NL presentatie op #CA-EED plenary meeting in Milaan oktober 2014, over #energy efficiency in Historical buildings and buildings owned by the armed forces #RVB #RVO #IrmaThijssen
Retail Space for Lease - 1221 W. Main St., Sun Prairie, WI
Ca eed 2014 milan wg2 4 nl presentation def
1. CA EED Plenary Meeting
Milan, Oct 2014
Core Theme 2 - Public Sector
Art. 5 - Working Group 2.4
Energy efficiency in historical
buildings and buildings
owned by the armed forces
NL - Irma Thijssen
2. EED Art 5 (Core Theme 2) – Public sector
• Art 5: Public sector (public buildings) at national, regional and
local level should fulfil an exemplary role as regards EE
• Art 5.1: historical buildings, defence sector, and worship places
• Art. 5.2: allows MS for exemptions of buildings from these
three areas. However these building categories frequently offer
high potential for energy savings and are found in all MS. As
such they are an important area to address.
• CA EED Plenary Meeting Milan Oct 2014 - Working Group 2.4
Questionnaire: 10 MS have asked for exemption
3. Central Government Real Estate Agency
• Formed in 2014 by the merger of four government real estate
agencies: the Defence Real Estate Agency, the Government
Buildings Agency, the State Property and Development Agency,
and the Government Real Estate Directorate
• 13.3 million square metres of gross floor space
• 81,000 hectares of land
• 1760 full-time equivalents
• prisons, court buildings, military barracks, airports, armed
forces sites, ministerial offices, ports, tax offices, listed
buildings and historical monuments, museums and palaces
• www.rijksvastgoedbedrijf.nl/english
4. Historical Buildings - monuments
• 62.000 national monuments
• 2/3 are dwellings, also a lot of ‘objects’
• 350 legally protected historical national buildings
• > 1 mln m2
• Palaces, museums, prisons, Courts of Justice
• A lot of vacancy in monumental and industrial buildings
5. Alternative Approach Article 5
• 350 historical national buildings are not under the obligation
of EPBD and EED
• NL makes no exception for monuments; the 350 monuments
are part of the EPBD and EED energy saving programme
• Alternative Approach Art. 5: 2% energy savings per year
(as a minimum, strategy for all national buildings)
• In some cases technical measures are not possible due to
specific architectural or engineering barriers
• Special innovations are being investigated, e.g. special
insulating extra slender glass and special blinds
• Own budgets, there is no dedicated funding
9. Local monuments
- 40.000 local monuments
- Specific funding, e.g. grants, tax
breaks, low-interest restauration fund
mortgages
- Two national funds, for conservation
and for allocation/transformation
- Now: no funding for energy-savings
- Idea for 2015: revolving fund for
energy-savings in monuments
(4 Ministries involved)
Examples:
- Verkade factory G > A+
- Temple G > A
10. Armed Forces buildings
• 11.000 Armed Forces buildings
• 6 mln m2
• 850 buildings (offices and living quarters) heated and net floor
area > 1,000 m2
• 2.9 mln m2
• 850 Energy Performance Action Plans (EPBD, EPA-U)
• They are not under the obligation of EPBD and EED
• NL makes no exception for defense buildings; the 350
monuments are part of the energy saving programme
11. Alternative Approach Article 5
• 350 offices and single living quarters are considered under the
obligation of EPBD and EED
• 2009 – 2019 Energy saving programme
• 2% energy savings per year
• Integrated in regular maintenance programme
• Average payback period of the package of measures is 7 years
• Smart meters are being installed
• Financing: own budget € 65 mln, there is no dedicated funding
12. Realisation Armed Forces buildings
• 2009 – 2011: € 10 mln >> 77 TJ (calculated)
• 2011 – 2012: investment stop
• 2013: catch-up effort > now on schedule again
• 2009 – 2013: € 25 mln
Planned:
• 2009 – 2019: € 65 mln >> 600 TJ = 0.6 PJ
- Only all offices and single living quarters: 300 TJ
- 300 TJ = 2x targets for 3% renovation per year
- 0.6 mln m2 sale and demolition
- 1.7 mln m2 buildings between 250 and 1,000 m2 (90% is covered)
- No specific barriers (architectural, engineering, safety)
14. Examples: KW III kazerne, Apeldoorn
75 years old
11.000 m2 bvo
Sustainable renovation
and transformation
from barracks to offices,
sports centre and shooting range
M€17
15. Thank you for your attention
Any questions?
Irma.Thijssen@rvo.nl
Editor's Notes
Titeldia Nederlands. Verander de titeldia in een Engelstalige door in de lijstweergave (links) te rechts-klikken op de titeldia. Kies de Engelstalige indeling.
Uitleg doel + kernelementen:
Samenwerking
Onafhankelijk
Groot bereik
Breed gedragen
Sterke merken vertegenwoordigd waaronder de overheid
Kwaliteitsmerk
Koppelpunt tussen
Niet bedreigend