–24
Archiving RetrospectivesArchiving RetrospectivesArchiving RetrospectivesArchiving Retrospectives
• Classifying of Projects:
– Project type
– Size
– Staffing
– Technology level
– Strategic or support
– Issues and problems
– Project mission and objectives
– Procedures and systems used
– Organization resources used
14–25
Key TermsKey TermsKey TermsKey Terms
Lessons learned
Organization evaluation
Performance review
Project closure
Project evaluation
Project facilitator
Retrospective
Team evaluation
360-degree review
14–26
Appendix 14.1
Project Closeout Checklist
Project CloseoutProject Closeout
ChecklistChecklist
Project CloseoutProject Closeout
ChecklistChecklist
14–28
Appendix 14.2
Euro Conversion—
Project Closure
Checklist
Euro Conversion—Euro Conversion—
Project ClosureProject Closure
ChecklistChecklist
Euro Conversion—Euro Conversion—
Project ClosureProject Closure
ChecklistChecklist
14–30

More Related Content

What's hot

10 reasons why projects fail or common mistakes to avoid
10 reasons why projects fail or common mistakes to avoid10 reasons why projects fail or common mistakes to avoid
10 reasons why projects fail or common mistakes to avoidMarianna Semenova
 
Final Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.pptFinal Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.pptGeorgeKabongah2
 
PMP Lecture 1: Introduction to Project Management
PMP Lecture 1: Introduction to Project ManagementPMP Lecture 1: Introduction to Project Management
PMP Lecture 1: Introduction to Project ManagementMohamed Loey
 
Project Closure Activities In Project Management PowerPoint Presentation Slides
Project Closure Activities In Project Management PowerPoint Presentation Slides Project Closure Activities In Project Management PowerPoint Presentation Slides
Project Closure Activities In Project Management PowerPoint Presentation Slides SlideTeam
 
Project Management: Integration Management Knowledge Area
Project Management: Integration Management Knowledge AreaProject Management: Integration Management Knowledge Area
Project Management: Integration Management Knowledge AreaJoshua Render
 
Project Management Steps And Process PowerPoint Presentation Slides
Project Management Steps And Process PowerPoint Presentation Slides Project Management Steps And Process PowerPoint Presentation Slides
Project Management Steps And Process PowerPoint Presentation Slides SlideTeam
 
PMP Chap 13 - Project stakeholder management Overview
PMP Chap 13 - Project stakeholder management OverviewPMP Chap 13 - Project stakeholder management Overview
PMP Chap 13 - Project stakeholder management OverviewAnand Bobade
 
PMO Kick-Off Presentation
PMO Kick-Off PresentationPMO Kick-Off Presentation
PMO Kick-Off PresentationEbru Seiwert
 
Chapter 1 An Overview Of Project Management
Chapter 1  An Overview Of Project ManagementChapter 1  An Overview Of Project Management
Chapter 1 An Overview Of Project ManagementMahesh Bendigeri
 
Project integration management
Project integration managementProject integration management
Project integration managementPrabudh Dhingra
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project ManagementKris Kimmerle
 
Project audit & review checklist
Project audit & review checklistProject audit & review checklist
Project audit & review checklistRam Srivastava
 

What's hot (20)

10 reasons why projects fail or common mistakes to avoid
10 reasons why projects fail or common mistakes to avoid10 reasons why projects fail or common mistakes to avoid
10 reasons why projects fail or common mistakes to avoid
 
Final Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.pptFinal Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.ppt
 
Project closure and audit
Project closure and auditProject closure and audit
Project closure and audit
 
Project governance
Project governanceProject governance
Project governance
 
PMP Lecture 1: Introduction to Project Management
PMP Lecture 1: Introduction to Project ManagementPMP Lecture 1: Introduction to Project Management
PMP Lecture 1: Introduction to Project Management
 
Project Closure Activities In Project Management PowerPoint Presentation Slides
Project Closure Activities In Project Management PowerPoint Presentation Slides Project Closure Activities In Project Management PowerPoint Presentation Slides
Project Closure Activities In Project Management PowerPoint Presentation Slides
 
Project management
Project managementProject management
Project management
 
Overview of Program Management
Overview of Program ManagementOverview of Program Management
Overview of Program Management
 
Project Management: Integration Management Knowledge Area
Project Management: Integration Management Knowledge AreaProject Management: Integration Management Knowledge Area
Project Management: Integration Management Knowledge Area
 
Program Management Deployment Concept Consulting
Program Management Deployment Concept ConsultingProgram Management Deployment Concept Consulting
Program Management Deployment Concept Consulting
 
project management
project managementproject management
project management
 
Project Management Steps And Process PowerPoint Presentation Slides
Project Management Steps And Process PowerPoint Presentation Slides Project Management Steps And Process PowerPoint Presentation Slides
Project Management Steps And Process PowerPoint Presentation Slides
 
Project Management Concepts
Project Management ConceptsProject Management Concepts
Project Management Concepts
 
PMP Chap 13 - Project stakeholder management Overview
PMP Chap 13 - Project stakeholder management OverviewPMP Chap 13 - Project stakeholder management Overview
PMP Chap 13 - Project stakeholder management Overview
 
PMO Kick-Off Presentation
PMO Kick-Off PresentationPMO Kick-Off Presentation
PMO Kick-Off Presentation
 
Project Closing
Project ClosingProject Closing
Project Closing
 
Chapter 1 An Overview Of Project Management
Chapter 1  An Overview Of Project ManagementChapter 1  An Overview Of Project Management
Chapter 1 An Overview Of Project Management
 
Project integration management
Project integration managementProject integration management
Project integration management
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
Project audit & review checklist
Project audit & review checklistProject audit & review checklist
Project audit & review checklist
 

Viewers also liked

Project audit and closure
Project audit and closureProject audit and closure
Project audit and closureVelita Furtado
 
Project Closure Checklist
Project Closure ChecklistProject Closure Checklist
Project Closure ChecklistDemand Metric
 
Theory of Constraints and Project Management: Challenging the Dominant Paradigm
Theory of Constraints and Project Management: Challenging the Dominant ParadigmTheory of Constraints and Project Management: Challenging the Dominant Paradigm
Theory of Constraints and Project Management: Challenging the Dominant ParadigmScott Abel
 
Audit Process, Audit Procedures, Audit Planning, Auditing
Audit Process, Audit Procedures, Audit Planning, AuditingAudit Process, Audit Procedures, Audit Planning, Auditing
Audit Process, Audit Procedures, Audit Planning, AuditingAdvance Business Consulting
 
Romanian Experiences with Monitoring and Water Quality Through Agricultural P...
Romanian Experiences with Monitoring and Water Quality Through Agricultural P...Romanian Experiences with Monitoring and Water Quality Through Agricultural P...
Romanian Experiences with Monitoring and Water Quality Through Agricultural P...Iwl Pcu
 
A-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBA-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBShiva Y Cmath
 
Mining strategies for the future - Trench & Sykes - Nov 2015 - Centre for Exp...
Mining strategies for the future - Trench & Sykes - Nov 2015 - Centre for Exp...Mining strategies for the future - Trench & Sykes - Nov 2015 - Centre for Exp...
Mining strategies for the future - Trench & Sykes - Nov 2015 - Centre for Exp...John Sykes
 
Project Completion Report 2014
Project Completion Report 2014Project Completion Report 2014
Project Completion Report 2014Roshan Chitrakar
 
Project management@ ppt doms
Project management@ ppt doms Project management@ ppt doms
Project management@ ppt doms Babasab Patil
 
PM Session 6
PM Session 6PM Session 6
PM Session 6dmdk12
 

Viewers also liked (20)

Project audit and closure
Project audit and closureProject audit and closure
Project audit and closure
 
Final Project Closing
Final Project ClosingFinal Project Closing
Final Project Closing
 
Project closeout transition checklist
Project closeout transition checklistProject closeout transition checklist
Project closeout transition checklist
 
Project Closure Report
Project Closure ReportProject Closure Report
Project Closure Report
 
Project Closure Checklist
Project Closure ChecklistProject Closure Checklist
Project Closure Checklist
 
Theory of Constraints and Project Management: Challenging the Dominant Paradigm
Theory of Constraints and Project Management: Challenging the Dominant ParadigmTheory of Constraints and Project Management: Challenging the Dominant Paradigm
Theory of Constraints and Project Management: Challenging the Dominant Paradigm
 
Project audit
Project auditProject audit
Project audit
 
How to do a Project Audit
How to do a Project AuditHow to do a Project Audit
How to do a Project Audit
 
Audit Process, Audit Procedures, Audit Planning, Auditing
Audit Process, Audit Procedures, Audit Planning, AuditingAudit Process, Audit Procedures, Audit Planning, Auditing
Audit Process, Audit Procedures, Audit Planning, Auditing
 
Project management
Project managementProject management
Project management
 
Romanian Experiences with Monitoring and Water Quality Through Agricultural P...
Romanian Experiences with Monitoring and Water Quality Through Agricultural P...Romanian Experiences with Monitoring and Water Quality Through Agricultural P...
Romanian Experiences with Monitoring and Water Quality Through Agricultural P...
 
C-RE-07
C-RE-07C-RE-07
C-RE-07
 
A-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBA-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KB
 
Mining strategies for the future - Trench & Sykes - Nov 2015 - Centre for Exp...
Mining strategies for the future - Trench & Sykes - Nov 2015 - Centre for Exp...Mining strategies for the future - Trench & Sykes - Nov 2015 - Centre for Exp...
Mining strategies for the future - Trench & Sykes - Nov 2015 - Centre for Exp...
 
Project Completion Report 2014
Project Completion Report 2014Project Completion Report 2014
Project Completion Report 2014
 
Project management@ ppt doms
Project management@ ppt doms Project management@ ppt doms
Project management@ ppt doms
 
Project Management Constraints
Project Management ConstraintsProject Management Constraints
Project Management Constraints
 
Metodologia
MetodologiaMetodologia
Metodologia
 
PM Session 6
PM Session 6PM Session 6
PM Session 6
 
How to close a project
How to close a projectHow to close a project
How to close a project
 

Similar to Project audit & closure

Lecture 6 Project Audit & Closure.ppt
Lecture 6 Project Audit & Closure.pptLecture 6 Project Audit & Closure.ppt
Lecture 6 Project Audit & Closure.pptMehediHasan636262
 
Construction Management in Developing Countries, Lecture 10
Construction Management in Developing Countries, Lecture 10Construction Management in Developing Countries, Lecture 10
Construction Management in Developing Countries, Lecture 10Hari Krishna Shrestha
 
Project Management
Project ManagementProject Management
Project ManagementAtif Rehmat
 
project integration mgmt.pdf
project integration mgmt.pdfproject integration mgmt.pdf
project integration mgmt.pdfIvarsLinde1
 
Project audit and closure
Project audit and closureProject audit and closure
Project audit and closureSanjay Vaij
 
Integrated Project Management
Integrated Project ManagementIntegrated Project Management
Integrated Project ManagementInam Khosa
 
Project Cycle Management WG5.ppt
Project Cycle Management WG5.pptProject Cycle Management WG5.ppt
Project Cycle Management WG5.pptMdFarhanShahriar3
 
Project Auditing
Project AuditingProject Auditing
Project AuditingSalih Islam
 
Business Analyst vs. Project Manager - Eliminating the Confusion!
Business Analyst vs. Project Manager - Eliminating the Confusion!Business Analyst vs. Project Manager - Eliminating the Confusion!
Business Analyst vs. Project Manager - Eliminating the Confusion!Corporate Education Group (CEG)
 
223417 Diploma_Sem4_software_engg-chap-05.ppt
223417 Diploma_Sem4_software_engg-chap-05.ppt223417 Diploma_Sem4_software_engg-chap-05.ppt
223417 Diploma_Sem4_software_engg-chap-05.pptDeepgaichor1
 
Project Management - Foundation
Project Management - FoundationProject Management - Foundation
Project Management - FoundationShabbeer Zafar
 

Similar to Project audit & closure (20)

Lecture 6 Project Audit & Closure.ppt
Lecture 6 Project Audit & Closure.pptLecture 6 Project Audit & Closure.ppt
Lecture 6 Project Audit & Closure.ppt
 
Chap014
Chap014Chap014
Chap014
 
Construction Management in Developing Countries, Lecture 10
Construction Management in Developing Countries, Lecture 10Construction Management in Developing Countries, Lecture 10
Construction Management in Developing Countries, Lecture 10
 
02.pptx
02.pptx02.pptx
02.pptx
 
Project Management
Project ManagementProject Management
Project Management
 
project integration mgmt.pdf
project integration mgmt.pdfproject integration mgmt.pdf
project integration mgmt.pdf
 
Project audit and closure
Project audit and closureProject audit and closure
Project audit and closure
 
Unit 1 spm
Unit 1  spmUnit 1  spm
Unit 1 spm
 
Unit 1 spm
Unit 1  spmUnit 1  spm
Unit 1 spm
 
Integrated Project Management
Integrated Project ManagementIntegrated Project Management
Integrated Project Management
 
M & E Presentation DSK.ppt
M & E Presentation DSK.pptM & E Presentation DSK.ppt
M & E Presentation DSK.ppt
 
Project Cycle Management WG5.ppt
Project Cycle Management WG5.pptProject Cycle Management WG5.ppt
Project Cycle Management WG5.ppt
 
Hm 418 harris ch10 ppt
Hm 418 harris ch10 pptHm 418 harris ch10 ppt
Hm 418 harris ch10 ppt
 
Project Auditing
Project AuditingProject Auditing
Project Auditing
 
Project management
Project managementProject management
Project management
 
Business Analyst vs. Project Manager - Eliminating the Confusion!
Business Analyst vs. Project Manager - Eliminating the Confusion!Business Analyst vs. Project Manager - Eliminating the Confusion!
Business Analyst vs. Project Manager - Eliminating the Confusion!
 
223417 Diploma_Sem4_software_engg-chap-05.ppt
223417 Diploma_Sem4_software_engg-chap-05.ppt223417 Diploma_Sem4_software_engg-chap-05.ppt
223417 Diploma_Sem4_software_engg-chap-05.ppt
 
Project Management - Foundation
Project Management - FoundationProject Management - Foundation
Project Management - Foundation
 
Agile Project Management
Agile Project ManagementAgile Project Management
Agile Project Management
 
Project Monitoring and Evaluation (M and E Plan) Notes
Project Monitoring and Evaluation (M and E Plan) NotesProject Monitoring and Evaluation (M and E Plan) Notes
Project Monitoring and Evaluation (M and E Plan) Notes
 

More from Gopalakrishnan P

Design of an accuracy control system in ship building industry
Design of an accuracy control system in ship building  industryDesign of an accuracy control system in ship building  industry
Design of an accuracy control system in ship building industryGopalakrishnan P
 
Ship maintenance performance measurement
Ship maintenance performance measurementShip maintenance performance measurement
Ship maintenance performance measurementGopalakrishnan P
 
Brochure ifs shipbuilding (1)
Brochure ifs shipbuilding (1)Brochure ifs shipbuilding (1)
Brochure ifs shipbuilding (1)Gopalakrishnan P
 
A practical approach for ship construction cost estimation
A practical approach for ship construction cost estimationA practical approach for ship construction cost estimation
A practical approach for ship construction cost estimationGopalakrishnan P
 

More from Gopalakrishnan P (7)

Design of an accuracy control system in ship building industry
Design of an accuracy control system in ship building  industryDesign of an accuracy control system in ship building  industry
Design of an accuracy control system in ship building industry
 
Gas cyl rule5
Gas cyl rule5Gas cyl rule5
Gas cyl rule5
 
Ship maintenance performance measurement
Ship maintenance performance measurementShip maintenance performance measurement
Ship maintenance performance measurement
 
Cat
Cat Cat
Cat
 
Brochure ifs shipbuilding (1)
Brochure ifs shipbuilding (1)Brochure ifs shipbuilding (1)
Brochure ifs shipbuilding (1)
 
Sales formulas
Sales formulasSales formulas
Sales formulas
 
A practical approach for ship construction cost estimation
A practical approach for ship construction cost estimationA practical approach for ship construction cost estimation
A practical approach for ship construction cost estimation
 

Recently uploaded

Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 

Recently uploaded (20)

Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 

Project audit & closure

  • 1. Project Closure CHAPTER FOURTEEN Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin
  • 2. Where We Are NowWhere We Are NowWhere We Are NowWhere We Are Now 14–2
  • 3. Major Tasks of Project ClosureMajor Tasks of Project ClosureMajor Tasks of Project ClosureMajor Tasks of Project Closure 1. Evaluate if the project delivered the expected benefits to all stakeholders. • Was the project managed well? • Was the customer satisfied? 1. Assess what was done wrong and what contributed to successes. 2. Identify changes to improve the delivery of future projects. 14–3
  • 4. Project Monitoring ActivitiesProject Monitoring ActivitiesProject Monitoring ActivitiesProject Monitoring Activities • A review of why the project was selected. • A reassessment of the project’s role in the organization’s priorities. • A check on the organizational culture to ensure it facilitates the type of project being implemented. • An assessment of how well the project team is functioning well and if its is appropriately staffed. • A check on external factors that might change where the project is heading or its importance. • A review of all factors relevant to the project and to managing future projects. 14–4
  • 5. Project Closure and Review DeliverablesProject Closure and Review DeliverablesProject Closure and Review DeliverablesProject Closure and Review Deliverables FIGURE 14.1 14–5
  • 6. Project ClosureProject ClosureProject ClosureProject Closure • Types of Project Closure – Normal – Premature – Perpetual – Failed Project – Changed Priority • Close-out Plan: Questions to be Asked – What tasks are required to close the project? – Who will be responsible for these tasks? – When will closure begin and end? – How will the project be delivered? 14–6
  • 7. Wrap-up Closure ChecklistWrap-up Closure ChecklistWrap-up Closure ChecklistWrap-up Closure Checklist TABLE 14.1 14–7
  • 8. Implementing ClosedownImplementing ClosedownImplementing ClosedownImplementing Closedown 1. Getting delivery acceptance from the customer. 2. Shutting down resources and releasing to new uses. 3. Reassigning project team members. 4. Closing accounts and paying all bills. 5. Evaluating the project team, project team members, and the project manager. 14–8
  • 9. Creating the Final ReportCreating the Final ReportCreating the Final ReportCreating the Final Report • Executive Summary – Project goals met/unmet – Stakeholder satisfaction with project – User reactions to quality of deliverables • Analysis – Project mission and objective – Procedures and systems used – Organization resources used • Recommendations – Technical improvements – Corrective actions • Lessons Learned – Reminders – Retrospectives • Appendix – Backup data – Critical information 14–9
  • 10. Project Performance EvaluationsProject Performance EvaluationsProject Performance EvaluationsProject Performance Evaluations • Reasons for Poor-Quality Project Performance Evaluations: –Evaluations of individuals are left to supervisors of the team member’s home department. –Typically measure team performance only on time, cost, and specifications. 14–10
  • 11. Pre-Implementation Conditions: TeamPre-Implementation Conditions: TeamPre-Implementation Conditions: TeamPre-Implementation Conditions: Team • Are standards and goals for measuring performance clear, challenging, and attainable? Lead to positive consequences? • Are responsibilities and performance standards known by all team members? • Are team rewards adequate? Management believes teams are important? • Is there a career path for successful project managers • Does the team have discretionary authority to manage short-term difficulties? • Is there a high level of trust within the organization culture? • Are there criteria beyond time, cost, and specifications? 14–11
  • 12. Sample Team Evaluation and Feedback SurveySample Team Evaluation and Feedback SurveySample Team Evaluation and Feedback SurveySample Team Evaluation and Feedback Survey TABLE 14.2 14–12
  • 13. Project Performance Evaluation: IndividualProject Performance Evaluation: IndividualProject Performance Evaluation: IndividualProject Performance Evaluation: Individual • Performance Assessment Responsibilities: –Functional organization or functional matrix: the individual’s area manager. • The area manager may solicit the project manager’s opinion of the individual’s performance on a specific project. –Balanced matrix: the project manager and the area manager jointly evaluate an individual’s performance. –Project matrix and project organizations: the project manager is responsible for appraising individual performance. 14–13
  • 14. Conducting Performance ReviewsConducting Performance ReviewsConducting Performance ReviewsConducting Performance Reviews • Begin by asking the individual to evaluate his or her own performance. • Avoid drawing comparisons with other team members; rather, assess the individual in terms of established standards and expectations. • Focus criticism on specific behaviors rather than on the individual personally. • Be consistent and fair in treatment of all team members. • Treat the review as one point in an ongoing process. 14–14
  • 15. Individual Performance AssessmentIndividual Performance AssessmentIndividual Performance AssessmentIndividual Performance Assessment • Multirater appraisal (“360-degree feedback) –Involves soliciting feedback concerning team members’ performance from all of the people that their work affects. • Project managers, area managers, peers, subordinates, and customers. 14–15
  • 16. RetrospectivesRetrospectivesRetrospectivesRetrospectives • Lessons Learned –An analysis carried out during and shortly after the project life cycle to capture positive and negative project learning—“what worked and what didn’t?” • Goals of Retrospectives –To reuse learned solutions –To stop repetitive mistakes 14–16
  • 17. Retrospectives (cont’d)Retrospectives (cont’d)Retrospectives (cont’d)Retrospectives (cont’d) • Barriers to Organizational Learning –Lack of post-project time for developing lessons –No post-project direction or support for teams –Lessons become blame sessions –Lessons are not applied in other locations –Organizational culture does not recognize value of learning 14–17
  • 18. The Value of Retrospective AnalysesThe Value of Retrospective AnalysesThe Value of Retrospective AnalysesThe Value of Retrospective Analyses • Making Retrospectives Effective: –Use an independent facilitator to guide the project team through the analysis project activities. –Include a minimum of three in-process learning gates during the life project cycle. –Designate a team member as owner for each point in the retrospective. –Develop an easy-to-use learning repository to ensure future utilization of retrospective lessons. –Mandate use of retrospectives as part of the normal process for all projects. 14–18
  • 19. Characteristics of a FacilitatorCharacteristics of a FacilitatorCharacteristics of a FacilitatorCharacteristics of a Facilitator 1. No direct involvement or direct interest in the project. 2. Perceived as impartial and fair 3. Respect of senior management and other project stakeholders. 4. Willingness to listen. 5. Independence and authority to report results without fear of recriminations from special interests. 6. Perceived as having the best interests of the organization in making decisions. 7. Broad-based experience in the organization or industry. 14–19
  • 20. Initiating the Retrospective ReviewInitiating the Retrospective Review • Have automatic times or points when reviews will take place. Avoid surprises. • Conduct reviews carefully and with sensitivity • Review staff must independent from the project. • Review reports need to be used and accessible. • Reviews support organizational culture • Project closures should be planned and orderly. • Certain “core conditions” must be in place to support team and individual evaluation. • Conduct individual and team evaluations separate from pay or merit reviews. 14–20
  • 21. The Retrospectives ProcessThe Retrospectives ProcessThe Retrospectives ProcessThe Retrospectives Process FIGURE 14.2 14–21
  • 22. Conducting a Retrospective AnalysisConducting a Retrospective AnalysisConducting a Retrospective AnalysisConducting a Retrospective Analysis • Initiation and Staffing • Data Collection and Analysis • Reporting 14–22
  • 23. Project Process Review QuestionnaireProject Process Review QuestionnaireProject Process Review QuestionnaireProject Process Review Questionnaire TABLE 14.3 1. Were the project objectives and strategic intent of the project clearly and explicitly communicated? 2. Were the objectives and strategy in alignment? 3. Were the stakeholders identified and included in the planning? 4. Were project resources adequate for this project? 5. Were people with the right skill sets assigned to this project? 6. Were time estimates reasonable and achievable? 7. Were the risks for the project appropriately identified and assessed before the project started? 8. Were the processes and practices appropriate for this type of project? Should projects of similar size and type use these systems? Why/why not? 9. Did outside contractors perform as expected? Explain. 10. Were communication methods appropriate and adequate among all stakeholders? Explain. 11. Is the customer satisfied with the project product? 12. Are the customers using the project deliverables as intended? Are they satisfied? 13. Were the project objectives met? 14. Are the stakeholders satisfied their strategic intents have been met? 15. Has the customer or sponsor accepted a formal statement that the terms of the project charter and scope have been met? 16. Were schedule, budget, and scope standards met? 17. Is there any one important area that needs to be reviewed and improved upon? Can you identify the cause? 14–23
  • 24. Organizational Culture Review QuestionnaireOrganizational Culture Review QuestionnaireOrganizational Culture Review QuestionnaireOrganizational Culture Review Questionnaire TABLE 14.4 1. Was the organizational culture supportive for this type of project? 2. Was senior management support adequate? 3. Were people with the right skills assigned to this project? 4. Did the project office help or hinder management of the project? Explain. 5. Did the team have access to organizational resources (people, funds, equipment)? 6. Was training for this project adequate? Explain. 7. Were lessons learned from earlier projects useful? Why? Where? 8. Did the project have a clear link to organizational objectives? Explain. 9. Was project staff properly reassigned? 10. Was the Human Resources Office helpful in finding new assignments? Comment. 14–24
  • 25. Archiving RetrospectivesArchiving RetrospectivesArchiving RetrospectivesArchiving Retrospectives • Classifying of Projects: – Project type – Size – Staffing – Technology level – Strategic or support – Issues and problems – Project mission and objectives – Procedures and systems used – Organization resources used 14–25
  • 26. Key TermsKey TermsKey TermsKey Terms Lessons learned Organization evaluation Performance review Project closure Project evaluation Project facilitator Retrospective Team evaluation 360-degree review 14–26
  • 28. Project CloseoutProject Closeout ChecklistChecklist Project CloseoutProject Closeout ChecklistChecklist 14–28
  • 30. Euro Conversion—Euro Conversion— Project ClosureProject Closure ChecklistChecklist Euro Conversion—Euro Conversion— Project ClosureProject Closure ChecklistChecklist 14–30