Otta Seal
(Design &Construction Procedures)
Sujit Dhital
Quality Management and Monitoring Specialist
SNRTP (PMU West )
SURFACING OPTION
Non Structural
Sand Seal
Otta Seal
DBSD
Structural
Asphalt Concrete
FACTORS AFFECTING CHOICES
Traffic Volume
Riding Quality Required
Operational Factor
Safety
Environmental Considerations
Construction and Maintenance
 Properties of Available Aggregate
Construction Cost
Required Service Life
OTTA SEAL
An Otta seal is a thin bituminous seal
comprising Natural or crushed
aggregate of all sizes and either a cut-
back or soft penetration grade bitumen
with or without sand cover seal
MECHANISM
Graded aggregate is placed on a relatively
thick film of comparatively soft binder
which on rolling and trafficking, works its
way upwards through the aggregate
interstices. The graded aggregate relies both
on mechanical interlocking and bitumen
binding for its strength
GENERAL
Similar to Conventional Chip Seal
(DBSD)
Binder Spray – Aggregate
Spreading – Rolling
Prime Normally Not Required
Like All Other Surface Treatments, An
Otta Seal Will Not Contribute Directly
To The Structural Strength Of The
Pavement
Pavement Must Be Properly Designed
To Withstand The Traffic Loading
Throughout Its Designed Life
OTTA SEAL CHOICES
LIMITATIONS
Lack of information regarding the Otta
Seal, properties, design, construction
and performance
 Reluctance to adopt new technology
Extra contractual Obligation
Otta seal Guiding Document
RECOMMENDED TYPE OF OTTA SEAL
IN RELATION TO TRAFFIC
PREFERRED AGGREGATE GRADING
DESIGN OF OTTA SEAL
GRADING GUIDELINES
Sieve
Sizes
(mm)
Open Grading Medium Grading Dense Grading
(% passing) (% passing) (% passing)
16.0 100 100 100
13.2 52 - 82 68 - 94 84 - 100
9.5 36 - 58 44 - 73 70 - 98
6.7 20 - 40 29 - 54 54 - 80
4.75 10 - 30 19 - 42 44 - 70
2.0 0 - 8 3 - 18 20 - 48
1.18 0 - 5 1 - 14 15 - 38
.425 0 - 2 0 - 6 7 - 25
.075 0 - 1 0 - 2 3 - 10
DESIGN OF OTTA SEAL
STRENGTH REQUIREMENT
Los Angeles
Abrasion value
IS: 2386 40 percent (Max)
Aggregate
Impact value
IS: 2386 30 percent (Max)
FI
IS: 2386 35 percent (Max)
Stripping Value
5 percent (Max)
DESIGN OF OTTA SEAL
Type of
Seal
Aggregate Spread Rates (m3/m2)
Open
Grading
Medium
Grading
Dense
Grading
Otta Seals 0.013-0.016 0.013-0.016 0.016-0.020
Sand Seals 0.010-0.012
Aggregate Application Rates
DESIGN OF OTTA SEAL
Binder Spray Rates Depends on:
Traffic (AADT)
Aggregate Grading
(Open/Medium/Dense)
Absorbency of Aggregate Particles
Priming of Base Course
DESIGN OF OTTA SEAL
Choice of Binder
 MC 3000, in warm weather
 MC 800, in cold weather when night temperature <10°
C.
 Blending of 80/ 100(VG10) with kerosene done at site
to produce required consistency
WEATHER LIMITATIONS
The minimum surface temperatures for
spraying of the different types and grades of
binder shall be :
 80/100 penetration grade bitumen: 50
o
C
 MC-3000 cutback bitumen: 22
o
C
 MC-800 cutback bitumen: 15
o
C
 MC-30 cutback bitumen: 10
o
C
 Emulsions: 5
o
C
DESIGN OF OTTA SEAL
Choice of Binder
AADT at
Construction
Type of Bitumen for Different Aggregate grading
Open Medium Dense
>1000 NA 150/200 pen MC 3000
MC 800 in cold
100 – 1000 150/200 pen 150/200 pen in
cold
MC 3000
MC 800 in cold
<100 150/200 pen MC 3000 MC 800
DESIGN OF OTTA SEAL
Binder Spray Rates (in litres/m2)
Type of Otta Seal Grading
Open Medium Dense
Double 1st Layer 1.6 1.7 1.8
2nd Layer 1.5 1.6 2.0
Single with
a Sand
Cover Seal
Fine Sand 0.7 0.7 0.6
Coarse sand 0.9 0.8 0.7
1st Layer 1.6 1.7 2.0
Single 1.7 1.8 2.0
Maintenance Reseal 1.5 1.6 1.8
DESIGN OF OTTA SEAL
Blending Guidelines
Required
Product
Cutter (kerosene) in percent of total
80/100 base Bitumen
150/200 Base
Bitumen
150/200
3-5% (flux oil is used
instead of Cutter)
-
MC 3000 8-10% 5-8%
MC 800 18-20% 15-18%
*
PRIME
Normally Not Required
Required only when calcareous base
Required because of High
Amount of Bitumen
Absorption
CONSTRUCTION PROCESS
Sub-grade preparation
Preparation of Sub Base
Preparation of CRM
Binder application
Aggregate spreading
Rolling
Sand sealing after about 8
weeks
OTTA SEAL CONSTRUCTION
EQUIPMENT USED:
 Bitumen boiler 1 No.
 Bitumen distributor 1 No.
 Pneumatic rollers 2 Nos.
 Steel roller 1 No.
 Chips spreader 1 No.
 Air compressor 1 No.
 speed of the distributor can be calculated from
equation
Speed of distributor = S/(R*W)
Where S is the rate of delivery (mass) from
the spray bar in kg/s
R is the design spray rate (mass) in kg/m
W is the sprayed width in metres
The required speed will then be in m/s.
DISTRIBUTOR CALIBRATION
PREPARATION OF BASE COURSE
Good Bond Between Base Course and
Surfacing Necessary
Brooming Dust and Foreign Matter
Light Watering to Suppress Dust and to
Facilitate Penetration of Binder
SEALING OPERATION
Spraying of Binder
Spreading of Aggregate
Initial Rolling
(On the Day of Construction)
Rolling Afterwards(Back Rolling )
ROLLING
Extensive Rolling with PTR is
Essential to Achieve a Good Result
One Pass with a Steel Roller will
Improve the Embedment of the
Larger Aggregate
TREATMENT
 Commercial Traffic Allowed After Initial
Rolling With PTR
 A Speed Limit (?) Should be Enforced for
2-3 Weeks
 Road may be reopen to traffic after
minimum of three passes with restricted
speed.
 On the Day of Construction :15 Passes
with PTR + 1 Pass with Steel Roller
 For Each of Next 2 Days :15 Passes with
PTR
 During First 2- 3 Weeks: Brooming Back
Aggregate
 2-3 Weeks After Construction :Sweep Off
Excess Aggregate and speed restriction
lifted.
ROLLING REQUIREMENTS
POST CONSTRUCTION
 Minimum of 8 - 12 Weeks Between First and
Second Layers
 Bleeding in Localised Areas and Wheel Path
is Normal in Otta Seals
 Any Available Fine Aggregate Can be Used for
Blinding Off
 In Case of Extensive Bleeding, Coarse
Aggregate May be Used
ADDITIONAL CONSIDERATIONS
Curing of 1st Seal for 8 – 12
Weeks
Enough Cover Aggregate to be
Applied for Sand Cover Seal and
Broomed Back Regularly until fully
Embedded. Normally 4 Weeks.
COMPLETED SECTION
 Single Otta
Seal +
Sand Seal
COMPLETED SECTION
 Single Otta
Seal without
Sand Seal
THANK YOU

More Related Content

What's hot (20)

Soil penetration tests
Soil penetration testsSoil penetration tests
Soil penetration tests
 
Lecture#01
Lecture#01Lecture#01
Lecture#01
 
Design of rigid pavements
Design of rigid pavementsDesign of rigid pavements
Design of rigid pavements
 
Benkelman beam deflection studies
Benkelman beam deflection studiesBenkelman beam deflection studies
Benkelman beam deflection studies
 
Rigid Pavement Design Part II
Rigid Pavement Design Part IIRigid Pavement Design Part II
Rigid Pavement Design Part II
 
Construction of flexible pavement
Construction of flexible pavementConstruction of flexible pavement
Construction of flexible pavement
 
Low cost road
Low cost roadLow cost road
Low cost road
 
Failures of a earthen dam
Failures of a earthen damFailures of a earthen dam
Failures of a earthen dam
 
Failures in flexible pavement
Failures in flexible pavementFailures in flexible pavement
Failures in flexible pavement
 
Bombay road plan
Bombay road planBombay road plan
Bombay road plan
 
Design flexible and rigid pavements
Design flexible and rigid pavementsDesign flexible and rigid pavements
Design flexible and rigid pavements
 
GROUND IMPROVEMENT-DENSIFICATION METHODS
GROUND IMPROVEMENT-DENSIFICATION METHODSGROUND IMPROVEMENT-DENSIFICATION METHODS
GROUND IMPROVEMENT-DENSIFICATION METHODS
 
Highway Materials Unit-III
Highway Materials  Unit-IIIHighway Materials  Unit-III
Highway Materials Unit-III
 
Geometric design of highway
Geometric design of highwayGeometric design of highway
Geometric design of highway
 
Highway drainage
Highway drainageHighway drainage
Highway drainage
 
Highway planning
Highway planningHighway planning
Highway planning
 
Unit 4
Unit 4Unit 4
Unit 4
 
Highway Drainage (Highway Engineering)
Highway Drainage (Highway Engineering)Highway Drainage (Highway Engineering)
Highway Drainage (Highway Engineering)
 
Tunnel engineering
  Tunnel engineering  Tunnel engineering
Tunnel engineering
 
Pavement Materials Bitumen
Pavement Materials  BitumenPavement Materials  Bitumen
Pavement Materials Bitumen
 

Similar to Design and construction procedure of otta seal

Sap parts technology brochure
Sap parts technology brochureSap parts technology brochure
Sap parts technology brochuresapparts
 
The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)theijes
 
Tobee TG Gravel Pump..pdf
Tobee TG Gravel Pump..pdfTobee TG Gravel Pump..pdf
Tobee TG Gravel Pump..pdfTobeePump2
 
IRJET - Study on Foundry Sand as a Partial Replacement for the Fine Aggregate
IRJET - Study on Foundry Sand as a Partial Replacement for the Fine AggregateIRJET - Study on Foundry Sand as a Partial Replacement for the Fine Aggregate
IRJET - Study on Foundry Sand as a Partial Replacement for the Fine AggregateIRJET Journal
 
Concrete compaction [compatibility mode]
Concrete compaction [compatibility mode]Concrete compaction [compatibility mode]
Concrete compaction [compatibility mode]Rajesh Jindal
 
Method statement for expansion joint
Method statement for expansion jointMethod statement for expansion joint
Method statement for expansion jointakash yadav
 
Effect of Dolomitic Marble Dust Powder and Calcitic Marble Dust Powder on C...
Effect of  Dolomitic Marble Dust Powder and Calcitic Marble  Dust Powder on C...Effect of  Dolomitic Marble Dust Powder and Calcitic Marble  Dust Powder on C...
Effect of Dolomitic Marble Dust Powder and Calcitic Marble Dust Powder on C...IRJET Journal
 
ORIENTATION REPORT SYED MOHSAN RAZA (1)
ORIENTATION REPORT SYED MOHSAN RAZA (1)ORIENTATION REPORT SYED MOHSAN RAZA (1)
ORIENTATION REPORT SYED MOHSAN RAZA (1)MOHSAN RAZA
 
dMT SPC® dry surface coatings for the ultimate wear protection on industrial ...
dMT SPC® dry surface coatings for the ultimate wear protection on industrial ...dMT SPC® dry surface coatings for the ultimate wear protection on industrial ...
dMT SPC® dry surface coatings for the ultimate wear protection on industrial ...dmtgms
 
Project Execution Plan for Muscat Runway Construction, Oman
Project Execution Plan for Muscat Runway Construction, OmanProject Execution Plan for Muscat Runway Construction, Oman
Project Execution Plan for Muscat Runway Construction, OmanDavid H Moloney
 
Construction Aspects of Rigid Pavements.ppt
Construction Aspects of Rigid Pavements.pptConstruction Aspects of Rigid Pavements.ppt
Construction Aspects of Rigid Pavements.pptbala506586
 

Similar to Design and construction procedure of otta seal (20)

20190906103937279.pdf
20190906103937279.pdf20190906103937279.pdf
20190906103937279.pdf
 
Sap parts technology brochure
Sap parts technology brochureSap parts technology brochure
Sap parts technology brochure
 
The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)
 
Tobee TG Gravel Pump..pdf
Tobee TG Gravel Pump..pdfTobee TG Gravel Pump..pdf
Tobee TG Gravel Pump..pdf
 
IRJET - Study on Foundry Sand as a Partial Replacement for the Fine Aggregate
IRJET - Study on Foundry Sand as a Partial Replacement for the Fine AggregateIRJET - Study on Foundry Sand as a Partial Replacement for the Fine Aggregate
IRJET - Study on Foundry Sand as a Partial Replacement for the Fine Aggregate
 
Concrete compaction [compatibility mode]
Concrete compaction [compatibility mode]Concrete compaction [compatibility mode]
Concrete compaction [compatibility mode]
 
Method statement for expansion joint
Method statement for expansion jointMethod statement for expansion joint
Method statement for expansion joint
 
TBBtires
TBBtiresTBBtires
TBBtires
 
rolling compact concreteRCC.pptx
 rolling compact concreteRCC.pptx rolling compact concreteRCC.pptx
rolling compact concreteRCC.pptx
 
Effect of Dolomitic Marble Dust Powder and Calcitic Marble Dust Powder on C...
Effect of  Dolomitic Marble Dust Powder and Calcitic Marble  Dust Powder on C...Effect of  Dolomitic Marble Dust Powder and Calcitic Marble  Dust Powder on C...
Effect of Dolomitic Marble Dust Powder and Calcitic Marble Dust Powder on C...
 
Esite Norton Vortex Rapid Blend
Esite Norton Vortex Rapid BlendEsite Norton Vortex Rapid Blend
Esite Norton Vortex Rapid Blend
 
ORIENTATION REPORT SYED MOHSAN RAZA (1)
ORIENTATION REPORT SYED MOHSAN RAZA (1)ORIENTATION REPORT SYED MOHSAN RAZA (1)
ORIENTATION REPORT SYED MOHSAN RAZA (1)
 
dMT SPC® dry surface coatings for the ultimate wear protection on industrial ...
dMT SPC® dry surface coatings for the ultimate wear protection on industrial ...dMT SPC® dry surface coatings for the ultimate wear protection on industrial ...
dMT SPC® dry surface coatings for the ultimate wear protection on industrial ...
 
Kellingray
KellingrayKellingray
Kellingray
 
CASE STUDY OF WAKOTA BRIDGE
CASE STUDY OF WAKOTA BRIDGECASE STUDY OF WAKOTA BRIDGE
CASE STUDY OF WAKOTA BRIDGE
 
Guniting ppt.pptx
Guniting ppt.pptxGuniting ppt.pptx
Guniting ppt.pptx
 
5840 Brochure
5840 Brochure5840 Brochure
5840 Brochure
 
Project Execution Plan for Muscat Runway Construction, Oman
Project Execution Plan for Muscat Runway Construction, OmanProject Execution Plan for Muscat Runway Construction, Oman
Project Execution Plan for Muscat Runway Construction, Oman
 
Superpave - Low Volume
Superpave - Low VolumeSuperpave - Low Volume
Superpave - Low Volume
 
Construction Aspects of Rigid Pavements.ppt
Construction Aspects of Rigid Pavements.pptConstruction Aspects of Rigid Pavements.ppt
Construction Aspects of Rigid Pavements.ppt
 

Recently uploaded

University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfrs7054576148
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 

Recently uploaded (20)

University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 

Design and construction procedure of otta seal

  • 1. Otta Seal (Design &Construction Procedures) Sujit Dhital Quality Management and Monitoring Specialist SNRTP (PMU West )
  • 2. SURFACING OPTION Non Structural Sand Seal Otta Seal DBSD Structural Asphalt Concrete
  • 3. FACTORS AFFECTING CHOICES Traffic Volume Riding Quality Required Operational Factor Safety Environmental Considerations Construction and Maintenance  Properties of Available Aggregate Construction Cost Required Service Life
  • 4. OTTA SEAL An Otta seal is a thin bituminous seal comprising Natural or crushed aggregate of all sizes and either a cut- back or soft penetration grade bitumen with or without sand cover seal
  • 5. MECHANISM Graded aggregate is placed on a relatively thick film of comparatively soft binder which on rolling and trafficking, works its way upwards through the aggregate interstices. The graded aggregate relies both on mechanical interlocking and bitumen binding for its strength
  • 6. GENERAL Similar to Conventional Chip Seal (DBSD) Binder Spray – Aggregate Spreading – Rolling Prime Normally Not Required Like All Other Surface Treatments, An Otta Seal Will Not Contribute Directly To The Structural Strength Of The Pavement Pavement Must Be Properly Designed To Withstand The Traffic Loading Throughout Its Designed Life
  • 8. LIMITATIONS Lack of information regarding the Otta Seal, properties, design, construction and performance  Reluctance to adopt new technology Extra contractual Obligation
  • 9. Otta seal Guiding Document
  • 10. RECOMMENDED TYPE OF OTTA SEAL IN RELATION TO TRAFFIC
  • 12. DESIGN OF OTTA SEAL GRADING GUIDELINES Sieve Sizes (mm) Open Grading Medium Grading Dense Grading (% passing) (% passing) (% passing) 16.0 100 100 100 13.2 52 - 82 68 - 94 84 - 100 9.5 36 - 58 44 - 73 70 - 98 6.7 20 - 40 29 - 54 54 - 80 4.75 10 - 30 19 - 42 44 - 70 2.0 0 - 8 3 - 18 20 - 48 1.18 0 - 5 1 - 14 15 - 38 .425 0 - 2 0 - 6 7 - 25 .075 0 - 1 0 - 2 3 - 10
  • 13. DESIGN OF OTTA SEAL STRENGTH REQUIREMENT Los Angeles Abrasion value IS: 2386 40 percent (Max) Aggregate Impact value IS: 2386 30 percent (Max) FI IS: 2386 35 percent (Max) Stripping Value 5 percent (Max)
  • 14. DESIGN OF OTTA SEAL Type of Seal Aggregate Spread Rates (m3/m2) Open Grading Medium Grading Dense Grading Otta Seals 0.013-0.016 0.013-0.016 0.016-0.020 Sand Seals 0.010-0.012 Aggregate Application Rates
  • 15. DESIGN OF OTTA SEAL Binder Spray Rates Depends on: Traffic (AADT) Aggregate Grading (Open/Medium/Dense) Absorbency of Aggregate Particles Priming of Base Course
  • 16. DESIGN OF OTTA SEAL Choice of Binder  MC 3000, in warm weather  MC 800, in cold weather when night temperature <10° C.  Blending of 80/ 100(VG10) with kerosene done at site to produce required consistency
  • 17. WEATHER LIMITATIONS The minimum surface temperatures for spraying of the different types and grades of binder shall be :  80/100 penetration grade bitumen: 50 o C  MC-3000 cutback bitumen: 22 o C  MC-800 cutback bitumen: 15 o C  MC-30 cutback bitumen: 10 o C  Emulsions: 5 o C
  • 18. DESIGN OF OTTA SEAL Choice of Binder AADT at Construction Type of Bitumen for Different Aggregate grading Open Medium Dense >1000 NA 150/200 pen MC 3000 MC 800 in cold 100 – 1000 150/200 pen 150/200 pen in cold MC 3000 MC 800 in cold <100 150/200 pen MC 3000 MC 800
  • 19. DESIGN OF OTTA SEAL Binder Spray Rates (in litres/m2) Type of Otta Seal Grading Open Medium Dense Double 1st Layer 1.6 1.7 1.8 2nd Layer 1.5 1.6 2.0 Single with a Sand Cover Seal Fine Sand 0.7 0.7 0.6 Coarse sand 0.9 0.8 0.7 1st Layer 1.6 1.7 2.0 Single 1.7 1.8 2.0 Maintenance Reseal 1.5 1.6 1.8
  • 20. DESIGN OF OTTA SEAL Blending Guidelines Required Product Cutter (kerosene) in percent of total 80/100 base Bitumen 150/200 Base Bitumen 150/200 3-5% (flux oil is used instead of Cutter) - MC 3000 8-10% 5-8% MC 800 18-20% 15-18% *
  • 21.
  • 22. PRIME Normally Not Required Required only when calcareous base Required because of High Amount of Bitumen Absorption
  • 23. CONSTRUCTION PROCESS Sub-grade preparation Preparation of Sub Base Preparation of CRM Binder application Aggregate spreading Rolling Sand sealing after about 8 weeks
  • 24. OTTA SEAL CONSTRUCTION EQUIPMENT USED:  Bitumen boiler 1 No.  Bitumen distributor 1 No.  Pneumatic rollers 2 Nos.  Steel roller 1 No.  Chips spreader 1 No.  Air compressor 1 No.
  • 25.  speed of the distributor can be calculated from equation Speed of distributor = S/(R*W) Where S is the rate of delivery (mass) from the spray bar in kg/s R is the design spray rate (mass) in kg/m W is the sprayed width in metres The required speed will then be in m/s. DISTRIBUTOR CALIBRATION
  • 26. PREPARATION OF BASE COURSE Good Bond Between Base Course and Surfacing Necessary Brooming Dust and Foreign Matter Light Watering to Suppress Dust and to Facilitate Penetration of Binder
  • 27. SEALING OPERATION Spraying of Binder Spreading of Aggregate Initial Rolling (On the Day of Construction) Rolling Afterwards(Back Rolling )
  • 28. ROLLING Extensive Rolling with PTR is Essential to Achieve a Good Result One Pass with a Steel Roller will Improve the Embedment of the Larger Aggregate
  • 29. TREATMENT  Commercial Traffic Allowed After Initial Rolling With PTR  A Speed Limit (?) Should be Enforced for 2-3 Weeks  Road may be reopen to traffic after minimum of three passes with restricted speed.
  • 30.  On the Day of Construction :15 Passes with PTR + 1 Pass with Steel Roller  For Each of Next 2 Days :15 Passes with PTR  During First 2- 3 Weeks: Brooming Back Aggregate  2-3 Weeks After Construction :Sweep Off Excess Aggregate and speed restriction lifted. ROLLING REQUIREMENTS
  • 31. POST CONSTRUCTION  Minimum of 8 - 12 Weeks Between First and Second Layers  Bleeding in Localised Areas and Wheel Path is Normal in Otta Seals  Any Available Fine Aggregate Can be Used for Blinding Off  In Case of Extensive Bleeding, Coarse Aggregate May be Used
  • 32. ADDITIONAL CONSIDERATIONS Curing of 1st Seal for 8 – 12 Weeks Enough Cover Aggregate to be Applied for Sand Cover Seal and Broomed Back Regularly until fully Embedded. Normally 4 Weeks.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38. COMPLETED SECTION  Single Otta Seal + Sand Seal
  • 39. COMPLETED SECTION  Single Otta Seal without Sand Seal