Quantity Surveying Objective
• GENERAL OBJECTIVES:
1 . To appreciate the place of quantitative assessment in every field of
the construction industry.
2. To attain the highest possible accuracy in quantitative problem
solving .
3. To be better understand the mode of site development and excavation.
4. To evaluate the material content of reinforced concrete structures.
• SPECIFIC OBJECTIVES:

1 - Mensuration Review
Calculate the area and volume of any figure comprised of a combination of various
shapes .
To calculate earth quantities

2. Basic Contract Document
Describe the objectives of a specification and the general conditions to a contract.

3. Method of Measurement
Define the order and accuracy of dimensions normally used
List the inclusions and exclusions allowed for in computing building areas and volume

4.Site Works:
Take off and bill
1. the quantities for the clearing and grubbing of a
new site.
2. the drainage work for a typical home.
3. a section of roadway and sidewalk.
Scope of Quantity surveying
• Estimating and cost advice
• Receiving instruction from the Employer and advising on various courses of action and
procedures to suit the particular requirements of the Project.
• Providing financial design criteria advice.

• Documentation and procurement
• Compilation of documentation, and management of the procurement processes

•

Contract administration
• Examining and reporting on tender offers for subcontracts, including financial comparisons with
budget.
• Preparing schedules of predicted cash flows.
•

Final account
Preparation, measurement of all final quantities, and evaluation of the final account as
submitted by the contractor

• Supplementary Services
Financial viability studies, and other pre-design phase studies involving
economic investigations and appraisals of a project.

More Related Content

What's hot

2. Detailed Estimate.pdf
2. Detailed Estimate.pdf2. Detailed Estimate.pdf
2. Detailed Estimate.pdfMegha Jambhale
 
Causes & Damage Detection
Causes & Damage DetectionCauses & Damage Detection
Causes & Damage DetectionAbhay Abhale
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project ManagementAravind Samala
 
Estimation And Costing Of A Building
Estimation And Costing Of A Building Estimation And Costing Of A Building
Estimation And Costing Of A Building shahidibn hussain
 
Specification writing-I
Specification writing-ISpecification writing-I
Specification writing-IKishor Ade
 
THUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITY
THUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITYTHUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITY
THUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITYSSudhaVelan
 
Chapter 7 stairs & staircases
Chapter 7 stairs & staircasesChapter 7 stairs & staircases
Chapter 7 stairs & staircasesKHUSHBU SHAH
 
Mode of measurement, rules for deduction of plastering & brickwork
Mode of measurement, rules for deduction of plastering & brickworkMode of measurement, rules for deduction of plastering & brickwork
Mode of measurement, rules for deduction of plastering & brickworkAshwiniChaudhari13
 
Defects in construction
Defects in constructionDefects in construction
Defects in constructionShivangi Saini
 
Unit-4_Specification
Unit-4_SpecificationUnit-4_Specification
Unit-4_SpecificationAkash Bharti
 
Stages in Construction
Stages in Construction Stages in Construction
Stages in Construction Mereia Kali
 
Stakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryStakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryAkshika Mahanama
 
Construction process
Construction processConstruction process
Construction processMazen Al-Qadi
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008AYM1979
 
Building Construction
Building ConstructionBuilding Construction
Building ConstructionWilden How
 
civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-ContractsNikhil Kumar
 
Building construction
Building constructionBuilding construction
Building constructionnhmurad
 

What's hot (20)

2. Detailed Estimate.pdf
2. Detailed Estimate.pdf2. Detailed Estimate.pdf
2. Detailed Estimate.pdf
 
Causes & Damage Detection
Causes & Damage DetectionCauses & Damage Detection
Causes & Damage Detection
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
Estimation And Costing Of A Building
Estimation And Costing Of A Building Estimation And Costing Of A Building
Estimation And Costing Of A Building
 
Specification writing-I
Specification writing-ISpecification writing-I
Specification writing-I
 
THUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITY
THUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITYTHUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITY
THUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITY
 
Building by laws
Building  by lawsBuilding  by laws
Building by laws
 
Chapter 7 stairs & staircases
Chapter 7 stairs & staircasesChapter 7 stairs & staircases
Chapter 7 stairs & staircases
 
Mode of measurement, rules for deduction of plastering & brickwork
Mode of measurement, rules for deduction of plastering & brickworkMode of measurement, rules for deduction of plastering & brickwork
Mode of measurement, rules for deduction of plastering & brickwork
 
Defects in construction
Defects in constructionDefects in construction
Defects in construction
 
Unit-4_Specification
Unit-4_SpecificationUnit-4_Specification
Unit-4_Specification
 
Stages in Construction
Stages in Construction Stages in Construction
Stages in Construction
 
Formwork
FormworkFormwork
Formwork
 
Stakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryStakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction Industry
 
Approximate estimate
Approximate estimateApproximate estimate
Approximate estimate
 
Construction process
Construction processConstruction process
Construction process
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
 
Building Construction
Building ConstructionBuilding Construction
Building Construction
 
civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-Contracts
 
Building construction
Building constructionBuilding construction
Building construction
 

Similar to Quantity surveying -scope and purpose

Estimation Costing and Valuation Unit 1
Estimation Costing and Valuation Unit 1Estimation Costing and Valuation Unit 1
Estimation Costing and Valuation Unit 1Padmasinh Patil
 
estimation,costingandvaluation.pdf
estimation,costingandvaluation.pdfestimation,costingandvaluation.pdf
estimation,costingandvaluation.pdfIctsol
 
construction-project-management-ppt-india-ppt.pptx
construction-project-management-ppt-india-ppt.pptxconstruction-project-management-ppt-india-ppt.pptx
construction-project-management-ppt-india-ppt.pptxBlackEagles1
 
A Course Material On Estimation And Quantity Surveying
A Course Material On Estimation And Quantity SurveyingA Course Material On Estimation And Quantity Surveying
A Course Material On Estimation And Quantity SurveyingClaire Webber
 
Iciitd2 150816125948-lva1-app6892
Iciitd2 150816125948-lva1-app6892Iciitd2 150816125948-lva1-app6892
Iciitd2 150816125948-lva1-app6892Pui Chun Shian
 
ICI + ITD PROJECT 1 SLIDES
ICI + ITD PROJECT 1 SLIDESICI + ITD PROJECT 1 SLIDES
ICI + ITD PROJECT 1 SLIDESSheng Zhe
 
Ici & itd
Ici & itd Ici & itd
Ici & itd pigxd123
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyorLY97
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor温 庄壁
 
Ici itd qs project 1
Ici itd qs project 1Ici itd qs project 1
Ici itd qs project 1Daniel Tan
 
3. QUANTITY SURVEYING.pptxgajanjsjsjjsjh
3. QUANTITY SURVEYING.pptxgajanjsjsjjsjh3. QUANTITY SURVEYING.pptxgajanjsjsjjsjh
3. QUANTITY SURVEYING.pptxgajanjsjsjjsjhTemeTeme1
 
MEASUREMENT PDF
MEASUREMENT PDFMEASUREMENT PDF
MEASUREMENT PDFIDHAMUKI
 
SPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONSPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONAr Naveen Naveen
 
ITD Presentation
ITD PresentationITD Presentation
ITD Presentationmasonsth
 
Resume (Material Specialist)
Resume (Material Specialist)Resume (Material Specialist)
Resume (Material Specialist)Saeed Ahmad
 
Pp1 presentation 2
Pp1 presentation 2Pp1 presentation 2
Pp1 presentation 2shensin1015
 

Similar to Quantity surveying -scope and purpose (20)

Estimation Costing and Valuation Unit 1
Estimation Costing and Valuation Unit 1Estimation Costing and Valuation Unit 1
Estimation Costing and Valuation Unit 1
 
estimation,costingandvaluation.pdf
estimation,costingandvaluation.pdfestimation,costingandvaluation.pdf
estimation,costingandvaluation.pdf
 
construction-project-management-ppt-india-ppt.pptx
construction-project-management-ppt-india-ppt.pptxconstruction-project-management-ppt-india-ppt.pptx
construction-project-management-ppt-india-ppt.pptx
 
A Course Material On Estimation And Quantity Surveying
A Course Material On Estimation And Quantity SurveyingA Course Material On Estimation And Quantity Surveying
A Course Material On Estimation And Quantity Surveying
 
Iciitd2 150816125948-lva1-app6892
Iciitd2 150816125948-lva1-app6892Iciitd2 150816125948-lva1-app6892
Iciitd2 150816125948-lva1-app6892
 
Ici itd-2
Ici itd-2Ici itd-2
Ici itd-2
 
ICI + ITD PROJECT 1 SLIDES
ICI + ITD PROJECT 1 SLIDESICI + ITD PROJECT 1 SLIDES
ICI + ITD PROJECT 1 SLIDES
 
Ici & itd
Ici & itd Ici & itd
Ici & itd
 
RHI Capability Summary
RHI Capability SummaryRHI Capability Summary
RHI Capability Summary
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
 
Ici itd qs project 1
Ici itd qs project 1Ici itd qs project 1
Ici itd qs project 1
 
3. QUANTITY SURVEYING.pptxgajanjsjsjjsjh
3. QUANTITY SURVEYING.pptxgajanjsjsjjsjh3. QUANTITY SURVEYING.pptxgajanjsjsjjsjh
3. QUANTITY SURVEYING.pptxgajanjsjsjjsjh
 
MEASUREMENT PDF
MEASUREMENT PDFMEASUREMENT PDF
MEASUREMENT PDF
 
Coordinated project information (cpi)
Coordinated project information (cpi)Coordinated project information (cpi)
Coordinated project information (cpi)
 
SPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONSPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATION
 
ITD Presentation
ITD PresentationITD Presentation
ITD Presentation
 
Resume (Material Specialist)
Resume (Material Specialist)Resume (Material Specialist)
Resume (Material Specialist)
 
Pp1 presentation 2
Pp1 presentation 2Pp1 presentation 2
Pp1 presentation 2
 
ECV All Chapters
ECV All ChaptersECV All Chapters
ECV All Chapters
 

More from Abhijeet Bhosale

Washington dc transit system
Washington dc transit systemWashington dc transit system
Washington dc transit systemAbhijeet Bhosale
 
Grading of bitumen by SURAJ KUMAR
Grading of bitumen by SURAJ KUMARGrading of bitumen by SURAJ KUMAR
Grading of bitumen by SURAJ KUMARAbhijeet Bhosale
 
production tests aging of bitumen and modified Bitumen
production tests aging of bitumen and modified Bitumen production tests aging of bitumen and modified Bitumen
production tests aging of bitumen and modified Bitumen Abhijeet Bhosale
 
Feasibility report -basic concepts with example
Feasibility report -basic concepts with exampleFeasibility report -basic concepts with example
Feasibility report -basic concepts with exampleAbhijeet Bhosale
 

More from Abhijeet Bhosale (8)

Washington dc transit system
Washington dc transit systemWashington dc transit system
Washington dc transit system
 
6 typesofvariables
6 typesofvariables6 typesofvariables
6 typesofvariables
 
Its technologies
Its technologiesIts technologies
Its technologies
 
Grading of bitumen by SURAJ KUMAR
Grading of bitumen by SURAJ KUMARGrading of bitumen by SURAJ KUMAR
Grading of bitumen by SURAJ KUMAR
 
production tests aging of bitumen and modified Bitumen
production tests aging of bitumen and modified Bitumen production tests aging of bitumen and modified Bitumen
production tests aging of bitumen and modified Bitumen
 
design of questionnaire
design of questionnairedesign of questionnaire
design of questionnaire
 
Golden gate bridge
Golden gate bridgeGolden gate bridge
Golden gate bridge
 
Feasibility report -basic concepts with example
Feasibility report -basic concepts with exampleFeasibility report -basic concepts with example
Feasibility report -basic concepts with example
 

Recently uploaded

Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...KokoStevan
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxVishalSingh1417
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfSanaAli374401
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingTeacherCyreneCayanan
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Shubhangi Sonawane
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 

Recently uploaded (20)

Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 

Quantity surveying -scope and purpose

  • 1. OBJECTIVE AND SCOPE OF QUANTITY SURVEYING by Abhijeet B. Bhosale (Roll no:14)
  • 2. Quantity Surveying Objective • GENERAL OBJECTIVES: 1 . To appreciate the place of quantitative assessment in every field of the construction industry. 2. To attain the highest possible accuracy in quantitative problem solving . 3. To be better understand the mode of site development and excavation. 4. To evaluate the material content of reinforced concrete structures.
  • 3. • SPECIFIC OBJECTIVES: 1 - Mensuration Review Calculate the area and volume of any figure comprised of a combination of various shapes . To calculate earth quantities 2. Basic Contract Document Describe the objectives of a specification and the general conditions to a contract. 3. Method of Measurement Define the order and accuracy of dimensions normally used
  • 4. List the inclusions and exclusions allowed for in computing building areas and volume 4.Site Works: Take off and bill 1. the quantities for the clearing and grubbing of a new site. 2. the drainage work for a typical home. 3. a section of roadway and sidewalk.
  • 5. Scope of Quantity surveying • Estimating and cost advice • Receiving instruction from the Employer and advising on various courses of action and procedures to suit the particular requirements of the Project. • Providing financial design criteria advice. • Documentation and procurement • Compilation of documentation, and management of the procurement processes • Contract administration • Examining and reporting on tender offers for subcontracts, including financial comparisons with budget. • Preparing schedules of predicted cash flows.
  • 6. • Final account Preparation, measurement of all final quantities, and evaluation of the final account as submitted by the contractor • Supplementary Services Financial viability studies, and other pre-design phase studies involving economic investigations and appraisals of a project.