Earthquake Management
Part-1
Composed by
H.M.A. Mahzuz
Assistant Professor (PhD Fellow),
Department of Civil and Environmental Engineering,
Shahjalal University of Science & Technology, Sylhet,
Bangladesh.
E-mail: mahzuz_211@ yahoo.com
Outline of the lecture
1) Organizations for responsible for earthquake
management.
2) Can we predict an earthquake?
3) Earthquake Management Cycle
4) Seismic Design Philosophy
5) Some unfavorable building configurations
Considering Earthquake
1) Organizations for responsible for earthquake management.
Several Responsible Organizations/Wings (GO) for
Earthquake Fighting
• Ministry of Disaster Management and Relief
• National Disaster Management Advisory Committee (NDMAC)
• National Disaster Management Council (NDMC),
• Inter Ministerial Disaster Management Coordination Committee (IMDMCC),
• Director General of Food (DGFood),
• Directorate of Relief and Rehabilitation (DRR),
• Disaster Management Bureau (DMB)
• Food Division, Union Disaster Management Committee (UDMC)
• Upazila Disaster Management Committee (UzDMC),
• City Corporation Disaster Management Committee (CCDMC),
• Zone/Upazila Municipal Disaster Management Committee (MDMC),
• District Disaster Management Committee (DDMC),
• National Platform for Disaster Risk Reduction (NPDRR)
Bangladesh NGO Foundation
Bangladesh Rural Improvement Fund (BRIF)
ASA
United Nations in Bangladesh
Care Programs Bangladesh
Grameen
Action aid bangladesh
BRAC
Noakhali Rural Devlopment Society
Odhikar
Ahsania Mission
Shahjahan Foundation - Registered Charity in UK,
Unnayan Ngo
USAID Bangladesh
Families for Children
Coast Coastal Association for Social Transformation Trust
Red Cross and Red Crescent Societies
NGO Forum
Several Responsible Organizations/Wings
(NGO) for Earthquake Fighting
2) Can we predict an earthquake?
Science has not reached at that stage as
yet!!
How much
time do we
have to
predict an
earthquake??
What's about the
Land of Earthquake-
Japan????!!!
The Earthquake Early Warning (EEW) is a warning issued just after an earthquake in Japan is
detected. The warnings are issued mainly by the Japan Meteorological Agency (JMA), and they
issue tips on how to react to the warnings.
Hit/ Success rate
JMA announced the hit rate of Earthquake Early Warning (EEW) on 31 May 2012, end of fiscal
year 2011. The hit rate defined here is that the Japan Meteorological Agency seismic intensity
scale number with warning issued immediately upon P-waves detected is fall or hit within plus-
minus 1 Magnitude-Shindo Number, ranges 0 to 7, out of ten numbers actually measured
Magnitude-Shindo Number as the single earthquake.
Fiscal year 2007: 75%
Fiscal year 2008: 82%
Fiscal year 2009: 76%
Fiscal year 2010: 28%
Fiscal year 2011: 56%
Fiscal year 2007 to 2009 hit rate recorded over 75%. Fiscal year 2010 hit rate came down to 28%
due to the number of successive aftershock after 2011 Tōhoku earthquake and tsunami which
occurred almost the end of fiscal year 2010, 11 March 2011. The hit rate was 72% till 10 March
2011 in fiscal year 2010. The reason of hit rate came down to 28% from 72% is very successive
plural number of aftershock judged to single large earthquake. The computer program has been
improved to ignore small scale earthquake from predicting program to increase hit rate and
fiscal year 2011 hit rate increased to 56%.
JMA aims to increase hit rate over 85% in fiscal year 2015.
Prediction:
Earthquake prediction by any geoscientist is far from success; however a
detailed and systematic investigation may lift its prediction. Earthquake
prediction in an area may be carried out under following heads:
a. Lithological characterization and structural setting of the region.
b. Crustal deformational studies.
c. Frequency of fore shock.
d. Repetitive land level survey.
e. Water tube tilt meters.
f. Geomagnetic observation.
g. Geothermal gradient.
h. Gravity survey.
I. Hazard mapping.
A variety of methods have been used for earthquake prediction, ranging
from planetary movement to odd behavior of animal but earthquake
prediction continues to be an elusive goal.
Reconstruction
Disaster
Rehabilitation
Rescue/
Relief
Development&
Strengthening
Prevention,
Mitigation &
Preparedness
Pre-Disaster Post-Disaster
3) Earthquake Management Cycle
►Emergency (During-Disaster) planning and Activities:
→To be mentally strong.
→To wear helmet.
→Just after feeling the first vibration, all the family members should go
out the house at a safe place.
→Don’t dive downward in fear.
→If it is impossible to get out from the house it is necessary to take
shelter near the columns or walls.
→Take shelter at the corner of the room if it is brick built.
→It is safe to take shelter at the room, under the tables, near the
columns.
→Come out quickly from water.
→Stay away from using lift.
→Switched off the gas line and electric line.
→Don‘t stay near high-rise building or electric line.
→ Stop the car while you are in driving.
→Don’t stop the car on the bridge.
Necessary things of pre-management:
→To acquire knowledge about earthquake.
→Achieve earthquake relative training.
→In establishing buildings must follow the building code and the consultancy of
engineers, ensure soil test before construction of building.
→Construct building and houses in strong soil.
→Use construction materials of proper grade.
→Use reinforced concrete column in place of brick.
→Keep in hand torch light and first aid materials.
→In case of multi-storied building provide emergency stairs.
→Keep safe distance between two buildings.
→Ensure more stairs to get out of the building.
→Incase of high-rise building must provide walls in car parking region.
→To protect old building take consultancy from engineers.
→Electric line and gas line must be kept save, as it is switched off easily.
→Provide helmet for all the members of the family as it can be used during
earthquake.
→Make beds and tables with strong wood as to take shelter under them if necessary.
→Provides more doors in the buildings to go to safe place during earthquake.
→Make conscious all the family members about earthquake.
►Post Earthquake Planning and Activities:
The post-earthquake steps that should be taken in urban centers after
earthquake disasters include:
→Detailed surveys regarding repair, restoration and condemnation
decisions.
→Assessment of socioeconomic conditions, resources.
→Measures and policies for relief, resettlement, rehabilitation, and
redevelopment.
→Re-establishment of government services.
→Institutional framework, implementing agencies.
→Disaster accounting.
→Planning and coordination of rehabilitation and reconstruction
assistance.
→Sitting of new settlements and communities.
→Retrofit of design codes and construction standards.
→Training and education programs.
→Reconstruction.
Severity of ground shaking at a given location during an
earthquake can be minor, moderate and strong.
Relatively speaking, minor shaking occurs frequently,
moderate shaking occasionally and strong shaking rarely.
 Don’t attempt to make EQ proof building (Bld. Will be too
robust and too expensive). Engineering intention shall be to
make EQ resistant building
4) Seismic Design Philosophy for Building
• Sustain little damage in small-to-moderate quakes (M <
5.5)
• Sustain some repairable damage for moderate quakes (5.5
< M < 7.0)
• Not collapse in large earthquakes (M > 7.0)
 Explanation of Earthquake Design Philosophy
• Under minor but frequent shaking the
main members of the building that carry
vertical and horizontal forces should not be
damaged, however the building parts that
do not carry load may sustain repairable
damage
• Under moderate but occasional shaking
the main members may sustain reparable
damage, while the other parts of the
building may be damaged such that they
may even have to be replaced after the EQ
• Under strong but rare shaking the main
members may sustain severe damage but
the building should not collapse
5) Some unfavorable building configurations Considering
Earthquake
Sudden deviations in load transfer path along the height lead to poor
performance of buildings.
Equal Load distribution is desirable
Avoid Soft story/ Short column
Avoid Heavy Overhangs
Masonry infilled RC frames: Using lighter hollow bricks or blocks for infills may reduce these
vulnerabilities. These bricks or blocks can be strengthened and secured by using rebars. Wire or
bamboo mesh may also be used to secure the infilled materials in RC frames.
Weak beam strong column: Weak beam strong column technology should be used to
design a seismic resistant frame, because, collapse of a beam results a localized failure,
but collapse of a column may cause the total failure of the building
Few facts about column and beam:
•Seismic Inertia Forces generated at its floor level is
transferred through its beam and column to the ground
• Failure of a column can affect the stability of the whole
building
• Failure of beam causes localized effect
• Correct building components should be ductile
• RC building should be designed using strong column
weak beam design method
Ductile and brittle structures –
seismic design attempts to avoid structures of the latter kind.
Basic components of a masonry building – walls are sensitive to
direction of earthquake forces.
Advantage sharing
between walls – only
possible if walls
are well connected
Earthquake-resistant detailing of
staircase in masonry building
– must be carefully designed and
constructed.
Horizontal Bands in masonry building
–Improve earthquake-resistance.
Earthquake response of a hipped roof masonry building – no vertical
reinforcement is provided in walls.
Vertical reinforcement in
masonry walls– wall
behaviour is modified.
Hollow bricks are preferable instead of solid bricks
•Bars may be used in hollow bricks to strengthen the walls
•Wire mesh may be used to strengthen the walls
•Hollow blocks or blocks with holes may be used too
Thank you

More Related Content

What's hot

What's hot (20)

Earthquake Resistant Masonry Buildings
Earthquake Resistant Masonry Buildings Earthquake Resistant Masonry Buildings
Earthquake Resistant Masonry Buildings
 
Earthquake resistance in buildings
Earthquake resistance in buildingsEarthquake resistance in buildings
Earthquake resistance in buildings
 
Earthquake resistant analysis and design of multistoried building
Earthquake resistant analysis and design of multistoried buildingEarthquake resistant analysis and design of multistoried building
Earthquake resistant analysis and design of multistoried building
 
Liquefaction of soil
Liquefaction of soilLiquefaction of soil
Liquefaction of soil
 
Earthquake Resistant Structure (Seismic Analysis)
Earthquake Resistant Structure (Seismic Analysis)Earthquake Resistant Structure (Seismic Analysis)
Earthquake Resistant Structure (Seismic Analysis)
 
Earthquake resistant buildings
Earthquake resistant buildingsEarthquake resistant buildings
Earthquake resistant buildings
 
Earthquake Resistent Structures
Earthquake Resistent StructuresEarthquake Resistent Structures
Earthquake Resistent Structures
 
Behavior of rc structure under earthquake loading
Behavior of rc structure under earthquake loadingBehavior of rc structure under earthquake loading
Behavior of rc structure under earthquake loading
 
Earthquake Engineering
Earthquake EngineeringEarthquake Engineering
Earthquake Engineering
 
ANALYSIS OF SOFT STOREY FOR MULTI STORYED BUILDING IN ZONE-4
ANALYSIS OF SOFT STOREY FOR MULTI STORYED BUILDING IN ZONE-4ANALYSIS OF SOFT STOREY FOR MULTI STORYED BUILDING IN ZONE-4
ANALYSIS OF SOFT STOREY FOR MULTI STORYED BUILDING IN ZONE-4
 
Seismology
SeismologySeismology
Seismology
 
Seismic Design Basics - Superstructure
Seismic Design Basics - SuperstructureSeismic Design Basics - Superstructure
Seismic Design Basics - Superstructure
 
earthquake resistant ppt
earthquake resistant pptearthquake resistant ppt
earthquake resistant ppt
 
Earthquake resistant buildings in india
Earthquake resistant buildings in indiaEarthquake resistant buildings in india
Earthquake resistant buildings in india
 
Shear walls
Shear wallsShear walls
Shear walls
 
Ductile detailing IS 13920
Ductile detailing IS 13920Ductile detailing IS 13920
Ductile detailing IS 13920
 
Seismic Analysis
Seismic AnalysisSeismic Analysis
Seismic Analysis
 
Earthquake resistant design
Earthquake resistant designEarthquake resistant design
Earthquake resistant design
 
Earthquake resistant building
Earthquake resistant buildingEarthquake resistant building
Earthquake resistant building
 
Earth resistant design philosophy
Earth resistant design philosophyEarth resistant design philosophy
Earth resistant design philosophy
 

Viewers also liked

Earthquake Early Warning for Shinkansen (Super Train)
Earthquake Early Warning for Shinkansen (Super Train)Earthquake Early Warning for Shinkansen (Super Train)
Earthquake Early Warning for Shinkansen (Super Train)
Ali Osman Öncel
 
Reducing the impacts of volcanoes
Reducing the impacts of volcanoesReducing the impacts of volcanoes
Reducing the impacts of volcanoes
Victoriahoo1996
 

Viewers also liked (20)

Earthquake management
Earthquake managementEarthquake management
Earthquake management
 
Disaster Management Earthquake by ujjwal patel
Disaster Management Earthquake by ujjwal patelDisaster Management Earthquake by ujjwal patel
Disaster Management Earthquake by ujjwal patel
 
Earthquake and risk mitigation
Earthquake and risk mitigationEarthquake and risk mitigation
Earthquake and risk mitigation
 
Seismic Retrofitting Techniques
Seismic Retrofitting TechniquesSeismic Retrofitting Techniques
Seismic Retrofitting Techniques
 
Earthquake
EarthquakeEarthquake
Earthquake
 
Tectonics: Tsunami risk management
Tectonics: Tsunami risk managementTectonics: Tsunami risk management
Tectonics: Tsunami risk management
 
Disaster in Japan, 11 March 2011
Disaster in Japan, 11 March 2011Disaster in Japan, 11 March 2011
Disaster in Japan, 11 March 2011
 
Communications in disasters
Communications in disastersCommunications in disasters
Communications in disasters
 
Japan 2011: Dreams will never die & Ganbaro Nippon
Japan 2011: Dreams will never die & Ganbaro Nippon Japan 2011: Dreams will never die & Ganbaro Nippon
Japan 2011: Dreams will never die & Ganbaro Nippon
 
Massive earthquake hits JAPAN – 2011 march-11
Massive earthquake hits JAPAN – 2011 march-11Massive earthquake hits JAPAN – 2011 march-11
Massive earthquake hits JAPAN – 2011 march-11
 
Erim Gurdal CV
Erim Gurdal CVErim Gurdal CV
Erim Gurdal CV
 
COATING PRESENTATION
COATING PRESENTATIONCOATING PRESENTATION
COATING PRESENTATION
 
ICT Applications for Disaster Management by Prof.Dr. Toshio OBI, Waseda Unive...
ICT Applications for Disaster Management by Prof.Dr. Toshio OBI, Waseda Unive...ICT Applications for Disaster Management by Prof.Dr. Toshio OBI, Waseda Unive...
ICT Applications for Disaster Management by Prof.Dr. Toshio OBI, Waseda Unive...
 
Earthquake Early Warning for Shinkansen (Super Train)
Earthquake Early Warning for Shinkansen (Super Train)Earthquake Early Warning for Shinkansen (Super Train)
Earthquake Early Warning for Shinkansen (Super Train)
 
ISCRAM 2013: Lessons Learnt from the 2011 Great East Japan Earthquake and Tsu...
ISCRAM 2013: Lessons Learnt from the 2011 Great East Japan Earthquake and Tsu...ISCRAM 2013: Lessons Learnt from the 2011 Great East Japan Earthquake and Tsu...
ISCRAM 2013: Lessons Learnt from the 2011 Great East Japan Earthquake and Tsu...
 
Earthquake project
Earthquake projectEarthquake project
Earthquake project
 
Reducing the impacts of volcanoes
Reducing the impacts of volcanoesReducing the impacts of volcanoes
Reducing the impacts of volcanoes
 
Tohoku Natural Disaster - March 11-2011
Tohoku Natural Disaster - March 11-2011Tohoku Natural Disaster - March 11-2011
Tohoku Natural Disaster - March 11-2011
 
Pilework
PileworkPilework
Pilework
 
Extending service life of existing bridges
Extending service life of existing bridgesExtending service life of existing bridges
Extending service life of existing bridges
 

Similar to Lecture earthquake-3

Managing Earthquakes
Managing EarthquakesManaging Earthquakes
Managing Earthquakes
peishi huang
 
Earthquake 3 Ps Nsr
Earthquake 3 Ps NsrEarthquake 3 Ps Nsr
Earthquake 3 Ps Nsr
tudorgeog
 
what to do when earthquake a presentation.pptx
what to do when earthquake a presentation.pptxwhat to do when earthquake a presentation.pptx
what to do when earthquake a presentation.pptx
304129
 
RVS: Lecture ppt
RVS: Lecture pptRVS: Lecture ppt
RVS: Lecture ppt
Mohd Danish
 
Secondary Three Geography- Earthquake Preparedness Measures
Secondary Three Geography- Earthquake Preparedness MeasuresSecondary Three Geography- Earthquake Preparedness Measures
Secondary Three Geography- Earthquake Preparedness Measures
Carol LMr
 

Similar to Lecture earthquake-3 (20)

Managing Earthquakes
Managing EarthquakesManaging Earthquakes
Managing Earthquakes
 
Mobile Architecture
Mobile ArchitectureMobile Architecture
Mobile Architecture
 
New how to conduct eq drill in school
New how to conduct eq drill in schoolNew how to conduct eq drill in school
New how to conduct eq drill in school
 
Earthquake Management Strategies
Earthquake Management StrategiesEarthquake Management Strategies
Earthquake Management Strategies
 
DRRM_ INSET.pptx
DRRM_ INSET.pptxDRRM_ INSET.pptx
DRRM_ INSET.pptx
 
Earthquake 3 Ps Nsr
Earthquake 3 Ps NsrEarthquake 3 Ps Nsr
Earthquake 3 Ps Nsr
 
Disaster resistant structure
Disaster resistant structure Disaster resistant structure
Disaster resistant structure
 
individual___collective_responses_to_hazards.ppt
individual___collective_responses_to_hazards.pptindividual___collective_responses_to_hazards.ppt
individual___collective_responses_to_hazards.ppt
 
Earthquake design
Earthquake designEarthquake design
Earthquake design
 
what to do when earthquake a presentation.pptx
what to do when earthquake a presentation.pptxwhat to do when earthquake a presentation.pptx
what to do when earthquake a presentation.pptx
 
ROLE OF ENGINEERS IN DISASTER MANAGEMENT
ROLE OF ENGINEERS IN DISASTER MANAGEMENTROLE OF ENGINEERS IN DISASTER MANAGEMENT
ROLE OF ENGINEERS IN DISASTER MANAGEMENT
 
Synopsis of project
Synopsis of projectSynopsis of project
Synopsis of project
 
RVS: Lecture ppt
RVS: Lecture pptRVS: Lecture ppt
RVS: Lecture ppt
 
Tectonics GW 3 Slides (Part 1)
Tectonics GW 3 Slides (Part 1)Tectonics GW 3 Slides (Part 1)
Tectonics GW 3 Slides (Part 1)
 
Seismic analysis of multi storey reinforced concrete buildings frame”
Seismic analysis of multi storey reinforced concrete buildings frame”Seismic analysis of multi storey reinforced concrete buildings frame”
Seismic analysis of multi storey reinforced concrete buildings frame”
 
Earthquake .pdf
Earthquake .pdfEarthquake .pdf
Earthquake .pdf
 
Interfacing Architectural Education & Disaster Management
Interfacing Architectural Education & Disaster ManagementInterfacing Architectural Education & Disaster Management
Interfacing Architectural Education & Disaster Management
 
Interfacing Architectural Education &Disaster Mangement
Interfacing Architectural Education &Disaster MangementInterfacing Architectural Education &Disaster Mangement
Interfacing Architectural Education &Disaster Mangement
 
Secondary Three Geography- Earthquake Preparedness Measures
Secondary Three Geography- Earthquake Preparedness MeasuresSecondary Three Geography- Earthquake Preparedness Measures
Secondary Three Geography- Earthquake Preparedness Measures
 
Earthquake engineering
Earthquake engineeringEarthquake engineering
Earthquake engineering
 

More from Dr. H.M.A. Mahzuz

Lecture 5 rcc building design considering earthquake and wind load
Lecture 5 rcc building design considering earthquake and wind loadLecture 5 rcc building design considering earthquake and wind load
Lecture 5 rcc building design considering earthquake and wind load
Dr. H.M.A. Mahzuz
 
Lecture 6 steel building design considering earthquake and wind load
Lecture 6 steel building design considering earthquake and wind loadLecture 6 steel building design considering earthquake and wind load
Lecture 6 steel building design considering earthquake and wind load
Dr. H.M.A. Mahzuz
 
Lecture 1 what is rcc column and its importance
Lecture 1 what is rcc column and its importanceLecture 1 what is rcc column and its importance
Lecture 1 what is rcc column and its importance
Dr. H.M.A. Mahzuz
 

More from Dr. H.M.A. Mahzuz (20)

Column math
Column mathColumn math
Column math
 
Lecture 7 steel
Lecture 7 steelLecture 7 steel
Lecture 7 steel
 
Lecture 5, concrete-hmm
Lecture 5, concrete-hmmLecture 5, concrete-hmm
Lecture 5, concrete-hmm
 
Lecture 4, constituents of concrete-coarse aggregate
Lecture 4, constituents of concrete-coarse aggregateLecture 4, constituents of concrete-coarse aggregate
Lecture 4, constituents of concrete-coarse aggregate
 
Lecture 3, constituents of concrete-fine aggregate
Lecture 3, constituents of concrete-fine aggregateLecture 3, constituents of concrete-fine aggregate
Lecture 3, constituents of concrete-fine aggregate
 
Lecture 11, paint
Lecture 11, paintLecture 11, paint
Lecture 11, paint
 
Lecture 2, constituents of concrete-cement
Lecture 2, constituents of concrete-cementLecture 2, constituents of concrete-cement
Lecture 2, constituents of concrete-cement
 
Some fun facts
Some fun factsSome fun facts
Some fun facts
 
Lecture 5 rcc building design considering earthquake and wind load
Lecture 5 rcc building design considering earthquake and wind loadLecture 5 rcc building design considering earthquake and wind load
Lecture 5 rcc building design considering earthquake and wind load
 
Lecture 7 shear wall
Lecture 7 shear wallLecture 7 shear wall
Lecture 7 shear wall
 
Lecture 6 steel building design considering earthquake and wind load
Lecture 6 steel building design considering earthquake and wind loadLecture 6 steel building design considering earthquake and wind load
Lecture 6 steel building design considering earthquake and wind load
 
Lecture 4 beam design and load combination
Lecture 4 beam design and load combinationLecture 4 beam design and load combination
Lecture 4 beam design and load combination
 
Lecture 3 section identify and 3 d frame
Lecture 3 section identify and 3 d frameLecture 3 section identify and 3 d frame
Lecture 3 section identify and 3 d frame
 
Lecture 2 grid system
Lecture 2 grid systemLecture 2 grid system
Lecture 2 grid system
 
Lecture 1 outline -latest
Lecture 1 outline -latestLecture 1 outline -latest
Lecture 1 outline -latest
 
Lecture 1 what is rcc column and its importance
Lecture 1 what is rcc column and its importanceLecture 1 what is rcc column and its importance
Lecture 1 what is rcc column and its importance
 
Tannery hmm
Tannery hmmTannery hmm
Tannery hmm
 
River bank erosion hmm
River bank erosion hmmRiver bank erosion hmm
River bank erosion hmm
 
Public health in disaster
Public health in disasterPublic health in disaster
Public health in disaster
 
Lecture 2 flood
Lecture 2 floodLecture 2 flood
Lecture 2 flood
 

Recently uploaded

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
KarakKing
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 

Recently uploaded (20)

Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 

Lecture earthquake-3

  • 1. Earthquake Management Part-1 Composed by H.M.A. Mahzuz Assistant Professor (PhD Fellow), Department of Civil and Environmental Engineering, Shahjalal University of Science & Technology, Sylhet, Bangladesh. E-mail: mahzuz_211@ yahoo.com
  • 2. Outline of the lecture 1) Organizations for responsible for earthquake management. 2) Can we predict an earthquake? 3) Earthquake Management Cycle 4) Seismic Design Philosophy 5) Some unfavorable building configurations Considering Earthquake
  • 3. 1) Organizations for responsible for earthquake management. Several Responsible Organizations/Wings (GO) for Earthquake Fighting • Ministry of Disaster Management and Relief • National Disaster Management Advisory Committee (NDMAC) • National Disaster Management Council (NDMC), • Inter Ministerial Disaster Management Coordination Committee (IMDMCC), • Director General of Food (DGFood), • Directorate of Relief and Rehabilitation (DRR), • Disaster Management Bureau (DMB) • Food Division, Union Disaster Management Committee (UDMC) • Upazila Disaster Management Committee (UzDMC), • City Corporation Disaster Management Committee (CCDMC), • Zone/Upazila Municipal Disaster Management Committee (MDMC), • District Disaster Management Committee (DDMC), • National Platform for Disaster Risk Reduction (NPDRR)
  • 4. Bangladesh NGO Foundation Bangladesh Rural Improvement Fund (BRIF) ASA United Nations in Bangladesh Care Programs Bangladesh Grameen Action aid bangladesh BRAC Noakhali Rural Devlopment Society Odhikar Ahsania Mission Shahjahan Foundation - Registered Charity in UK, Unnayan Ngo USAID Bangladesh Families for Children Coast Coastal Association for Social Transformation Trust Red Cross and Red Crescent Societies NGO Forum Several Responsible Organizations/Wings (NGO) for Earthquake Fighting
  • 5. 2) Can we predict an earthquake? Science has not reached at that stage as yet!!
  • 6. How much time do we have to predict an earthquake??
  • 7. What's about the Land of Earthquake- Japan????!!!
  • 8. The Earthquake Early Warning (EEW) is a warning issued just after an earthquake in Japan is detected. The warnings are issued mainly by the Japan Meteorological Agency (JMA), and they issue tips on how to react to the warnings. Hit/ Success rate JMA announced the hit rate of Earthquake Early Warning (EEW) on 31 May 2012, end of fiscal year 2011. The hit rate defined here is that the Japan Meteorological Agency seismic intensity scale number with warning issued immediately upon P-waves detected is fall or hit within plus- minus 1 Magnitude-Shindo Number, ranges 0 to 7, out of ten numbers actually measured Magnitude-Shindo Number as the single earthquake. Fiscal year 2007: 75% Fiscal year 2008: 82% Fiscal year 2009: 76% Fiscal year 2010: 28% Fiscal year 2011: 56% Fiscal year 2007 to 2009 hit rate recorded over 75%. Fiscal year 2010 hit rate came down to 28% due to the number of successive aftershock after 2011 Tōhoku earthquake and tsunami which occurred almost the end of fiscal year 2010, 11 March 2011. The hit rate was 72% till 10 March 2011 in fiscal year 2010. The reason of hit rate came down to 28% from 72% is very successive plural number of aftershock judged to single large earthquake. The computer program has been improved to ignore small scale earthquake from predicting program to increase hit rate and fiscal year 2011 hit rate increased to 56%. JMA aims to increase hit rate over 85% in fiscal year 2015.
  • 9. Prediction: Earthquake prediction by any geoscientist is far from success; however a detailed and systematic investigation may lift its prediction. Earthquake prediction in an area may be carried out under following heads: a. Lithological characterization and structural setting of the region. b. Crustal deformational studies. c. Frequency of fore shock. d. Repetitive land level survey. e. Water tube tilt meters. f. Geomagnetic observation. g. Geothermal gradient. h. Gravity survey. I. Hazard mapping. A variety of methods have been used for earthquake prediction, ranging from planetary movement to odd behavior of animal but earthquake prediction continues to be an elusive goal.
  • 11. ►Emergency (During-Disaster) planning and Activities: →To be mentally strong. →To wear helmet. →Just after feeling the first vibration, all the family members should go out the house at a safe place. →Don’t dive downward in fear. →If it is impossible to get out from the house it is necessary to take shelter near the columns or walls. →Take shelter at the corner of the room if it is brick built. →It is safe to take shelter at the room, under the tables, near the columns. →Come out quickly from water. →Stay away from using lift. →Switched off the gas line and electric line. →Don‘t stay near high-rise building or electric line. → Stop the car while you are in driving. →Don’t stop the car on the bridge.
  • 12. Necessary things of pre-management: →To acquire knowledge about earthquake. →Achieve earthquake relative training. →In establishing buildings must follow the building code and the consultancy of engineers, ensure soil test before construction of building. →Construct building and houses in strong soil. →Use construction materials of proper grade. →Use reinforced concrete column in place of brick. →Keep in hand torch light and first aid materials. →In case of multi-storied building provide emergency stairs. →Keep safe distance between two buildings. →Ensure more stairs to get out of the building. →Incase of high-rise building must provide walls in car parking region. →To protect old building take consultancy from engineers. →Electric line and gas line must be kept save, as it is switched off easily. →Provide helmet for all the members of the family as it can be used during earthquake. →Make beds and tables with strong wood as to take shelter under them if necessary. →Provides more doors in the buildings to go to safe place during earthquake. →Make conscious all the family members about earthquake.
  • 13. ►Post Earthquake Planning and Activities: The post-earthquake steps that should be taken in urban centers after earthquake disasters include: →Detailed surveys regarding repair, restoration and condemnation decisions. →Assessment of socioeconomic conditions, resources. →Measures and policies for relief, resettlement, rehabilitation, and redevelopment. →Re-establishment of government services. →Institutional framework, implementing agencies. →Disaster accounting. →Planning and coordination of rehabilitation and reconstruction assistance. →Sitting of new settlements and communities. →Retrofit of design codes and construction standards. →Training and education programs. →Reconstruction.
  • 14. Severity of ground shaking at a given location during an earthquake can be minor, moderate and strong. Relatively speaking, minor shaking occurs frequently, moderate shaking occasionally and strong shaking rarely.  Don’t attempt to make EQ proof building (Bld. Will be too robust and too expensive). Engineering intention shall be to make EQ resistant building 4) Seismic Design Philosophy for Building • Sustain little damage in small-to-moderate quakes (M < 5.5) • Sustain some repairable damage for moderate quakes (5.5 < M < 7.0) • Not collapse in large earthquakes (M > 7.0)
  • 15.  Explanation of Earthquake Design Philosophy • Under minor but frequent shaking the main members of the building that carry vertical and horizontal forces should not be damaged, however the building parts that do not carry load may sustain repairable damage • Under moderate but occasional shaking the main members may sustain reparable damage, while the other parts of the building may be damaged such that they may even have to be replaced after the EQ • Under strong but rare shaking the main members may sustain severe damage but the building should not collapse
  • 16. 5) Some unfavorable building configurations Considering Earthquake
  • 17.
  • 18.
  • 19.
  • 20. Sudden deviations in load transfer path along the height lead to poor performance of buildings.
  • 21.
  • 22. Equal Load distribution is desirable
  • 23.
  • 24.
  • 25.
  • 26.
  • 27. Avoid Soft story/ Short column
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 34.
  • 35. Masonry infilled RC frames: Using lighter hollow bricks or blocks for infills may reduce these vulnerabilities. These bricks or blocks can be strengthened and secured by using rebars. Wire or bamboo mesh may also be used to secure the infilled materials in RC frames.
  • 36. Weak beam strong column: Weak beam strong column technology should be used to design a seismic resistant frame, because, collapse of a beam results a localized failure, but collapse of a column may cause the total failure of the building
  • 37. Few facts about column and beam: •Seismic Inertia Forces generated at its floor level is transferred through its beam and column to the ground • Failure of a column can affect the stability of the whole building • Failure of beam causes localized effect • Correct building components should be ductile • RC building should be designed using strong column weak beam design method
  • 38. Ductile and brittle structures – seismic design attempts to avoid structures of the latter kind.
  • 39.
  • 40. Basic components of a masonry building – walls are sensitive to direction of earthquake forces.
  • 41. Advantage sharing between walls – only possible if walls are well connected
  • 42.
  • 43. Earthquake-resistant detailing of staircase in masonry building – must be carefully designed and constructed.
  • 44. Horizontal Bands in masonry building –Improve earthquake-resistance.
  • 45.
  • 46. Earthquake response of a hipped roof masonry building – no vertical reinforcement is provided in walls.
  • 47. Vertical reinforcement in masonry walls– wall behaviour is modified.
  • 48. Hollow bricks are preferable instead of solid bricks •Bars may be used in hollow bricks to strengthen the walls •Wire mesh may be used to strengthen the walls •Hollow blocks or blocks with holes may be used too
  • 49.