Introduction to the Study

Futureof theGardinerEast

Environmental Assessment & Urban Design Study

The Gardiner Expressway East and Lake Shore Boulevard are important
transportation infrastructure in the City of Toronto. Nearly 20 years
ago, the initial Crombie Commission recommended the removal of the
entire elevated Gardiner Expressway. It wasn’t until 2003 that the first
section of the Gardiner (east of Bouchette Street) was removed.

Study Lenses

In 2008, Waterfront Toronto’s Board of Directors and the Toronto City
Council passed resolutions to comence the study of the future of the
Gardiner Expressway East and Lake Shore Boulevard.

Environment

The study includes the following components:
• Individual Environmental Assessment
• Urban Design Study
The Terms of Reference for the study was completed and approved by
the Ministry of Environment in 2009.

Urban Design

Economics

Transportation &
Infrastructure
Study Area

Futureof theGardinerEast

Environmental Assessment & Urban Design Study

La

Harbourfront
Centre

Jarvis Street

Church Street

Toronto Inner Harbour

Leslie Street

Spadina Avenue

Yonge Street

Lower Younge
Precinct

East Bayfront
Precinct

way

Gardiner Expressway

Sho
ke

Blvd
re

West Don
Lands Precinct

ark

CN Tower

King Street

yP

Union Station

le
Val

Central Busines
District

Don

Queen Street

Logan Avenue

The section of the Gardiner Expressway East / Lake Shore Boulevard that is being studied for reconfiguration extends from approximately west of
Lower Jarvis Street to approximately Leslie Street. It includes areas south of King Street to the waterfront.

ating
h Ke
Nort
cinct
Pre

Lower Don Lands

e

Lak

hore
S

Port Lands

B

vard
oule
Historical Context
The F.G. Gardiner Expressway (Gardiner) was named
after the first chair of the former Metro Council,
Frederick G. Gardiner who was a strong advocate for
the project.

1929: View of Toronto’s Waterfront

Futureof theGardinerEast

Environmental Assessment & Urban Design Study

Construction on the Gardiner began in 1956. It was built in
segments and completed in 1965 at a cost of approximately
$103 million.

1956: Building of the Gardiner Expressway, routed through
industrial waterfront, completed in 1965

The Gardiner runs for about 20 kilometres from the foot of
Highway 427 and the Queen Elizabeth Way in the west to
the Don Valley Parkway in the east.

2000: Demolition of the Gardiner East from Don Valley Parkway to
Leslie Street

1987

1990

1996

2001

2003 - 2006

2008

Study of potential
modifications to the
Gardiner Expressway
ramps in the downtown
area, titled the Central
Bayfront Ramp Study.
The study recommended
several modifications to
the Gardiner Expressway
ramps.

The Crombie
Commission suggested
the removal of the
entire elevated Gardiner
Expressway and its
replacement with a
network of tunnels and
surface roads.

Planning began for the
removal of the 1.3 km
section of the Gardiner
Expressway east of the
Don River, between
Bouchette Street and
Leslie Street, which was
completed in 2003.

The Toronto Waterfront
Revitalization Task Force
proposed that the rest of
the elevated Gardiner
Expressway be replaced.
Recommendations included
a tunnel, improved road
network, construction of
the Front Street Extension,
widening of the Richmond /
Adelaide DVP ramps.

Waterfront Toronto examined
options for the reconfiguration
of the Gardiner / Lake Shore
to stimulate waterfront
revitalization. Studies
demonstrated the cost of
removing the entire Gardiner
was too high. Other scenarios
demonstrated a lower cost;
including the least congested
portion of the expressway from
Lower Jarvis Street to the DVP.

Waterfront Toronto Board of
Directors and City Council
adopted the proposal to
complete an Individual
Environmental Assessment and
Integrated Urban Design study
to explore the feasibility of
removing part of the elevated
Gardiner Expressway from
approximately Jarvis Street to
Logan Avenue.
Waterfront Revitalization
Waterfront Toronto’s mandate is to put Toronto at the forefront of
global cities in the 21st century by transforming the waterfront
into beautiful and sustainable communities, fostering economic
growth in knowledge-based, creative industries, and ultimately
redefining how Toronto, Ontario and Canada are perceived by
the world.
A core part of that mission includes building high-quality public
infrastructure, including parks, promenades, boulevards, and
other amenities needed to generate vibrant urban activity.
Corus Quay, East Bay Front

West Don Lands

Spadina WaveDeck, completed 2008
This 55
acre site is located on the
Inner Harbour and is within
walking distance of downtown
Toronto. It includes established
neighbourhoods and many
entertainment and cultural
attractions.
The new district will have
7,000 residential units, jobs
for 8,000 people and 1.5
km of continuous water’s
edge promenade.

Quay:

Queens Quay

East Bayfront

A AVE.

JARVIS ST.

YONGE ST.

Expected
to be completed in Spring
2015, the Queens Quay area
will be transformed into an
iconic boulevard where the
needs of all users will be
accommodated.
From recreational and transit,
to bicycle, pedestrian and
vehicular traffic, the overall
landscape and public realm
will be enhanced within the
Queens Quay corridor.

SPADIN

Queens

East Bayfront:
Futureof theGardinerEast

Environmental Assessment & Urban Design Study

Don Mouth Naturalization:

Naturalizing
the mouth of the Don River and providing
flood protection to the Port Lands were
identified as one of the top priorities for all three
levels of government when they first announced the
establishment of Waterfront Toronto in 2001. This
project proposes to transform the existing mouth
of the Don River including the Keating Channel,
into a healthier, more naturalized river outlet to the
lake, while at the same time, removing the risk of
flooding to 230 hectares of urban land to the east
and south of the river.

West Don Lands: The West Don Lands’ 80
acre site is immediately adjacent to the Distillery
District and has strong connections to the St.
Lawrence and Corktown neighbourhoods.
Once completed, it will have 5,800 residential
units, including 1,200 units of affordable rental
housing, 1,000,000 square feet of commercial
space, 23 acres of parks and public spaces,
a new transit line, an elementary school, a
recreation centre, and childcare centres.
West Don Lands

Lower Don Lands

Keating Channel (Lower Don Lands): A
Municipal Class EA and Precinct Plan is
being undertaken for the Lower Don
Lands area. This initiative incorporates
approximately 25,000 residents in 12,000
units, mixed use and varied densities.
10,000 jobs are also planned. The Keating
Channel precinct will be the first developed
community of the Lower Don Lands and will
draw the City around the northeast corner of
the Toronto Inner Harbour.
Study Goals and Principles
GOAL 1:

REVITALIZE THE WATERFRONT

A public realm that provides adequate
access to open space, landscape, light and
air, and contributes to the revitalization of
the waterfront needs to be created. The
project should:
Prioritize urban design excellence, placemaking, and quality of life as integral
components of project design and
evaluation.
Contribute to the creation of the waterfront
as a regional / tourist destination.
Rejuvenate the underutilized and
derelict lands under and adjacent to the
expressway.
Balance provision of new amenities for
both local and regional users, recognizing
that local and regional stakeholders may
value amenities and infrastructure in
different ways.
Build on existing planning initiatives and
conclusions. The EA study will coordinate
and seek opportunities of mutual benefit
with those initiatives.
Acknowledge this project as an
opportunity for City-building. Evaluate
city-building investments, outcomes,
and benefits in local, regional, and global
contexts.

GOAL 2:

Futureof theGardinerEast

Environmental Assessment & Urban Design Study

RECONNECT THE CITY WITH THE LAKE

The Gardiner Expressway East and Lake
Shore Boulevard pair have long been
perceived as a barrier that disconnects
the downtown from its waterfront. The
railroad viaduct is a physical barrier,
limiting waterfront area access to four
underpasses. Any reconfiguration of the
Gardiner East and Lake Shore Blvd will
need to include welcoming and accessible
routes to the waterfront, breaking down
the psychological and physical barriers
that exist today. The project should:
Create physical, visual, and cognitive
connections to the waterfront for
downtown, the City, and region. The
waterfront is an amenity that belongs
and should be accessible to the
public.
Design the public realm to be attractive,
accessible and connected. The qualities
of experience offered by streets,
plazas, parks, promenades, pathways,
bicycle routes, and visual corridors
will be major drivers of design
decisions. Public spaces should be
accessible and perceived as public.
The new urban fabric should become a
connector between the downtown and
new waterfront communities, one that
uses transit, street design and new
mixed-use communities to stitch the
city with its unique waterfront
experience.
Study Goals and Principles
GOAL 3:

BALANCE MODES OF TRAVEL

Any new configuration of the Gardiner Expressway
East and Lake Shore Blvd will need to maintain an
effective local and regional transportation system,
including commuters and freight, and minimize
negative impacts by balancing alternative travel
modes, including transit (local and regional),
cycling and walking within the system. The project
should:
Acknowledge transportation initiatives – both
positive and negative – on regional economic
competitiveness,
land-use,
development
character,
settlement
patterns,
and
environmental issues such as air quality and
ambient noise.
Maintain reliable access to the City and its
neighborhoods for local residents, commuters,
freight trucks, and regional travelers.
The corridor plays an important role in the
movement of traffic through the City and larger
region. The reconfiguration alternatives will
address the through-traffic function of the
Gardiner Expressway East and Lake Shore Blvd.
Acknowledge and integrate other planned transit
(local and regional) initiatives being proposed
for the City.
Consider a combination of supply, system
and
demand
management
measures.
Creatively maximize the performance of
infrastructure through management and
operation.

GOAL 4:

Futureof theGardinerEast

Environmental Assessment & Urban Design Study

ACHIEVE SUSTAINABILITY

This project should advance the City’s and
Waterfront Toronto’s commitment to green,
healthy, and energy efficient development.
Sustainable design solutions can improve
environmental quality and biodiversity, and
minimize public health risks. The project will:
Consider Waterfront Toronto’s and the City’s
sustainability policies and frameworks.
Help contribute to development that has an
overall positive impact. These benefits are
to result in environmental enhancements,
economic security, and social/cultural gains.
Contribute
to
the
improvement
of
environmental quality and public health,
including air quality.
Complement if not enhance other waterfront
environmental naturalization initiatives.
Accommodate the plans for flood conveyance
and flood protection to lands in the Don
River mouth area, the Port Lands and south
Riverdale community.
Promote social engagement and interaction.
Promote the City’s initiatives to reduce
greenhouse gas emissions.
Promote public awareness and education on
environmental issues through the physical
design of infrastructure and public realm.
Integrate ecology and natural systems with
urbanism.
Study Goals and Principles
GOAL 5:

CREATE VALUE

The future reconfiguration of the Gardiner Expressway East and
Lake Shore Boulevard can act as a catalyst for good development
and contribute to an integrated, vibrant, and successful
waterfront. Further, any changes to the Gardiner Expressway
East and Lake Shore Blvd pair will require a significant public
investment, whether in rehabilitation and enhancement of the
existing structure or replacement with a new or alternative facility.
That investment should be targeted to maximize opportunities
for revitalization, and to leverage the economic benefits of the
project, rather than simply preserving the single purpose Gardiner
Expressway. The project should:.
Plan and design for positive net value creation in local, regional,
and global contexts.
Define a public and private investment structure that creates
and captures value for the public sector. The public sector,
through these city-building initiatives, creates value for the
community, in terms of streets, open space, and catalysts for
private development.
Maximize net economic and environmental benefits.

Futureof theGardinerEast

Environmental Assessment & Urban Design Study
ORIGIN / DESTINATION STUDY – DOWNTOWN VS. THROUGH TRIPS
AM Peak Hour EASTBOUND
Spadina/YorkBay-Yonge
3,000
54%

Eastbound
@ Dufferin
5,650
per hour

5,650

Primary function is not as a regional connection:

Jarvis/
Sherbourne
1,400
25%

2,600

DVP
900
16%

1,200

Gardiner East
Study Area

Spadina/YorkBay-Yonge
2,600
35%
To
Dufferin
/Hwy 427
5,650
21%

1,500

Richmond
1,800
24%
Jarvis/ Sherbourne
500
7%

Lake Shore
350
6%

DVP
4,500 per hour

2,700

AM Peak Hour WESTBOUND

•

4,500

Gardiner East
Study Area

Lake Shore
2,900

Most eastbound Gardiner trips are destined for
downtown locations. Only 22% of eastbound trips
use the Gardiner to bypass the city

•

Most westbound and southbound (from DVP)
Gardiner trips are destined for downtown locations.
Only 21% of westbound and southbound trips use
the Gardiner to bypass the city.
How Commuters get Downtown
(AM Peak Hour 2011)

Gardiner East Passes Through Five Emerging
Neighbourhoods

Walk/Cycle
4%
(5,900)

Auto (Gardiner
Eastbound @
Bathurst)
4%
(6,100)

Don River

GO Transit
19%
(29,500)

Bathurst

TTC Transit
49%
(77,700)

Auto (All Other
Routes)
21%
(33,500)

Dupont

4.2km – Lake Shore Blvd East (Yonge to Leslie)
•
Most eastbound Gardiner trips are destined for
e.g. locations. Only Jarvis
downtown Ossington to22% of eastbound trips
use the Gardiner to bypass the city
South Riverdale
2.4km

Auto (Gardiner
Westbound @
DVP)
3%
(5,200)

157,200 Total

2.4km – Gardiner Expressway Elevated Structure
e.g. King to Bloor

Lower
Yonge

East Bayfront

Keating

Port Lands

Source: AM Peak Hour Inbound to Downtown: Transportation City Cordon Count (2011)
Downtown: Defined as Bathurst to Don River and Waterfront to the rail corridor north of Bloor

Transportation Demand Growth

Downtown Population & Employment Growth

250,000

+237,900 Total

Total Trips

200,000
+157,200 Total

150,000
100,000

+115,500 Total

Actual

Projection

50,000

Populatoin/ Employment

AM Peak Hour Inbound to Downtown
600,000
500,000
400,000
300,000
200,000
100,000
0

0
1975 1981 1985 1991 1995 2001 2006 2011 2016 2021 2026 2031
Auto (Gardiner Westbound @ DVP)
Auto (Gardiner Eastbound @ Bathurst)
Auto (All Other Routes)
TTC Transit
GO Transit
Walk/ Cycle
Source: AM Peak Hour Inbound to Downtown: 1) Transportation City Cordon Count (1975-2011); 2) Transportation Model EMME2 Forecast (2011-2031); 3) 2006 Transportation Tomorrow Survey (TTS) for Walk/Cycle Mode and Other Data;
Downtown: Defined as Bathurst to Don River and Waterfront to the rail corridor north of Bloor

Population

Employment

Source: Downtown Employment/ Population: 1) Census Canada (1981-2011); and 2) Employment/ Population City's Flash Forward Report (2011-2031).
Downtown: Defined as Bathurst to Don River and Waterfront to the rail corridor north of Bloor
CONSULTATION ACTIVITIES
Consultation for the Gardiner East EA has included
the following activities:
•
stakeholder advisory committee meetings;
•
public forums;
•
web-enabled consultations; and
•
social media.
To date we have successfully engaged over
5,000 individuals.

ROUND ONE CONSULTATION

ROUND TWO CONSULTATION

Round One of the public consultation process was held
between May 28th and June 28th, 2013, and
successfully engaged over 1,000 individuals.

Round Two of the public consultation process occurred
between October 1st and October 31st, 2013, and
successfully engaged over 1,500 individuals.

The purpose of Round One of the consultation process
was to:
•
Reintroduce the EA and Study process and
provide a refresher on the approved EA Terms of
Reference;
•
Identify any changes to the Study since the
approved 2010 Terms of Reference (i.e. Study
Area extents);
•
Obtain feedback from participants to inform the
development of alternative solutions; and
•
Share information on case studies and
innovative options.

The purpose of Round Two of the consultation process
was to:
•
Present the Four Draft Alternative Solutions for
consideration: Maintain, Improve, Replace,
Remove;
•
Identify the Evaluation Process and
opportunities for input;
•
Obtain feedback from participants to refine the
alternative solutions and complete the
evaluation.

Round One consultation focused on 14 “key ideas” for
reconfiguring the Gardiner and Lake Shore Boulevard
that were categorized according to the four
alternatives – Maintain, Improve, Replace and
Remove.

NEXT STEPS

Documentation of the input received during the first
two rounds of consultation is available on the project
website: www.gardinereast.ca

3
Maintain the elevated expressway
No Changes to the Previous
Plan

BEFORE

• Move ahead with the Gardiner
rehabilitation program
• Reconstruct deck of
expressway
• Realign Lake Shore Blvd
through the Keating Precinct
(east of Cherry Street, south of
the rail corridor)

AFTER

Improve the urban fabric while maintaining the existing expressway
Previous Plan
• Relocate and rebuild Lake
Shore Blvd under the Gardiner
• Rebuild Gardiner deck with 4
lanes; open in the middle
Revised Plan
• Rebuild Gardiner deck with 4
lanes open on the south side
• Lake Shore largely stays as is
with:
• Intersection improvements
• Remove southern
eastbound lane east of
Jarvis Street
• New east-west walking and
cycling trail

BEFORE

AFTER

Replace with a new expressway
No Changes to the Previous
Plan
• New elevated 4-lane
expressway – ending at Don
River
• Single column design, 5m
higher
• 4 lane Lake Shore Boulevard
• Opens up land for public realm,
parks, green space and
increased development
• Opens up more light and air at
street level
• New east-west walking and
cycling trail

BEFORE

AFTER

Remove the elevated expressway and build a new boulevard
Revised Plan with a
Two Sided Street
• Improved cross section to allow
for an 8 lane boulevard with
development along 85% of the
north and south sides of the
street
• North side development
provides a buffer from rail
corridor
• Opens up entire ground level to
light and air
• Extensively treed boulevard
• New east-west walking and
cycling trail

BEFORE

AFTER
Maintain

the elevated expressway

LAKE SHORE BOULEVARD @ SHERBOURNE STREET

•

Gardiner rehab program maintains existing auto capacity

•

No public realm improvements on Lake Shore Boulevard

•

Numerous turn restrictions / conflict points on Lake Shore Boulevard

•

6 years of lane closures on the Gardiner Expressway

•

$300M Cost (NPV), $870M Cost (2013$)
Improve

the urban fabric while maintaining the existing expressway

LAKE SHORE BOULEVARD @ SHERBOURNE STREET

•

Modified Gardiner rehab program with reduced lanes and standard shoulders

•

Public realm improvements on Lake Shore Boulevard and new cycling trail

•

Reduction of turn restrictions and conflicts between autos, pedestrians and cyclists

•

6 years of lane closures on the Gardiner Expressway and Lake Shore Boulevard

•

$360M Cost (NPV), $865M Cost (2013$)
Replace

with a new expressway

LAKE SHORE BOULEVARD @ SHERBOURNE STREET

•

New elevated structure built to today’s highway standards

•

Public realm improvements on Lake Shore Boulevard and new cycling trail

•

Requires full closure of the corridor for construction

•

$700M Cost (NPV), $1,390M Cost (2013$)

•

$65-70M Revenue (NPV), $150-160M (2013$)
Remove

the elevated expressway and build a new boulevard

LAKE SHORE BOULEVARD @ SHERBOURNE STREET

•
•
•
•
•

New 8 lane boulevard – greatest impact to auto travel times
Boulevard lined with 1,200 new trees, dedicated turning lanes, sidewalks, retail frontage and
cycling trail
3 years of lane closures in the expressway corridor
$240M Cost (NPV), $470M Cost (2013$)
$80-90M Revenue (NPV), $220-240M (2013$)
GARDINER EXPRESSWAY @ SHERBOURNE STREET

MAINTAIN REPLACE

IMPROVE REMOVE
LAKE SHORE BOULEVARD @ PARLIAMENT STREET

MAINTAIN REPLACE

IMPROVE REMOVE
(Don Mouth Naturalization)

MAINTAIN &
IMPROVE

REMOVE
Study Lenses

Criteria Group
Planning

Urban Design

Public Realm
Built Form
Regional Economics

Economics

Local Economics
Direct Cost & Benefit

Automobiles
Transit
Pedestrians

Transportation &
Infrastructure

Cycling
Movement of Goods
Safety

Constructability
Social & Health

Natural Environment

Environment
Cultural Resources

Criteria
Consistency with Official Plans
Consistency with Precinct Plans
Streetscape
View Corridors
Public Realm Space (open space, landscape, multi-use paths, plazas, etc.)
Rail Corridor and Berm
Street Frontage
City Competitiveness
Congestion
Business Activity
Visitor/Tourism Attractiveness
On Street Parking
Capital Funding & Cost
Lifecycle Cost
Land Value Creation
Commuter Travel Time
Impact on Average Auto Travel Time within Downtown
Vehicle Volumes/Speed
Road Network Flexibility/Choice
Transit Impact
North-South Sidewalks (crossing times)
East-West sidewalks
East-West Movement
Vehicle Operations
Access Opportunity
Safety Risk for Pedestrians
Safety Risk for Pedestrians and Cyclist
Safety Risk for Cyclists and Motorists
Safety Risks for Motorists on the Gardiner
Duration
Transportation Management
Construction Impact on Private Property
Health (Noise and Air Quality including Greenhouse Gas Emissions)
Terrestrial Environment
Aquatic Environment
Water Quality (stormwater management)
Water Quantity (surface water run-off)
Microclimate
Tree-Lined Shaded Street
Built Heritage
12
Cultural Landscapes
Archaeology
Buffalo Skyway, Buffalo

Maintain E. River Waterfront Esplanade, New York Improve

Age of
Infrastructure
Age of
Infrastructure
Decision Made

Decision
Made

Project Cost
Key Impacts

Tourism and city
building, new
access, new
community and
creation of jobs

$117 million (USD)
Rehabilitation for a
safe and reliable
travel route

$165 million
(USD)

Key Impacts

Maintain
(rehabilitate)
existing highway

Improve street
section and
reconfigure
space under
elevated
highway

Project Cost

60 years

59 years

Central Artery / “Big Dig”, Boston

Age of
Infrastructure

45 years

Decision Made

Replace with cutand-cover tunnel
with at-grade
boulevard with
greenway placed
over tunnel

Project Cost

Key Impacts

Embarcadero Freeway, San Francisco

Age of
Infrastructure

32 years

Decision Made

Remove highway
and provide 6-lane
at grade urban
boulevard

Project Cost

$80 million (USD)

Key Impacts

Increased property
values, increase in
jobs, increase in
housing units and
new public space

$22 billion (USD)
Improved travel
times, costly,
increased tourism
and increased
property values

Replace

Remove
Contact Us
Participate in Online Discussions
The Gardiner East consultation website provides information as well as hosting
public discussion forums where you can read, rate, post and reply to public
comments on the project.
Visit our website today:

www.GardinerEast.ca

Futureof theGardinerEast

Environmental Assessment & Urban Design Study

CONTACT US
Facilitator’s Office
505 Consumers Road, Suite 1005,
Toronto, Ontario, M2J 4V8
Phone: 416-479-0662

Call, Email or Send Us a Letter
The project team will respond to concerns and requests for information through
the telephone hotline, email, fax, or post. See contact information to the right.

Email: info@gardinereast.ca
Website: www.GardinerEast.ca

More Related Content

What's hot

Replace as+gg boards
Replace as+gg boardsReplace as+gg boards
Replace as+gg boardsGardinerEast
 
Improve kpmb+big boards
Improve kpmb+big boardsImprove kpmb+big boards
Improve kpmb+big boardsGardinerEast
 
Improve dsr+aa booklet
Improve dsr+aa bookletImprove dsr+aa booklet
Improve dsr+aa bookletGardinerEast
 
Improve dsr+aa boards
Improve dsr+aa boardsImprove dsr+aa boards
Improve dsr+aa boardsGardinerEast
 
Remove oma+amo booklet
Remove oma+amo bookletRemove oma+amo booklet
Remove oma+amo bookletGardinerEast
 
Delivering the Rehabilitation of the F.G. Gardiner Expressway
Delivering the Rehabilitation of the F.G. Gardiner ExpresswayDelivering the Rehabilitation of the F.G. Gardiner Expressway
Delivering the Rehabilitation of the F.G. Gardiner ExpresswayToronto Public Consultation Unit
 
New Street Typologies/New Street Types - Getting more out of the same R.O.W.:...
New Street Typologies/New Street Types - Getting more out of the same R.O.W.:...New Street Typologies/New Street Types - Getting more out of the same R.O.W.:...
New Street Typologies/New Street Types - Getting more out of the same R.O.W.:...Congress for the New Urbanism
 
Urban Design and Street Typology: Do They Matter?
Urban Design and Street Typology: Do They Matter?Urban Design and Street Typology: Do They Matter?
Urban Design and Street Typology: Do They Matter?William Riggs
 
Revitalizing The Figueroa Corridor
Revitalizing The Figueroa CorridorRevitalizing The Figueroa Corridor
Revitalizing The Figueroa Corridorkvon15
 
Jasper Downtown Riverfront Master Plan draft
Jasper Downtown Riverfront Master Plan draftJasper Downtown Riverfront Master Plan draft
Jasper Downtown Riverfront Master Plan draftMatthew Crane
 
Sabarmati riverfront
Sabarmati riverfrontSabarmati riverfront
Sabarmati riverfrontshiv404
 
King Street Pilot Public Meeting - Feb 13 2017
King Street Pilot Public Meeting - Feb 13 2017King Street Pilot Public Meeting - Feb 13 2017
King Street Pilot Public Meeting - Feb 13 2017City of Toronto Planning
 

What's hot (20)

Replace as+gg boards
Replace as+gg boardsReplace as+gg boards
Replace as+gg boards
 
Improve kpmb+big boards
Improve kpmb+big boardsImprove kpmb+big boards
Improve kpmb+big boards
 
Improve dsr+aa booklet
Improve dsr+aa bookletImprove dsr+aa booklet
Improve dsr+aa booklet
 
Improve dsr+aa boards
Improve dsr+aa boardsImprove dsr+aa boards
Improve dsr+aa boards
 
Remove oma+amo booklet
Remove oma+amo bookletRemove oma+amo booklet
Remove oma+amo booklet
 
Delivering the Rehabilitation of the F.G. Gardiner Expressway
Delivering the Rehabilitation of the F.G. Gardiner ExpresswayDelivering the Rehabilitation of the F.G. Gardiner Expressway
Delivering the Rehabilitation of the F.G. Gardiner Expressway
 
Removing Toronto's Expressway One Piece at a Time
Removing Toronto's Expressway One Piece at a TimeRemoving Toronto's Expressway One Piece at a Time
Removing Toronto's Expressway One Piece at a Time
 
New Street Typologies/New Street Types - Getting more out of the same R.O.W.:...
New Street Typologies/New Street Types - Getting more out of the same R.O.W.:...New Street Typologies/New Street Types - Getting more out of the same R.O.W.:...
New Street Typologies/New Street Types - Getting more out of the same R.O.W.:...
 
Urban Design and Street Typology: Do They Matter?
Urban Design and Street Typology: Do They Matter?Urban Design and Street Typology: Do They Matter?
Urban Design and Street Typology: Do They Matter?
 
Transit Ready Design - Canin CNU17
Transit Ready Design - Canin CNU17Transit Ready Design - Canin CNU17
Transit Ready Design - Canin CNU17
 
FG Gardiner New Simcoe Ramp - display boards
FG Gardiner   New Simcoe Ramp - display boardsFG Gardiner   New Simcoe Ramp - display boards
FG Gardiner New Simcoe Ramp - display boards
 
New York's Next Great Waterfront Park - Urban Design
New York's Next Great Waterfront Park - Urban DesignNew York's Next Great Waterfront Park - Urban Design
New York's Next Great Waterfront Park - Urban Design
 
Revitalizing The Figueroa Corridor
Revitalizing The Figueroa CorridorRevitalizing The Figueroa Corridor
Revitalizing The Figueroa Corridor
 
Ahmedabad srfdcl
Ahmedabad srfdclAhmedabad srfdcl
Ahmedabad srfdcl
 
Jasper Downtown Riverfront Master Plan draft
Jasper Downtown Riverfront Master Plan draftJasper Downtown Riverfront Master Plan draft
Jasper Downtown Riverfront Master Plan draft
 
The Cermak/Blue Island Sustainable Streetscape
The Cermak/Blue Island Sustainable StreetscapeThe Cermak/Blue Island Sustainable Streetscape
The Cermak/Blue Island Sustainable Streetscape
 
King Street Pilot Public Meeting
King Street Pilot Public MeetingKing Street Pilot Public Meeting
King Street Pilot Public Meeting
 
041916-HBP-Media Packet-Complete
041916-HBP-Media Packet-Complete041916-HBP-Media Packet-Complete
041916-HBP-Media Packet-Complete
 
Sabarmati riverfront
Sabarmati riverfrontSabarmati riverfront
Sabarmati riverfront
 
King Street Pilot Public Meeting - Feb 13 2017
King Street Pilot Public Meeting - Feb 13 2017King Street Pilot Public Meeting - Feb 13 2017
King Street Pilot Public Meeting - Feb 13 2017
 

Viewers also liked

GE Replace Elevated Plan Lake Shore Boulevard
GE Replace Elevated Plan Lake Shore BoulevardGE Replace Elevated Plan Lake Shore Boulevard
GE Replace Elevated Plan Lake Shore BoulevardGardinerEast
 
Improve Plan Gardiner Expressway East
Improve Plan Gardiner Expressway EastImprove Plan Gardiner Expressway East
Improve Plan Gardiner Expressway EastGardinerEast
 
GE Replace Plan Elevated
GE Replace Plan ElevatedGE Replace Plan Elevated
GE Replace Plan ElevatedGardinerEast
 
GE Improve Plan Lake Shore Boulevard
GE Improve Plan Lake Shore BoulevardGE Improve Plan Lake Shore Boulevard
GE Improve Plan Lake Shore BoulevardGardinerEast
 

Viewers also liked (8)

GE Replace Elevated Plan Lake Shore Boulevard
GE Replace Elevated Plan Lake Shore BoulevardGE Replace Elevated Plan Lake Shore Boulevard
GE Replace Elevated Plan Lake Shore Boulevard
 
Remove Plan
Remove PlanRemove Plan
Remove Plan
 
Improve Plan Gardiner Expressway East
Improve Plan Gardiner Expressway EastImprove Plan Gardiner Expressway East
Improve Plan Gardiner Expressway East
 
GE Replace Plan Elevated
GE Replace Plan ElevatedGE Replace Plan Elevated
GE Replace Plan Elevated
 
GE Improve Plan Lake Shore Boulevard
GE Improve Plan Lake Shore BoulevardGE Improve Plan Lake Shore Boulevard
GE Improve Plan Lake Shore Boulevard
 
Replace Plan
Replace PlanReplace Plan
Replace Plan
 
Remove Plan
Remove PlanRemove Plan
Remove Plan
 
Improve Plan
Improve PlanImprove Plan
Improve Plan
 

Similar to Gardiner East EA Public Forum 3 (Feb062014) - panels

Landscape architecture VI _hargreaves_associates.pptx
Landscape architecture  VI _hargreaves_associates.pptxLandscape architecture  VI _hargreaves_associates.pptx
Landscape architecture VI _hargreaves_associates.pptxSanobarseher
 
Nicholas DiFrank - Professional Portfolio 2015
Nicholas DiFrank - Professional Portfolio 2015Nicholas DiFrank - Professional Portfolio 2015
Nicholas DiFrank - Professional Portfolio 2015Nicholas DiFrank
 
Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_knelischer
 
Waterfront for All Summit Workshop #5: Who’s in charge: silos vs. coordinatio...
Waterfront for All Summit Workshop #5: Who’s in charge: silos vs. coordinatio...Waterfront for All Summit Workshop #5: Who’s in charge: silos vs. coordinatio...
Waterfront for All Summit Workshop #5: Who’s in charge: silos vs. coordinatio...Waterfront for All
 
Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_knelischer
 
Gardiner east designideas_brief
Gardiner east designideas_briefGardiner east designideas_brief
Gardiner east designideas_briefGardinerEast
 
Gardiner east designideas_brief
Gardiner east designideas_briefGardiner east designideas_brief
Gardiner east designideas_briefGardinerEast
 
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...Crosstown TO
 
Ontario Place for All - Presentation by Ken Greenberg
Ontario Place for All - Presentation by Ken GreenbergOntario Place for All - Presentation by Ken Greenberg
Ontario Place for All - Presentation by Ken GreenbergWaterfront for All
 
Finalontarioplaceslides 190113190136
Finalontarioplaceslides 190113190136Finalontarioplaceslides 190113190136
Finalontarioplaceslides 190113190136StefanPodgrabinski
 
Case StudyManaging Projects from Start to CompletionThe Rivers.docx
Case StudyManaging Projects from Start to CompletionThe Rivers.docxCase StudyManaging Projects from Start to CompletionThe Rivers.docx
Case StudyManaging Projects from Start to CompletionThe Rivers.docxtroutmanboris
 
Turning the Tide: "Opening Out Towards the Water"– The Big Picture
Turning the Tide: "Opening Out Towards the Water"– The Big PictureTurning the Tide: "Opening Out Towards the Water"– The Big Picture
Turning the Tide: "Opening Out Towards the Water"– The Big PictureCUNY Sustainable Cities
 
Campbellford Bridge Detailed Design Council Update.pdf
Campbellford Bridge Detailed Design Council Update.pdfCampbellford Bridge Detailed Design Council Update.pdf
Campbellford Bridge Detailed Design Council Update.pdfKatrinaMcCullough2
 
Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)GardinerEast
 
In 21st Century Toronto, There is Momentum | Charles A. Birnbaum
In 21st Century Toronto, There is Momentum | Charles A. BirnbaumIn 21st Century Toronto, There is Momentum | Charles A. Birnbaum
In 21st Century Toronto, There is Momentum | Charles A. Birnbaumvalenzuelalfaazdamkz
 
2014: Designing Dredge - Reconsidering the Toledo Riverfront
2014: Designing Dredge - Reconsidering the Toledo Riverfront2014: Designing Dredge - Reconsidering the Toledo Riverfront
2014: Designing Dredge - Reconsidering the Toledo Riverfrontnorthcoastdesigncompetition
 
Blair Brixton Portfolio 2011 Med Res
Blair Brixton Portfolio 2011 Med ResBlair Brixton Portfolio 2011 Med Res
Blair Brixton Portfolio 2011 Med ResBLAIRBRIXTON
 

Similar to Gardiner East EA Public Forum 3 (Feb062014) - panels (20)

Northriverside Research web
Northriverside Research webNorthriverside Research web
Northriverside Research web
 
Landscape architecture VI _hargreaves_associates.pptx
Landscape architecture  VI _hargreaves_associates.pptxLandscape architecture  VI _hargreaves_associates.pptx
Landscape architecture VI _hargreaves_associates.pptx
 
Nicholas DiFrank - Professional Portfolio 2015
Nicholas DiFrank - Professional Portfolio 2015Nicholas DiFrank - Professional Portfolio 2015
Nicholas DiFrank - Professional Portfolio 2015
 
Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_
 
Waterfront for All Summit Workshop #5: Who’s in charge: silos vs. coordinatio...
Waterfront for All Summit Workshop #5: Who’s in charge: silos vs. coordinatio...Waterfront for All Summit Workshop #5: Who’s in charge: silos vs. coordinatio...
Waterfront for All Summit Workshop #5: Who’s in charge: silos vs. coordinatio...
 
Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_
 
Gardiner east designideas_brief
Gardiner east designideas_briefGardiner east designideas_brief
Gardiner east designideas_brief
 
Gardiner east designideas_brief
Gardiner east designideas_briefGardiner east designideas_brief
Gardiner east designideas_brief
 
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
 
Ontario Place for All - Presentation by Ken Greenberg
Ontario Place for All - Presentation by Ken GreenbergOntario Place for All - Presentation by Ken Greenberg
Ontario Place for All - Presentation by Ken Greenberg
 
Finalontarioplaceslides 190113190136
Finalontarioplaceslides 190113190136Finalontarioplaceslides 190113190136
Finalontarioplaceslides 190113190136
 
What if 280 came down
What if 280 came downWhat if 280 came down
What if 280 came down
 
Case StudyManaging Projects from Start to CompletionThe Rivers.docx
Case StudyManaging Projects from Start to CompletionThe Rivers.docxCase StudyManaging Projects from Start to CompletionThe Rivers.docx
Case StudyManaging Projects from Start to CompletionThe Rivers.docx
 
Turning the Tide: "Opening Out Towards the Water"– The Big Picture
Turning the Tide: "Opening Out Towards the Water"– The Big PictureTurning the Tide: "Opening Out Towards the Water"– The Big Picture
Turning the Tide: "Opening Out Towards the Water"– The Big Picture
 
Campbellford Bridge Detailed Design Council Update.pdf
Campbellford Bridge Detailed Design Council Update.pdfCampbellford Bridge Detailed Design Council Update.pdf
Campbellford Bridge Detailed Design Council Update.pdf
 
Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)
 
In 21st Century Toronto, There is Momentum | Charles A. Birnbaum
In 21st Century Toronto, There is Momentum | Charles A. BirnbaumIn 21st Century Toronto, There is Momentum | Charles A. Birnbaum
In 21st Century Toronto, There is Momentum | Charles A. Birnbaum
 
2014: Designing Dredge - Reconsidering the Toledo Riverfront
2014: Designing Dredge - Reconsidering the Toledo Riverfront2014: Designing Dredge - Reconsidering the Toledo Riverfront
2014: Designing Dredge - Reconsidering the Toledo Riverfront
 
Blair Brixton Portfolio 2011 Med Res
Blair Brixton Portfolio 2011 Med ResBlair Brixton Portfolio 2011 Med Res
Blair Brixton Portfolio 2011 Med Res
 
Portfolio 2018
Portfolio 2018Portfolio 2018
Portfolio 2018
 

Recently uploaded

Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajanpragatimahajan3
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...PsychoTech Services
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingTeacherCyreneCayanan
 

Recently uploaded (20)

Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 

Gardiner East EA Public Forum 3 (Feb062014) - panels

  • 1. Introduction to the Study Futureof theGardinerEast Environmental Assessment & Urban Design Study The Gardiner Expressway East and Lake Shore Boulevard are important transportation infrastructure in the City of Toronto. Nearly 20 years ago, the initial Crombie Commission recommended the removal of the entire elevated Gardiner Expressway. It wasn’t until 2003 that the first section of the Gardiner (east of Bouchette Street) was removed. Study Lenses In 2008, Waterfront Toronto’s Board of Directors and the Toronto City Council passed resolutions to comence the study of the future of the Gardiner Expressway East and Lake Shore Boulevard. Environment The study includes the following components: • Individual Environmental Assessment • Urban Design Study The Terms of Reference for the study was completed and approved by the Ministry of Environment in 2009. Urban Design Economics Transportation & Infrastructure
  • 2. Study Area Futureof theGardinerEast Environmental Assessment & Urban Design Study La Harbourfront Centre Jarvis Street Church Street Toronto Inner Harbour Leslie Street Spadina Avenue Yonge Street Lower Younge Precinct East Bayfront Precinct way Gardiner Expressway Sho ke Blvd re West Don Lands Precinct ark CN Tower King Street yP Union Station le Val Central Busines District Don Queen Street Logan Avenue The section of the Gardiner Expressway East / Lake Shore Boulevard that is being studied for reconfiguration extends from approximately west of Lower Jarvis Street to approximately Leslie Street. It includes areas south of King Street to the waterfront. ating h Ke Nort cinct Pre Lower Don Lands e Lak hore S Port Lands B vard oule
  • 3. Historical Context The F.G. Gardiner Expressway (Gardiner) was named after the first chair of the former Metro Council, Frederick G. Gardiner who was a strong advocate for the project. 1929: View of Toronto’s Waterfront Futureof theGardinerEast Environmental Assessment & Urban Design Study Construction on the Gardiner began in 1956. It was built in segments and completed in 1965 at a cost of approximately $103 million. 1956: Building of the Gardiner Expressway, routed through industrial waterfront, completed in 1965 The Gardiner runs for about 20 kilometres from the foot of Highway 427 and the Queen Elizabeth Way in the west to the Don Valley Parkway in the east. 2000: Demolition of the Gardiner East from Don Valley Parkway to Leslie Street 1987 1990 1996 2001 2003 - 2006 2008 Study of potential modifications to the Gardiner Expressway ramps in the downtown area, titled the Central Bayfront Ramp Study. The study recommended several modifications to the Gardiner Expressway ramps. The Crombie Commission suggested the removal of the entire elevated Gardiner Expressway and its replacement with a network of tunnels and surface roads. Planning began for the removal of the 1.3 km section of the Gardiner Expressway east of the Don River, between Bouchette Street and Leslie Street, which was completed in 2003. The Toronto Waterfront Revitalization Task Force proposed that the rest of the elevated Gardiner Expressway be replaced. Recommendations included a tunnel, improved road network, construction of the Front Street Extension, widening of the Richmond / Adelaide DVP ramps. Waterfront Toronto examined options for the reconfiguration of the Gardiner / Lake Shore to stimulate waterfront revitalization. Studies demonstrated the cost of removing the entire Gardiner was too high. Other scenarios demonstrated a lower cost; including the least congested portion of the expressway from Lower Jarvis Street to the DVP. Waterfront Toronto Board of Directors and City Council adopted the proposal to complete an Individual Environmental Assessment and Integrated Urban Design study to explore the feasibility of removing part of the elevated Gardiner Expressway from approximately Jarvis Street to Logan Avenue.
  • 4. Waterfront Revitalization Waterfront Toronto’s mandate is to put Toronto at the forefront of global cities in the 21st century by transforming the waterfront into beautiful and sustainable communities, fostering economic growth in knowledge-based, creative industries, and ultimately redefining how Toronto, Ontario and Canada are perceived by the world. A core part of that mission includes building high-quality public infrastructure, including parks, promenades, boulevards, and other amenities needed to generate vibrant urban activity. Corus Quay, East Bay Front West Don Lands Spadina WaveDeck, completed 2008
  • 5. This 55 acre site is located on the Inner Harbour and is within walking distance of downtown Toronto. It includes established neighbourhoods and many entertainment and cultural attractions. The new district will have 7,000 residential units, jobs for 8,000 people and 1.5 km of continuous water’s edge promenade. Quay: Queens Quay East Bayfront A AVE. JARVIS ST. YONGE ST. Expected to be completed in Spring 2015, the Queens Quay area will be transformed into an iconic boulevard where the needs of all users will be accommodated. From recreational and transit, to bicycle, pedestrian and vehicular traffic, the overall landscape and public realm will be enhanced within the Queens Quay corridor. SPADIN Queens East Bayfront:
  • 6. Futureof theGardinerEast Environmental Assessment & Urban Design Study Don Mouth Naturalization: Naturalizing the mouth of the Don River and providing flood protection to the Port Lands were identified as one of the top priorities for all three levels of government when they first announced the establishment of Waterfront Toronto in 2001. This project proposes to transform the existing mouth of the Don River including the Keating Channel, into a healthier, more naturalized river outlet to the lake, while at the same time, removing the risk of flooding to 230 hectares of urban land to the east and south of the river. West Don Lands: The West Don Lands’ 80 acre site is immediately adjacent to the Distillery District and has strong connections to the St. Lawrence and Corktown neighbourhoods. Once completed, it will have 5,800 residential units, including 1,200 units of affordable rental housing, 1,000,000 square feet of commercial space, 23 acres of parks and public spaces, a new transit line, an elementary school, a recreation centre, and childcare centres. West Don Lands Lower Don Lands Keating Channel (Lower Don Lands): A Municipal Class EA and Precinct Plan is being undertaken for the Lower Don Lands area. This initiative incorporates approximately 25,000 residents in 12,000 units, mixed use and varied densities. 10,000 jobs are also planned. The Keating Channel precinct will be the first developed community of the Lower Don Lands and will draw the City around the northeast corner of the Toronto Inner Harbour.
  • 7. Study Goals and Principles GOAL 1: REVITALIZE THE WATERFRONT A public realm that provides adequate access to open space, landscape, light and air, and contributes to the revitalization of the waterfront needs to be created. The project should: Prioritize urban design excellence, placemaking, and quality of life as integral components of project design and evaluation. Contribute to the creation of the waterfront as a regional / tourist destination. Rejuvenate the underutilized and derelict lands under and adjacent to the expressway. Balance provision of new amenities for both local and regional users, recognizing that local and regional stakeholders may value amenities and infrastructure in different ways. Build on existing planning initiatives and conclusions. The EA study will coordinate and seek opportunities of mutual benefit with those initiatives. Acknowledge this project as an opportunity for City-building. Evaluate city-building investments, outcomes, and benefits in local, regional, and global contexts. GOAL 2: Futureof theGardinerEast Environmental Assessment & Urban Design Study RECONNECT THE CITY WITH THE LAKE The Gardiner Expressway East and Lake Shore Boulevard pair have long been perceived as a barrier that disconnects the downtown from its waterfront. The railroad viaduct is a physical barrier, limiting waterfront area access to four underpasses. Any reconfiguration of the Gardiner East and Lake Shore Blvd will need to include welcoming and accessible routes to the waterfront, breaking down the psychological and physical barriers that exist today. The project should: Create physical, visual, and cognitive connections to the waterfront for downtown, the City, and region. The waterfront is an amenity that belongs and should be accessible to the public. Design the public realm to be attractive, accessible and connected. The qualities of experience offered by streets, plazas, parks, promenades, pathways, bicycle routes, and visual corridors will be major drivers of design decisions. Public spaces should be accessible and perceived as public. The new urban fabric should become a connector between the downtown and new waterfront communities, one that uses transit, street design and new mixed-use communities to stitch the city with its unique waterfront experience.
  • 8. Study Goals and Principles GOAL 3: BALANCE MODES OF TRAVEL Any new configuration of the Gardiner Expressway East and Lake Shore Blvd will need to maintain an effective local and regional transportation system, including commuters and freight, and minimize negative impacts by balancing alternative travel modes, including transit (local and regional), cycling and walking within the system. The project should: Acknowledge transportation initiatives – both positive and negative – on regional economic competitiveness, land-use, development character, settlement patterns, and environmental issues such as air quality and ambient noise. Maintain reliable access to the City and its neighborhoods for local residents, commuters, freight trucks, and regional travelers. The corridor plays an important role in the movement of traffic through the City and larger region. The reconfiguration alternatives will address the through-traffic function of the Gardiner Expressway East and Lake Shore Blvd. Acknowledge and integrate other planned transit (local and regional) initiatives being proposed for the City. Consider a combination of supply, system and demand management measures. Creatively maximize the performance of infrastructure through management and operation. GOAL 4: Futureof theGardinerEast Environmental Assessment & Urban Design Study ACHIEVE SUSTAINABILITY This project should advance the City’s and Waterfront Toronto’s commitment to green, healthy, and energy efficient development. Sustainable design solutions can improve environmental quality and biodiversity, and minimize public health risks. The project will: Consider Waterfront Toronto’s and the City’s sustainability policies and frameworks. Help contribute to development that has an overall positive impact. These benefits are to result in environmental enhancements, economic security, and social/cultural gains. Contribute to the improvement of environmental quality and public health, including air quality. Complement if not enhance other waterfront environmental naturalization initiatives. Accommodate the plans for flood conveyance and flood protection to lands in the Don River mouth area, the Port Lands and south Riverdale community. Promote social engagement and interaction. Promote the City’s initiatives to reduce greenhouse gas emissions. Promote public awareness and education on environmental issues through the physical design of infrastructure and public realm. Integrate ecology and natural systems with urbanism.
  • 9. Study Goals and Principles GOAL 5: CREATE VALUE The future reconfiguration of the Gardiner Expressway East and Lake Shore Boulevard can act as a catalyst for good development and contribute to an integrated, vibrant, and successful waterfront. Further, any changes to the Gardiner Expressway East and Lake Shore Blvd pair will require a significant public investment, whether in rehabilitation and enhancement of the existing structure or replacement with a new or alternative facility. That investment should be targeted to maximize opportunities for revitalization, and to leverage the economic benefits of the project, rather than simply preserving the single purpose Gardiner Expressway. The project should:. Plan and design for positive net value creation in local, regional, and global contexts. Define a public and private investment structure that creates and captures value for the public sector. The public sector, through these city-building initiatives, creates value for the community, in terms of streets, open space, and catalysts for private development. Maximize net economic and environmental benefits. Futureof theGardinerEast Environmental Assessment & Urban Design Study
  • 10. ORIGIN / DESTINATION STUDY – DOWNTOWN VS. THROUGH TRIPS AM Peak Hour EASTBOUND Spadina/YorkBay-Yonge 3,000 54% Eastbound @ Dufferin 5,650 per hour 5,650 Primary function is not as a regional connection: Jarvis/ Sherbourne 1,400 25% 2,600 DVP 900 16% 1,200 Gardiner East Study Area Spadina/YorkBay-Yonge 2,600 35% To Dufferin /Hwy 427 5,650 21% 1,500 Richmond 1,800 24% Jarvis/ Sherbourne 500 7% Lake Shore 350 6% DVP 4,500 per hour 2,700 AM Peak Hour WESTBOUND • 4,500 Gardiner East Study Area Lake Shore 2,900 Most eastbound Gardiner trips are destined for downtown locations. Only 22% of eastbound trips use the Gardiner to bypass the city • Most westbound and southbound (from DVP) Gardiner trips are destined for downtown locations. Only 21% of westbound and southbound trips use the Gardiner to bypass the city.
  • 11. How Commuters get Downtown (AM Peak Hour 2011) Gardiner East Passes Through Five Emerging Neighbourhoods Walk/Cycle 4% (5,900) Auto (Gardiner Eastbound @ Bathurst) 4% (6,100) Don River GO Transit 19% (29,500) Bathurst TTC Transit 49% (77,700) Auto (All Other Routes) 21% (33,500) Dupont 4.2km – Lake Shore Blvd East (Yonge to Leslie) • Most eastbound Gardiner trips are destined for e.g. locations. Only Jarvis downtown Ossington to22% of eastbound trips use the Gardiner to bypass the city South Riverdale 2.4km Auto (Gardiner Westbound @ DVP) 3% (5,200) 157,200 Total 2.4km – Gardiner Expressway Elevated Structure e.g. King to Bloor Lower Yonge East Bayfront Keating Port Lands Source: AM Peak Hour Inbound to Downtown: Transportation City Cordon Count (2011) Downtown: Defined as Bathurst to Don River and Waterfront to the rail corridor north of Bloor Transportation Demand Growth Downtown Population & Employment Growth 250,000 +237,900 Total Total Trips 200,000 +157,200 Total 150,000 100,000 +115,500 Total Actual Projection 50,000 Populatoin/ Employment AM Peak Hour Inbound to Downtown 600,000 500,000 400,000 300,000 200,000 100,000 0 0 1975 1981 1985 1991 1995 2001 2006 2011 2016 2021 2026 2031 Auto (Gardiner Westbound @ DVP) Auto (Gardiner Eastbound @ Bathurst) Auto (All Other Routes) TTC Transit GO Transit Walk/ Cycle Source: AM Peak Hour Inbound to Downtown: 1) Transportation City Cordon Count (1975-2011); 2) Transportation Model EMME2 Forecast (2011-2031); 3) 2006 Transportation Tomorrow Survey (TTS) for Walk/Cycle Mode and Other Data; Downtown: Defined as Bathurst to Don River and Waterfront to the rail corridor north of Bloor Population Employment Source: Downtown Employment/ Population: 1) Census Canada (1981-2011); and 2) Employment/ Population City's Flash Forward Report (2011-2031). Downtown: Defined as Bathurst to Don River and Waterfront to the rail corridor north of Bloor
  • 12. CONSULTATION ACTIVITIES Consultation for the Gardiner East EA has included the following activities: • stakeholder advisory committee meetings; • public forums; • web-enabled consultations; and • social media. To date we have successfully engaged over 5,000 individuals. ROUND ONE CONSULTATION ROUND TWO CONSULTATION Round One of the public consultation process was held between May 28th and June 28th, 2013, and successfully engaged over 1,000 individuals. Round Two of the public consultation process occurred between October 1st and October 31st, 2013, and successfully engaged over 1,500 individuals. The purpose of Round One of the consultation process was to: • Reintroduce the EA and Study process and provide a refresher on the approved EA Terms of Reference; • Identify any changes to the Study since the approved 2010 Terms of Reference (i.e. Study Area extents); • Obtain feedback from participants to inform the development of alternative solutions; and • Share information on case studies and innovative options. The purpose of Round Two of the consultation process was to: • Present the Four Draft Alternative Solutions for consideration: Maintain, Improve, Replace, Remove; • Identify the Evaluation Process and opportunities for input; • Obtain feedback from participants to refine the alternative solutions and complete the evaluation. Round One consultation focused on 14 “key ideas” for reconfiguring the Gardiner and Lake Shore Boulevard that were categorized according to the four alternatives – Maintain, Improve, Replace and Remove. NEXT STEPS Documentation of the input received during the first two rounds of consultation is available on the project website: www.gardinereast.ca 3
  • 13. Maintain the elevated expressway No Changes to the Previous Plan BEFORE • Move ahead with the Gardiner rehabilitation program • Reconstruct deck of expressway • Realign Lake Shore Blvd through the Keating Precinct (east of Cherry Street, south of the rail corridor) AFTER Improve the urban fabric while maintaining the existing expressway Previous Plan • Relocate and rebuild Lake Shore Blvd under the Gardiner • Rebuild Gardiner deck with 4 lanes; open in the middle Revised Plan • Rebuild Gardiner deck with 4 lanes open on the south side • Lake Shore largely stays as is with: • Intersection improvements • Remove southern eastbound lane east of Jarvis Street • New east-west walking and cycling trail BEFORE AFTER Replace with a new expressway No Changes to the Previous Plan • New elevated 4-lane expressway – ending at Don River • Single column design, 5m higher • 4 lane Lake Shore Boulevard • Opens up land for public realm, parks, green space and increased development • Opens up more light and air at street level • New east-west walking and cycling trail BEFORE AFTER Remove the elevated expressway and build a new boulevard Revised Plan with a Two Sided Street • Improved cross section to allow for an 8 lane boulevard with development along 85% of the north and south sides of the street • North side development provides a buffer from rail corridor • Opens up entire ground level to light and air • Extensively treed boulevard • New east-west walking and cycling trail BEFORE AFTER
  • 14. Maintain the elevated expressway LAKE SHORE BOULEVARD @ SHERBOURNE STREET • Gardiner rehab program maintains existing auto capacity • No public realm improvements on Lake Shore Boulevard • Numerous turn restrictions / conflict points on Lake Shore Boulevard • 6 years of lane closures on the Gardiner Expressway • $300M Cost (NPV), $870M Cost (2013$)
  • 15. Improve the urban fabric while maintaining the existing expressway LAKE SHORE BOULEVARD @ SHERBOURNE STREET • Modified Gardiner rehab program with reduced lanes and standard shoulders • Public realm improvements on Lake Shore Boulevard and new cycling trail • Reduction of turn restrictions and conflicts between autos, pedestrians and cyclists • 6 years of lane closures on the Gardiner Expressway and Lake Shore Boulevard • $360M Cost (NPV), $865M Cost (2013$)
  • 16. Replace with a new expressway LAKE SHORE BOULEVARD @ SHERBOURNE STREET • New elevated structure built to today’s highway standards • Public realm improvements on Lake Shore Boulevard and new cycling trail • Requires full closure of the corridor for construction • $700M Cost (NPV), $1,390M Cost (2013$) • $65-70M Revenue (NPV), $150-160M (2013$)
  • 17. Remove the elevated expressway and build a new boulevard LAKE SHORE BOULEVARD @ SHERBOURNE STREET • • • • • New 8 lane boulevard – greatest impact to auto travel times Boulevard lined with 1,200 new trees, dedicated turning lanes, sidewalks, retail frontage and cycling trail 3 years of lane closures in the expressway corridor $240M Cost (NPV), $470M Cost (2013$) $80-90M Revenue (NPV), $220-240M (2013$)
  • 18. GARDINER EXPRESSWAY @ SHERBOURNE STREET MAINTAIN REPLACE IMPROVE REMOVE
  • 19. LAKE SHORE BOULEVARD @ PARLIAMENT STREET MAINTAIN REPLACE IMPROVE REMOVE
  • 21. Study Lenses Criteria Group Planning Urban Design Public Realm Built Form Regional Economics Economics Local Economics Direct Cost & Benefit Automobiles Transit Pedestrians Transportation & Infrastructure Cycling Movement of Goods Safety Constructability Social & Health Natural Environment Environment Cultural Resources Criteria Consistency with Official Plans Consistency with Precinct Plans Streetscape View Corridors Public Realm Space (open space, landscape, multi-use paths, plazas, etc.) Rail Corridor and Berm Street Frontage City Competitiveness Congestion Business Activity Visitor/Tourism Attractiveness On Street Parking Capital Funding & Cost Lifecycle Cost Land Value Creation Commuter Travel Time Impact on Average Auto Travel Time within Downtown Vehicle Volumes/Speed Road Network Flexibility/Choice Transit Impact North-South Sidewalks (crossing times) East-West sidewalks East-West Movement Vehicle Operations Access Opportunity Safety Risk for Pedestrians Safety Risk for Pedestrians and Cyclist Safety Risk for Cyclists and Motorists Safety Risks for Motorists on the Gardiner Duration Transportation Management Construction Impact on Private Property Health (Noise and Air Quality including Greenhouse Gas Emissions) Terrestrial Environment Aquatic Environment Water Quality (stormwater management) Water Quantity (surface water run-off) Microclimate Tree-Lined Shaded Street Built Heritage 12 Cultural Landscapes Archaeology
  • 22. Buffalo Skyway, Buffalo Maintain E. River Waterfront Esplanade, New York Improve Age of Infrastructure Age of Infrastructure Decision Made Decision Made Project Cost Key Impacts Tourism and city building, new access, new community and creation of jobs $117 million (USD) Rehabilitation for a safe and reliable travel route $165 million (USD) Key Impacts Maintain (rehabilitate) existing highway Improve street section and reconfigure space under elevated highway Project Cost 60 years 59 years Central Artery / “Big Dig”, Boston Age of Infrastructure 45 years Decision Made Replace with cutand-cover tunnel with at-grade boulevard with greenway placed over tunnel Project Cost Key Impacts Embarcadero Freeway, San Francisco Age of Infrastructure 32 years Decision Made Remove highway and provide 6-lane at grade urban boulevard Project Cost $80 million (USD) Key Impacts Increased property values, increase in jobs, increase in housing units and new public space $22 billion (USD) Improved travel times, costly, increased tourism and increased property values Replace Remove
  • 23. Contact Us Participate in Online Discussions The Gardiner East consultation website provides information as well as hosting public discussion forums where you can read, rate, post and reply to public comments on the project. Visit our website today: www.GardinerEast.ca Futureof theGardinerEast Environmental Assessment & Urban Design Study CONTACT US Facilitator’s Office 505 Consumers Road, Suite 1005, Toronto, Ontario, M2J 4V8 Phone: 416-479-0662 Call, Email or Send Us a Letter The project team will respond to concerns and requests for information through the telephone hotline, email, fax, or post. See contact information to the right. Email: info@gardinereast.ca Website: www.GardinerEast.ca