SlideShare a Scribd company logo
1 of 18
the power of all of us
2Group Members
Group Members
Maruf Abdullah 132-15-2703
M. M. Arifin
Ferdoush Joy
131-15-2614
Md. Touhidul
Hasan Shadi
132-15-2680
Md. Mahbub Hasan 132-15-2719
3Project Topic
4Project Goal
Project Goal
Our main goal of this project is to create such
a restaurant management software or system
which will save time of both customers &
restaurant management team. On the other
hand it will help to run business with much
more efficiently than past.
With this system customers can order food
easily and order’s copy will go directly to
kitchen room and cash counter immediately.
5Find the Recognition of Need
Why We Need This System??
 In our current situation we face few
troubles like misunderstanding while we
order food (from Customer’s Point of
View).
 Doubt on Waiters (from
Manager’s/Management’s Point of view).
To revoke these types of problems we need
this software.
6Feasibility Study of the System
Feasibility Study
 It is very Logical to handle above
mentioned problems.
 This system will not a complex. It’s very
simple and easy to maintain.
 In present situation Upper & Middle
Class Restaurant Management may have
much demand of this system.
7Analysis Part
Project Analysis
According to our project goal we have to do following
things …
 User Login Option.
 Table No, Food Items, Price, Food Selection & Order
options.
 Order flow to Kitchen Room & Cash Counter .
 Order Receiving Acknowledgement.
 Bill Receiving System.
User Login
Customer
Order
Receive &
Food
Preparing
Bill
Payment
& Bill
Receive
DATABASE
Food
Selection
& Submit
Order
Cash
Counter
Kitchen
Room
Agent
Waiters
Data Flow (Analysis Part)
Figure: Data Flow
9Required Materials
Required Materials
Platform Windows, Mac,
Android
Languages Java, XML, C#,
PHP, Objective C
etc..
Server XAMPP
Others JDK 8, Database,
Wi-Fi Zone
10Software we may use
Software We May Use
o MS Access
o Eclipse
o SDK Manager
o ADT Plug-in
o Net Beans
o Visual Studio
o X-Code
o Xampp
11Team Work
Team Work
 Maruf Abdullah (Team leader, System
analyst, Tester, Designer)
 Md. Touhidul Hasan Shadi (Implementer)
 M. M. Arifin Ferdoush Joy (Implementer)
 Md. Mahbub Hasan (Database Tester)
12Time Frame
Time Frame (Estimated)
• Duration of Project: 1 Month = 30 Days
• Analysis & Design Duration: 30% of 30 Days = 8 Days
• Implementation: 50% of 30 Days = 15 Days
• Testing & Debugging: 15% of 30 Days = 5 Days
• Extra Reserve Time: 5% of 30 Days = 2 Days
• Total Working Hours: 28 X 6 (Days X Per day working
hours) = 168 Hours
13Estimate Costing
Estimate Costing
Total Cost: BDT. 15600 only.
Cost Distribution: (Hours * Rate)
Analysis & Design: 48 * 100 = BDT. 4800 only.
Implementation: 90 * 80 = BDT. 7200 only.
Testing: 30 * 120 = BDT. 3600 only.
14Design
Design Analysis & Development
We are developing a system which will work on
Windows & Android Platform. Few screen-shoots
of the system attached here …
15Design
Design Analysis & Development
16Advantages
Advantages of This System
 Easy to Use.
 Easy to Learn the system.
 Easy to Order Food.
 Easy to Select Which foods have to prepare.
 Easy to Calculate Bill.
 This system can be used in Windows, Mac &
Android OS Platform.
17Question s & Answering
18Goodbye Greetings

More Related Content

What's hot

An Online Food Ordering Service
An Online Food Ordering ServiceAn Online Food Ordering Service
An Online Food Ordering Serviceshreeram38
 
Online Crime Reporting ppt
Online Crime Reporting pptOnline Crime Reporting ppt
Online Crime Reporting pptShirinAkhtar5
 
Restaurant management system project
Restaurant management system projectRestaurant management system project
Restaurant management system projectrelocathi789
 
Online Food Ordering System
Online Food Ordering SystemOnline Food Ordering System
Online Food Ordering SystemAnkita Jangir
 
Restaurant Management System
Restaurant Management SystemRestaurant Management System
Restaurant Management SystemJuliasmith1985
 
Restaurant manager app
Restaurant manager appRestaurant manager app
Restaurant manager appNidhi Kumari
 
SRS For Online Store
SRS For Online StoreSRS For Online Store
SRS For Online StoreAhsan Rizwan
 
Software Requirements Specification on Student Information System (SRS on SIS)
Software Requirements Specification on Student Information System (SRS on SIS)Software Requirements Specification on Student Information System (SRS on SIS)
Software Requirements Specification on Student Information System (SRS on SIS)Minhas Kamal
 
Online job portal java project report
Online job portal java project reportOnline job portal java project report
Online job portal java project reportIIUM
 
Hostel Management System Proposal Report.pdf
Hostel Management System Proposal Report.pdfHostel Management System Proposal Report.pdf
Hostel Management System Proposal Report.pdfShohedulIslam3
 
Online food ordering system
Online food ordering systemOnline food ordering system
Online food ordering systemIqraKhan158
 
ppt on e crime management system
ppt on e crime management systemppt on e crime management system
ppt on e crime management systemKrishna Kinkar Jha
 
Food ordering system for red bd csc 397
Food ordering system for red bd csc 397Food ordering system for red bd csc 397
Food ordering system for red bd csc 397Sumaiya Ismail
 
Online food project
Online food projectOnline food project
Online food projectAshik Khan
 
Restaurant Management System PowerPoint Presentation Slides
Restaurant Management System PowerPoint Presentation SlidesRestaurant Management System PowerPoint Presentation Slides
Restaurant Management System PowerPoint Presentation SlidesSlideTeam
 
Online Food Order System for Restaurants.pdf
Online Food Order System for Restaurants.pdfOnline Food Order System for Restaurants.pdf
Online Food Order System for Restaurants.pdfRohini SharmaOhlan
 
Synopsis of Library Management System
Synopsis of Library Management SystemSynopsis of Library Management System
Synopsis of Library Management SystemAnkit Verma
 

What's hot (20)

An Online Food Ordering Service
An Online Food Ordering ServiceAn Online Food Ordering Service
An Online Food Ordering Service
 
Online Crime Reporting ppt
Online Crime Reporting pptOnline Crime Reporting ppt
Online Crime Reporting ppt
 
Restaurant management system project
Restaurant management system projectRestaurant management system project
Restaurant management system project
 
Online Food Ordering System
Online Food Ordering SystemOnline Food Ordering System
Online Food Ordering System
 
Order now – restaurant management system
Order now – restaurant management systemOrder now – restaurant management system
Order now – restaurant management system
 
Restaurant Management System
Restaurant Management SystemRestaurant Management System
Restaurant Management System
 
Restaurant manager app
Restaurant manager appRestaurant manager app
Restaurant manager app
 
SRS For Online Store
SRS For Online StoreSRS For Online Store
SRS For Online Store
 
Software Requirements Specification on Student Information System (SRS on SIS)
Software Requirements Specification on Student Information System (SRS on SIS)Software Requirements Specification on Student Information System (SRS on SIS)
Software Requirements Specification on Student Information System (SRS on SIS)
 
Food Order Management System
Food Order Management SystemFood Order Management System
Food Order Management System
 
Software engineering
Software engineeringSoftware engineering
Software engineering
 
Online job portal java project report
Online job portal java project reportOnline job portal java project report
Online job portal java project report
 
Hostel Management System Proposal Report.pdf
Hostel Management System Proposal Report.pdfHostel Management System Proposal Report.pdf
Hostel Management System Proposal Report.pdf
 
Online food ordering system
Online food ordering systemOnline food ordering system
Online food ordering system
 
ppt on e crime management system
ppt on e crime management systemppt on e crime management system
ppt on e crime management system
 
Food ordering system for red bd csc 397
Food ordering system for red bd csc 397Food ordering system for red bd csc 397
Food ordering system for red bd csc 397
 
Online food project
Online food projectOnline food project
Online food project
 
Restaurant Management System PowerPoint Presentation Slides
Restaurant Management System PowerPoint Presentation SlidesRestaurant Management System PowerPoint Presentation Slides
Restaurant Management System PowerPoint Presentation Slides
 
Online Food Order System for Restaurants.pdf
Online Food Order System for Restaurants.pdfOnline Food Order System for Restaurants.pdf
Online Food Order System for Restaurants.pdf
 
Synopsis of Library Management System
Synopsis of Library Management SystemSynopsis of Library Management System
Synopsis of Library Management System
 

Viewers also liked

Restaurant Business Plan Presentation
Restaurant Business Plan PresentationRestaurant Business Plan Presentation
Restaurant Business Plan PresentationMahadi Hasan
 
Themed restaurant
Themed restaurantThemed restaurant
Themed restaurantBinoy Thapa
 
Contoh proposal usaha makanan
Contoh proposal usaha makananContoh proposal usaha makanan
Contoh proposal usaha makananArya Ningrat
 
Restaurant Design Presentation
Restaurant Design PresentationRestaurant Design Presentation
Restaurant Design Presentationmaggielair
 
The restaurant from concept to operation 6th - walker
The restaurant  from concept to operation 6th - walkerThe restaurant  from concept to operation 6th - walker
The restaurant from concept to operation 6th - walkerLesterrs
 
Restaurant Design: 18 Considerations to Remember
Restaurant Design: 18 Considerations to RememberRestaurant Design: 18 Considerations to Remember
Restaurant Design: 18 Considerations to RememberAaron Allen
 
Restaurant project
Restaurant projectRestaurant project
Restaurant projectArun Kabra
 
Restaurant Presentation
Restaurant PresentationRestaurant Presentation
Restaurant PresentationShahid Sameer
 
Cafe construction project report
Cafe construction project reportCafe construction project report
Cafe construction project reportHagi Sahib
 
Шүүлгийн системийг сургалтанд хэрэглэх технологи
Шүүлгийн системийг сургалтанд хэрэглэх технологиШүүлгийн системийг сургалтанд хэрэглэх технологи
Шүүлгийн системийг сургалтанд хэрэглэх технологиАзжаргал Нинжбадгар
 
Disabled young people's perspectives of the child protection system in England
Disabled young people's perspectives of the child protection system in EnglandDisabled young people's perspectives of the child protection system in England
Disabled young people's perspectives of the child protection system in EnglandBASPCAN
 
Co-production in Safeguarding Children
Co-production in Safeguarding ChildrenCo-production in Safeguarding Children
Co-production in Safeguarding ChildrenBASPCAN
 
Submitting Apps and Games to the Amazon Appstore
Submitting Apps and Games to the Amazon AppstoreSubmitting Apps and Games to the Amazon Appstore
Submitting Apps and Games to the Amazon AppstoreAmazon Appstore Developers
 
Didactica de la Educación Superior, Centro, Estudios, Posgrado
Didactica de la Educación Superior, Centro, Estudios, PosgradoDidactica de la Educación Superior, Centro, Estudios, Posgrado
Didactica de la Educación Superior, Centro, Estudios, PosgradoÁlvaro Miguel Carranza Montalvo
 

Viewers also liked (20)

Draw Star in Visual Studio
Draw Star in Visual StudioDraw Star in Visual Studio
Draw Star in Visual Studio
 
Restaurant Business Plan Presentation
Restaurant Business Plan PresentationRestaurant Business Plan Presentation
Restaurant Business Plan Presentation
 
Group Presentation Final
Group Presentation FinalGroup Presentation Final
Group Presentation Final
 
Themed restaurant
Themed restaurantThemed restaurant
Themed restaurant
 
Contoh proposal usaha makanan
Contoh proposal usaha makananContoh proposal usaha makanan
Contoh proposal usaha makanan
 
Restaurant Design Presentation
Restaurant Design PresentationRestaurant Design Presentation
Restaurant Design Presentation
 
The restaurant from concept to operation 6th - walker
The restaurant  from concept to operation 6th - walkerThe restaurant  from concept to operation 6th - walker
The restaurant from concept to operation 6th - walker
 
Restaurant Design: 18 Considerations to Remember
Restaurant Design: 18 Considerations to RememberRestaurant Design: 18 Considerations to Remember
Restaurant Design: 18 Considerations to Remember
 
Restaurant project
Restaurant projectRestaurant project
Restaurant project
 
Restaurant Presentation
Restaurant PresentationRestaurant Presentation
Restaurant Presentation
 
Cafe construction project report
Cafe construction project reportCafe construction project report
Cafe construction project report
 
Шүүлгийн системийг сургалтанд хэрэглэх технологи
Шүүлгийн системийг сургалтанд хэрэглэх технологиШүүлгийн системийг сургалтанд хэрэглэх технологи
Шүүлгийн системийг сургалтанд хэрэглэх технологи
 
YHON JAIRO DURAN M
YHON JAIRO DURAN MYHON JAIRO DURAN M
YHON JAIRO DURAN M
 
Disabled young people's perspectives of the child protection system in England
Disabled young people's perspectives of the child protection system in EnglandDisabled young people's perspectives of the child protection system in England
Disabled young people's perspectives of the child protection system in England
 
Co-production in Safeguarding Children
Co-production in Safeguarding ChildrenCo-production in Safeguarding Children
Co-production in Safeguarding Children
 
Submitting Apps and Games to the Amazon Appstore
Submitting Apps and Games to the Amazon AppstoreSubmitting Apps and Games to the Amazon Appstore
Submitting Apps and Games to the Amazon Appstore
 
Unit 14 LO1
Unit 14 LO1Unit 14 LO1
Unit 14 LO1
 
1stdayofschool
1stdayofschool1stdayofschool
1stdayofschool
 
Didactica de la Educación Superior, Centro, Estudios, Posgrado
Didactica de la Educación Superior, Centro, Estudios, PosgradoDidactica de la Educación Superior, Centro, Estudios, Posgrado
Didactica de la Educación Superior, Centro, Estudios, Posgrado
 
Unit 13 LO2
Unit 13 LO2Unit 13 LO2
Unit 13 LO2
 

Similar to New Restaurant Management System Concept

Odoo Implementation Process: Know Everything from Challenges to Checklist
Odoo Implementation Process: Know Everything from Challenges to ChecklistOdoo Implementation Process: Know Everything from Challenges to Checklist
Odoo Implementation Process: Know Everything from Challenges to ChecklistKsolves
 
Ahmed Jassat SAOUG ~ Turning Challenges into oppertunities
Ahmed Jassat  SAOUG ~ Turning Challenges into oppertunitiesAhmed Jassat  SAOUG ~ Turning Challenges into oppertunities
Ahmed Jassat SAOUG ~ Turning Challenges into oppertunitiesZahid02
 
ERPAL + ERP Solution, Case Study
ERPAL + ERP Solution, Case StudyERPAL + ERP Solution, Case Study
ERPAL + ERP Solution, Case StudyAniket Maithani
 
12th CBSE Computer Science Project
12th CBSE Computer Science Project12th CBSE Computer Science Project
12th CBSE Computer Science ProjectAshwin Francis
 
Top 10 Agile Metrics
Top 10 Agile MetricsTop 10 Agile Metrics
Top 10 Agile MetricsXBOSoft
 
The Business Value of Modernizing your Windows Infrastructure and Bringing Li...
The Business Value of Modernizing your Windows Infrastructure and Bringing Li...The Business Value of Modernizing your Windows Infrastructure and Bringing Li...
The Business Value of Modernizing your Windows Infrastructure and Bringing Li...Puppet
 
DOES14: Scott Prugh, CSG - DevOps and Lean in Legacy Environments
DOES14: Scott Prugh, CSG - DevOps and Lean in Legacy EnvironmentsDOES14: Scott Prugh, CSG - DevOps and Lean in Legacy Environments
DOES14: Scott Prugh, CSG - DevOps and Lean in Legacy EnvironmentsDevOps Enterprise Summmit
 
DOES14 - Scott Prugh - CSG - DevOps and Lean in Legacy Environments
DOES14 - Scott Prugh - CSG - DevOps and Lean in Legacy EnvironmentsDOES14 - Scott Prugh - CSG - DevOps and Lean in Legacy Environments
DOES14 - Scott Prugh - CSG - DevOps and Lean in Legacy EnvironmentsGene Kim
 
Why take a Continuous Delivery approach in your organisatiion
Why take a Continuous Delivery approach in your organisatiionWhy take a Continuous Delivery approach in your organisatiion
Why take a Continuous Delivery approach in your organisatiionNish Mahanty
 
Sheet1Starbuck process improvement budgetresources required .docx
Sheet1Starbuck   process  improvement   budgetresources  required .docxSheet1Starbuck   process  improvement   budgetresources  required .docx
Sheet1Starbuck process improvement budgetresources required .docxlesleyryder69361
 
Practical insights in implementing lean principles Lean India Summit 2014
Practical insights in implementing lean principles Lean India Summit 2014Practical insights in implementing lean principles Lean India Summit 2014
Practical insights in implementing lean principles Lean India Summit 2014Lean India Summit
 
Cutting Costs with Automation
Cutting Costs with AutomationCutting Costs with Automation
Cutting Costs with AutomationVaporware
 
College Management System project
College Management System projectCollege Management System project
College Management System projectManish Kushwaha
 
adosadaojdoisadaodiaosdijasodiasodjowqidoqidjowqdwq
adosadaojdoisadaodiaosdijasodiasodjowqidoqidjowqdwqadosadaojdoisadaodiaosdijasodiasodjowqidoqidjowqdwq
adosadaojdoisadaodiaosdijasodiasodjowqidoqidjowqdwqJoelBelleth
 
Odoo Implementation Methodology
Odoo Implementation MethodologyOdoo Implementation Methodology
Odoo Implementation MethodologyQuang Ngoc
 
Odoo implementation
Odoo implementationOdoo implementation
Odoo implementationOdoo Thaidev
 

Similar to New Restaurant Management System Concept (20)

Odoo Implementation Process: Know Everything from Challenges to Checklist
Odoo Implementation Process: Know Everything from Challenges to ChecklistOdoo Implementation Process: Know Everything from Challenges to Checklist
Odoo Implementation Process: Know Everything from Challenges to Checklist
 
Ahmed Jassat SAOUG ~ Turning Challenges into oppertunities
Ahmed Jassat  SAOUG ~ Turning Challenges into oppertunitiesAhmed Jassat  SAOUG ~ Turning Challenges into oppertunities
Ahmed Jassat SAOUG ~ Turning Challenges into oppertunities
 
ERPAL + ERP Solution, Case Study
ERPAL + ERP Solution, Case StudyERPAL + ERP Solution, Case Study
ERPAL + ERP Solution, Case Study
 
E M S ppt (1).pptx
E M S ppt (1).pptxE M S ppt (1).pptx
E M S ppt (1).pptx
 
12th CBSE Computer Science Project
12th CBSE Computer Science Project12th CBSE Computer Science Project
12th CBSE Computer Science Project
 
Top 10 Agile Metrics
Top 10 Agile MetricsTop 10 Agile Metrics
Top 10 Agile Metrics
 
Ems usability engineering
Ems   usability engineeringEms   usability engineering
Ems usability engineering
 
The Business Value of Modernizing your Windows Infrastructure and Bringing Li...
The Business Value of Modernizing your Windows Infrastructure and Bringing Li...The Business Value of Modernizing your Windows Infrastructure and Bringing Li...
The Business Value of Modernizing your Windows Infrastructure and Bringing Li...
 
DOES14: Scott Prugh, CSG - DevOps and Lean in Legacy Environments
DOES14: Scott Prugh, CSG - DevOps and Lean in Legacy EnvironmentsDOES14: Scott Prugh, CSG - DevOps and Lean in Legacy Environments
DOES14: Scott Prugh, CSG - DevOps and Lean in Legacy Environments
 
DOES14 - Scott Prugh - CSG - DevOps and Lean in Legacy Environments
DOES14 - Scott Prugh - CSG - DevOps and Lean in Legacy EnvironmentsDOES14 - Scott Prugh - CSG - DevOps and Lean in Legacy Environments
DOES14 - Scott Prugh - CSG - DevOps and Lean in Legacy Environments
 
LOAY FARAHAT PMP
LOAY FARAHAT PMPLOAY FARAHAT PMP
LOAY FARAHAT PMP
 
Why take a Continuous Delivery approach in your organisatiion
Why take a Continuous Delivery approach in your organisatiionWhy take a Continuous Delivery approach in your organisatiion
Why take a Continuous Delivery approach in your organisatiion
 
Sheet1Starbuck process improvement budgetresources required .docx
Sheet1Starbuck   process  improvement   budgetresources  required .docxSheet1Starbuck   process  improvement   budgetresources  required .docx
Sheet1Starbuck process improvement budgetresources required .docx
 
Practical insights in implementing lean principles Lean India Summit 2014
Practical insights in implementing lean principles Lean India Summit 2014Practical insights in implementing lean principles Lean India Summit 2014
Practical insights in implementing lean principles Lean India Summit 2014
 
Cutting Costs with Automation
Cutting Costs with AutomationCutting Costs with Automation
Cutting Costs with Automation
 
College Management System project
College Management System projectCollege Management System project
College Management System project
 
adosadaojdoisadaodiaosdijasodiasodjowqidoqidjowqdwq
adosadaojdoisadaodiaosdijasodiasodjowqidoqidjowqdwqadosadaojdoisadaodiaosdijasodiasodjowqidoqidjowqdwq
adosadaojdoisadaodiaosdijasodiasodjowqidoqidjowqdwq
 
Odoo Implementation Methodology
Odoo Implementation MethodologyOdoo Implementation Methodology
Odoo Implementation Methodology
 
Odoo implementation
Odoo implementationOdoo implementation
Odoo implementation
 
HOSTEL.pptx
HOSTEL.pptxHOSTEL.pptx
HOSTEL.pptx
 

Recently uploaded

Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoordharasingh5698
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 

Recently uploaded (20)

Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 

New Restaurant Management System Concept

  • 1. the power of all of us
  • 2. 2Group Members Group Members Maruf Abdullah 132-15-2703 M. M. Arifin Ferdoush Joy 131-15-2614 Md. Touhidul Hasan Shadi 132-15-2680 Md. Mahbub Hasan 132-15-2719
  • 4. 4Project Goal Project Goal Our main goal of this project is to create such a restaurant management software or system which will save time of both customers & restaurant management team. On the other hand it will help to run business with much more efficiently than past. With this system customers can order food easily and order’s copy will go directly to kitchen room and cash counter immediately.
  • 5. 5Find the Recognition of Need Why We Need This System??  In our current situation we face few troubles like misunderstanding while we order food (from Customer’s Point of View).  Doubt on Waiters (from Manager’s/Management’s Point of view). To revoke these types of problems we need this software.
  • 6. 6Feasibility Study of the System Feasibility Study  It is very Logical to handle above mentioned problems.  This system will not a complex. It’s very simple and easy to maintain.  In present situation Upper & Middle Class Restaurant Management may have much demand of this system.
  • 7. 7Analysis Part Project Analysis According to our project goal we have to do following things …  User Login Option.  Table No, Food Items, Price, Food Selection & Order options.  Order flow to Kitchen Room & Cash Counter .  Order Receiving Acknowledgement.  Bill Receiving System.
  • 8. User Login Customer Order Receive & Food Preparing Bill Payment & Bill Receive DATABASE Food Selection & Submit Order Cash Counter Kitchen Room Agent Waiters Data Flow (Analysis Part) Figure: Data Flow
  • 9. 9Required Materials Required Materials Platform Windows, Mac, Android Languages Java, XML, C#, PHP, Objective C etc.. Server XAMPP Others JDK 8, Database, Wi-Fi Zone
  • 10. 10Software we may use Software We May Use o MS Access o Eclipse o SDK Manager o ADT Plug-in o Net Beans o Visual Studio o X-Code o Xampp
  • 11. 11Team Work Team Work  Maruf Abdullah (Team leader, System analyst, Tester, Designer)  Md. Touhidul Hasan Shadi (Implementer)  M. M. Arifin Ferdoush Joy (Implementer)  Md. Mahbub Hasan (Database Tester)
  • 12. 12Time Frame Time Frame (Estimated) • Duration of Project: 1 Month = 30 Days • Analysis & Design Duration: 30% of 30 Days = 8 Days • Implementation: 50% of 30 Days = 15 Days • Testing & Debugging: 15% of 30 Days = 5 Days • Extra Reserve Time: 5% of 30 Days = 2 Days • Total Working Hours: 28 X 6 (Days X Per day working hours) = 168 Hours
  • 13. 13Estimate Costing Estimate Costing Total Cost: BDT. 15600 only. Cost Distribution: (Hours * Rate) Analysis & Design: 48 * 100 = BDT. 4800 only. Implementation: 90 * 80 = BDT. 7200 only. Testing: 30 * 120 = BDT. 3600 only.
  • 14. 14Design Design Analysis & Development We are developing a system which will work on Windows & Android Platform. Few screen-shoots of the system attached here …
  • 16. 16Advantages Advantages of This System  Easy to Use.  Easy to Learn the system.  Easy to Order Food.  Easy to Select Which foods have to prepare.  Easy to Calculate Bill.  This system can be used in Windows, Mac & Android OS Platform.
  • 17. 17Question s & Answering