HDD ASSIST METHODS
     PIPE RAMMING
HDD RAM ASSIST

                       • When problems arise while
                         horizontal directional drilling
          HDD ASSIST

                         (HDD) costs begin to add up with
                         each tick of the clock.
PIPE RAMMING




                       • Quick reaction time and expert
                         technical support are critical to
                         salvaging a bore gone bad.
                       • The percussive power of pipe
                         rammers can help free stuck
                         product pipes, drill stems, and
                         help remove product pipes on
                         failed bores.
FOUR METHODS

                       •Washover casings
          HDD ASSIST


                       •Pull back assist
PIPE RAMMING




                       •Pipe extraction
                       •Drill stem recovery
WASHOVER CASING METHOD
          HDD ASSIST
PIPE RAMMING




                       • Used as a pilot for large HDD projects      • Makes a guide down hole for mud motors
                       • Casings are rammed through difficult soil   • Casing provides a path for drill fluid
                         conditions to rock or solid soil              recycling and reduces the loss of fluids
                                                                       in surface soils
ON THE JOB: WASHOVER CASINGS

                       • Hong Kong, China
                        –Wash over casing
          HDD ASSIST


                       • Pipe sizes
PIPE RAMMING




                        –2 – 54” casings
                       • Equipment
                        –24” Rammer
                       • Ram distance
                        –2 @ 66’
PULL BACK ASSIST METHOD
          HDD ASSIST
PIPE RAMMING




                       • Assist HDD when pullback is not possible      • Percussive power frees immobilized
                         and machine still has rotation capabilities     product pipes.
                       • Rammer attached to product pipe

Recommended

Padeye design calculation
Padeye design calculationPadeye design calculation
Padeye design calculationadiq1901
 
Pressure vessel, its types with different testing methods
Pressure vessel, its types with different testing methodsPressure vessel, its types with different testing methods
Pressure vessel, its types with different testing methodsIhsan Wassan
 
Steel stacks guide
Steel stacks guideSteel stacks guide
Steel stacks guideKhaled Eid
 
Nondestructive testing
Nondestructive testingNondestructive testing
Nondestructive testingGulfam Hussain
 
ASME SEC. VIII DIV. 1 & 2.pptx
ASME SEC. VIII DIV. 1 & 2.pptxASME SEC. VIII DIV. 1 & 2.pptx
ASME SEC. VIII DIV. 1 & 2.pptxvipinverma125286
 

More Related Content

What's hot

Heat Shrink Cable Terminations - High Voltage Cable Terminations, 6.6kV 3 Co...
Heat Shrink Cable Terminations - High Voltage  Cable Terminations, 6.6kV 3 Co...Heat Shrink Cable Terminations - High Voltage  Cable Terminations, 6.6kV 3 Co...
Heat Shrink Cable Terminations - High Voltage Cable Terminations, 6.6kV 3 Co...Thorne & Derrick International
 
Asco 8210 Series RedHat Solenoid Valve
Asco 8210 Series RedHat Solenoid ValveAsco 8210 Series RedHat Solenoid Valve
Asco 8210 Series RedHat Solenoid ValveCarotek
 
MET 304 Revited joints
MET 304 Revited jointsMET 304 Revited joints
MET 304 Revited jointshotman1991
 
Standard_Penetration_Test__SPT_.pptx
Standard_Penetration_Test__SPT_.pptxStandard_Penetration_Test__SPT_.pptx
Standard_Penetration_Test__SPT_.pptxTabRasa1
 
Magnetic flow meter for industrial process measurement
Magnetic flow meter for industrial process measurementMagnetic flow meter for industrial process measurement
Magnetic flow meter for industrial process measurementCTi Controltech
 
Design & Mitigation of blast resistant doors
Design & Mitigation of blast resistant doorsDesign & Mitigation of blast resistant doors
Design & Mitigation of blast resistant doorsAvhishek Singh
 
Brittle coating and test
Brittle coating and testBrittle coating and test
Brittle coating and testDavalsab M.L
 
Inspection manual for piping
Inspection manual for pipingInspection manual for piping
Inspection manual for pipingKhiem Vo Duy
 
Asme viii Div. 1 presentation rev.0
Asme viii Div. 1  presentation   rev.0Asme viii Div. 1  presentation   rev.0
Asme viii Div. 1 presentation rev.0Mohammad Mahrous
 
Types of stresses and theories of failure (machine design & industrial drafti...
Types of stresses and theories of failure (machine design & industrial drafti...Types of stresses and theories of failure (machine design & industrial drafti...
Types of stresses and theories of failure (machine design & industrial drafti...Digvijaysinh Gohil
 
Variable stresses in machine parts
Variable stresses in machine partsVariable stresses in machine parts
Variable stresses in machine partsEmran Hossain
 
Guidelines for the procurement and testing of STATCOMS
Guidelines for the procurement and testing of STATCOMSGuidelines for the procurement and testing of STATCOMS
Guidelines for the procurement and testing of STATCOMSPower System Operation
 
Standard Padeye Sheet.pdf
Standard Padeye Sheet.pdfStandard Padeye Sheet.pdf
Standard Padeye Sheet.pdfhiski1
 
HV tower design 1
HV tower design 1HV tower design 1
HV tower design 1Thy Khy
 
Intro to Rotary Draw Bending: An Engineer’s Guide to Bending Tubes
Intro to Rotary Draw Bending: An Engineer’s Guide to Bending Tubes Intro to Rotary Draw Bending: An Engineer’s Guide to Bending Tubes
Intro to Rotary Draw Bending: An Engineer’s Guide to Bending Tubes Tube Form Solutions
 

What's hot (20)

Heat Shrink Cable Terminations - High Voltage Cable Terminations, 6.6kV 3 Co...
Heat Shrink Cable Terminations - High Voltage  Cable Terminations, 6.6kV 3 Co...Heat Shrink Cable Terminations - High Voltage  Cable Terminations, 6.6kV 3 Co...
Heat Shrink Cable Terminations - High Voltage Cable Terminations, 6.6kV 3 Co...
 
Asco 8210 Series RedHat Solenoid Valve
Asco 8210 Series RedHat Solenoid ValveAsco 8210 Series RedHat Solenoid Valve
Asco 8210 Series RedHat Solenoid Valve
 
A.s.m.e
A.s.m.eA.s.m.e
A.s.m.e
 
MET 304 Revited joints
MET 304 Revited jointsMET 304 Revited joints
MET 304 Revited joints
 
Roxtec Cable Transits - Catalogue
Roxtec Cable Transits - CatalogueRoxtec Cable Transits - Catalogue
Roxtec Cable Transits - Catalogue
 
Standard_Penetration_Test__SPT_.pptx
Standard_Penetration_Test__SPT_.pptxStandard_Penetration_Test__SPT_.pptx
Standard_Penetration_Test__SPT_.pptx
 
Magnetic flow meter for industrial process measurement
Magnetic flow meter for industrial process measurementMagnetic flow meter for industrial process measurement
Magnetic flow meter for industrial process measurement
 
Design & Mitigation of blast resistant doors
Design & Mitigation of blast resistant doorsDesign & Mitigation of blast resistant doors
Design & Mitigation of blast resistant doors
 
Brittle coating and test
Brittle coating and testBrittle coating and test
Brittle coating and test
 
Inspection manual for piping
Inspection manual for pipingInspection manual for piping
Inspection manual for piping
 
Asme viii Div. 1 presentation rev.0
Asme viii Div. 1  presentation   rev.0Asme viii Div. 1  presentation   rev.0
Asme viii Div. 1 presentation rev.0
 
Dnv rp-d101
Dnv rp-d101Dnv rp-d101
Dnv rp-d101
 
Introduction Leak Testing
Introduction Leak TestingIntroduction Leak Testing
Introduction Leak Testing
 
Types of stresses and theories of failure (machine design & industrial drafti...
Types of stresses and theories of failure (machine design & industrial drafti...Types of stresses and theories of failure (machine design & industrial drafti...
Types of stresses and theories of failure (machine design & industrial drafti...
 
Variable stresses in machine parts
Variable stresses in machine partsVariable stresses in machine parts
Variable stresses in machine parts
 
Guidelines for the procurement and testing of STATCOMS
Guidelines for the procurement and testing of STATCOMSGuidelines for the procurement and testing of STATCOMS
Guidelines for the procurement and testing of STATCOMS
 
Standard Padeye Sheet.pdf
Standard Padeye Sheet.pdfStandard Padeye Sheet.pdf
Standard Padeye Sheet.pdf
 
HV tower design 1
HV tower design 1HV tower design 1
HV tower design 1
 
Acoustic Emission testing
Acoustic Emission testingAcoustic Emission testing
Acoustic Emission testing
 
Intro to Rotary Draw Bending: An Engineer’s Guide to Bending Tubes
Intro to Rotary Draw Bending: An Engineer’s Guide to Bending Tubes Intro to Rotary Draw Bending: An Engineer’s Guide to Bending Tubes
Intro to Rotary Draw Bending: An Engineer’s Guide to Bending Tubes
 

Viewers also liked

Joint fsawwa region vii asce-ewri pipeline rehabilitation presentation ro 11-...
Joint fsawwa region vii asce-ewri pipeline rehabilitation presentation ro 11-...Joint fsawwa region vii asce-ewri pipeline rehabilitation presentation ro 11-...
Joint fsawwa region vii asce-ewri pipeline rehabilitation presentation ro 11-...ascemiami-dade
 
Trenchless Installation of Drainage Culverts with Pipe Ramming Method
Trenchless Installation of Drainage Culverts with Pipe Ramming MethodTrenchless Installation of Drainage Culverts with Pipe Ramming Method
Trenchless Installation of Drainage Culverts with Pipe Ramming MethodHammerHead Trenchless Equipment
 
Pipe bursting and Pre-chlorination_effectiveness on large scale projects
Pipe bursting and Pre-chlorination_effectiveness on large scale projectsPipe bursting and Pre-chlorination_effectiveness on large scale projects
Pipe bursting and Pre-chlorination_effectiveness on large scale projectsHammerHead Trenchless Equipment
 
Wastewater Collection System & Results-Oriented Management Using Autonomous R...
Wastewater Collection System & Results-Oriented Management Using Autonomous R...Wastewater Collection System & Results-Oriented Management Using Autonomous R...
Wastewater Collection System & Results-Oriented Management Using Autonomous R...OHM Advisors
 
Michels - GeoOmaha Presentation Final
Michels - GeoOmaha Presentation FinalMichels - GeoOmaha Presentation Final
Michels - GeoOmaha Presentation FinalBrad Eifert
 
Dcl presentaion for hdd
Dcl presentaion for hddDcl presentaion for hdd
Dcl presentaion for hddMohammed wahab
 

Viewers also liked (16)

Pipe Bursting
Pipe BurstingPipe Bursting
Pipe Bursting
 
Joint fsawwa region vii asce-ewri pipeline rehabilitation presentation ro 11-...
Joint fsawwa region vii asce-ewri pipeline rehabilitation presentation ro 11-...Joint fsawwa region vii asce-ewri pipeline rehabilitation presentation ro 11-...
Joint fsawwa region vii asce-ewri pipeline rehabilitation presentation ro 11-...
 
Hdd training curriculum 2014 dw 01
Hdd training curriculum 2014 dw 01Hdd training curriculum 2014 dw 01
Hdd training curriculum 2014 dw 01
 
Comparing Rehabilitation and Replacement Applications
Comparing Rehabilitation and Replacement ApplicationsComparing Rehabilitation and Replacement Applications
Comparing Rehabilitation and Replacement Applications
 
HammerHead PP Template, No Logo. 4:3
HammerHead PP Template, No Logo. 4:3HammerHead PP Template, No Logo. 4:3
HammerHead PP Template, No Logo. 4:3
 
Static Pipe Bursting Case Stidies
Static Pipe Bursting Case StidiesStatic Pipe Bursting Case Stidies
Static Pipe Bursting Case Stidies
 
Pneumatic Pipe Bursting Case Studies
Pneumatic Pipe Bursting Case StudiesPneumatic Pipe Bursting Case Studies
Pneumatic Pipe Bursting Case Studies
 
HammerHead PP Template, 16:9
HammerHead PP Template, 16:9HammerHead PP Template, 16:9
HammerHead PP Template, 16:9
 
Trenchless Installation of Drainage Culverts with Pipe Ramming Method
Trenchless Installation of Drainage Culverts with Pipe Ramming MethodTrenchless Installation of Drainage Culverts with Pipe Ramming Method
Trenchless Installation of Drainage Culverts with Pipe Ramming Method
 
HammerHead PP Template, 4:3
HammerHead PP Template, 4:3HammerHead PP Template, 4:3
HammerHead PP Template, 4:3
 
Pipe bursting and Pre-chlorination_effectiveness on large scale projects
Pipe bursting and Pre-chlorination_effectiveness on large scale projectsPipe bursting and Pre-chlorination_effectiveness on large scale projects
Pipe bursting and Pre-chlorination_effectiveness on large scale projects
 
HammerHead PP Template, No Logo, 16:9
HammerHead PP Template, No Logo, 16:9HammerHead PP Template, No Logo, 16:9
HammerHead PP Template, No Logo, 16:9
 
Wastewater Collection System & Results-Oriented Management Using Autonomous R...
Wastewater Collection System & Results-Oriented Management Using Autonomous R...Wastewater Collection System & Results-Oriented Management Using Autonomous R...
Wastewater Collection System & Results-Oriented Management Using Autonomous R...
 
Michels - GeoOmaha Presentation Final
Michels - GeoOmaha Presentation FinalMichels - GeoOmaha Presentation Final
Michels - GeoOmaha Presentation Final
 
Pipe Bursting Project Considerations
Pipe Bursting Project ConsiderationsPipe Bursting Project Considerations
Pipe Bursting Project Considerations
 
Dcl presentaion for hdd
Dcl presentaion for hddDcl presentaion for hdd
Dcl presentaion for hdd
 

Recently uploaded

Mycology Update February 2024 Microbes with Morgan
Mycology Update February 2024 Microbes with MorganMycology Update February 2024 Microbes with Morgan
Mycology Update February 2024 Microbes with MorganMargie Morgan
 
The basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxThe basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxdeputymitchell2
 
Digital Footprints to Career Pathways - Building a Strong Professional Online...
Digital Footprints to Career Pathways - Building a Strong Professional Online...Digital Footprints to Career Pathways - Building a Strong Professional Online...
Digital Footprints to Career Pathways - Building a Strong Professional Online...Sue Beckingham
 
Peninsula Channel Commanders Rules Handbook
Peninsula Channel Commanders Rules HandbookPeninsula Channel Commanders Rules Handbook
Peninsula Channel Commanders Rules Handbookpccwebmasterhmb
 
Odontogenesis and its related anomiles.pptx
Odontogenesis and its related anomiles.pptxOdontogenesis and its related anomiles.pptx
Odontogenesis and its related anomiles.pptxMennat Allah Alkaram
 
Permeation enhancer of Transdermal drug delivery system
Permeation enhancer of Transdermal drug delivery systemPermeation enhancer of Transdermal drug delivery system
Permeation enhancer of Transdermal drug delivery systemchetanpatil2572000
 
BIOCHEMICAL PROPERTIES OF WATER .Raveesh.pptx
BIOCHEMICAL PROPERTIES OF WATER .Raveesh.pptxBIOCHEMICAL PROPERTIES OF WATER .Raveesh.pptx
BIOCHEMICAL PROPERTIES OF WATER .Raveesh.pptxRAVEESHAD
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...
BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...
BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...Nguyen Thanh Tu Collection
 
Candace-Stone project& portfolio 1 class
Candace-Stone project& portfolio 1 classCandace-Stone project& portfolio 1 class
Candace-Stone project& portfolio 1 classccstone
 
Add Products From Catalog in Odoo 17 Sales
Add Products From Catalog in Odoo 17 SalesAdd Products From Catalog in Odoo 17 Sales
Add Products From Catalog in Odoo 17 SalesCeline George
 
Andreas Schleicher_ Strengthening Upper Secondary Education in Lithuania
Andreas Schleicher_ Strengthening Upper Secondary  Education in LithuaniaAndreas Schleicher_ Strengthening Upper Secondary  Education in Lithuania
Andreas Schleicher_ Strengthening Upper Secondary Education in LithuaniaEduSkills OECD
 
Mycobacteriology update 2024 Margie Morgan.ppt
Mycobacteriology update 2024 Margie Morgan.pptMycobacteriology update 2024 Margie Morgan.ppt
Mycobacteriology update 2024 Margie Morgan.pptMargie Morgan
 
A TEXTBOOK OF INTELLECTUAL ROPERTY RIGHTS
A TEXTBOOK OF INTELLECTUAL ROPERTY RIGHTSA TEXTBOOK OF INTELLECTUAL ROPERTY RIGHTS
A TEXTBOOK OF INTELLECTUAL ROPERTY RIGHTSDr.M.Geethavani
 
EDL 290F Week 2 - Good Company (2024).pdf
EDL 290F Week 2  - Good Company (2024).pdfEDL 290F Week 2  - Good Company (2024).pdf
EDL 290F Week 2 - Good Company (2024).pdfElizabeth Walsh
 
Unit 5th topic Drugs used in congestive Heart failure and shock.pdf
Unit 5th topic Drugs used in congestive Heart failure and shock.pdfUnit 5th topic Drugs used in congestive Heart failure and shock.pdf
Unit 5th topic Drugs used in congestive Heart failure and shock.pdfSUMIT TIWARI
 
Discussing the new Competence Framework for project managers in the built env...
Discussing the new Competence Framework for project managers in the built env...Discussing the new Competence Framework for project managers in the built env...
Discussing the new Competence Framework for project managers in the built env...Association for Project Management
 
Ideotype concept and climate resilient crop varieties for future- Wheat, Rice...
Ideotype concept and climate resilient crop varieties for future- Wheat, Rice...Ideotype concept and climate resilient crop varieties for future- Wheat, Rice...
Ideotype concept and climate resilient crop varieties for future- Wheat, Rice...AKSHAYMAGAR17
 
SSC Hindu Religion and Moral Education MCQ Solutions 2024.pdf
SSC Hindu Religion and Moral Education MCQ Solutions 2024.pdfSSC Hindu Religion and Moral Education MCQ Solutions 2024.pdf
SSC Hindu Religion and Moral Education MCQ Solutions 2024.pdfMohonDas
 
Decision on Curriculum Change Path: Towards Standards-Based Curriculum in Ghana
Decision on Curriculum Change Path: Towards Standards-Based Curriculum in GhanaDecision on Curriculum Change Path: Towards Standards-Based Curriculum in Ghana
Decision on Curriculum Change Path: Towards Standards-Based Curriculum in GhanaPrince Armah, PhD
 
Dr.M.Florence Dayana-Cloud Computing-unit - 4.pdf
Dr.M.Florence Dayana-Cloud Computing-unit - 4.pdfDr.M.Florence Dayana-Cloud Computing-unit - 4.pdf
Dr.M.Florence Dayana-Cloud Computing-unit - 4.pdfDr.Florence Dayana
 

Recently uploaded (20)

Mycology Update February 2024 Microbes with Morgan
Mycology Update February 2024 Microbes with MorganMycology Update February 2024 Microbes with Morgan
Mycology Update February 2024 Microbes with Morgan
 
The basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxThe basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptx
 
Digital Footprints to Career Pathways - Building a Strong Professional Online...
Digital Footprints to Career Pathways - Building a Strong Professional Online...Digital Footprints to Career Pathways - Building a Strong Professional Online...
Digital Footprints to Career Pathways - Building a Strong Professional Online...
 
Peninsula Channel Commanders Rules Handbook
Peninsula Channel Commanders Rules HandbookPeninsula Channel Commanders Rules Handbook
Peninsula Channel Commanders Rules Handbook
 
Odontogenesis and its related anomiles.pptx
Odontogenesis and its related anomiles.pptxOdontogenesis and its related anomiles.pptx
Odontogenesis and its related anomiles.pptx
 
Permeation enhancer of Transdermal drug delivery system
Permeation enhancer of Transdermal drug delivery systemPermeation enhancer of Transdermal drug delivery system
Permeation enhancer of Transdermal drug delivery system
 
BIOCHEMICAL PROPERTIES OF WATER .Raveesh.pptx
BIOCHEMICAL PROPERTIES OF WATER .Raveesh.pptxBIOCHEMICAL PROPERTIES OF WATER .Raveesh.pptx
BIOCHEMICAL PROPERTIES OF WATER .Raveesh.pptx
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...
BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...
BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...
 
Candace-Stone project& portfolio 1 class
Candace-Stone project& portfolio 1 classCandace-Stone project& portfolio 1 class
Candace-Stone project& portfolio 1 class
 
Add Products From Catalog in Odoo 17 Sales
Add Products From Catalog in Odoo 17 SalesAdd Products From Catalog in Odoo 17 Sales
Add Products From Catalog in Odoo 17 Sales
 
Andreas Schleicher_ Strengthening Upper Secondary Education in Lithuania
Andreas Schleicher_ Strengthening Upper Secondary  Education in LithuaniaAndreas Schleicher_ Strengthening Upper Secondary  Education in Lithuania
Andreas Schleicher_ Strengthening Upper Secondary Education in Lithuania
 
Mycobacteriology update 2024 Margie Morgan.ppt
Mycobacteriology update 2024 Margie Morgan.pptMycobacteriology update 2024 Margie Morgan.ppt
Mycobacteriology update 2024 Margie Morgan.ppt
 
A TEXTBOOK OF INTELLECTUAL ROPERTY RIGHTS
A TEXTBOOK OF INTELLECTUAL ROPERTY RIGHTSA TEXTBOOK OF INTELLECTUAL ROPERTY RIGHTS
A TEXTBOOK OF INTELLECTUAL ROPERTY RIGHTS
 
EDL 290F Week 2 - Good Company (2024).pdf
EDL 290F Week 2  - Good Company (2024).pdfEDL 290F Week 2  - Good Company (2024).pdf
EDL 290F Week 2 - Good Company (2024).pdf
 
Unit 5th topic Drugs used in congestive Heart failure and shock.pdf
Unit 5th topic Drugs used in congestive Heart failure and shock.pdfUnit 5th topic Drugs used in congestive Heart failure and shock.pdf
Unit 5th topic Drugs used in congestive Heart failure and shock.pdf
 
Discussing the new Competence Framework for project managers in the built env...
Discussing the new Competence Framework for project managers in the built env...Discussing the new Competence Framework for project managers in the built env...
Discussing the new Competence Framework for project managers in the built env...
 
Ideotype concept and climate resilient crop varieties for future- Wheat, Rice...
Ideotype concept and climate resilient crop varieties for future- Wheat, Rice...Ideotype concept and climate resilient crop varieties for future- Wheat, Rice...
Ideotype concept and climate resilient crop varieties for future- Wheat, Rice...
 
SSC Hindu Religion and Moral Education MCQ Solutions 2024.pdf
SSC Hindu Religion and Moral Education MCQ Solutions 2024.pdfSSC Hindu Religion and Moral Education MCQ Solutions 2024.pdf
SSC Hindu Religion and Moral Education MCQ Solutions 2024.pdf
 
Decision on Curriculum Change Path: Towards Standards-Based Curriculum in Ghana
Decision on Curriculum Change Path: Towards Standards-Based Curriculum in GhanaDecision on Curriculum Change Path: Towards Standards-Based Curriculum in Ghana
Decision on Curriculum Change Path: Towards Standards-Based Curriculum in Ghana
 
Dr.M.Florence Dayana-Cloud Computing-unit - 4.pdf
Dr.M.Florence Dayana-Cloud Computing-unit - 4.pdfDr.M.Florence Dayana-Cloud Computing-unit - 4.pdf
Dr.M.Florence Dayana-Cloud Computing-unit - 4.pdf
 

HDD Assist Methods

  • 1. HDD ASSIST METHODS PIPE RAMMING
  • 2. HDD RAM ASSIST • When problems arise while horizontal directional drilling HDD ASSIST (HDD) costs begin to add up with each tick of the clock. PIPE RAMMING • Quick reaction time and expert technical support are critical to salvaging a bore gone bad. • The percussive power of pipe rammers can help free stuck product pipes, drill stems, and help remove product pipes on failed bores.
  • 3. FOUR METHODS •Washover casings HDD ASSIST •Pull back assist PIPE RAMMING •Pipe extraction •Drill stem recovery
  • 4. WASHOVER CASING METHOD HDD ASSIST PIPE RAMMING • Used as a pilot for large HDD projects • Makes a guide down hole for mud motors • Casings are rammed through difficult soil • Casing provides a path for drill fluid conditions to rock or solid soil recycling and reduces the loss of fluids in surface soils
  • 5. ON THE JOB: WASHOVER CASINGS • Hong Kong, China –Wash over casing HDD ASSIST • Pipe sizes PIPE RAMMING –2 – 54” casings • Equipment –24” Rammer • Ram distance –2 @ 66’
  • 6. PULL BACK ASSIST METHOD HDD ASSIST PIPE RAMMING • Assist HDD when pullback is not possible • Percussive power frees immobilized and machine still has rotation capabilities product pipes. • Rammer attached to product pipe
  • 7. PULLBACK ASSIST HDD ASSIST CONNECTION METHOD STEEL PIPE RAMMING Rammer is locked into steel casing via collets. Steel casing is installed using pullback force of HDD and percussive force of the rammer.
  • 8. PULLBACK ASSSIST CONNECTION METHOD HDPE (OPTION 1) HDD ASSIST PIPE RAMMING Rammer is locked into steel casing via collets. The steel casing is connected to the HDPE product pipe via steel to HDPE flange compression kit. HDD pull force is used in conjunction with the rammer to install the pipe.
  • 9. PULLBACK ASSIST CONNECTION METHOD HDPE (OPTION 2) HDD ASSIST PIPE RAMMING Rammer is locked into steel casing via collets. Steel casing is welded to steel ring that is flush with HDPE face, and welded to steel sleeve. Steel sleeve is bolted to HDPE product pipe. HDD pull force is used in conjunction with the rammer to install the pipe.
  • 10. ON THE JOB: PULLBACK ASSIST • Normangee, TX –Pullback Assist (pipe stuck for 4 HDD ASSIST days before start of assist) • Reason for pullback failure – PIPE RAMMING excessive flooding in area caused collapsed entry pit and hole. • HDD Rig –500,000 lb pullback • Pipe –2,800’ of 36” casing • Equipment –24” Rammer
  • 11. ON THE JOB: PULLBACK ASSIST • Stewart, FL –HDPE Pullback Assist, pipe sat HDD ASSIST for more than two weeks before assist could be started due to PIPE RAMMING excessive hurricane season. • HDD Rig –1.2 M lb custom drill rig • Pipe size –4,500’ of 24” HDPE pipe 80’ deep • Equipment –24” Rammer
  • 12. PIPE EXTRACTION METHOD HDD ASSIST PIPE RAMMING • Remove stuck product pipe and bore • Percussive action along with static again tension pulls product pipe, removing it • Rammer is attached to product pipe by from the bore fabricating an adaptor
  • 13. PIPE EXTRACTION HDD ASSIST CONNECTION METHOD FOR STEEL CASING PIPE RAMMING Rammer is locked into steel casing that is welded onto the product casing. Static pull force is used in conjunction with the rammer to extract the product casing.
  • 14. PIPE EXTRACTION HDD ASSIST CONNECTION METHOD FOR HDPE PIPE RAMMING Rammer is locked into steel casing that is welded onto the steel sleeve. Steel sleeve is bolted to HDPE product pipe. Static pull force is used in conjunction with the rammer to extract the product casing.
  • 15. ON THE JOB: PIPE EXTRACTION • Orlando, FL –HDPE Pipe Extraction HDD ASSIST • Pipe size PIPE RAMMING –850’ extraction of 30” HDPE pipe • Equipment –16” Rammer
  • 16. DRILL STEM RECOVERY METHOD HDD ASSIST PIPE RAMMING • Recover expensive stuck drill rod • Kinetic energy is used to assist in • Rammer is attached the to drill rod by pulling or pushing rod out of the ground fabricating an adaptor with the assist of static tension
  • 17. ON THE JOB: DRILL STEM RECOVERY HDD ASSIST PIPE RAMMING
  • 18. RECOMMENDED HAMMERS Calculated Rammer Impact Rate Pipe Diameter HDD Class Impact Force Size BPM Range at 1 ft/min* HDD ASSIST 7” 24,000 lbs 295 184,000 lbs 8” – 16” PIPE RAMMING 24,000; 33,000; 8” 223 252,000 lbs 8” – 24” 50,000 lbs 33,000; 50,000; 12” 271 744,000 lbs 12” – 36” 80,000 lbs 16” 80,000 lbs 231 1,094,000 lbs 12” – 48” 80,000; 20” 190 1,740,000 lbs 20” – 54” 150,000 lbs 150,000 lbs 24” 177 2,020,000 lbs 24” – 72” and larger *The numbers shown here are based on calculation and are for comparative purposes only between various models of HammerHead Rammers. The numbers are not intended for engineering applications.
  • 19. THANK YOU FIRST NAME LAST NAME PRESENTER TITLE E: info@hammerheadmole.com P: 800.331.6653 | INT: +1.262.567.8833 | F: 262.567.5068 W: www.hammerheadtrenchless.com

Editor's Notes

  1. When installing a steel pipe, it is usually a simple matter of inserting a set of collets into the pipe which allow the hammer to lock into the casing. In some instances, the pipe may need to be reinforced, or a fabricated adapter may be needed to match the size of the available collets to the size of the product pipe.
  2. When installing HDPE pipe, an adapter will be needed to allow the connection of the hammer to the pipe. The easiest is a flange adapter that is fused to the pipe string, then a steel casing is added to the flange adapter, and the whole assembly is bolted up. This provides a stub of casing for the collets, which in turn, lock the hammer.
  3. A second alternative is to fabricate a sleeve which should just fit over the HDPE. The sleeve is then bolted into the HDPE pipe. At the end of the sleeve is a plate that will butt up against the back of the HDPE. Then a casing is welded and gusseted to the plate to provide a receiver for the collets and ramming tool.
  4. The adapter for steel casing is the easiest; it is simply a piece of casing, which need not be the same size as the pipe being installed, it can be sized to whichever set of collets is most convenient. The piece of casing is welded on top of the product, then gussets are added for increased strength. The collets will go on the front side of the arrangement so that the hammer is pounding the pipe out of the bore.
  5. For HDPE, a steel sleeve will need to be fabricated to fit more or less snugly over the HDPE, then bolted to the pipe. A piece of casing is welded to the top of the sleeve just like for the steel extraction adapter, to act as a receiver for the ramming tool and collets.