What is Pipe Ramming?
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT




                                       A pneumatic hammer installs an open ended steel casing that is cleaned out during and after completion of
                                       pipe installation.
PIPE RAMMING APPLICATIONS
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT


                                       •Steel casing installation
                                       •Culvert replacement
                                       •Ram and swallow
                                       •Slick boring
                                       •Piling
                                       •HDD Assist
                                        –Wash-over casings
                                        –Stuck Bores
                                        –Removal of drill stem
                                        –Hydro-locked casings
Advantages
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Trenchless
                                       • Able to swallow rock as large as the
                                         inside diameter of the casing
                                       • Method does not remove soil until
                                         casing is installed
                                       • Minimizes voids
                                         –Roads
                                         –Railroads
                                       • Reduced soil compaction
Preferred for Adverse Soil Conditions
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Free flowing sand
                                       • Cobble conditions
                                       • Large rock formations
                                       • Excessive ground water
SWALLOWS LARGE OBSTRUCTIONS
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT


                                       • Rock swallowed during ram
                                       • Spoil removed post ram




                                       54” Casing
CULVERT SWALLOWING
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT




                                       An oversized casing is rammed over existing culvert. After installation is complete, old culvert and spoil is
                                       removed. Steel casing can serve as the drainage culvert or as a carrier pipe for another pipe inserted
                                       within.
TELESCOPING METHOD
PIPE RAMMING                           FOR LONGER DISTANCES
CULVERT INSTALLATION AND REPLACEMENT




                                       An oversized pipe is rammed over the existing culvert until production ceases and is cleaned out. Further
                                       progress is made with smaller casings installed within the oversized pipe in the same manner.
METHOD IMPLEMENTATION
Trenchless Culvert Replacement Under Railways with the Pipe Ramming Method
RAM SITE LAYOUT
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT




                                               Note: Follow local regulations for sloping or shoring of pit.
SITE PREP: CASING PLACEMENT
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT




                                        Rail system   I-beam   Pipe Mule™
                                                               Leveling System
STEEL CASING PREP
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       SOIL SHOE                                   LUBRICATION




                                         Steel Casing

                                                   Internal Shoe

                                                                   External Shoe

                                       Reinforces lead casing and provides an      Supplies lubricating fluid to OD and ID of
                                       annulus for lubrication.                    casing during installation.
COLLETS AND RAMMER
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT

                                       Install Pushing Collets/Collars                Install Rammer




                                       Collets and collars help to distribute the     The rammer is locked into the collets when
                                       ramming force to the face of the pipe.         the tool is started.
                                       The collets also lock the rammer into place.
SPOIL REMOVAL
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT

                                       Spoil removal for >30” and/or               Spoil removal <30” Casing
                                       large spoil/culverts




                                                                                                    Seal kit
                                       Manual excavation, HDD culvert cleaning     Air and/or water pressure. Seal kit for air
                                       tools, jet washing, auger boring wherever   pressure removal.
                                       applicable.
PIPE RAMMING CASE STUDIES
HIGHWAY & RAILROAD CULVERT INSTALLATION & REPLACEMENT WITH PIPE RAMMING
NEW INSTALLATION – ROCKVILLE, MN
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Project
                                        –2 – drainage culverts under
                                         railroad
                                       • Pipe sizes
                                        –1-60” Casing
                                        –1-32” Casing
                                       • Equipment
                                        –24” Rammer
                                       • Ram distance
                                        –1 @ 90’
                                        –1@ 195’
                                       • Free flowing sand
                                       • Holding grade
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT   NEW INSTALLATION – GRAND ISLAND, NE

                                       • Project
                                        –1 – drainage culvert under railroad
                                       • Pipe sizes
                                        –1-24” Casing
                                       • Equipment
                                        –24” Rammer
                                       • Ram distance
                                        –1 @ 250’
                                       • Free flowing sand with loose coal
                                         dust and other materials
                                       • Installed with 2% grade
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT   NEW INSTALLATION – COUER D’ALENE, ID

                                       • Project
                                        –2 – drainage culverts under RR
                                         and Highway
                                       • Pipe sizes
                                        –2 - 48” casings
                                       • Equipment
                                        –23” Rammer
                                       • Ram distance
                                        –1 @ 190’
                                        –1@ 195’
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT   NEW INSTALLATIONS – MARICOPA CTY, AZ

                                       • New culvert installation under rail
                                         bed.
                                       • 84” steel casing
                                       • 24” HammerHead Pipe Rammer
TELESCOPING METHOD – ALASKA
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Replacement of 84” dia. culvert
                                         drain with telescoping method
                                       • 96” steel casing, 164 feet.
                                       • 24” HammerHead Pipe Rammer




                                                                           Collapsed 7’ casing, 164 feet long
TELESCOPING METHOD – ALASKA
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Replacement of 84” dia. culvert
                                         drain with telescoping method
                                       • 96” steel casing, 164 feet.
                                       • 24” HammerHead Pipe Rammer




                                                                           First section of pipe installed.
TELESCOPING METHOD – ALASKA
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Replacement of 84” dia. culvert
                                         drain with telescoping method
                                       • 96” steel casing, 164 feet.
                                       • 24” HammerHead Pipe Rammer




                                                                           Swallowing and removing sections.
TELESCOPING METHOD – ALASKA
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Replacement of 84” dia. culvert
                                         drain with telescoping method
                                       • 96” steel casing, 164 feet.
                                       • 24” HammerHead Pipe Rammer




                                                                           Telescoping 60 feet down sized
                                                                           sections.
TELESCOPING METHOD – ALASKA
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Replacement of 84” dia. culvert
                                         drain with telescoping method
                                       • 96” steel casing, 164 feet.
                                       • 24” HammerHead Pipe Rammer




                                                                           Trenchless telescoped pipe.
NEW INSTALLATION – DALTON HWY, AK
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Drainage culvert
                                       • Glacial til/new road bed
                                       • Service hwy between Prudhoe
                                         Bay oil reserves & Fairbanks
NEW INSTALLATION – DALTON HWY, AK
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Project
                                        –1 – drainage culvert under service
                                         highway
                                       • Pipe sizes
                                        –1 - 36” casing
                                       • Equipment
                                        –24” Rammer
                                       • Ram distance
                                        –1 @ 160’
NEW INSTALLATION – DALTON HWY, AK
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Project
                                        –1 – drainage culvert under service
                                         highway
                                       • Pipe sizes
                                        –1 - 36” casing
                                       • Equipment
                                        –24” Rammer
                                       • Ram distance
                                        –1 @ 160’
HDD ASSIST METHODS
     PIPE RAMMING
HDD RAM ASSIST

                       • When problems arise while
                         horizontal directional drilling
          HDD ASSIST

                         (HDD) costs begin to add up with
                         each tick of the clock.
PIPE RAMMING




                       • Quick reaction time and expert
                         technical support are critical to
                         salvaging a bore gone bad.
                       • The percussive power of pipe
                         rammers can help free stuck
                         product pipes, drill stems, and
                         help remove product pipes on
                         failed bores.
FOUR METHODS

                       •Washover casings
          HDD ASSIST


                       •Pull back assist
PIPE RAMMING




                       •Pipe extraction
                       •Drill stem recovery
WASHOVER CASING METHOD
          HDD ASSIST
PIPE RAMMING




                       • Used as a pilot for large HDD projects      • Makes a guide down hole for mud motors
                       • Casings are rammed through difficult soil   • Casing provides a path for drill fluid
                         conditions to rock or solid soil              recycling and reduces the loss of fluids
                                                                       in surface soils
ON THE JOB: WASHOVER CASINGS

                       • Hong Kong, China
                        –Wash over casing
          HDD ASSIST


                       • Pipe sizes
PIPE RAMMING




                        –2 – 54” casings
                       • Equipment
                        –24” Rammer
                       • Ram distance
                        –2 @ 66’
PULL BACK ASSIST METHOD
          HDD ASSIST
PIPE RAMMING




                       • Assist HDD when pullback is not possible      • Percussive power frees immobilized
                         and machine still has rotation capabilities     product pipes.
                       • Rammer attached to product pipe
PULLBACK ASSIST
          HDD ASSIST   CONNECTION METHOD STEEL
PIPE RAMMING




                       Rammer is locked into steel casing via collets. Steel casing is installed using
                       pullback force of HDD and percussive force of the rammer.
PULLBACK ASSSIST
                       CONNECTION METHOD HDPE
                       (OPTION 1)
          HDD ASSIST
PIPE RAMMING




                       Rammer is locked into steel casing via collets. The steel casing is connected to
                       the HDPE product pipe via steel to HDPE flange compression kit. HDD pull force
                       is used in conjunction with the rammer to install the pipe.
PULLBACK ASSIST
                       CONNECTION METHOD HDPE
                       (OPTION 2)
          HDD ASSIST
PIPE RAMMING




                       Rammer is locked into steel casing via collets. Steel casing is welded to
                       steel ring that is flush with HDPE face, and welded to steel sleeve. Steel
                       sleeve is bolted to HDPE product pipe. HDD pull force is used in conjunction
                       with the rammer to install the pipe.
ON THE JOB: PULLBACK ASSIST

                       • Normangee, TX
                        –Pullback Assist (pipe stuck for 4
          HDD ASSIST

                         days before start of assist)
                       • Reason for pullback failure –
PIPE RAMMING




                         excessive flooding in area
                         caused collapsed entry pit and
                         hole.
                       • HDD Rig
                        –500,000 lb pullback
                       • Pipe
                        –2,800’ of 36” casing
                       • Equipment
                        –24” Rammer
ON THE JOB: PULLBACK ASSIST

                       • Stewart, FL
                        –HDPE Pullback Assist, pipe sat
          HDD ASSIST

                         for more than two weeks before
                         assist could be started due to
PIPE RAMMING




                         excessive hurricane season.
                       • HDD Rig
                        –1.2 M lb custom drill rig
                       • Pipe size
                        –4,500’ of 24” HDPE pipe 80’
                         deep
                       • Equipment
                        –24” Rammer
PIPE EXTRACTION METHOD
          HDD ASSIST
PIPE RAMMING




                       • Remove stuck product pipe and bore      • Percussive action along with static
                         again                                     tension pulls product pipe, removing it
                       • Rammer is attached to product pipe by     from the bore
                         fabricating an adaptor
PIPE EXTRACTION
          HDD ASSIST   CONNECTION METHOD FOR STEEL CASING
PIPE RAMMING




                       Rammer is locked into steel casing that is welded onto the product casing.
                       Static pull force is used in conjunction with the rammer to extract the product
                       casing.
PIPE EXTRACTION
          HDD ASSIST   CONNECTION METHOD FOR HDPE
PIPE RAMMING




                       Rammer is locked into steel casing that is welded onto the steel
                       sleeve. Steel sleeve is bolted to HDPE product pipe. Static pull force
                       is used in conjunction with the rammer to extract the product casing.
ON THE JOB: PIPE EXTRACTION

                       • Orlando, FL
                        –HDPE Pipe Extraction
          HDD ASSIST


                       • Pipe size
PIPE RAMMING




                        –850’ extraction of 30” HDPE pipe
                       • Equipment
                        –16” Rammer
DRILL STEM RECOVERY METHOD
          HDD ASSIST
PIPE RAMMING




                       • Recover expensive stuck drill rod        • Kinetic energy is used to assist in
                       • Rammer is attached the to drill rod by     pulling or pushing rod out of the ground
                         fabricating an adaptor                     with the assist of static tension
ON THE JOB: DRILL STEM RECOVERY
          HDD ASSIST
PIPE RAMMING
RECOMMENDED HAMMERS
                                                                                                      Calculated
                         Rammer                                               Impact Rate                                     Pipe Diameter
                                                   HDD Class                                         Impact Force
                           Size                                                  BPM                                             Range
                                                                                                      at 1 ft/min*
          HDD ASSIST


                              7”                    24,000 lbs                       295                184,000 lbs                 8” – 16”
PIPE RAMMING




                                                 24,000; 33,000;
                              8”                                                     223                252,000 lbs                 8” – 24”
                                                    50,000 lbs
                                                 33,000; 50,000;
                             12”                                                     271                744,000 lbs                12” – 36”
                                                   80,000 lbs

                             16”                    80,000 lbs                       231              1,094,000 lbs                12” – 48”

                                                      80,000;
                             20”                                                     190              1,740,000 lbs                20” – 54”
                                                    150,000 lbs
                                                    150,000 lbs
                             24”                                                     177              2,020,000 lbs                24” – 72”
                                                    and larger
                       *The numbers shown here are based on calculation and are for comparative purposes only between various models of HammerHead
                       Rammers. The numbers are not intended for engineering applications.
THANK YOU

 FIRST NAME LAST NAME
 PRESENTER TITLE
 E: info@hammerheadmole.com
 P: 800.331.6653 | INT: +1.262.567.8833 | F: 262.567.5068
 W: www.hammerheadtrenchless.com

More Related Content

What's hot

Earthwork notes
Earthwork notesEarthwork notes
Earthwork notes
Adilen Del
 
A Presentation on Bored Cast-in-Situ Piles
A Presentation on Bored Cast-in-Situ PilesA Presentation on Bored Cast-in-Situ Piles
A Presentation on Bored Cast-in-Situ Piles
Subham Kundu
 

What's hot (20)

Trenchless technolgy
Trenchless technolgyTrenchless technolgy
Trenchless technolgy
 
DMC piling
DMC pilingDMC piling
DMC piling
 
Rubber dam
Rubber dam Rubber dam
Rubber dam
 
Gravity dam forces
Gravity dam forcesGravity dam forces
Gravity dam forces
 
Design of An Immersed Tube Tunnel
Design of An Immersed Tube TunnelDesign of An Immersed Tube Tunnel
Design of An Immersed Tube Tunnel
 
Drainage Engineering (cross drainage structures)
Drainage Engineering (cross drainage structures)Drainage Engineering (cross drainage structures)
Drainage Engineering (cross drainage structures)
 
Earthwork notes
Earthwork notesEarthwork notes
Earthwork notes
 
Dewatering techniques
Dewatering techniquesDewatering techniques
Dewatering techniques
 
PQC concrete road
PQC concrete roadPQC concrete road
PQC concrete road
 
Design and construction procedure of otta seal
Design and construction procedure of otta sealDesign and construction procedure of otta seal
Design and construction procedure of otta seal
 
Control of ground water in excavation
Control of ground water in excavation Control of ground water in excavation
Control of ground water in excavation
 
dewateringtechniques 2.pptx
dewateringtechniques 2.pptxdewateringtechniques 2.pptx
dewateringtechniques 2.pptx
 
Rutting In Flexible Pavement ppt
Rutting In Flexible Pavement pptRutting In Flexible Pavement ppt
Rutting In Flexible Pavement ppt
 
2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTU
2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTU2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTU
2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTU
 
Pipe Jacking
Pipe JackingPipe Jacking
Pipe Jacking
 
IRC-6-2016.pdf
IRC-6-2016.pdfIRC-6-2016.pdf
IRC-6-2016.pdf
 
SUSTAINABLE CONSTRUCTION TECHNIQUES
SUSTAINABLE CONSTRUCTION TECHNIQUESSUSTAINABLE CONSTRUCTION TECHNIQUES
SUSTAINABLE CONSTRUCTION TECHNIQUES
 
Bridges Functionality and Aesthetics
Bridges Functionality and AestheticsBridges Functionality and Aesthetics
Bridges Functionality and Aesthetics
 
Sinking of well foundation
Sinking of well foundationSinking of well foundation
Sinking of well foundation
 
A Presentation on Bored Cast-in-Situ Piles
A Presentation on Bored Cast-in-Situ PilesA Presentation on Bored Cast-in-Situ Piles
A Presentation on Bored Cast-in-Situ Piles
 

Viewers also liked

DSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipe
DSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipeDSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipe
DSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipe
Deltares
 
Soil compaction handbook_low_res_0212_data_id_59525_version_1
Soil compaction handbook_low_res_0212_data_id_59525_version_1Soil compaction handbook_low_res_0212_data_id_59525_version_1
Soil compaction handbook_low_res_0212_data_id_59525_version_1
Anil Kumar S
 
Generation of electricity using the flow or velocity of vehicle exhaust gas
Generation of electricity using the flow or velocity of vehicle exhaust gasGeneration of electricity using the flow or velocity of vehicle exhaust gas
Generation of electricity using the flow or velocity of vehicle exhaust gas
Vel Murugan
 
Construction equipments
Construction equipmentsConstruction equipments
Construction equipments
Ashish Parihar
 

Viewers also liked (20)

Pneumatic Pipe Bursting Case Studies
Pneumatic Pipe Bursting Case StudiesPneumatic Pipe Bursting Case Studies
Pneumatic Pipe Bursting Case Studies
 
Static Pipe Bursting Case Stidies
Static Pipe Bursting Case StidiesStatic Pipe Bursting Case Stidies
Static Pipe Bursting Case Stidies
 
DSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipe
DSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipeDSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipe
DSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipe
 
Soil MEchanics
Soil MEchanicsSoil MEchanics
Soil MEchanics
 
Pipe Bursting
Pipe BurstingPipe Bursting
Pipe Bursting
 
Pipe Bursting Project Considerations
Pipe Bursting Project ConsiderationsPipe Bursting Project Considerations
Pipe Bursting Project Considerations
 
Equipment For Compaction
Equipment For Compaction Equipment For Compaction
Equipment For Compaction
 
AUE 893
AUE 893AUE 893
AUE 893
 
Compaction
CompactionCompaction
Compaction
 
compaction equipment
compaction equipmentcompaction equipment
compaction equipment
 
Methods Of Improving Soil Bearing Capacity
Methods Of Improving Soil Bearing CapacityMethods Of Improving Soil Bearing Capacity
Methods Of Improving Soil Bearing Capacity
 
Soil compaction handbook_low_res_0212_data_id_59525_version_1
Soil compaction handbook_low_res_0212_data_id_59525_version_1Soil compaction handbook_low_res_0212_data_id_59525_version_1
Soil compaction handbook_low_res_0212_data_id_59525_version_1
 
Generation of electricity using the flow or velocity of vehicle exhaust gas
Generation of electricity using the flow or velocity of vehicle exhaust gasGeneration of electricity using the flow or velocity of vehicle exhaust gas
Generation of electricity using the flow or velocity of vehicle exhaust gas
 
Ppt on electricity generation from exhaust hot gases
Ppt on electricity generation from exhaust hot gasesPpt on electricity generation from exhaust hot gases
Ppt on electricity generation from exhaust hot gases
 
Automatic-gear-shift-mechanism
 Automatic-gear-shift-mechanism Automatic-gear-shift-mechanism
Automatic-gear-shift-mechanism
 
casting ppt
casting pptcasting ppt
casting ppt
 
Casting
CastingCasting
Casting
 
Lecture 5 soil compaction
Lecture 5 soil compactionLecture 5 soil compaction
Lecture 5 soil compaction
 
Lecture 7 stress distribution in soil
Lecture 7 stress distribution in soilLecture 7 stress distribution in soil
Lecture 7 stress distribution in soil
 
Construction equipments
Construction equipmentsConstruction equipments
Construction equipments
 

Similar to The Pipe Ramming Method

Trenchless Installation of Drainage Culverts with Pipe Ramming Method
Trenchless Installation of Drainage Culverts with Pipe Ramming MethodTrenchless Installation of Drainage Culverts with Pipe Ramming Method
Trenchless Installation of Drainage Culverts with Pipe Ramming Method
HammerHead Trenchless Equipment
 
Qcs Product Brochure
Qcs Product BrochureQcs Product Brochure
Qcs Product Brochure
calvinschmidt
 
03 drilling recent development ui 17 sep 2007
03 drilling recent development   ui 17 sep 200703 drilling recent development   ui 17 sep 2007
03 drilling recent development ui 17 sep 2007
yudi05
 
Your Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docxYour Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docx
odiliagilby
 

Similar to The Pipe Ramming Method (20)

Trenchless Installation of Drainage Culverts with Pipe Ramming Method
Trenchless Installation of Drainage Culverts with Pipe Ramming MethodTrenchless Installation of Drainage Culverts with Pipe Ramming Method
Trenchless Installation of Drainage Culverts with Pipe Ramming Method
 
underwater construction
underwater constructionunderwater construction
underwater construction
 
Failures of an earthen dam
Failures of an earthen damFailures of an earthen dam
Failures of an earthen dam
 
Qcs Product Brochure
Qcs Product BrochureQcs Product Brochure
Qcs Product Brochure
 
Suspension bridges
Suspension bridgesSuspension bridges
Suspension bridges
 
Alan sutton
Alan suttonAlan sutton
Alan sutton
 
03 drilling recent development ui 17 sep 2007
03 drilling recent development   ui 17 sep 200703 drilling recent development   ui 17 sep 2007
03 drilling recent development ui 17 sep 2007
 
Tunnel boring machine ppt
Tunnel boring machine pptTunnel boring machine ppt
Tunnel boring machine ppt
 
TCD2011 - Kunne bedre kompetanse avverget Macondo-ulykken i Mexico-gulfen? v/...
TCD2011 - Kunne bedre kompetanse avverget Macondo-ulykken i Mexico-gulfen? v/...TCD2011 - Kunne bedre kompetanse avverget Macondo-ulykken i Mexico-gulfen? v/...
TCD2011 - Kunne bedre kompetanse avverget Macondo-ulykken i Mexico-gulfen? v/...
 
CFA and DD Piles in Earthquake Country - DM Holloway - SEAOSC Seminar - Long...
CFA and DD Piles in Earthquake Country  - DM Holloway - SEAOSC Seminar - Long...CFA and DD Piles in Earthquake Country  - DM Holloway - SEAOSC Seminar - Long...
CFA and DD Piles in Earthquake Country - DM Holloway - SEAOSC Seminar - Long...
 
Drainage
DrainageDrainage
Drainage
 
Metkon Pipa Bawah Laut.pdf
Metkon Pipa Bawah Laut.pdfMetkon Pipa Bawah Laut.pdf
Metkon Pipa Bawah Laut.pdf
 
Directional Drilling
Directional DrillingDirectional Drilling
Directional Drilling
 
Dewatering techniques
Dewatering techniquesDewatering techniques
Dewatering techniques
 
Newport Marina Presentation March 2015
Newport Marina Presentation March 2015Newport Marina Presentation March 2015
Newport Marina Presentation March 2015
 
1.Pile foundations 2021 (1).pptx
1.Pile foundations 2021 (1).pptx1.Pile foundations 2021 (1).pptx
1.Pile foundations 2021 (1).pptx
 
pipes.pptx
pipes.pptxpipes.pptx
pipes.pptx
 
Your Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docxYour Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docx
 
CEMATRIX Cellular Concrete - Wet Mix (Ready Mix) Applications
CEMATRIX Cellular Concrete - Wet Mix (Ready Mix) ApplicationsCEMATRIX Cellular Concrete - Wet Mix (Ready Mix) Applications
CEMATRIX Cellular Concrete - Wet Mix (Ready Mix) Applications
 
Cofferdams
Cofferdams Cofferdams
Cofferdams
 

More from HammerHead Trenchless Equipment (10)

Static Pipe Bursting Systems
Static Pipe Bursting SystemsStatic Pipe Bursting Systems
Static Pipe Bursting Systems
 
Pneumatic Pipe Bursting Systems
Pneumatic Pipe Bursting SystemsPneumatic Pipe Bursting Systems
Pneumatic Pipe Bursting Systems
 
HammerHead Mole Piercing Tools
HammerHead Mole Piercing ToolsHammerHead Mole Piercing Tools
HammerHead Mole Piercing Tools
 
Pipe bursting and Pre-chlorination_effectiveness on large scale projects
Pipe bursting and Pre-chlorination_effectiveness on large scale projectsPipe bursting and Pre-chlorination_effectiveness on large scale projects
Pipe bursting and Pre-chlorination_effectiveness on large scale projects
 
HDD Assist Methods
HDD Assist MethodsHDD Assist Methods
HDD Assist Methods
 
Comparing Rehabilitation and Replacement Applications
Comparing Rehabilitation and Replacement ApplicationsComparing Rehabilitation and Replacement Applications
Comparing Rehabilitation and Replacement Applications
 
HammerHead PP Template, No Logo. 4:3
HammerHead PP Template, No Logo. 4:3HammerHead PP Template, No Logo. 4:3
HammerHead PP Template, No Logo. 4:3
 
HammerHead PP Template, 16:9
HammerHead PP Template, 16:9HammerHead PP Template, 16:9
HammerHead PP Template, 16:9
 
HammerHead PP Template, 4:3
HammerHead PP Template, 4:3HammerHead PP Template, 4:3
HammerHead PP Template, 4:3
 
HammerHead PP Template, No Logo, 16:9
HammerHead PP Template, No Logo, 16:9HammerHead PP Template, No Logo, 16:9
HammerHead PP Template, No Logo, 16:9
 

Recently uploaded

1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Krashi Coaching
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
heathfieldcps1
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 

Recently uploaded (20)

A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 

The Pipe Ramming Method

  • 1. PIPE RAMMING METHOD PRESENTER(S) NAMES
  • 2. What is Pipe Ramming? PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT A pneumatic hammer installs an open ended steel casing that is cleaned out during and after completion of pipe installation.
  • 3. PIPE RAMMING APPLICATIONS PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT •Steel casing installation •Culvert replacement •Ram and swallow •Slick boring •Piling •HDD Assist –Wash-over casings –Stuck Bores –Removal of drill stem –Hydro-locked casings
  • 4. Advantages PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Trenchless • Able to swallow rock as large as the inside diameter of the casing • Method does not remove soil until casing is installed • Minimizes voids –Roads –Railroads • Reduced soil compaction
  • 5. Preferred for Adverse Soil Conditions PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Free flowing sand • Cobble conditions • Large rock formations • Excessive ground water
  • 6. SWALLOWS LARGE OBSTRUCTIONS PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Rock swallowed during ram • Spoil removed post ram 54” Casing
  • 7. CULVERT SWALLOWING PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT An oversized casing is rammed over existing culvert. After installation is complete, old culvert and spoil is removed. Steel casing can serve as the drainage culvert or as a carrier pipe for another pipe inserted within.
  • 8. TELESCOPING METHOD PIPE RAMMING FOR LONGER DISTANCES CULVERT INSTALLATION AND REPLACEMENT An oversized pipe is rammed over the existing culvert until production ceases and is cleaned out. Further progress is made with smaller casings installed within the oversized pipe in the same manner.
  • 9. METHOD IMPLEMENTATION Trenchless Culvert Replacement Under Railways with the Pipe Ramming Method
  • 10. RAM SITE LAYOUT PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT Note: Follow local regulations for sloping or shoring of pit.
  • 11. SITE PREP: CASING PLACEMENT PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT Rail system I-beam Pipe Mule™ Leveling System
  • 12. STEEL CASING PREP PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT SOIL SHOE LUBRICATION Steel Casing Internal Shoe External Shoe Reinforces lead casing and provides an Supplies lubricating fluid to OD and ID of annulus for lubrication. casing during installation.
  • 13. COLLETS AND RAMMER PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT Install Pushing Collets/Collars Install Rammer Collets and collars help to distribute the The rammer is locked into the collets when ramming force to the face of the pipe. the tool is started. The collets also lock the rammer into place.
  • 14. SPOIL REMOVAL PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT Spoil removal for >30” and/or Spoil removal <30” Casing large spoil/culverts Seal kit Manual excavation, HDD culvert cleaning Air and/or water pressure. Seal kit for air tools, jet washing, auger boring wherever pressure removal. applicable.
  • 15. PIPE RAMMING CASE STUDIES HIGHWAY & RAILROAD CULVERT INSTALLATION & REPLACEMENT WITH PIPE RAMMING
  • 16. NEW INSTALLATION – ROCKVILLE, MN PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Project –2 – drainage culverts under railroad • Pipe sizes –1-60” Casing –1-32” Casing • Equipment –24” Rammer • Ram distance –1 @ 90’ –1@ 195’ • Free flowing sand • Holding grade
  • 17. PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT NEW INSTALLATION – GRAND ISLAND, NE • Project –1 – drainage culvert under railroad • Pipe sizes –1-24” Casing • Equipment –24” Rammer • Ram distance –1 @ 250’ • Free flowing sand with loose coal dust and other materials • Installed with 2% grade
  • 18. PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT NEW INSTALLATION – COUER D’ALENE, ID • Project –2 – drainage culverts under RR and Highway • Pipe sizes –2 - 48” casings • Equipment –23” Rammer • Ram distance –1 @ 190’ –1@ 195’
  • 19. PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT NEW INSTALLATIONS – MARICOPA CTY, AZ • New culvert installation under rail bed. • 84” steel casing • 24” HammerHead Pipe Rammer
  • 20. TELESCOPING METHOD – ALASKA PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Replacement of 84” dia. culvert drain with telescoping method • 96” steel casing, 164 feet. • 24” HammerHead Pipe Rammer Collapsed 7’ casing, 164 feet long
  • 21. TELESCOPING METHOD – ALASKA PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Replacement of 84” dia. culvert drain with telescoping method • 96” steel casing, 164 feet. • 24” HammerHead Pipe Rammer First section of pipe installed.
  • 22. TELESCOPING METHOD – ALASKA PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Replacement of 84” dia. culvert drain with telescoping method • 96” steel casing, 164 feet. • 24” HammerHead Pipe Rammer Swallowing and removing sections.
  • 23. TELESCOPING METHOD – ALASKA PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Replacement of 84” dia. culvert drain with telescoping method • 96” steel casing, 164 feet. • 24” HammerHead Pipe Rammer Telescoping 60 feet down sized sections.
  • 24. TELESCOPING METHOD – ALASKA PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Replacement of 84” dia. culvert drain with telescoping method • 96” steel casing, 164 feet. • 24” HammerHead Pipe Rammer Trenchless telescoped pipe.
  • 25. NEW INSTALLATION – DALTON HWY, AK PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Drainage culvert • Glacial til/new road bed • Service hwy between Prudhoe Bay oil reserves & Fairbanks
  • 26. NEW INSTALLATION – DALTON HWY, AK PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Project –1 – drainage culvert under service highway • Pipe sizes –1 - 36” casing • Equipment –24” Rammer • Ram distance –1 @ 160’
  • 27. NEW INSTALLATION – DALTON HWY, AK PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Project –1 – drainage culvert under service highway • Pipe sizes –1 - 36” casing • Equipment –24” Rammer • Ram distance –1 @ 160’
  • 28. HDD ASSIST METHODS PIPE RAMMING
  • 29. HDD RAM ASSIST • When problems arise while horizontal directional drilling HDD ASSIST (HDD) costs begin to add up with each tick of the clock. PIPE RAMMING • Quick reaction time and expert technical support are critical to salvaging a bore gone bad. • The percussive power of pipe rammers can help free stuck product pipes, drill stems, and help remove product pipes on failed bores.
  • 30. FOUR METHODS •Washover casings HDD ASSIST •Pull back assist PIPE RAMMING •Pipe extraction •Drill stem recovery
  • 31. WASHOVER CASING METHOD HDD ASSIST PIPE RAMMING • Used as a pilot for large HDD projects • Makes a guide down hole for mud motors • Casings are rammed through difficult soil • Casing provides a path for drill fluid conditions to rock or solid soil recycling and reduces the loss of fluids in surface soils
  • 32. ON THE JOB: WASHOVER CASINGS • Hong Kong, China –Wash over casing HDD ASSIST • Pipe sizes PIPE RAMMING –2 – 54” casings • Equipment –24” Rammer • Ram distance –2 @ 66’
  • 33. PULL BACK ASSIST METHOD HDD ASSIST PIPE RAMMING • Assist HDD when pullback is not possible • Percussive power frees immobilized and machine still has rotation capabilities product pipes. • Rammer attached to product pipe
  • 34. PULLBACK ASSIST HDD ASSIST CONNECTION METHOD STEEL PIPE RAMMING Rammer is locked into steel casing via collets. Steel casing is installed using pullback force of HDD and percussive force of the rammer.
  • 35. PULLBACK ASSSIST CONNECTION METHOD HDPE (OPTION 1) HDD ASSIST PIPE RAMMING Rammer is locked into steel casing via collets. The steel casing is connected to the HDPE product pipe via steel to HDPE flange compression kit. HDD pull force is used in conjunction with the rammer to install the pipe.
  • 36. PULLBACK ASSIST CONNECTION METHOD HDPE (OPTION 2) HDD ASSIST PIPE RAMMING Rammer is locked into steel casing via collets. Steel casing is welded to steel ring that is flush with HDPE face, and welded to steel sleeve. Steel sleeve is bolted to HDPE product pipe. HDD pull force is used in conjunction with the rammer to install the pipe.
  • 37. ON THE JOB: PULLBACK ASSIST • Normangee, TX –Pullback Assist (pipe stuck for 4 HDD ASSIST days before start of assist) • Reason for pullback failure – PIPE RAMMING excessive flooding in area caused collapsed entry pit and hole. • HDD Rig –500,000 lb pullback • Pipe –2,800’ of 36” casing • Equipment –24” Rammer
  • 38. ON THE JOB: PULLBACK ASSIST • Stewart, FL –HDPE Pullback Assist, pipe sat HDD ASSIST for more than two weeks before assist could be started due to PIPE RAMMING excessive hurricane season. • HDD Rig –1.2 M lb custom drill rig • Pipe size –4,500’ of 24” HDPE pipe 80’ deep • Equipment –24” Rammer
  • 39. PIPE EXTRACTION METHOD HDD ASSIST PIPE RAMMING • Remove stuck product pipe and bore • Percussive action along with static again tension pulls product pipe, removing it • Rammer is attached to product pipe by from the bore fabricating an adaptor
  • 40. PIPE EXTRACTION HDD ASSIST CONNECTION METHOD FOR STEEL CASING PIPE RAMMING Rammer is locked into steel casing that is welded onto the product casing. Static pull force is used in conjunction with the rammer to extract the product casing.
  • 41. PIPE EXTRACTION HDD ASSIST CONNECTION METHOD FOR HDPE PIPE RAMMING Rammer is locked into steel casing that is welded onto the steel sleeve. Steel sleeve is bolted to HDPE product pipe. Static pull force is used in conjunction with the rammer to extract the product casing.
  • 42. ON THE JOB: PIPE EXTRACTION • Orlando, FL –HDPE Pipe Extraction HDD ASSIST • Pipe size PIPE RAMMING –850’ extraction of 30” HDPE pipe • Equipment –16” Rammer
  • 43. DRILL STEM RECOVERY METHOD HDD ASSIST PIPE RAMMING • Recover expensive stuck drill rod • Kinetic energy is used to assist in • Rammer is attached the to drill rod by pulling or pushing rod out of the ground fabricating an adaptor with the assist of static tension
  • 44. ON THE JOB: DRILL STEM RECOVERY HDD ASSIST PIPE RAMMING
  • 45. RECOMMENDED HAMMERS Calculated Rammer Impact Rate Pipe Diameter HDD Class Impact Force Size BPM Range at 1 ft/min* HDD ASSIST 7” 24,000 lbs 295 184,000 lbs 8” – 16” PIPE RAMMING 24,000; 33,000; 8” 223 252,000 lbs 8” – 24” 50,000 lbs 33,000; 50,000; 12” 271 744,000 lbs 12” – 36” 80,000 lbs 16” 80,000 lbs 231 1,094,000 lbs 12” – 48” 80,000; 20” 190 1,740,000 lbs 20” – 54” 150,000 lbs 150,000 lbs 24” 177 2,020,000 lbs 24” – 72” and larger *The numbers shown here are based on calculation and are for comparative purposes only between various models of HammerHead Rammers. The numbers are not intended for engineering applications.
  • 46. THANK YOU FIRST NAME LAST NAME PRESENTER TITLE E: info@hammerheadmole.com P: 800.331.6653 | INT: +1.262.567.8833 | F: 262.567.5068 W: www.hammerheadtrenchless.com

Editor's Notes

  1. When installing a steel pipe, it is usually a simple matter of inserting a set of collets into the pipe which allow the hammer to lock into the casing. In some instances, the pipe may need to be reinforced, or a fabricated adapter may be needed to match the size of the available collets to the size of the product pipe.
  2. When installing HDPE pipe, an adapter will be needed to allow the connection of the hammer to the pipe. The easiest is a flange adapter that is fused to the pipe string, then a steel casing is added to the flange adapter, and the whole assembly is bolted up. This provides a stub of casing for the collets, which in turn, lock the hammer.
  3. A second alternative is to fabricate a sleeve which should just fit over the HDPE. The sleeve is then bolted into the HDPE pipe. At the end of the sleeve is a plate that will butt up against the back of the HDPE. Then a casing is welded and gusseted to the plate to provide a receiver for the collets and ramming tool.
  4. The adapter for steel casing is the easiest; it is simply a piece of casing, which need not be the same size as the pipe being installed, it can be sized to whichever set of collets is most convenient. The piece of casing is welded on top of the product, then gussets are added for increased strength. The collets will go on the front side of the arrangement so that the hammer is pounding the pipe out of the bore.
  5. For HDPE, a steel sleeve will need to be fabricated to fit more or less snugly over the HDPE, then bolted to the pipe. A piece of casing is welded to the top of the sleeve just like for the steel extraction adapter, to act as a receiver for the ramming tool and collets.