9. Improve Modulus of all Layers Above
7.6x Modulus Jump Factor
70% Subgrade Stabilization
ENABLES Marginal Infill
10. Proven Results (published in over 55 articles)
Before Loading* After Loading*
* SIM Tests (D-6992) : Neoloy guaranteed 75-year performance
11. Proven Performance in 1000’s of Projects
UK Ministry of Defence
“Neoloy was a clear winner by
substantial margin….
Technically superior solution”
UK Royal Engineers Corps
“Exceeded all expectations….
75% reduction in costs….
Saved lives!” Lt. Colonel Bazeley