SlideShare a Scribd company logo
1 of 41
<Insert Picture Here>




What’s New in Primavera P6 EPPM Release 8.1   May 19, 2011
Brian Saldutti
Oracle Primavera Product Strategy
Agenda


•   Refreshed User Interface
•   Resource Management
•   Project Management
•   Risk Management
•   Portfolio Management
•   Administration
•   Technologies
•   P6 Professional
•   Mobile
•   Reporting



                               2
Refreshed User Interface


                           3
Refreshed User Interface
                                    Main navigation moved
                                        to tabs to easily
                                     identify where you are




               Icons replaced with text for
                    easier readability




                                                              4
Refreshed User Interface




              Detailed pages modernized
                     and simplified



                                          5
Refreshed User Interface



 • Control Center Performance
 • UI Scalability




                                Buttons always appear
                                 when page scrolls to
                                   improve usability




                                                        6
Resource Management


                      7
Resource Management




                      Dates and duration fields available
                          for viewing and updating in
                          Resource Assignments tab




                                                            8
Resource Management




Filter options available when
assigning resources including
  currently opened projects




                                9
Resource Management
                      Assign resources to multiple
                        assignments at once and
                           search for best fit




                                                     10
Resource Management




                          Run Check Resource
                        Overallocation to identify
                      resource constraints that may
                           impact the project




                                                      11
Resource Management




                Automatic notification appears
                  when service is completed




                                                 12
Resource Management



                           See resource overallocation in
                                  week increments




                  Take action to fix the
                     overallocation
                                                        13
Project Management


                     14
Project Management




                     New fields available in
                           EPS View –
                      Last Scheduled Date
                       Last Leveled Date
                     Last Apply Actuals Date




                                               15
Project Management




                       Define Gantt bars
                     based on User Defined
                         Fields (UDFs)




                                             16
Project Management




                        Risk adjusted
                      schedule views to
                     reflect Risk Analysis
                              data


                                             17
Risk Management


                  18
Risk Management



 •x




                  Organize categories in a
                      hierarchy for risk
                    breakdown structure




                                             19
Risk Management



 •x




                  Copy and paste risks
                     within a single
                    project or across
                    multiple projects




                                         20
Risk Management



 •x




                  Relative thresholds support for
                   use across multiple projects




                                               21
Risk Management




                  Additional fields to better
                   track and analyze risks




                                                22
Risk Management

                  Risk exposure and score
                   available at the project
                      level for analysis




                                              23
Portfolio Management


                       24
Portfolio Management


 • Drill into WBS UDFs
                          Drill down to view
                         and edit WBS UDF’s
                          via the Dashboard
                            and Portfolios




                                               25
Administration


                 26
Project Scheduled Services




Specify a rolling date
  when configuring
  project services




                               27
Scheduled Services Status




                            Standardized log files for
                              all services including
                               translation support

                                                         28
User Sessions




            Administrators can reset
             sessions for users who
              have been locked out.




                                       29
Technologies


               30
Technologies


 New platforms
 •   Google Chrome 9 Browser
 •   Server platform – HP-UX Itanium
 •   Administration – Oracle Enterprise Manager 11g
 •   JRE 1.6.0_24+
 •   BI Publisher 11g
 •   UCM 11g
 •   Brazilian Portuguese language support


 Additional Tools
 • Project integrity checker
 • Jackrabbit to UCM migration tool




                                                      31
P6 Professional


                  32
P6 EPPM Optional Client & P6 Professional 8.1

        P6 EPPM –                                          P6 Professional –
Includes: P6 Web and Optional Client                     Supports: stand alone and work groups

                                                 Stand alone or
                                           Offline mode for P6 EPPM
            End Users using
             P6 Web client
                                                           End Users
                                                            using P6
                                                          Professional
                                                           with local           End Users using
                                                           database             P6 Professional
                                              Local P6
                                               PMDB



                                       Import/Export
             P6 PMDB                                                             P6 PMDB




                                                              End Users using
          End Users using P6                                                       End Users using
                                                              P6 Professional
            Optional Client                                                        P6 Professional




                                                                                                  33
Mobile


         34
Mobile – iPhone App


                                                    Update time spent ,
Star favorite tasks
                                                     time left & dates
                             View assigned
                             tasks by project




       Graphical indicator
         of health/status
                                                 Email comments and
                                                photos related to a task



                                                                    35 35
Mobile – Email Updates
                                      Email changes to
                                      update P6 project
   Filter list of tasks




Send email to                              View assigned
request tasks                              tasks by project




Easily mark a                           Update time spent ,
task complete                            time left & dates



                              Receive confirmation
                              message for updates
                                                          36 36
Reporting


            37
Reporting

Reporting Changes
• P6 Schema increased to store calculated fields
• Incremental update of projects via trickle process
    – Project filter, Manual or Automatic publication
• Global Publishing Services
• BI Publisher 11g support
    – Web based report layout editor
    – Create reports that combine P6 data with other data sources
• P6 Analytics
    – Unlimited number of codes supported

Benefits
•   Improved performance
•   Near real-time reporting
•   ODS an optional component for BI Reporting
•   SQL Server support


                                                                    38 38
Reporting


                P6 EPPM 8.1                                                    P6 Analytics 1.x
                                                                                     OBIEE+/SE-1
                                         Oracle BI Publisher
                                                                                          P6 Catalog

                                     Near Real-Time                         Oracle BI Interactive Dashboards
Transactional                         Operational
  Reporting                            Reporting
                                                                                         P6 Metadata

                  P6 PMDB                                                         Oracle BI Answers
                                                           Static
                   Extension Tables and Views           Operational
                                                         Reporting
                                                                                               Analytical
                                                                                               Reporting


                                                                                   Project Activity Star

                                                                                    Project History Star
                                                                 ODS
                                         ETL                                     Resource Assignment Star
                                    Periodic Extract,
                                                                                 Resource Utilization Star
                                   Transform & Load
                                        Process
                                                                       P6 Data Warehouse
                                                        P6 Reporting Database 2.x


                                                                                                               39 39
Reporting




            Project options to
            enable publication
              and set priority




                                 40
For more information please visit:

    www.oracle.com/primavera

More Related Content

What's hot

1 jazz overview-karthik_k
1 jazz overview-karthik_k1 jazz overview-karthik_k
1 jazz overview-karthik_k
IBM
 
mcAMDOIS - CAPI
mcAMDOIS - CAPImcAMDOIS - CAPI
mcAMDOIS - CAPI
mcAMDOIS
 
3 hang on_a_minute-ankur_goyal
3 hang on_a_minute-ankur_goyal3 hang on_a_minute-ankur_goyal
3 hang on_a_minute-ankur_goyal
IBM
 
Design Management with RSA 8.5: Effective Collaboration for Better Design
Design Management with RSA 8.5: Effective Collaboration for Better DesignDesign Management with RSA 8.5: Effective Collaboration for Better Design
Design Management with RSA 8.5: Effective Collaboration for Better Design
Roger Snook
 
Checking the health of your active directory enviornment
Checking the health of your active directory enviornmentChecking the health of your active directory enviornment
Checking the health of your active directory enviornment
Spiffy
 
4 agile developement_using_ccrc-sujeet_mishra
4 agile developement_using_ccrc-sujeet_mishra4 agile developement_using_ccrc-sujeet_mishra
4 agile developement_using_ccrc-sujeet_mishra
IBM
 
PabitraSubudhi_Remedy-ITSM Sr. Engineer V2.0
PabitraSubudhi_Remedy-ITSM Sr. Engineer V2.0PabitraSubudhi_Remedy-ITSM Sr. Engineer V2.0
PabitraSubudhi_Remedy-ITSM Sr. Engineer V2.0
Vyom Labs
 
Offshore Software Development, Software Testing by CAMO Solutions
Offshore Software Development, Software Testing by CAMO SolutionsOffshore Software Development, Software Testing by CAMO Solutions
Offshore Software Development, Software Testing by CAMO Solutions
CAMO Solutions LLC
 
Fujieh.maura
Fujieh.mauraFujieh.maura
Fujieh.maura
NASAPMC
 
T carlson mbontrager_wtippin_lsinger_v2
T carlson mbontrager_wtippin_lsinger_v2T carlson mbontrager_wtippin_lsinger_v2
T carlson mbontrager_wtippin_lsinger_v2
NASAPMC
 

What's hot (18)

1 jazz overview-karthik_k
1 jazz overview-karthik_k1 jazz overview-karthik_k
1 jazz overview-karthik_k
 
mcAMDOIS - CAPI
mcAMDOIS - CAPImcAMDOIS - CAPI
mcAMDOIS - CAPI
 
3 hang on_a_minute-ankur_goyal
3 hang on_a_minute-ankur_goyal3 hang on_a_minute-ankur_goyal
3 hang on_a_minute-ankur_goyal
 
Design Management with RSA 8.5: Effective Collaboration for Better Design
Design Management with RSA 8.5: Effective Collaboration for Better DesignDesign Management with RSA 8.5: Effective Collaboration for Better Design
Design Management with RSA 8.5: Effective Collaboration for Better Design
 
Checking the health of your active directory enviornment
Checking the health of your active directory enviornmentChecking the health of your active directory enviornment
Checking the health of your active directory enviornment
 
ALM for SharePoint projects
ALM for SharePoint projectsALM for SharePoint projects
ALM for SharePoint projects
 
TERMINALFOUR t44u 2012 - Product roadmap
TERMINALFOUR t44u 2012 - Product roadmapTERMINALFOUR t44u 2012 - Product roadmap
TERMINALFOUR t44u 2012 - Product roadmap
 
IBM Rational Software Conference 2009: Requirements Definition & Management T...
IBM Rational Software Conference 2009: Requirements Definition & Management T...IBM Rational Software Conference 2009: Requirements Definition & Management T...
IBM Rational Software Conference 2009: Requirements Definition & Management T...
 
Sap B1 In1 Day 30 5 2012
Sap B1 In1 Day 30 5 2012Sap B1 In1 Day 30 5 2012
Sap B1 In1 Day 30 5 2012
 
Skyward Erp Presentation
Skyward Erp PresentationSkyward Erp Presentation
Skyward Erp Presentation
 
Cics Explorer April 2009
Cics Explorer April 2009Cics Explorer April 2009
Cics Explorer April 2009
 
Estimating Packaged Software - The first part of a framework
Estimating Packaged Software - The first part of a frameworkEstimating Packaged Software - The first part of a framework
Estimating Packaged Software - The first part of a framework
 
4 agile developement_using_ccrc-sujeet_mishra
4 agile developement_using_ccrc-sujeet_mishra4 agile developement_using_ccrc-sujeet_mishra
4 agile developement_using_ccrc-sujeet_mishra
 
PabitraSubudhi_Remedy-ITSM Sr. Engineer V2.0
PabitraSubudhi_Remedy-ITSM Sr. Engineer V2.0PabitraSubudhi_Remedy-ITSM Sr. Engineer V2.0
PabitraSubudhi_Remedy-ITSM Sr. Engineer V2.0
 
Offshore Software Development, Software Testing by CAMO Solutions
Offshore Software Development, Software Testing by CAMO SolutionsOffshore Software Development, Software Testing by CAMO Solutions
Offshore Software Development, Software Testing by CAMO Solutions
 
Fujieh.maura
Fujieh.mauraFujieh.maura
Fujieh.maura
 
T carlson mbontrager_wtippin_lsinger_v2
T carlson mbontrager_wtippin_lsinger_v2T carlson mbontrager_wtippin_lsinger_v2
T carlson mbontrager_wtippin_lsinger_v2
 
project managment - wang jing yuan (Eric Wang)
project managment - wang jing yuan (Eric Wang)project managment - wang jing yuan (Eric Wang)
project managment - wang jing yuan (Eric Wang)
 

Viewers also liked

Oracle PPM. What's new in P6release 8.2?
Oracle PPM.  What's new in P6release 8.2?Oracle PPM.  What's new in P6release 8.2?
Oracle PPM. What's new in P6release 8.2?
Vladimir Ivanov
 
20160405 How to Install Primavera P6 16.1 Professional desktop
20160405 How to Install Primavera P6 16.1 Professional desktop20160405 How to Install Primavera P6 16.1 Professional desktop
20160405 How to Install Primavera P6 16.1 Professional desktop
p6academy
 

Viewers also liked (20)

Is Oracle PCM still valid - Oracle Primavera P6 Collaborate 14
Is Oracle PCM still valid - Oracle Primavera P6 Collaborate 14Is Oracle PCM still valid - Oracle Primavera P6 Collaborate 14
Is Oracle PCM still valid - Oracle Primavera P6 Collaborate 14
 
Oracle PPM. What's new in P6release 8.2?
Oracle PPM.  What's new in P6release 8.2?Oracle PPM.  What's new in P6release 8.2?
Oracle PPM. What's new in P6release 8.2?
 
Primavera P6 EPPM Portlets Index
Primavera P6 EPPM Portlets IndexPrimavera P6 EPPM Portlets Index
Primavera P6 EPPM Portlets Index
 
What's New in Primavera 15.2 Webcast
What's New in Primavera 15.2 WebcastWhat's New in Primavera 15.2 Webcast
What's New in Primavera 15.2 Webcast
 
Whats new in Primavera P6 EPPM 15.2?
Whats new in Primavera P6 EPPM 15.2?Whats new in Primavera P6 EPPM 15.2?
Whats new in Primavera P6 EPPM 15.2?
 
Primavera P6 Professional Windows 10 Installation Instructions
Primavera P6 Professional Windows 10 Installation InstructionsPrimavera P6 Professional Windows 10 Installation Instructions
Primavera P6 Professional Windows 10 Installation Instructions
 
Administering Users, Access and Views in P6 EPPM (Web) Release 8 and later
Administering Users, Access and Views in P6 EPPM  (Web) Release 8 and laterAdministering Users, Access and Views in P6 EPPM  (Web) Release 8 and later
Administering Users, Access and Views in P6 EPPM (Web) Release 8 and later
 
P6 Release 8 Installation Orientation
P6 Release 8 Installation OrientationP6 Release 8 Installation Orientation
P6 Release 8 Installation Orientation
 
Whats new in primavera p6 eppm 8.3.2 - Oracle Primavera P6 Collaborate 14
Whats new in primavera p6 eppm 8.3.2 - Oracle Primavera P6 Collaborate 14Whats new in primavera p6 eppm 8.3.2 - Oracle Primavera P6 Collaborate 14
Whats new in primavera p6 eppm 8.3.2 - Oracle Primavera P6 Collaborate 14
 
Primavera P6 installation
Primavera P6 installationPrimavera P6 installation
Primavera P6 installation
 
Primavera p6 professional windows 8 installation instructions
Primavera p6 professional windows 8 installation instructionsPrimavera p6 professional windows 8 installation instructions
Primavera p6 professional windows 8 installation instructions
 
S Curves Made Easy With Primavera P6
S Curves Made Easy With Primavera P6S Curves Made Easy With Primavera P6
S Curves Made Easy With Primavera P6
 
206430 whats new in primavera p6 rel8 3
206430 whats new in primavera p6 rel8 3206430 whats new in primavera p6 rel8 3
206430 whats new in primavera p6 rel8 3
 
20160405 How to Install Primavera P6 16.1 Professional desktop
20160405 How to Install Primavera P6 16.1 Professional desktop20160405 How to Install Primavera P6 16.1 Professional desktop
20160405 How to Install Primavera P6 16.1 Professional desktop
 
Activity Duration Types Explained with example in Primavera
Activity Duration Types Explained with example in PrimaveraActivity Duration Types Explained with example in Primavera
Activity Duration Types Explained with example in Primavera
 
Oracle Primavera P6 16.1 Released - Everything You Need To Know
Oracle Primavera P6 16.1 Released - Everything You Need To KnowOracle Primavera P6 16.1 Released - Everything You Need To Know
Oracle Primavera P6 16.1 Released - Everything You Need To Know
 
Hacking Primavera P6 - Creative Solutions to Common Problems From the Primave...
Hacking Primavera P6 - Creative Solutions to Common Problems From the Primave...Hacking Primavera P6 - Creative Solutions to Common Problems From the Primave...
Hacking Primavera P6 - Creative Solutions to Common Problems From the Primave...
 
What's New In Primavera P6 EPPM 17.1
What's New In Primavera P6 EPPM 17.1What's New In Primavera P6 EPPM 17.1
What's New In Primavera P6 EPPM 17.1
 
Managing cash flow in Primavera P6 - Oracle Primavera P6 Collaborate 14
Managing cash flow in Primavera P6 - Oracle Primavera P6 Collaborate 14Managing cash flow in Primavera P6 - Oracle Primavera P6 Collaborate 14
Managing cash flow in Primavera P6 - Oracle Primavera P6 Collaborate 14
 
Features comparison between Primavera and Microsoft Project
Features comparison between Primavera and Microsoft ProjectFeatures comparison between Primavera and Microsoft Project
Features comparison between Primavera and Microsoft Project
 

Similar to Primavera P6 8.1. What’s new

P6 EPPM Functionality
P6 EPPM FunctionalityP6 EPPM Functionality
P6 EPPM Functionality
DRMcNatty
 
LUXproject Functionality Overview R12.1
LUXproject Functionality Overview R12.1LUXproject Functionality Overview R12.1
LUXproject Functionality Overview R12.1
Alexander Zagvozdin
 
Nadeus Education Services session on Google Apps and Google App Engine
Nadeus Education Services session on Google Apps and Google App EngineNadeus Education Services session on Google Apps and Google App Engine
Nadeus Education Services session on Google Apps and Google App Engine
Nadeus Education Services
 
Revolutionizing the user_experience
Revolutionizing the user_experienceRevolutionizing the user_experience
Revolutionizing the user_experience
QuestexConf
 

Similar to Primavera P6 8.1. What’s new (20)

P6 EPPM Functionality
P6 EPPM FunctionalityP6 EPPM Functionality
P6 EPPM Functionality
 
Audaxis : BI Project for an Association of Pharmacists
Audaxis : BI Project for an Association of PharmacistsAudaxis : BI Project for an Association of Pharmacists
Audaxis : BI Project for an Association of Pharmacists
 
Tips and Tricks for Building a Web-Based Planning Application in SAP
Tips and Tricks for Building a Web-Based Planning Application in SAP Tips and Tricks for Building a Web-Based Planning Application in SAP
Tips and Tricks for Building a Web-Based Planning Application in SAP
 
The process of software architecting
The process of software architectingThe process of software architecting
The process of software architecting
 
Nuxeo in 2011: A year in review and a preview of what's next!
Nuxeo in 2011: A year in review and a preview of what's next!Nuxeo in 2011: A year in review and a preview of what's next!
Nuxeo in 2011: A year in review and a preview of what's next!
 
LUXproject Functionality Overview R12.1
LUXproject Functionality Overview R12.1LUXproject Functionality Overview R12.1
LUXproject Functionality Overview R12.1
 
Sizings primavera
Sizings primaveraSizings primavera
Sizings primavera
 
1844final 100811113357 Phpapp01
1844final 100811113357 Phpapp011844final 100811113357 Phpapp01
1844final 100811113357 Phpapp01
 
1844final 100811113357 Phpapp01
1844final 100811113357 Phpapp011844final 100811113357 Phpapp01
1844final 100811113357 Phpapp01
 
Project management in Agile Way
Project management in Agile WayProject management in Agile Way
Project management in Agile Way
 
Primavera roadmap
Primavera roadmapPrimavera roadmap
Primavera roadmap
 
Codendi Datasheet
Codendi DatasheetCodendi Datasheet
Codendi Datasheet
 
Virtualization Management With Quest V Foglight
Virtualization Management With Quest V FoglightVirtualization Management With Quest V Foglight
Virtualization Management With Quest V Foglight
 
Nadeus Education Services session on Google Apps and Google App Engine
Nadeus Education Services session on Google Apps and Google App EngineNadeus Education Services session on Google Apps and Google App Engine
Nadeus Education Services session on Google Apps and Google App Engine
 
ManageEngine Applications Manager Overview
ManageEngine Applications Manager OverviewManageEngine Applications Manager Overview
ManageEngine Applications Manager Overview
 
IPSA Mapping Software CoolMaps®
IPSA Mapping Software CoolMaps®IPSA Mapping Software CoolMaps®
IPSA Mapping Software CoolMaps®
 
Naavinya Version 4 1
Naavinya Version 4 1Naavinya Version 4 1
Naavinya Version 4 1
 
Applications at Scale
Applications at ScaleApplications at Scale
Applications at Scale
 
Revolutionizing the user_experience
Revolutionizing the user_experienceRevolutionizing the user_experience
Revolutionizing the user_experience
 
LUXproject functionality overview R11.8
LUXproject functionality overview R11.8LUXproject functionality overview R11.8
LUXproject functionality overview R11.8
 

More from Vladimir Ivanov

Сравнение Spider Project, MS Project + Turbo, Primavera + ПМСОФТ
Сравнение Spider Project, MS Project + Turbo, Primavera + ПМСОФТСравнение Spider Project, MS Project + Turbo, Primavera + ПМСОФТ
Сравнение Spider Project, MS Project + Turbo, Primavera + ПМСОФТ
Vladimir Ivanov
 
Сравнение Spider Project, MS Project + Turbo, Primavera + ПМСОФТ
Сравнение Spider Project, MS Project + Turbo, Primavera + ПМСОФТСравнение Spider Project, MS Project + Turbo, Primavera + ПМСОФТ
Сравнение Spider Project, MS Project + Turbo, Primavera + ПМСОФТ
Vladimir Ivanov
 
Project Conf 2014 hauduc
Project Conf 2014 hauducProject Conf 2014 hauduc
Project Conf 2014 hauduc
Vladimir Ivanov
 
Строители Калифорнии
Строители КалифорнииСтроители Калифорнии
Строители Калифорнии
Vladimir Ivanov
 
Учет рабочего времени в MS Project Server
Учет рабочего времени в MS Project ServerУчет рабочего времени в MS Project Server
Учет рабочего времени в MS Project Server
Vladimir Ivanov
 
Microsoft Summit: Project + SharePoint in action
Microsoft Summit: Project + SharePoint in actionMicrosoft Summit: Project + SharePoint in action
Microsoft Summit: Project + SharePoint in action
Vladimir Ivanov
 
SAP, Oracle, MS Dynamics. Market share and KPIs
SAP, Oracle, MS Dynamics. Market share and KPIsSAP, Oracle, MS Dynamics. Market share and KPIs
SAP, Oracle, MS Dynamics. Market share and KPIs
Vladimir Ivanov
 
Instantis resource management maturity model (white paper)
Instantis resource management maturity model (white paper)Instantis resource management maturity model (white paper)
Instantis resource management maturity model (white paper)
Vladimir Ivanov
 

More from Vladimir Ivanov (20)

Демонстрация Turbo Planner в Стройгазконсалтинг
Демонстрация Turbo Planner в СтройгазконсалтингДемонстрация Turbo Planner в Стройгазконсалтинг
Демонстрация Turbo Planner в Стройгазконсалтинг
 
Сравнение Spider Project, MS Project + Turbo, Primavera + ПМСОФТ
Сравнение Spider Project, MS Project + Turbo, Primavera + ПМСОФТСравнение Spider Project, MS Project + Turbo, Primavera + ПМСОФТ
Сравнение Spider Project, MS Project + Turbo, Primavera + ПМСОФТ
 
Сравнение Spider Project, MS Project + Turbo, Primavera + ПМСОФТ
Сравнение Spider Project, MS Project + Turbo, Primavera + ПМСОФТСравнение Spider Project, MS Project + Turbo, Primavera + ПМСОФТ
Сравнение Spider Project, MS Project + Turbo, Primavera + ПМСОФТ
 
презентация Turbo planner 2015
презентация Turbo planner 2015презентация Turbo planner 2015
презентация Turbo planner 2015
 
Портфолио Вадима Гери
Портфолио Вадима ГериПортфолио Вадима Гери
Портфолио Вадима Гери
 
Портфолио Владимира Иванова
Портфолио Владимира ИвановаПортфолио Владимира Иванова
Портфолио Владимира Иванова
 
Управление проектированием (ПИР/НИОКР) в Turbo Planner
Управление проектированием (ПИР/НИОКР) в Turbo PlannerУправление проектированием (ПИР/НИОКР) в Turbo Planner
Управление проектированием (ПИР/НИОКР) в Turbo Planner
 
Turbo Planner 2014
Turbo Planner 2014Turbo Planner 2014
Turbo Planner 2014
 
Project Conf 2014 hauduc
Project Conf 2014 hauducProject Conf 2014 hauduc
Project Conf 2014 hauduc
 
Строители Калифорнии
Строители КалифорнииСтроители Калифорнии
Строители Калифорнии
 
Учет рабочего времени в MS Project Server
Учет рабочего времени в MS Project ServerУчет рабочего времени в MS Project Server
Учет рабочего времени в MS Project Server
 
Microsoft Summit: Project + SharePoint in action
Microsoft Summit: Project + SharePoint in actionMicrosoft Summit: Project + SharePoint in action
Microsoft Summit: Project + SharePoint in action
 
Проекты ПИР/НИОКР. Рейтинг Gartner 2013 по лучшим мировым практикам
Проекты ПИР/НИОКР. Рейтинг Gartner 2013 по лучшим мировым практикамПроекты ПИР/НИОКР. Рейтинг Gartner 2013 по лучшим мировым практикам
Проекты ПИР/НИОКР. Рейтинг Gartner 2013 по лучшим мировым практикам
 
Управление проектами в капстрое. Лучшие практики.
Управление проектами в капстрое. Лучшие практики.Управление проектами в капстрое. Лучшие практики.
Управление проектами в капстрое. Лучшие практики.
 
It pro
It proIt pro
It pro
 
Строительный портал
Строительный порталСтроительный портал
Строительный портал
 
SAP, Oracle, MS Dynamics. Market share and KPIs
SAP, Oracle, MS Dynamics. Market share and KPIsSAP, Oracle, MS Dynamics. Market share and KPIs
SAP, Oracle, MS Dynamics. Market share and KPIs
 
Instantis price list
Instantis price listInstantis price list
Instantis price list
 
Instantis resource management maturity model (white paper)
Instantis resource management maturity model (white paper)Instantis resource management maturity model (white paper)
Instantis resource management maturity model (white paper)
 
Instantis RMMM
Instantis RMMMInstantis RMMM
Instantis RMMM
 

Recently uploaded

Recently uploaded (20)

Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 

Primavera P6 8.1. What’s new

  • 1. <Insert Picture Here> What’s New in Primavera P6 EPPM Release 8.1 May 19, 2011 Brian Saldutti Oracle Primavera Product Strategy
  • 2. Agenda • Refreshed User Interface • Resource Management • Project Management • Risk Management • Portfolio Management • Administration • Technologies • P6 Professional • Mobile • Reporting 2
  • 4. Refreshed User Interface Main navigation moved to tabs to easily identify where you are Icons replaced with text for easier readability 4
  • 5. Refreshed User Interface Detailed pages modernized and simplified 5
  • 6. Refreshed User Interface • Control Center Performance • UI Scalability Buttons always appear when page scrolls to improve usability 6
  • 8. Resource Management Dates and duration fields available for viewing and updating in Resource Assignments tab 8
  • 9. Resource Management Filter options available when assigning resources including currently opened projects 9
  • 10. Resource Management Assign resources to multiple assignments at once and search for best fit 10
  • 11. Resource Management Run Check Resource Overallocation to identify resource constraints that may impact the project 11
  • 12. Resource Management Automatic notification appears when service is completed 12
  • 13. Resource Management See resource overallocation in week increments Take action to fix the overallocation 13
  • 15. Project Management New fields available in EPS View – Last Scheduled Date Last Leveled Date Last Apply Actuals Date 15
  • 16. Project Management Define Gantt bars based on User Defined Fields (UDFs) 16
  • 17. Project Management Risk adjusted schedule views to reflect Risk Analysis data 17
  • 19. Risk Management •x Organize categories in a hierarchy for risk breakdown structure 19
  • 20. Risk Management •x Copy and paste risks within a single project or across multiple projects 20
  • 21. Risk Management •x Relative thresholds support for use across multiple projects 21
  • 22. Risk Management Additional fields to better track and analyze risks 22
  • 23. Risk Management Risk exposure and score available at the project level for analysis 23
  • 25. Portfolio Management • Drill into WBS UDFs Drill down to view and edit WBS UDF’s via the Dashboard and Portfolios 25
  • 27. Project Scheduled Services Specify a rolling date when configuring project services 27
  • 28. Scheduled Services Status Standardized log files for all services including translation support 28
  • 29. User Sessions Administrators can reset sessions for users who have been locked out. 29
  • 31. Technologies New platforms • Google Chrome 9 Browser • Server platform – HP-UX Itanium • Administration – Oracle Enterprise Manager 11g • JRE 1.6.0_24+ • BI Publisher 11g • UCM 11g • Brazilian Portuguese language support Additional Tools • Project integrity checker • Jackrabbit to UCM migration tool 31
  • 33. P6 EPPM Optional Client & P6 Professional 8.1 P6 EPPM – P6 Professional – Includes: P6 Web and Optional Client Supports: stand alone and work groups Stand alone or Offline mode for P6 EPPM End Users using P6 Web client End Users using P6 Professional with local End Users using database P6 Professional Local P6 PMDB Import/Export P6 PMDB P6 PMDB End Users using End Users using P6 End Users using P6 Professional Optional Client P6 Professional 33
  • 34. Mobile 34
  • 35. Mobile – iPhone App Update time spent , Star favorite tasks time left & dates View assigned tasks by project Graphical indicator of health/status Email comments and photos related to a task 35 35
  • 36. Mobile – Email Updates Email changes to update P6 project Filter list of tasks Send email to View assigned request tasks tasks by project Easily mark a Update time spent , task complete time left & dates Receive confirmation message for updates 36 36
  • 37. Reporting 37
  • 38. Reporting Reporting Changes • P6 Schema increased to store calculated fields • Incremental update of projects via trickle process – Project filter, Manual or Automatic publication • Global Publishing Services • BI Publisher 11g support – Web based report layout editor – Create reports that combine P6 data with other data sources • P6 Analytics – Unlimited number of codes supported Benefits • Improved performance • Near real-time reporting • ODS an optional component for BI Reporting • SQL Server support 38 38
  • 39. Reporting P6 EPPM 8.1 P6 Analytics 1.x OBIEE+/SE-1 Oracle BI Publisher P6 Catalog Near Real-Time Oracle BI Interactive Dashboards Transactional Operational Reporting Reporting P6 Metadata P6 PMDB Oracle BI Answers Static Extension Tables and Views Operational Reporting Analytical Reporting Project Activity Star Project History Star ODS ETL Resource Assignment Star Periodic Extract, Resource Utilization Star Transform & Load Process P6 Data Warehouse P6 Reporting Database 2.x 39 39
  • 40. Reporting Project options to enable publication and set priority 40
  • 41. For more information please visit: www.oracle.com/primavera